| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹3.6 LAccepted-AOC BASANTPUR KEDLA DIST RAMGARH JHARKHAND | KEDLA | RAMGARH | JHARKHAND | L-1 | Accepted-AOC Accept | |
| 2 | L-2₹3.6 L+₹2,200.31 (0.61%)Rejected-AOC BASANTPUR KEDLA RAMGARH DIST RAMGARH JHARKHAND | KEDLA | RAMGARH | JHARKHAND | L-2 | Rejected-AOC Accept | |
| 3 | L-3₹3.6 L+₹2,672.90 (0.74%)Rejected-AOC BASANTPUR KEDLA DIST RAMGARH JHARKHAND | BASANTPUR | RAMGARH | JHARKHAND | L-3 | Rejected-AOC Accept |
Tender Value
₹3.6 L
EMD Value
₹4,600
Closing Date
16 Sept 2024, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
PAWAN KUMAR
KEDLA WASHERY, HAZARIBAG AREA, CCL
04 nos. joint preparation and 02 nos. GC-10 gear coupling changing after lifting, dismantling and re-installation of take-up arrangement of unit no. 116A 04 nos. snub drum lagging and B1 bunker jam cleaning of Pre-Washery at Kedla Washery.
2024_CCL_316866_1
PO/KW/E-Tender/24-25/26, Dated- 05.09.2024
Open Tender
Electrical and Maintenance Works
Item Rate
15 days
KEDLA WASHERY
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,600
Yes
18 Mar 2025
6 Sept 2024
17 Sept 2024
6 Sept 2024
16 Sept 2024
6 Sept 2024
6 Sept 2024 - 12 Sept 2024
Amount
04 nos. Joint preparation take-up lifting & re-installation. (a) Take-up lifting/dismantling cost preparation.
(b) Take-up lre-installation cost.
For 02 nos. gear coupling changing gear box and gear coupling dismantling and re-installation. (a) Dismantling Cost.
(b) Gear box and coupling installation cost.
For lagging work take-up lifting/dismantling and re-installation. (a) Lifting/dismantling cost of take-up stystem for lagging
(b) Re-installation cost.
B1 Bunker jam cleaning, For jam cleaning grizzly dismantling & re-installation . (a) Dismantling Cost.
(b) Re-installation cost.
(c) Bunker cleaning cost-Capacity of 01 nos. bunker.
Total impact of GST for the purpose of CTC
TRIBHUWAN ENTERPRISES
TRIDEO CONSTRACTION
techsummary_328379.pdf
PDF • 0.34 MB
finsummary_328379.pdf
PDF • 0.34 MB
316866W.pdf
PDF • 0.34 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .