Providing Temporary illumination on Hire basis to outside taken over Temples in AE(SKVST)Section in connection with Vakunta Ekadasi & Dwadasi in ESD-SBH, Tirupati for the year 2026-27
978146
335/DE(Elec)-II/TTD/TPT/2026-27
OPEN - NCB
Electrical Works
CHITTOOR, ANDHRA PRADESH
7 documents required · 7 mandatory
₹153
18 Aug 2026
18 Aug 2026
18 Aug 2026
Hire Charges for Supplying, Fixing, Wiring, Servicing and Maintaining of festival decorative Series Sets consisting of 50 to 100 Nos of Bulbs including suitable wire & controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Two days. Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for Supply, Fixing, Wiring, Servicing & Maintaining of 4’ - 40Watt Strip type fluorescent fitting / T5 / LED batten fitting with all accessories including suitable wire & controls wherever necessary as directed during execution and removal, transportation of all materials, loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Two days Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for Supply, Fixing, Wiring, Servicing & Maintaining of 150 / 200 / 240W LED Flood Light Fitting with all accessories including suitable wire and controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Two days Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for supplying, fixing, wiring, servicing and maintaining pedestal fan / Pedestal 18/24” Air circulators with suitable wires & controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Two days Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for providing LED Lamps / LED rope Bamboo stick designs of different deities, Arches & designs etc., as directed during execution with different colours & Lights to operate at 230 V, Single/Three phase supply. The deites, Arches & designs etc, should be fixed firmly on existing scaffolding / as directed during execution and giving necessary connection. (Note: The rate should be inclussive of transportation, erection, testing and removing charges etc) - For Two days. Note:- 1) The 6.2 V Bamboo stick designs of different dieties, Arches & designs etc., where ever necessary are to be arranged the deties, Arches & designs etc., with / without creeping circuits. Each circuit is connected through a step down transformer / SMPS if required. 2) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 3) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for providing LED Design boards of different deities / designs etc, as directed during execution with different colours & Lights to operate at 230V, Single phase supply. The boards should be fixed firmly on existing scaffolding / as directed during execution and giving necessary connections. (Note: The rate should inclusive of transportation, erection and removing charges) - For Two days Note:- 1) The specified designs board should have made with painting on the front side so that in day times, the design is appears as painting board, and in night times the replica of design is to be appear with colour LEDs so as to lit the natural colour of the deity / design.
2) The LED's are to be arranged to the board with / without creeping circuits. Each circuit is connected through a step down transformer / SMPS. 3) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 4) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for temporary illumination, consisting of 54W LED RGB Parcan light fitting non integral weather proof die cast alluminium housing with IP66 protection wih control gear box, control gear with required cables, holder, mains duly erected with required scaffolding and dismantled on existing poles including cost and conveyance of all materials and labour charges etc., complete. For Two days Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire Charges for Erection and removal of scaffolding for erection of Electrical illumination Figures wherever necessary as directed during execution including providing necessary struts, ties, bracings etc, from bottom to 10 meter. Note:- 1. TTD Lorry to be arranged on Free of cost for transportation of scaffolding materials To and Fro exclusive for scaffolding works for erection of electrical cutout at Tirumala except for works at Tirupati and Tirchanoor and transportation charges will be paid separately for outside places, 2. Erection should be completed before Two days of commencement of the Festival / Utsavam. 3. The TTD has not responsible for theft and fire accident.
4. The existing scaffolding shall be reused are continued upto 2 Months and the rate shall be allowed for such extension at 25% less over the above rates. 5. The measurements shall be given for the front view of the scaffoldings. 6. 10% extra will be paid for 4-mada streets at Tirumala. 7. Transportation charges will be paid for outside places 15% extra for Tirupati rates (beyond 18 KMs) 8. The above rates are excluding GST.
Hire Charges for Erection and removal of scaffolding for erection of Electrical illumination Figures wherever necessary as directed during execution including providing necessary struts, ties, bracings etc, from bottom to 20 meter. Note:- 1. TTD Lorry to be arranged on Free of cost for transportation of scaffolding materials To and Fro exclusive for scaffolding works for erection of electrical cutout at Tirumala except for works at Tirupati and Tirchanoor and transportation charges will be paid separately for outside places, 2. Erection should be completed before Two days of commencement of the Festival / Utsavam. 3. The TTD has not responsible for theft and fire accident.
4. The existing scaffolding shall be reused are continued upto 2 Months and the rate shall be allowed for such extension at 25% less over the above rates. 5. The measurements shall be given for the front view of the scaffoldings. 6. 10% extra will be paid for 4-mada streets at Tirumala. 7. Transportation charges will be paid for outside places 15% extra for Tirupati rates (beyond 18 KMs) 8. The above rates are excluding GST.
Hire charges for supplying, fixing, wiring and 5 KVA DG set with suitable change over switch, cables and connections. The DG set should be maintained for all the 24 hours for running the set with operator wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed (Excluding the cost of Diesel Oil) - For One day Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Supply, Transporation of Diesel Oil for DG set
(Rupees Four Lakh Twenty Nine Thousand Eight Hundred and Paise Four only)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
NIT 335.docx
TENDER_DOCUMENT • 0.16 MB
Schedule 335.xls
TENDER_DOCUMENT • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].