Tender Value
₹2.7 L
EMD Value
₹5,500
Closing Date
18 Jul 2026, 2:00 pm7d left
E.E. WS BR XVI
E.E (WS) BR-XVI, JOKA DIAMOND PARK, KOL-104
REPAIR TO LEAKS OF FILTER W/S EXISTING 350MM, 300MM, 250 MM DIA RESERVE MAIN AND OTHER W/S SERVICE MAIN, INSTALLATION OF AIR RELEASE AND SLUICE VALVE AT TALPUKUR RD, SARKARHAT LANE, D.H. ROAD, ETC. IN WARD NO-126, BR- XVI.
2026_KMC_1031508_1
KMC/WS/JOKA/03/2026-27
Open Tender
CIVIL WORKS
28 days
IN WARD NO-126, BR- XVI.
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹5,500
10 Jul 2026
10 Jul 2026
20 Jul 2026
10 Jul 2026
18 Jul 2026
10 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.10 Hire and labour charges for coir rope fencing 25 mm dia rope single on 120 mm dia bamboo posts 1.40 m above G.L and 600 mm below G.L, 1.50 m apart including digging holes complete. | 208 | MTR | 17 | ₹3,536 |
| 2 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 2. Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. | 88.31 | %M3 | 119.27 | ₹10,532.73 |
| 3 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 3. Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation. | 85.44 | %M3 | 77.54 | ₹6,625.02 |
| 4 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.14 Signalling arrangement at both sides of site to avoid any accident during working period 4 nos. red flags during sunlight at 4 corners and 2 nos light (lamp) in other than sunlight. | 22 | DAY | 202 | ₹4,444 |
| 5 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.13 Hire & labour charges for diesel generating set for lighting including fuel,300M wire, 11 points with 200 Watt bulb with post for hanging & maintaining the same for day & night for the period. | 2 | DAY | 1,650 | ₹3,300 |
| 6 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.12 Supplying sign-board made of 25 mm thick sal plank with frame on all side of sal batten 50 mm x 32 mm with nailed on post 3.15m x 100mm x100mm and fitting fixing such with digging holes of dia 300 mm and depth 750 mm in all sorts of soil and repacking and consolidating the gap aroundthe post with cement concrete (1 : 3 : 6) painting 2 coats including cost of nails, bolts and nuts etc. complete in all respect as per direction of theEngineer-in-charge. Payment of concrete and painting to be made separately.(ii) 900 mm. x 600 mm. size of board. | 2 | EA | 813 | ₹1,626 |
| 7 | CHAPTER - VII MISCELLANEOUS ITEMS Dewatering by pumps including all leads, lifts and making all arrangements of disposal. where continuous flow of water from a source other than natural or ground water is encountered in case of emergency maintenance works related to leakage. breakage and making wet connections. [Note ;- In case of any other situation demanding such emergency dewatering. use of this item is to be approved by the Superintending Engineer/Tender Accepting Authority. This item shall be executed on the specific direction duly supported by proper clarification of the E.I.C. who will be satisfied in absolute discretion that such work has not been necessitated due to any natural source of water or any fault of the Contractor] | 384 | HPH | 33 | ₹12,672 |
| 8 | CHAPTER - I [ SUPPLEMENTARY ] EXCAVATION, SHORING, BAMBOO PILING, FENCING & SIGN BOARD, LIGHTING & SIGNALING AND SITE CLEANING ETC. 1.5 Cutting & picking up existing metalled black top portion of road surface to an average depth of 300 mm by using Jack hammer with all necessary tool and plant including reening the serviceable materials & stacking within a lead of 75 mtr. all complete as per direction of the Engineer-in- Charge. | 5.28 | M3 | 636 | ₹3,358.08 |
| 9 | (C) III: Labour Rate for Sanitary and Plumbing 5.Plumbing Helper NOTE:The above rates are exclusive of 10 % profit and 1% Labour welfare cess, which would be admissible to the Contractor, but contractual percentage will not be applicable on the above rates. Page 113 of 124 | 14 | EA | 270 | ₹3,780 |
| 10 | CHAPTER - II LAYING & JOINTING PIPES, SPECIALS ETC.2.1 C.I. / D.I. Pipe & Specials 2.1 C.I. / D.I. Pipe & Specials 2.1.5 Rubber gasket joints to C.l./D.l. pipes and specials all complete to makesthe joint water tight as required hydraulic pressure as per specification and direction of the Engineer-in-Charge.[Cost of Rubber. gasket of approved make induding supply to any pointwithin the Kolkata Municipal Area shall be paid separately.}Diameter in mm 300mm dia. | 4 | EA | 124 | ₹496 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.22 MB
Tendernotice_2.pdf
PDF • 1.22 MB
BOQ_2532872.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid