| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.3 CrAccepted-AOC | ₹35.3 Cr | L1 | Accepted-AOC First Lowest |
| 2 | L2₹37.0 CrRejected-AOC | ₹37.0 Cr | L2 | Rejected-AOC Second Lowest |
| 3 | L3₹40.0 CrRejected-AOC KANNUR | KERALA | 670001 | ₹40.0 Cr | L3 | Rejected-AOC Third Lowest |
| 4 | L4₹42.0 CrRejected-Finance 5TH FLOOR ALPHA PLAZA K P VALLON ROAD KADAVANTHRA KOCHI KERALA PIN 682020 | KOCHI | ERNAKULAM | KERALA | 682020 | ₹42.0 Cr | L4 | Rejected-Finance Forth Lowest |
| 5 | L5₹48.1 CrRejected-Finance PLOT NO S 7 M R COMPLEX PAPER MILL ROAD TAJ NAGAR SPB COLONY PO ERODE 638 010 | ERODE | ERODE | TAMIL NADU | 638010 | ₹48.1 Cr | L5 | Rejected-Finance Fifth lowest |
| Sl No | Description | Qty | Unit | RAJU CHACKO L1 | THE URALUNGAL LABOUR CONTRACT CO-OPERATIVE SOCIETY L3 | CHERIAN VARKEY CONSTRUCTION CO PVT LTD L4 | K V JOSEPH AND SONS PRIVATE LIMITED L2 | M.RAJKUMAR L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00BRIDGE PROPER | ||||||||
| 1.00 | OD9107/2021-2022::Providing platform (pontoon steel work rivetted and bolted in build up section etc) trussed
and framed work with M.S and iron plates etc, straightening cutting fabrication and hoisting including applying one coat of iron primer for pontoon including cost of materials labour charges, current charges for welding etc and launching in to the river and mobilization charges to the pile point and anchoring the same in to the required possession including cost of iron rope and labour charges and hire for motor boat marine type having engine cover 370 to 411 and higher of winch chain block etc and all other incidental charges including maintaining, lighting, night watching etc complete | 1,176 | metre | 2,520 ₹29.6 L | 1,571 ₹18.5 L | 1,700 ₹20.0 L | 4,500 ₹52.9 L | 6,500 ₹76.4 L |
| 1.00 | OD112182/2021-2022:Forming temporary island of the size 10.00X6.00X2.00 and outer ring bund of 75cm width by driving downfull size coconut piles 3.00m below bed level at 80 c/c on both side of ring bund and braced with 1/4 split coconut wailing pieces 1.50m c/c around with double layer of ettamat fixed to bamboo frame using bamboo reapers with 30cm c/c on both ways and filling with inner portion of the bund with contractors own earth cut, conveyed and spreading in layers compacting with rammer with all leads and lifts etc complete and maintaining island throughout the period of construction and dismantling and removing the bund after the completion of the work etc as per the direction of departmental officers at site | 4 | each | 2,15,460 ₹8.6 L | 13,00,358 ₹52.0 L | 2,80,000 ₹11.2 L | 5,50,000 ₹22 L | 9,00,000 ₹36 L |
| 1.00 | 12.22:Providing Steel Liner 10mm thick for Curbs and 6 mm thick for Steining of Wells including Fabricating and Setting out as per Detailed Drawing. | 231.6 | MT | 1,15,239.6 ₹2.7 Cr | 1,19,791 ₹2.8 Cr | 1,60,000 ₹3.7 Cr | 1,32,000 ₹3.1 Cr | 90,000 ₹2.1 Cr |
| 1.00 | 12.25.3:Bored cast-in-situ M35 grade R.C.C. Pile Using Batching Plant, Transit Mixer and Concrete Pump excluding Reinforcement complete as per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m. Pile diameter-1200 mm | 960 | metre | 17,823.33 ₹1.7 Cr | 18,351 ₹1.8 Cr | 19,700 ₹1.9 Cr | 21,250 ₹2.0 Cr | 27,000 ₹2.6 Cr |
| 1.00 | OD9153/2021-2022:Bored cast-in-situ M40 grade R.C.C. Pile Using Batching Plant, Transit Mixer and
Concrete Pump excluding Reinforcement complete as per Drawing and Technical Specifications and removal of
excavated earth with all lifts and lead upto 1000 m.Pile diameter-1200 mm | 2,736 | metre | 18,453.33 ₹5.0 Cr | 17,837 ₹4.9 Cr | 20,870 ₹5.7 Cr | 21,500 ₹5.9 Cr | 33,000 ₹9.0 Cr |
| 1.01 | 12.1.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means | 323.79 | cum | 252 ₹81,595.58 | 123 ₹39,826.42 | 100 ₹32,379.20 | 81.32 ₹26,330.77 | 250 ₹80,948 |
| 1.01 | 12.8.F.2.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M30 - Using Batching Plant, Transit Mixer and Concrete Pump | 13.64 | cum | 11,592 ₹1.6 L | 9,269 ₹1.3 L | 10,400 ₹1.4 L | 10,000 ₹1.4 L | 10,750 ₹1.5 L |
| 1.01 | 12.38.D.2:Cement Concrete for Reinforced Concrete in Pile Cap complete as per Drawing and Technical Specification R C C Grade M35 - Using Batching plant, Transit Mixer and Concrete pump | 609.93 | cum | 14,490 ₹88.4 L | 14,189 ₹86.5 L | 10,750 ₹65.6 L | 13,000 ₹79.3 L | 14,500 ₹88.4 L |
| 1.01 | 12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications | 748.68 | MT | 90,200.88 ₹6.8 Cr | 1,07,335 ₹8.0 Cr | 99,000 ₹7.4 Cr | 1,06,000 ₹7.9 Cr | 94,000 ₹7.0 Cr |
Tender Value
₹32.5 Cr
EMD Value
₹5 L
Closing Date
19 Apr 2025, 3:00 pmClosed
Project Director, PMU-KRFB, TVM
The Project Director, Kerala Road Fund Board, Project Management Unit, Ground Floor, BSNL Office Building at CGM(O), Doorsanchar Bhavan, PMG Junction Trivandrum-695033
Construction
2025_KRFB_756615_1
PWD/KR/TR/91871/2021_5_1/1
Open Tender
Civil Works - Bridges
545 days
Ernakulam
Please refer Tender documents.
8 documents required · 8 mandatory
₹19,518
Yes
₹5 L
Yes
Office of the Project Director, PMU-KRFB, TVM
23 Aug 2025
29 Mar 2025
21 Apr 2025
29 Mar 2025
19 Apr 2025
29 Mar 2025
4 Apr 2025
Amount
BRIDGE PROPER
OD9107/2021-2022::Providing platform (pontoon steel work rivetted and bolted in build up section etc) trussed and framed work with M.S and iron plates etc, straightening cutting fabrication and hoisting including applying one coat of iron primer for pontoon including cost of materials labour charges, current charges for welding etc and launching in to the river and mobilization charges to the pile point and anchoring the same in to the required possession including cost of iron rope and labour charges and hire for motor boat marine type having engine cover 370 to 411 and higher of winch chain block etc and all other incidental charges including maintaining, lighting, night watching etc complete
OD112182/2021-2022:Forming temporary island of the size 10.00X6.00X2.00 and outer ring bund of 75cm width by driving downfull size coconut piles 3.00m below bed level at 80 c/c on both side of ring bund and braced with 1/4 split coconut wailing pieces 1.50m c/c around with double layer of ettamat fixed to bamboo frame using bamboo reapers with 30cm c/c on both ways and filling with inner portion of the bund with contractors own earth cut, conveyed and spreading in layers compacting with rammer with all leads and lifts etc complete and maintaining island throughout the period of construction and dismantling and removing the bund after the completion of the work etc as per the direction of departmental officers at site
12.22:Providing Steel Liner 10mm thick for Curbs and 6 mm thick for Steining of Wells including Fabricating and Setting out as per Detailed Drawing.
12.25.3:Bored cast-in-situ M35 grade R.C.C. Pile Using Batching Plant, Transit Mixer and Concrete Pump excluding Reinforcement complete as per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m. Pile diameter-1200 mm
OD9153/2021-2022:Bored cast-in-situ M40 grade R.C.C. Pile Using Batching Plant, Transit Mixer and Concrete Pump excluding Reinforcement complete as per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m.Pile diameter-1200 mm
12.1.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means
12.8.F.2.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M30 - Using Batching Plant, Transit Mixer and Concrete Pump
12.38.D.2:Cement Concrete for Reinforced Concrete in Pile Cap complete as per Drawing and Technical Specification R C C Grade M35 - Using Batching plant, Transit Mixer and Concrete pump
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
13.5.H.p.2:Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications RCC Grade M35 - With Batching Plant, Transit Mixer and Concrete Pump - Height upto 5m
OD112199/2024-2025:Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications RCC Grade M40 - With Batching Plant, Transit Mixer and Concrete Pump
13.14:Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to IRC: 83 (Part-II) section IX and clause 2005 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications.
13.6:Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications
OD9324/2021-2022:Providing weep holes in Reinforced concrete abutment, wing wall/return wall with 75 mm dia PVC pipe, extending through the full width of the structure with slope of 1V : 20H towards drawing foce. Complete as per drawing and Technical Specifications including all charges
14.1F.2.B:"Furnishing and Placing PSC Grade M45 Using Batching Plant, Transit Mixer, and Concrete Pump as per drawing and Technical Specification. For T-beam & slab including launching of precast girders by launching truss upto 40 m span - Height 5m to 10m
14.1E.1.2.B:Furnishing and Placing PSC Grade 40 as per drawing and Technical Specification For T-beam & slab Superstructure - Height 5m to 10m - PSC Grade M-40 - Using Batching Plant, Transit Mixer and Concrete Pump.
14.2:Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
5.15:Providing and laying 25 mm thick mastic asphalt wearing course with paving grade bitumen (VG - 30) meeting the requirements given in table 500-40, prepared by using a mastic cooker and laid to the required level and slope after cleaning the surface, including providing an antiskid surface with bitumen precoated fine grained hard stone chipping of 13.2 mm nominal size at the rate of 0.005cum per 10 sqm and at an approximate spacing of 10 cm center to center in both directions, pressed into the surface when the temperature of surfaces is not less than 1000C, protruding 1 mm to 4 mm over mastic surface, all complete as per clause 516
5.6.2.a:Providing and laying bituminous concrete with 80-100 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with a bituminous binder( NRMB) @ 5.4 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level, and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects For Grading - II (13.2 mm Nominal Size)
14.3:High tensile steel wires/strands including all accessories for stressing, stressing operations and grouting complete as per drawing and Technical Specifications
14.9:Drainage Spouts complete as per drawing and Technical specification
14.22:Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation
8.8:Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces
APPROACH ROAD
2.2:Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area
2.3.2.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Mechanical Means
2.1.2:Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit. Girth from 600 mm to 900 mm
2.4.4.B:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Dismantling Stone Masonry - Rubble stone masonry in cement mortar.
2.4.2.B:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Prestressed / reinforced cement concrete grade M-20 & above - By Mechanical Means
2.4.3.B:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Dismantling Brick / Tile work - In cement mortar
3.15:Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres by Mechanical Means
12.1.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means
OD173733/2024-2025:Supplying and stacking well matured straight 6m long coconut post having avg diameter on 25cm for driving down through various strata below bed level including cost conveyance labour charges etc complete.
OD9344/2021-2022:Driving down coconut pile to lines and levels through soft to medium clay soil strata including all hire charges and labour and all other appliances necessary for pile driving down after pointing the bottom end. Details for one post of 6m long 15 numbers per day 6X15=90m. Details for 90m length.
OD9349/2021-2022:Cutting and removing the excess length of Wooden/ Coconut piles to lines and levels and removing the cut end of piles and stacking within 150m
OD9367/2021-2022:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site.
OD9371/2021-2022:Providing and construction of a gabion structure for retaining earth with segments of wire crates of size 7 m x 3 m x 0.6 m each divided into 1.5 m compartments by cross netting, made from 4 mm galvanised steel wire @ 32 kg per 10 sqm having minimum tensile strength of 300 Mpa conforming to IS:280 and galvanizing coating conforming to IS:4826, woven into mesh with double twist, mesh size not exceeding 100 x 100 mm, filled with boulders with least dimension of 200 mm, all loose ends to be tied with 4 mm galvanised steel wire as per drawing, all complete as per directions of Engineer-in-charge twist, mesh size not exceeding 100 x 100 mm, filled with boulders with least dimension of 200 mm, all loose ends to be tied with 4 mm galvanised steel wire. Unit = cum Taking output = 7 x 3 x 0.6 = 12.60 cum
15.6:Laying of a geotextile filter between pitching and embankment slopes on which pitching is laid to prevent escape of the embankment material through the voids of the stone pitching/cement concrete blocks as well as to allow free movement of water without creating any uplift head on the pitching.
13.10:Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.
3.16:Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.
3.18:Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
12.8.F.2.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M30 - Using Batching Plant, Transit Mixer and Concrete Pump
14.10:PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification.
14.1D.2.1.A:"Furnishing and Placing RCC/PSC Grade M35 Using Batching Plant, Transit Mixer, and Concrete Pump as per drawing and Technical Specification For solid slab super-structure - Height upto 5m
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15
12.8.E.2.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. RCC Grade M25 - With Batching Plant, Transit Mixer and Concrete Pump
12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer
13.5.G.p.2:Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications RCC Grade M30 - Height upto 5m - using Batching Plant, Transit Mixer and Concrete Pump
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
13.6:Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications
14.2:Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
55.16:Providing and fixing guard post Providing and fixing guard post of size 200mmx200mm, 1400mm long, 800mm above ground level and 600mm below GL. casted in M20 Grade concrete reinforced with 4 nos of 8mm dia longitudinal bars and 6mm dia stirrups @ 100mm c/c, firmly fixed in position by means of foundation of size 0.5mx0.5mx0.7m in M15 grade concrete below ground level including painting 2 coats on exposed surface with synthetic enamel paint in alternate white & black band 20cm wide
4.1.A.2:Construction of granular sub-base by providing graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with a motor grader on the prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 Grading-II - Plant Mix Method
4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
5.1.a:Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.
5.2.b:Providing and applying tack coat with bitumen emulsion (RS) using emulsion pressure distributor at the rate of 0.25 - 0.30 kg per sqm on the prepared Granular Surface cleaned with mechanical broom.
5.3.2.a:Providing and laying bituminous macadam with 80-100 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with a bituminous binder (VG 30), transported to the site, laid over a previously prepared surface with paver finisher to the required grade, level, and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction For Grading II - (19 mm nominal size)
5.6.2.a:Providing and laying bituminous concrete with 80-100 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with a bituminous binder( NRMB) @ 5.4 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level, and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects For Grading - II (13.2 mm Nominal Size)
8.13:Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads on Bituminous Surface @ 250 gms per sqm area, the thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform, and free from streaks and holes.
OD183622/2024-2025:Providing and laying of Interlock concrete block pavements having thickness 60mm (M30) as per drawings and technical specification clause 1504 confirming to IS 15658and laid in required colour and pattern over and including 50 mm thick compacted bed of 6 mm metal including edge concreting for 300mm width and 150mm depth with CC M35 (@0.045 m3/m)
55.10.1:Providing and erecting retro-reflectorised Object Hazard Marker 300mm x 900mm Providing and erecting retro-reflectorised Object Hazard Marker sign with 07 years warranty, manufactured as per IRC 67 USING Type IV ASTM D 4956-09 micro prismatic retro reflective sheeting fixed over aluminium sheetig, 2 mm thick / aluminium composit material sheeting 4 mm thick with suitable back support frame and supported on a mild steel angle iron post 75mmx75mmx6mm, firmly fixed 30cm above ground level by means of properly designed foundation with M 15 grade cement concrete 30cmx30x45cm, 45cm below ground level including painting all non-reflective faces with epoxy paint 2 coats over epoxy primer as per approved drawing and clause 801.300 mm x 900 mm
8.23.A:Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 811.3
55.14:Providing and fixing retro-reflectorised ceramic tilesProviding and fixing retro-reflectorised ceramic tiles of size 10cmX20cm using High Intensity Micro Prismatic (Type IV) grade sheeting with 7 years warranty fixed over Ist quality ceramic glazed tiles including cost of glue, cutting charges, fixing with suitable adhisive on concrete or other surface etc complete.
8.5:Providing and fixing of direction and place identification retro-reflectorised sign with 7 years warranty manufactured as per IRC :67 made of Type IV micro prismatic grade sheeting fixed over aluminium sheeting, 2 mm thick/ aluminium composit material sheeting 4 mm thick with area not exceeding 0.9 sqm, with suitable back supporting frame of MS angle 40x40x6 and supported on GI pipe pole 50mm NB confirming to IS 1239 firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm x 45 cm x 60 cm, 60 cm below ground level including painting all exposed surface with 2 coats of epoxy painting over epoxy primer and as per approved drawing and clause 801 including lettering symbols etc.
8.15:Supplying and installation of delineator (Roadway indicators) posts 80- 100cm high above ground level, pained black, and white in 15 cm wide strips, fitted with min. 80 x 100 mm rectangular or 75 mm dia circular retro reflectorized panels at the top with minimum visibility of 300m with provisions to prevent edge lifting and vandalisam, and conforming to clause 806 , IRC-79 and the drawings including fixing to ground (The deleniator shall be of approved type as per specification)
8.35:Providing and fixing reflective road studs (Raised Pavement Marker) of ' category A' made out of ASA/HIPS/ABS moulded body with shanks and conforming to ASTM D 4280, strong enough to support a load of more than 13.635 T when tested in accordance with ASTM D 4280, reflective panel confirming to ASTM D 788, and reflectivity conforming to clause 804.4. including installation, drilling, fixing with adhesive etc. with 2 years warranty for the road stud as well as for in field performance as per clause 804.7.3 Road Markers/Road Stud with Lense Reflector :-
BOAT JETTY
OD9382/2021-2022:RING BUND Type-I-Putting up ring bund as per approved shape 2.5m bottom width, 1m top width using empty gunny/polythene bags filled with earth placed in 2 rows at 0.6m apart and filled in between with puddle clay to form bund for an average height 2.00m including labour dismantling the bund after completion of the work etc. complete.
OD9385/2021-2022:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete.(Derived from CPWD Buildings Item No. 60.2.2)
OD9386/2021-2022:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site.
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
55.17.2:Bored cast-in-situ M30 grade R.C.C. Pile excluding Reinforcement complete as per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m. Pile diameter-750 mm
OD9387/2021-2022:Providing casing pipe of 1200mm inner dia made out of 6mm thick M.S. plate used for casting in-situ bored piles and erecting at site in lines and levels and driving down to the required depth including cost and conveyance of all materials, all fabrication charges and welding charges with all leads and lifts etc. complete according to the necessity at site as directed by the deptl. officers. 12.22 MoRTH 1200 & 1900
12.38.C.2:Cement Concrete for Reinforced Concrete in Pile Cap complete as per Drawing and Technical Specification R C C Grade M-30- Using Batching Plant, Transit Mixer, and Concrete Pump
12.8.G.2.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. RCC Grade M30 - Using Batching Plant, Transit Mixer and Concrete Pump
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
OD173781/2024-2025:Supplying and stacking well matured straight 6m long coconut post having avg diameter on 25cm for driving down through various strata below bed level including cost conveyance labour charges etc complete.
OD9391/2021-2022:Driving down coconut pile to lines and levels through soft to medium clay soil strata including all hire charges and labour and all other appliances necessary for pile driving down after pointing the bottom end. Details for one post of 6m long 15 numbers per day 6X15=90m. Details for 90m length.
OD173851/2024-2025:Cutting and removing the excess length of Wooden/ Coconut piles to lines and levels and removing the cut end of piles and stacking within 150m.
K V JOSEPH AND SONS PRIVATE LIMITED (BID ID -2198561)
THE URALUNGAL LABOUR CONTRACT CO-OPERATIVE SOCIETY (BID ID -2198394)
CHERIAN VARKEY CONSTRUCTION CO PVT LTD (BID ID -2198429)
M.RAJKUMAR (BID ID -2198236)
Bidder Name
CHERIAN VARKEY CONSTRUCTION CO PVT LTD
THE URALUNGAL LABOUR CONTRACT CO-OPERATIVE SOCIETY
K V JOSEPH AND SONS PRIVATE LIMITED
RAJU CHACKO
M.RAJKUMAR
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf