| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 LAdmitted-Finance | ₹2.8 L | L1 | Admitted-Finance |
| 2 | L2₹3.1 L+₹21,239 (7.46%)Admitted-Finance | ₹3.1 L+₹21,239 (7.46%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | HUM INFRASTRUCTURE L2 | DEV ENTERPRISE L1 |
|---|---|---|---|---|---|
| 1.00 | Transportation of 40m GB tower material including ladder, working platform, cable tray and antenna fixtures etc. and Type-I BTS shelter with all materials and all the sturctural members of BTS shelter like PU foam wall, floor and roof pannels , Roofing sheets , Flooring Ply sheet, Antistatic Flooring , Door, M.S. Girder Section etc. by maintaining the safety precautions to avoid any damage to materials etc. all from the departmental store at SSA HQ or some other city / place to the site of work under consideration & vice versa. The item includes sorting (if required), loading, unloading and stacking of the material all complete and as per the directions of Engineer- in-charge. (a) 40 m GB tower materials and Type-I BTS shelter approx. weight 10.00 MT and distance up to 75 km | 1 | Job | 45,000 ₹45,000 Lowest | 49,900 ₹49,900 |
| 2.00 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. (a) All kinds of soil | 94 | Cum | 108 ₹10,152 Lowest | 150 ₹14,100 |
| 3.00 | Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. (a) All kinds of soil. | 45 | Cum | 171 ₹7,695 | 90 ₹4,050 Lowest |
| 4.00 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 94 | Cum | 180 ₹16,920 | 80 ₹7,520 Lowest |
| 5.00 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | 43 | Cum | 207 ₹8,901 | 95 ₹4,085 Lowest |
| 6.00 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. (a) Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 3.5 | Cum | 630 ₹2,205 Lowest | 1,800 ₹6,300 |
| 7.00 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | 39.5 | Cum | 1,620 ₹63,990 | 1,000 ₹39,500 Lowest |
| 8.00 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. | 43 | Cum | 270 ₹11,610 | 90 ₹3,870 Lowest |
| 9.00 | Labour Charges for dismantling and dismembering of existing 40 metre high Ground Based tower (Approx. weight 10.00 MT) made of mild steel flat, tees, Angles, Channels, tubes etc. including associated Components like wave guide , Ladders, railing, Antena , Earthing patti, Platform, fixtures , Aviation Light Assembly etc. including sorting of tower members / nuts and bolts washers etc. Including bundling of Similar Small plates , Small Angle & flat Section by binding with G.I.Wires properly and packaging of all nuts and bolts in gunny bags Complete as per direction of Engineer-in-Charge. The payment shall be made on the weight basis and for it the electronic weighment slip shall be produced by the Agency. The rate are inclusive of all above operations including Electronic Weighment Charges, Toll Taxes , insurance Charges of man and materials in visinity , providing G.I. binding wires and gunny bags for which nothing extra shall be paid to the Agency. | 1 | Job | 1,39,500 ₹1,39,500 | 1,35,000 ₹1,35,000 Lowest |
| 10.00 | Dismantling and dismembering of Type I BTS Shelter size approx. 2.13m x3.13mx2.76m, made of PU foam wall, floor and roof pannels , Roofing sheets , Flooring Ply sheet, Antistatic Flooring , Door, M.S. Girder Section etc. carefully. Including sorting of Shelter members, fixtures and fittings of door like hinges , latch lock etc. properly Complete and lowering of all materials from terrace to Ground as per direction of Engineer-in-Charge. The rate are inclusive of all above operations including Electronic Weighment Charges, Toll Taxes , insurance Charges of man and materials in visinity , providing G.I. binding wires, wooden boxes and gunny bags for which nothing extra shall be paid to the Agency. The small articles received shall be packed in a wooden box/plastic bag arraned by the Agency. | 1 | Job | 40,050 ₹40,050 | 36,000 ₹36,000 Lowest |
Tender Value
₹2.8 L
EMD Value
₹5,584
Closing Date
21 Aug 2026, 6:00 pmClosed
EE civil Ahmedabad
3rd floor, Vasna TE building, Vasna Ahmedabad
Etender for Dismantling of AMD439 -40 mtr NBLW GB tower and BTS shelter along with foundation and reflling upto ground level at Sahij, Dholka, Ahmedabad
2026_BSNL_287476_1
27/BSNL/CD/AHD/2026 dated 11/08/2026
Open Tender
Civil Works
Item Rate
30 days
Ahmedabad
Please refer Tender documents.
4 documents required · 4 mandatory
₹590
Accounts Officer (Cash), PGMTD, BSNL, Ahmedabad
₹5,584
5 Sept 2026
13 Aug 2026
25 Aug 2026
13 Aug 2026
21 Aug 2026
13 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Transportation of 40m GB tower material including ladder, working platform, cable tray and antenna fixtures etc. and Type-I BTS shelter with all materials and all the sturctural members of BTS shelter like PU foam wall, floor and roof pannels , Roofing sheets , Flooring Ply sheet, Antistatic Flooring , Door, M.S. Girder Section etc. by maintaining the safety precautions to avoid any damage to materials etc. all from the departmental store at SSA HQ or some other city / place to the site of work under consideration & vice versa. The item includes sorting (if required), loading, unloading and stacking of the material all complete and as per the directions of Engineer- in-charge. (a) 40 m GB tower materials and Type-I BTS shelter approx. weight 10.00 MT and distance up to 75 km | 1 | Job | - | - |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. (a) All kinds of soil | 94 | Cum | - | - |
| 3 | Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. (a) All kinds of soil. | 45 | Cum | - | - |
| 4 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 94 | Cum | - | - |
| 5 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | 43 | Cum | - | - |
| 6 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. (a) Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 3.5 | Cum | - | - |
| 7 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | 39.5 | Cum | - | - |
| 8 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. | 43 | Cum | - | - |
| 9 | Labour Charges for dismantling and dismembering of existing 40 metre high Ground Based tower (Approx. weight 10.00 MT) made of mild steel flat, tees, Angles, Channels, tubes etc. including associated Components like wave guide , Ladders, railing, Antena , Earthing patti, Platform, fixtures , Aviation Light Assembly etc. including sorting of tower members / nuts and bolts washers etc. Including bundling of Similar Small plates , Small Angle & flat Section by binding with G.I.Wires properly and packaging of all nuts and bolts in gunny bags Complete as per direction of Engineer-in-Charge. The payment shall be made on the weight basis and for it the electronic weighment slip shall be produced by the Agency. The rate are inclusive of all above operations including Electronic Weighment Charges, Toll Taxes , insurance Charges of man and materials in visinity , providing G.I. binding wires and gunny bags for which nothing extra shall be paid to the Agency. | 1 | Job | - | - |
| 10 | Dismantling and dismembering of Type I BTS Shelter size approx. 2.13m x3.13mx2.76m, made of PU foam wall, floor and roof pannels , Roofing sheets , Flooring Ply sheet, Antistatic Flooring , Door, M.S. Girder Section etc. carefully. Including sorting of Shelter members, fixtures and fittings of door like hinges , latch lock etc. properly Complete and lowering of all materials from terrace to Ground as per direction of Engineer-in-Charge. The rate are inclusive of all above operations including Electronic Weighment Charges, Toll Taxes , insurance Charges of man and materials in visinity , providing G.I. binding wires, wooden boxes and gunny bags for which nothing extra shall be paid to the Agency. The small articles received shall be packed in a wooden box/plastic bag arraned by the Agency. | 1 | Job | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.59 MB
Tendernotice_2.pdf
PDF • 0.47 MB
Tendernotice_3.pdf
PDF • 0.55 MB
eNIT27DismantlingGBTBTSshelterSahijDholka.pdf
Tender Documents • 1.58 MB
eNIT27dec.pdf
Other Document • 0.53 MB
eNIT27app.pdf
Other Document • 0.46 MB
BOQ_335407.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .