| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | BGO CONSTRUCTION AND SERVICES LLP Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹15 L
Closing Date
10 Aug 2020, 2:30 pmClosed
Samrat Dutta
Brahmaputra Cracker and Polymer Limited, C and P Department, Administrative Building, PO_Lepetkata, Dist_DIBRUGARH, Assam, Pin Code_786006
Please refer Tender documents.
2020_BCPL_572126_1
BCPL/CNP/LE20W039SD/01426
Open Tender
Miscellaneous Services
730 days
Brahmaputra Cracker and Polymer Limited
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹15 L
Yes
Brahmaputra Cracker and Polymer Limited
9 Sept 2020
18 Jul 2020
11 Aug 2020
18 Jul 2020
10 Aug 2020
18 Jul 2020
27 Jul 2020
Amount
LLDPE/ HDPE PART-A
1.10 LLDPE:Basic Minimum Wage & VDA for shift Long Text: For shift assistance on round the clock basis s in BCPL plant consisting of 04 Highly skilled+04 Unskilled (04 Operators + 04 Helpers) (In case of absence/ additional requirement of any worker from the above composition of manpower, deduction/ additional payment shall be made as per awarded unit rate as per the following weightage against different category of manpower: ( Highly skilled = 0.156 ; Unskilled = 0.094)
1.20 LLDPE:Basic Min. Wage & VDA for G shift Long Text: General shift assistance services in BCPL plant consisting of 01 Highly skilled+05 Unskilled (01 Operator + 05 Helper) (In case of absence/ additional requirement of any worker, deduction/ additional payment shall be made as per awarded unit rate as per the following weightage against different category of manpower:- (Highly skilled = 0.249; Unskilled = 0.150)
1.30 LLDPE: Payment against Paid Annual Leave
1.40 LLDPE: Payment against 03 NH & 08 FH Long Text: Payment against 03 National holidays & 08 Festival Holidays
1.50 LLDPE: Payment against EPF Long Text: Payment against deposition of Employee Provident Fund @ 13.00%
1.60 LLDPE: Payment against Bonus Long Text: Payment against Bonus @8.33% on basic + DA
1.70 LLDPE: Payment against ESIC@ 3.25%
LLDPE: Payment against NSA Long Text: Payment against Non Statutory allowance @ 16%
1.90 LLDPE: Payment against shift allowance Long Text: Payment against Shift Allowance for A, B & C-shift duties
1.100 LLDPE: Payment against Uniform & PPEs Long Text: Payment towards 02 sets of Uniform, 01 NO OF Safety Helmet, 01 pair of Safety Shoe, 02 pairs of Socks. The same shall be release upon submission of documentary proof against purchase & distribution.
1.110 LLDPE: Payment towards Medical Check up
1.120 LLDPE: Revision of Minimum wages Long Text: Provision of Revision of Minimum wages
1.130 LLDPE: Scope of supply by contractor Long Text: Supply of 200 pairs cotton handgloves, 50 nos. ear plugs, 50 nos. Dust Musk, 5 nos. PVC suits & 20 nos. safety goggles as per safety standard to meet industrial purpose on monthly basis {In case of Less/extra supply of reqired quantities on monthly basis against listed safety wears, deduction/additional payment shall be made as per awarded/quoted Unit Rate as per the following weightage against each type: Cotton Hand glove=0.637; Ear plug=0.060; Dust Musk= 0.080; PVC suit=0.199; Safety goggles=0.024 }
1.140 LLDPE: Contractors overhead & profit
PP UNIT PART-B
2.10 PPU: Basic Min Wage&VDA FOR SHIFT Long Text: For shift assistance onround the clock basis s in BCPL plant consisting of 02 Highly skilled+04 Unskilled (02 Operators + 04 Helpers) (In case of absence/ additional requirement of any worker from the above composition of manpower, deduction/ additional payment shall be made as per awarded unit rate as per the following weightage against different category of manpower: ( Highly skilled = 0.226 ; Unskilled = 0.137)
2.20 PPU: Basic Min Wage&VDA FOR SHIFT Long Text: General shift assistance services in BCPL plant consisting of 01 Highly skilled+01 Unskilled (01 Operator + 01 Helper) (In case of absence/ additional requirement of any worker, deduction/ additional payment shall be made as per awarded unit rate as per the following weightage against different category of manpower:- ( Highly skilled = 0.623; Unskilled = 0.377)
2.30 Payment against Paid Annual Leave
2.40 Payment against 03 NH & 08 FH Long Text: Payment against 03 National holidays & 08 Festival Holidays
2.50 Payment against EPF Long Text: Payment against deposition of Employee Provident Fund @ 13.00%
2.60 Payment against Bonus @8.33% on basic+DA
2.70 Payment against ESIC@ 3.25%
2.80 Payment against NS allowance Long Text: Payment against Non Statutory allowance @ 16%
2.90 Payment against shift allowance Long Text: Payment against Shift Allowance for A, B & C-shift duties
2.100 Payment against Uniform & PPEs Long Text: Payment towards 02 sets of Uniform, 01 NO OF Safety Helmet, 01 pair of Safety Shoe, 02 pairs of Socks. The same shall be release upon submission of documentary proof against purchase & distribution.
2.110 Payment towards Medical Check up
2.120 Provision of Revision of Minimum wages
2.130 Scope of supply by contractor Long Text: Supply of 200 pairs cotton handgloves, 50 nos. ear plugs, 50 nos. Dust Musk, 5 nos. PVC suits & 20 nos. safety goggles as per safety standard to meet industrial purpose on monthly basis {In case of Less/extra supply of reqired quantities on monthly basis against listed safety wears, deduction/additional payment shall be made as per awarded/quoted Unit Rate as per the following weightage against each type: Cotton Hand glove=0.637; Ear plug=0.060; Dust Musk= 0.080; PVC suit=0.199; Safety goggles=0.024 }
2.140 Contractors overhead & profit
PTD DEPARTMENT FOR BAGGING AND DISPATCH OF FINISHED PRODUCT PART-C
3.10 PTD Baggin:Basic Min Wage&VDA- A+B SHIFT Long Text: For shift assistance in A and B shift operations in BCPL PTD-BAGGING plant consisting of 07 Highly skilled + 05 Skilled + 15 Unskilled (01 Supervisors+ 05 M/c Operator + 01 Instrumentation Technician+ 05 Fork Lift Operator + 15 Helpers ) (In case of absence/ additional requirement of any worker from the above composition of manpower, deduction/ additional payment shall be made as per awarded unit rate as per the following weightage against different category of manpower: (Highly skilled = 0.049; Skilled = 0.042; Unskilled = 0.030)
3.20 PTD Bagging: Basic Min Wage&VDA- C SHIFT Long Text: For shift assistance in C shift operation in BCPL PTD-BAGGING plant consisting of 05 Highly skilled + 03 Skilled + 9 Unskilled (01 Supervisors+ 03 M/c Operator + 01 Instrumentation Technician+ 03 Fork Lift Operator + 09 Helpers) (In case of absence/ additional requirement of any worker from the above composition of manpower, deduction/ additional payment shall be made as per awarded unit rate as per the following weightage against different category of manpower: (Highly skilled = 0.077 ; Skilled = 0.066; Unskilled = 0.047)
3.30 PTD Bagging: Basic Min Wage&VDA- G SHIFT Long Text: General shift assistance services in BCPL plant consisting of 12 Unskilled (12 Helper) (In case of absence/ additional requirement of any worker, deduction/ additional payment shall be made as per awarded unit rate as per the following weightage against different category of manpower:- ( skilled = 0.083)
3.40 PTD Dispatch:Basic Min Wage&VDA-A+BSHIFT Long Text: For shift assistance on round the clock basiss in BCPL plant consisting of 01 Highly skilled + 06 Skilled (01 Supervisors+ 06 Fork Lift Operator) (In case of absence/ additional requirement of any worker from the above composition of manpower, deduction/ additional payment shall be made as per awarded unit rate as per the following weightage against different category of manpower: ( Highly Skilled = 0.163 ; Skilled = 0.139)
3.50 Payment against Paid Annual Leave
3.60 Payment against 03 NH & 08 FH Long Text: Payment against 03 National holidays & 08 Festival Holidays
3.70 Payment against EPF Long Text: Payment against deposition of Employee Provident Fund @ 13.00%
3.80 Payment against Bonus @8.33% on basic+DA
3.90 Payment against ESIC@ 3.25%
3.100 Payment against NS allowance Long Text: Payment against Non Statutory allowance @ 16%
3.110 Payment against shift allowance Long Text: Payment against Shift Allowance for A, B & C-shift duties
3.120 Payment against Uniform & PPEs Long Text: Payment towards 02 sets of Uniform, 01 NO OF Safety Helmet, 01 pair of Safety Shoe, 02 pairs of Socks. The same shall be release upon submission of documentary proof against purchase & distribution.
3.130 Payment towards Medical Check up
3.140 Provision of Revision of Minimum wages
3.150 Scope of supply by contractor Long Text: Supply of 200 pairs cotton handgloves, 50 nos. ear plugs, 50 nos. Dust Musk, 5 nos. PVC suits & 20 nos. safety goggles as per safety standard to meet industrial purpose on monthly basis {In case of Less/extra supply of reqired quantities on monthly basis against listed safety wears, deduction/additional payment shall be made as per awarded/quoted Unit Rate as per the following weightage against each type: Cotton Hand glove=0.637; Ear plug=0.060; Dust Musk= 0.080; PVC suit=0.199; Safety goggles=0.024 }
3.160 Contractors overhead & profit
ENVIRONMENT DEPARTMENT PART-D
4.10 ENVIRONMENT:Basic Min Wages & VDA Long Text: General shift assistance services in BCPL plant consisting of 1 Highly Skilled (1 Operator) (In case of absence/ additional requirement of any worker, deduction/ additional payment shall be made as per awarded unit rate as per the following weightage against different category of manpower:- (Highly Skilled = 1)
4.20 Payment against Paid Annual Leave
4.30 Payment against 03 NH & 08 FH Long Text: Payment against 03 National holidays & 08 Festival Holidays
4.40 Payment against EPF Long Text: Payment against deposition of Employee Provident Fund @ 13.00%
4.50 Payment against Bonus @8.33% on basic+DA
4.60 Payment against ESIC@ 3.25%
4.70 Payment against NS allowance Long Text: Payment against Non Statutory allowance @ 16%
4.80 Payment against Uniform & PPEs Long Text: Payment towards 02 sets of Uniform, 01 NO OF Safety Helmet, 01 pair of Safety Shoe, 02 pairs of Socks. The same shall be release upon submission of documentary proof against purchase & distribution.
4.90 Payment towards Medical Check up
4.100 Provision of Revision of Minimum wages
4.110 Scope of supply by contractor Long Text: Supply of 200 pairs cotton handgloves, 50 nos. ear plugs, 50 nos. Dust Musk, 5 nos. PVC suits & 20 nos. safety goggles as per safety standard to meet industrial purpose on monthly basis {In case of Less/extra supply of reqired quantities on monthly basis against listed safety wears, deduction/additional payment shall be made as per awarded/quoted Unit Rate as per the following weightage against each type: Cotton Hand glove=0.637; Ear plug=0.060; Dust Musk= 0.080; PVC suit=0.199; Safety goggles=0.024 }
4.120 Contractors overhead & profit
H S UTILITY SERVICES
TECON CONSTRUCTION INDIA LLP
UPCEM ENGINEERING and CONSULTANCY PVT LTD
LAKWA STEEL CONSTRUCTION
M/S AYCON
AARVI ENCON LIMITED (formerly known as AARVI ENCON PVT.LTD.
KINGBRAIN SOLUTION PVT LTD
DIBRU ENGINNERING
BGO CONSTRUCTION AND SERVICES LLP
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid