₹30.6 L
EMD Value
₹30,600
Closing Date
2 Feb 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, P. H. Works Division, GWSSB, AHMEDABAD
Pipeline for Connection of New UG Sump at Pipali Main HW under Seven RWSS (Dhandhuka Group)
266470
25 of 2025-2026
Open
Civil Works - Water Works
Works
Ahmedabad
2 documents required · 0 mandatory · 2 optional
₹1,500
Yes
Executive Engineer, Public Health Works Division, GWSSB, Ahmedabad
₹30,600
Yes
19 Jan 2026
19 Jan 2026
19 Jan 2026
2 Feb 2026
19 Jan 2026
Total amount of Schedule B1=
2. Each item of Schedule-B has been divided into broad components. The Employer's
Representative shall assess the value of each component as indicated in paragraph
3. Percentages are indicated against each component of each items specified in
Schedule B, based on the Employer's best appreciation of the value of the
component as related to the total costs of the concerned item as whole. A head
titled (any other item(s)) is included in each breakdown of schedule and the
tenderer shall at the time of tendering indicate any additional items which he
considers necessary but cannot be covered by any of the heads indicated in the
4. The percentage breakup as indicated in the Schedule may differ from that
corresponding to the tenderer’s scheme and design and he should take this into
account while quoting his lump sum prices for the items specified in Schedule-B.
5. The contractor shall, after approval of his detailed designs and drawings furnish to
the Employer's Representative an initial bill of quantities to all major items, to be
reviewed and updated periodically with the Employer's Representative. This bill of
quantities will be used for assessment of percentage progress of the component at
any stage. By measurement jointly taken by the Employer's Representative and the
Contractor, mutually agreed and entered in the measurement books in the form and
by the method approved by the Employer's Representative, and signed jointly by
both the parties.
BREAK UP FOR INTERIM PAYMENTS
Percentage Payment to
Item Description of Items
a On receipt of materials at project site 65 % of Quoted rate
b On Excavation, Lowering, laying and Jointing 20 % of Quoted rate
c On Hydraulic testing 5 % of Quoted rate
d On refilling and disposal of surplus stuff 5 % of Quoted rate
e After commissioning 5 % of Quoted rate
Signature of contractor Executive Engineer
P. H. Works Dn., G.W.S.S.B,
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Schedule B.pdf
VOL 1 A Technical Bid.pdf
VOL 1 B GCC.pdf
VOL 2A Extent of work.pdf
VOL 2B Tech Spec Civil.pdf
VOL 3 Price Bid.pdf
1.GST GR.pdf
Document
Document
4 Purchase Policy GR.pdf
5 Royalti circular DOC-18.06.2016.pdf
6 vigilance GR.pdf
7 Form No 9 and Form 18 H (2).pdf
8 SD EMD GR 25-26.pdf
E Tender Notice 25 of 25-26.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .