Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.8 LAccepted-AOC EDATHARA | ₹18.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹19.4 LRejected-Finance PADIYARA MEENADAM P O KOTTAYAM 686 516 | KOTTAYAM | KOTTAYAM | KERALA | 686516 | ₹19.4 L | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | RAJAN VARGHESE L2 | VISHNU M L1 |
|---|---|---|---|---|---|
| 1.00OFFICE MAINTENANCE | |||||
| 1.00 | OD437325/2025-2026: Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. | 2,480.38 | sqm | 50 ₹1.2 L | 22.29 ₹55,287.63 |
| 1.00 | 13.26:Providing and applying plaster of paris putty of 2 mm thickness over plastered surface to prepare the surface even and smooth complete. | 1,993.67 | sqm | 145 ₹2.9 L | 228.95 ₹4.6 L |
| 1.00 | 13.46.1:Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) | 2,533.79 | sqm | 175 ₹4.4 L | 178.29 ₹4.5 L |
| 1.00 | 14.72:Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done . | 188 | sqm | 250 ₹47,000 | 304.46 ₹57,238.48 |
| 1.00 | 13.116:Polishing in high gloss/matt finish melamine clear polish on wood work in required color/wooden shade texture with following process in the sequence as detailed below:
1. The surface to be polished is rubbed with sand paper 80/120 no. and then with sand paper of 160/180 nos.
2. Applying two coats of sealer with spray gun and allowing sufficient drying time for 1st coat and 2nd coat is allowed to dry for 8 to 12 hrs.
3. On drying of sealer coat, wet rubbing with emery cloth of finer grading with ample water to remove excess sealer layer and make the surface further smooth after this wet rubbing, then surface is applied with special grade melamine fillers to fill all the small and big holes/grooves etc. Filler coat to be allowed to dry for 4 to 6 hrs on which again a light wet rubbing is done
this surface is further allowed to dry for 12 hrs.
4. On this, 1st coat of melamine polish is applied with spray gun using melamine clear polish and melamine thinner in required proportion. This 1st coat is allowed to dry for 24 hrs then this dry surface is again fine wet rubbed smooth, which is further allowed to dry for 12 hrs. The final melamine polish is applied with compressor pressure spray gun using melamine clear polish and melamine thinner mixed in required proportion complete as per direction of Engineer-in-Charge. (Final coat to be done in
1 or 2 layers without gap of time.) | 65.91 | sqm | 450 ₹29,658.15 | 1,235.68 ₹81,439.96 |
| 1.01 | OD491290/2025-2026:Providing and fixing Thomson Multi wood board or equivalent make paneling 18 mm thick, to frame, backing or studding with screws etc. complete (Frames, backing or studding to be paid separately)as per the direction of site Engineer-in-charge. | 84.81 | sqm | 2,500 ₹2.1 L | 2,316.07 ₹2.0 L |
| 1.01 | OD491292/2025-2026: Veneer Paneling:Providing and fixing panelling(up to 2600 mm height or as per design intent)
as per approved drawing. Framework finished with 19 mm thick plywood (ISI 303 grade ,
Greenply/Equivalent), i.e. 50 mm sections to fixed at 600 mm c-c spacing/as per site condition
.Exposed side of the frame to be fixed with 9 mm plywood (ISI 303 grade ,
Greenply/Equivalent).Finish the panelling with 4 mm thick melamine finished veneer sheet (
Greenply /Equivalent,) fixed on to the plywood using suitable adhesive(HeatX/Equivalent).
Finish the panelling with necessary grooves, electrical / window openings if any. Including cost
and conveyance charges of all materials, labour charges etc. | 84.81 | sqm | 2,500 ₹2.1 L | 3,705.5 ₹3.1 L |
| 1.01 | 12.45.2:Providing and fixing false ceiling at all height including providing and fixing of frame work made of special sections, power pressed from M.S. sheets and galvanized with zinc coating of 120 gms/ sqm (both side inclusive) as per IS : 277 and consisting of angle cleats of size 25 mm wide x 1.6 mm thick with flanges of 27 mm and 37 mm, at 1200 mm centre to centre, one flange fixed to the ceiling with dash fastener 12.5 mm dia x 50 mm long with 6 mm dia bolts, other flange of cleat fixed to the angle hangers of 25x10x0.50 mm of required length with nuts & bolts of required size and other end of angle hanger fixed with intermediate G.I. channels 45x15x0.9 mm running at the spacing of 1200 mm centre to centre, to which the ceiling section 0.5 mm thick bottom wedge of 80 mm with tapered flanges of 26 mm each having lips of 10.5 mm, at 450 mm centre to centre, shall be fixed in a direction perpendicular to G.I. intermediate channel with connecting clips made out of 2.64 mm dia x 230 mm long G.I. wire at every junction, including fixing perimeter channels 0.5 mm thick 27 mm high having flanges of 20 mm and 30 mm long, the perimeter of ceiling fixed to wall/partition with the help of rawl plugs at 450 mm centre, with 25 mm long dry wall screws @ 230 mm interval, including fixing of gypsum board to ceiling section and perimeter channel with the help of dry wall screws of size 3.5x25 mm at 230 mm c/c, including jointing and finishing to a flush finish of tapered and square edges of the board with recommended jointing compound, jointing tapes, finishing with jointing compound in 3 layers covering upto 150 mm on both sides of joint and two coats of primer suitable for board, all as per manufacturer's specification and also including the cost of making openings for light fittings, grills, diffusers, cutouts made with frame of perimeter channels suitably fixed, all complete as per drawings, specification and direction of the Engineer in Charge but excluding the cost of painting with:12.5 mm thick tapered edge Glass Reinforced Gypsum (GRG) board conforming
to IS: 2095- (Part 3):1996 (Boards with BIS certification marks) | 51.33 | sqm | 2,000 ₹1.0 L | 1,374.49 ₹70,552.57 |
| 1.01 | OD491543/2025-2026:Engaging labours for carpentry works of windows and doors | 5 | Day | 1,300 ₹6,500 | 1,120.71 ₹5,603.55 |
Tender Value
₹22.0 L
EMD Value
₹50,000
Closing Date
2 Mar 2026, 4:00 pmClosed
Assistant Executive Engineer,
OFFICE OF THE EXECUTIVE ENGINEER, LID EW, PALAKKAD MUNICIPALITY
GENERAL PMC PRO NO 534 2025 26 RENNOVATION OF PALAKKAD MUNICIPALITY OFFICE General Civil Work
2026_LSGD_839431_1
24/AEE/LID EW/PMC/2025-26
Open Tender
Civil Works - Others
palakkad municipality
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
23 Mar 2026
23 Feb 2026
3 Mar 2026
23 Feb 2026
2 Mar 2026
23 Feb 2026
OFFICE MAINTENANCE
OD437325/2025-2026: Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete.
13.26:Providing and applying plaster of paris putty of 2 mm thickness over plastered surface to prepare the surface even and smooth complete.
13.46.1:Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
14.72:Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done .
13.116:Polishing in high gloss/matt finish melamine clear polish on wood work in required color/wooden shade texture with following process in the sequence as detailed below: 1. The surface to be polished is rubbed with sand paper 80/120 no. and then with sand paper of 160/180 nos. 2. Applying two coats of sealer with spray gun and allowing sufficient drying time for 1st coat and 2nd coat is allowed to dry for 8 to 12 hrs. 3. On drying of sealer coat, wet rubbing with emery cloth of finer grading with ample water to remove excess sealer layer and make the surface further smooth after this wet rubbing, then surface is applied with special grade melamine fillers to fill all the small and big holes/grooves etc. Filler coat to be allowed to dry for 4 to 6 hrs on which again a light wet rubbing is done this surface is further allowed to dry for 12 hrs. 4. On this, 1st coat of melamine polish is applied with spray gun using melamine clear polish and melamine thinner in required proportion. This 1st coat is allowed to dry for 24 hrs then this dry surface is again fine wet rubbed smooth, which is further allowed to dry for 12 hrs. The final melamine polish is applied with compressor pressure spray gun using melamine clear polish and melamine thinner mixed in required proportion complete as per direction of Engineer-in-Charge. (Final coat to be done in 1 or 2 layers without gap of time.)
OD491290/2025-2026:Providing and fixing Thomson Multi wood board or equivalent make paneling 18 mm thick, to frame, backing or studding with screws etc. complete (Frames, backing or studding to be paid separately)as per the direction of site Engineer-in-charge.
OD491292/2025-2026: Veneer Paneling:Providing and fixing panelling(up to 2600 mm height or as per design intent) as per approved drawing. Framework finished with 19 mm thick plywood (ISI 303 grade , Greenply/Equivalent), i.e. 50 mm sections to fixed at 600 mm c-c spacing/as per site condition .Exposed side of the frame to be fixed with 9 mm plywood (ISI 303 grade , Greenply/Equivalent).Finish the panelling with 4 mm thick melamine finished veneer sheet ( Greenply /Equivalent,) fixed on to the plywood using suitable adhesive(HeatX/Equivalent). Finish the panelling with necessary grooves, electrical / window openings if any. Including cost and conveyance charges of all materials, labour charges etc.
12.45.2:Providing and fixing false ceiling at all height including providing and fixing of frame work made of special sections, power pressed from M.S. sheets and galvanized with zinc coating of 120 gms/ sqm (both side inclusive) as per IS : 277 and consisting of angle cleats of size 25 mm wide x 1.6 mm thick with flanges of 27 mm and 37 mm, at 1200 mm centre to centre, one flange fixed to the ceiling with dash fastener 12.5 mm dia x 50 mm long with 6 mm dia bolts, other flange of cleat fixed to the angle hangers of 25x10x0.50 mm of required length with nuts & bolts of required size and other end of angle hanger fixed with intermediate G.I. channels 45x15x0.9 mm running at the spacing of 1200 mm centre to centre, to which the ceiling section 0.5 mm thick bottom wedge of 80 mm with tapered flanges of 26 mm each having lips of 10.5 mm, at 450 mm centre to centre, shall be fixed in a direction perpendicular to G.I. intermediate channel with connecting clips made out of 2.64 mm dia x 230 mm long G.I. wire at every junction, including fixing perimeter channels 0.5 mm thick 27 mm high having flanges of 20 mm and 30 mm long, the perimeter of ceiling fixed to wall/partition with the help of rawl plugs at 450 mm centre, with 25 mm long dry wall screws @ 230 mm interval, including fixing of gypsum board to ceiling section and perimeter channel with the help of dry wall screws of size 3.5x25 mm at 230 mm c/c, including jointing and finishing to a flush finish of tapered and square edges of the board with recommended jointing compound, jointing tapes, finishing with jointing compound in 3 layers covering upto 150 mm on both sides of joint and two coats of primer suitable for board, all as per manufacturer's specification and also including the cost of making openings for light fittings, grills, diffusers, cutouts made with frame of perimeter channels suitably fixed, all complete as per drawings, specification and direction of the Engineer in Charge but excluding the cost of painting with:12.5 mm thick tapered edge Glass Reinforced Gypsum (GRG) board conforming to IS: 2095- (Part 3):1996 (Boards with BIS certification marks)
OD491543/2025-2026:Engaging labours for carpentry works of windows and doors
13.99.1:Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :One or more coats on old work
OD492235/2025-2026:Providing and fixing 12 mm thick frameless toughened glass door shutter of approved brand and manufacture, including providing and fixing top & bottom pivot & spring type fixing arrangement and making necessary holes etc. for fixing required door fittings, all complete as per direction of Engineer-in-charge ( Door handle, lock and stopper etc to be paid separately)
OD498915/2025-2026:providing and fixing heavy duty fibre cement board 6mm thick for floring as per the instruction of site engineer(cost of frame work paid to be seprately
OD498992/2025-2026:Lettering in stainless steel for name Board work including labour ,material and fittings charges etc .complete (Area to be measured including standard spacing between letters)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1414489.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1414489.xls
BOQ • 0.31 MB
viewsbd_merged.pdf
Tender Documents • 1.67 MB
affidavit.pdf
Tender Documents • 0.34 MB
epayment.pdf
Tender Documents • 0.34 MB
formoftender.pdf
Tender Documents • 0.34 MB
integritypact.pdf
Tender Documents • 0.33 MB
preliminaryagreement.pdf
Tender Documents • 0.35 MB
Download all tender documents and submit your bid