Executive Engineer (Ele./Mech.), Water Works Dep, VMC
DESIGN, ENGINEERING, SUPPLY, INSTALLATION, TESTING, COMMISSIONING, SYNCHRONIZING WITH THE GRID OF GRID CONNECTED SOLAR TREE SOLAR PV SYSTEMS ON CAPEX MODEL NET METERING BASIS ON THE FABRICATED TREE STRUCTURE OF IDENTIFIED LOCATIONS WITH COMPREHENSIVE MAINTENANCE OF SAME FOR 5(FIVE) YEARS INCLUDING DEFECT LIABILITY PERIOD OF 5 YEARS
267849
VMC/FPC/EPC/SOLAR TREE/2025-26
Open
Supply,erection and Commissioning
Works
Vadodara
3 documents required · 3 mandatory
₹10,000
Municipal Commissioner, Vadodara Municipal Corporation
₹10.0 L
21 Jan 2026
21 Jan 2026
21 Jan 2026
10 Feb 2026
21 Jan 2026
Bid No: [VMC/FPC/EPC/SOLAR TREE/2025-26]
OFFICE OF THE EXECUTIVE ENGINEER (ELECTRICAL)
STREET LIGHT DEPARTMENT
VADODARA MUNICIPAL CORPORATION
VADODARA MUNICIPAL CORPORATION.
OFFICE: Khanderao Market Building, Rajmahal Road, Vadodara-390001.
E-TENDER NOTICE
Vadodara Municipal Corporation invites tender in two parts Technical Bid & Price bid from
Contractors for the TENDER BID FOR DESIGN, ENGINEERING, SUPPLY, INSTALLATION, TESTING,
COMMISSIONING, SYNCHRONIZING WITH THE GRID OF GRID CONNECTED SOLAR TREE SOLAR PV
SYSTEMS ON CAPEX MODEL NET METERING BASIS ON THE FABRICATED TREE STRUCTURE OF
IDENTIFIED LOCATIONS WITH COMPREHENSIVE MAIN Through on line e-tendering system.
Estimated Completio E.M.D Tender Stamp Downloading Last Date for
cost n Period Rs. fee Rs. Duty Rs. online tender Online
(In Rs.) Documents Submission of
from. Completed
Date/Time Date/Time
Rs. 6 Months Rs.9,97,066/- 10,000/- As per rule 21.01.2026 to 10.02.2026 up
4,98,53,281/- (Excluding 10.02.2026 up to 16:00 hrs
(Inclusive GST) Monsoon) to 11:00 hrs.
(1) The tender bid document will be available and downloaded from www.tender.n procure.com website (2)
Tender document should be accepted only by E-tendering method on www.tender.n procure.com website (3)
Conditional tender shall not be accepted. If any condition in the price bid is found, the tender will liable to be
rejected. (4) Hard copy of Pre-qualification bid along with EMD & tender fee shall be submitted by Registered
A.D. / Speed Post only & should be addressed to Executive Engineer, Futuristic Planning Cell (FPC) Vadodara
Municipal Corporation, Khanderao Market Building, Rajmahal Road, Vadodara–390001 till dt.12.02.2026 up to
16:00 hrs. (5) The Advertisement is also available on Website of Vadodara Municipal Corporation. (6) VMC
reserves the right to accept or reject any or all tenders without assigning any reason thereof. (7) This Tender
notice shall form a part of contract document.
PRO No. / 2025-26 HOD Futuristic Planning Cell
Visit us at :www.vmc.gov.in
Sr No Section Description Page No
1 Invitation for Bid (IFB)
2 Section -1 Instructions to Bidders
3 Section -2 Qualification Information
4 Section -3 Conditions of Contract
5 Section -4 Contract Data
6 Section -5 Technical Specification
7 Section -7 Form of Bid
8 Section -8 Securities and Other Forms
11 Section -9 Documents to be furnished by Bidder
INVITATION FOR BID
NATIONAL COMPETITIVE BIDDING
1. The Executive Engineer, Futuristic Planning Cell (FPC), Vadodara Municipal
Corporation invites bids for the works detailed in the table.
The bidders may submit bids for the following works.
Pac Name of work Approximate Bid Cost of Perio #Class of
kag value of works security docume d of Registration
e (Rs.) (Rs.) nt compl / Category
1.0 TENDER BID FOR Rs. 4,98,53,281/- Rs.9,97,065/- Rs.10,000./ 6 Months Appropriate
DESIGN, (Inclusive GST) - (Excluding class for
ENGINEERING, Monsoon) electrical
SUPPLY, category
WITH THE GRID OF
SOLAR TREE SOLAR
CAPEX MODEL NET
FABRICATED TREE
2. Prospective / Interested bidder may download the Bid Documents from website
https://www.tender.nprocure.com free of cost till the Time and Date as
mentioned on online NIT at website https://www.tender.nprocure.com.
3. However, Bidder who is submitting the Bid Online will have to pay the Bid
Document Fee / Tender Fee through Demand Draft only of any Schedule Bank
payable at Vadodara and in favor of ‘Municipal Commissioner, Municipal
Corporation, Vadodara. Once the Bid is received online, Bid Document / Tender
Fee will not be refundable.
The Demand Draft for Bid Document / Tender fee / Bank Guarantee against Bid
Security / EMD shall be submitted in electronic format through online (by
scanning) while uploading the bid, this submission shall mean that bid document /
tender fee and Bid Security / EMD has been received. Accordingly, the offer of only
those shall be opened whose Bid Document / Tender Fee and Bid Security / EMD
have been received electronically. However, for the purpose of realization of
Demand Draft / Bank Guarantee bidder shall send the same in original through
R.P.A.D. so as to reach to #‘Executive Engineer, Futuristic Planning Cell, 2nd floor,
Vadodara Municipal Corporation, Khanderao Market Building, Rajmahal Road,
Vadodara-390001 on or before 12.02.2026 up to 16.00 Hrs.
Note : If any bidder will fill the online documents & price bid but fail to submit
hard copy before last date & time of submission than a bidder will going to be
restricted to fill any tender for next six(06) months in VMC.
Penetrative action for not submitting Demand Draft / Bank Guarantee in original
to Executive Engineer / Tender Inviting Authority by bidder shall be initiated.
Bidder will be abeyance from filling tender for next six months in VMC.
4. Bids received online, will be opened on the time, date and place as specified in the
online NIT at website https://www.nprocure.com in the presence of the bidders
or their authorized representatives, who wish to remain present.
If the office happens to be closed on the day of opening of the bids as specified,
the bids will be opened on the next working day at the same time and venue.
6. Other Information is as under:
A. Agencies can prepare and edit their offers a number of times before the end of
the tender submission date and time. After the tender submission date and
time, the bidder cannot modify / edit / withdraw their submitted offer in any
case. No written or online request in this regard shall be granted.
B. Offers in physical form will not be accepted in any case.
C. Demand Draft purchased by the other then bidder and issued after the last
date of submission of Bids, will not be considered or accepted.
D. The cost incurred by the contractor for this offer for clarification or attending
discussion, conferences or site visits will not be reimbursed by the Employer
or Engineer-in-Charge.
E. Conditional tender shall not be accepted.
F. Any changes, addition, alternation made in the prescribed form attached with
tender are liable to be rejected.
G. Any change in format or conditional Bank Guarantee will not be accepted and
the bidder will be considered non-responsive.
H. All the bidders are instructed to fill in information strictly in accordance with
the format given in the checklist /qualification document / tender document.
I. It is mandatory for the bidders to supply each and every information as asked
strictly in electronic format at appropriate places only.
J. Blank / insufficient information shall be treated as nil information and shall
result in disqualification.
K. Even if the bidder has been qualified in a similar or larger size of project in the
past, it shall not be deemed to be a ground / reason for not giving required
information for this work / bid.
L. Information supplied for earlier projects shall not be considered while
evaluation of this bid. The Government will not ask for any other information,
unless it is found absolutely necessary by the competent authority.
M. If found necessary, the contractor will be intimated for negotiation,
Works following documents shall be submitted in electronic format only through
online by scanning and the (i) Bid Document Fee / Tender Fee (ii) Bid Security /
EMD should be sent in original to the Tender opening authority through RPAD, so
as to reach the Executive Engineer on or before 12.02.2026 up to 16.00 Hrs.
This is a two bid tendering system and the tender documents consists of –
Part I: Technical Bid
Part II: Price Bid.
The Tenderer shall submit this tender in accordance with the various instructions
included in the tender documents.
PREQUALIFICATION / TECHNICAL BID:-
The Tenderer shall have to submit Prequalification Bid with related documents
“On Line” through (n) procure website and “Hard Copy” through RPAD / Speed
This cover shall contain following:
1. Rs. 10,000/- (Ten Thousand Only) in the form of Demand Draft/Pay Order from
any Nationalized bank or banks approved as per government of Gujarat finance
department GR NO FD/MSM/e-file/04/2023/4020/DMO Date 11/03/2024 and GR No
FD/MSM/e-File/4/023/0057/D.M.O Date 21/04/2023 only and it should be in favour
of “Municipal Commissioner”, Vadodara Municipal Corporation at Vadodara only to be
forwarded towards non-refundable Tender Fee.
2. Rs.9,97,066/- (Rupees Nine Lac Ninty Seven Thousand & Sixty Six Only) in the form of
Demand Draft or Pay Order or Bank Guarantee of any Nationalized Bank or banks
approved as per government of Gujarat finance department GR NO FD/MSM/e-
file/04/2023/4020/DMO Date 11/03/2024 and GR No FD/MSM/e-
File/4/023/0057/D.M.O Date 21/04/2023 only and it should be in in favour of
Municipal Commissioner, Vadodara Municipal Corporation only to be forwarded
towards EMD. Validity period minimum 6 months. Forwarding letter along with
conditions/clarifications, if any and necessary documents as below.
a) Copies of original documents defining the constitution of legal & stable power of
attorney of the signatory of the tender to commit the Tender.
b) Copies of Provident Fund, GST, ESIC Registration certificate shall be submitted along
c) The Tenderer must have registered in appropriate class for electrical category either
with Vadodara Municipal Corporation, Central / State / PWD / M.E.S./Semi Govt.
organizations / MGVCL / UGVCL / DGVCL / PGVCL / DISCOM / GEDA and MSME. If
contractor have not registered with the VMC, then after getting work order he should
get registered with the VMC within 30 days.
d) The Bidder should be original manufacturer /their sole selling agents / authorized
distributers / dealers / channel partner. In case other than the Original manufacturer,
a specific authorization letter of the manufacturer is required to be submitted on
company letter head for PV Module and Invertor (PCU).
e) Valid Solvency Certificate of Rs.150 Lac shall be attached along with tender
f) Bidder shall have financial capability of average annual financial turnover during the
last three years, ending 31st March of the previous financial year, should be at least
30% of the estimated cost (Rs 149.56 Lac).
g) Tenderer should have carried out single similar nature job works during last 7 years
ending last day of month previous to the one in which applications are invited should
be either of the following:-
Three similar completed works costing not less than the amount equal to 40% of the
estimated cost of SETC Work (Rs. 199.41 lac).
Two similar completed works costing not less than the amount equal to 50% of the
estimated cost of SETC Work (Rs. 249.27 lac).
One similar completed works costing not less than the amount equal to 80% of the
estimated cost of SETC Work (Rs.398.83 lac).
Similar work means “Design, Engineering, Supply Installation testing and
commissioning of Solar Trees in Municipal Corporation, Central / State / PWD / M.E.S.
/ Semi Govt.” Copies of work order and completion certificate from the concerned
organization in the name of tenderer shall be submitted. Following enhancement
factors will be use for the cost of work executed and financial figures to common base
for the value of work order.
M.F. as Amount in
mentioned Rupees Multiplying Rs
here under Factor
h) Organization setup.
i) Detailed technical literature/catalogue shall be submitted along with the tender.
j) Audited balance sheet for last three years duly attested by C.A.
k) Last receipt of Provident fund, GST and ESIC
1) The contractor should have not been debarred from any Central/ State Govt.
Department/ Agency. i.e. Contractor should not be under debarment at the time of
submission of bid.
2) The company/ its product of SPV modules must be registered with MNRE (as per
3) The Bidder shall be either a body incorporated in India under the Companies Act,
or2013 & shall be engaged in the business of Solar Power.
4) The Bidder shall have experience in Solar PV Power Project (s) from last five (5) years
from the date of submission of Bid. A copy of Work Order/ LoI and Completion
Certificate shall be furnish along with the bid in support of above.
5) The Bidder shall have DESIGN, ENGINEERING, SUPPLY, INSTALLATION, TESTING,
COMMISSIONING, SYNCHRONIZING WITH THE GRID OF GRID CONNECTED SOLAR
TREE SOLAR PV SYSTEMS as EPC Contractor (Sole Bidder) of cumulative installed
capacity of 300KW or above in India from 1 April 2016 as on the Deadline for
Submission to meet the cumulative capacity.
6) The Bidder shall also submit documentary proof of achievement of targeted performance
generation (CUF) Certificate of at least one solar tree of 10 kW or above installed in India
and have completed minimum two (2) years operation & maintenance and the same shall
be certified by the Developer/Client/Owner of that particular solar PV power plant.
7) Bidder shall submit, in support to the above Point (i), the list of projects commissioned
along with their work order/ LOA and the commissioning certificates/ charging certificate
from DisCom confirming the commissioning of the plant. In case the Bidder wants to meet
the eligibility criterion through its own power plant, then a certificate from Chartered
Accountant to that effect will be required to be submitted.
8) The Bidder shall have qualified manpower with relevant design, engineering,
procurement, supply, project execution expertise and experience for development of Solar
9) Joint venture prohibition: - joint venture (JV) OR Consortium bids shall not be allowed.
10) The bidder should submit the “NEEGG”(Net Electrical Energy Generation Guarantee)
Annexure on Rs 300 Non Judicial stamp paper with Notarized. If this document is not found
enclosed in the Technical bid part-I than the tender will be outright reject.
Tenderer is not allowed to mention rates in Technical Bid. All the Tender pages must
be duly sealed & signed. Original tender documents must be submitted as it is. This
cover must be superscripted as “Prequalification/Tender Bid, Name of Work, and
Date of Opening & PRO No.
1) Price Bid cover (Hard Copy) shall not be accepted by Vadodara Municipal
Corporation by post or personally. The Price Bid shall be submitted through the
website of (n) procure only. The bidder who had completed the formalities of
registration with the agency “(n) procure” are only eligible to quote the price bid of this
tender through the web site https://www.tender.nprocure.com within the stipulated time
limit mentioned in the advertisement.
2) All bidders can submit the price bid only on web site. The prices for offer are to be
quoted by the bidders at specified spaces. No condition will be accepted along with the
IMPORTANT NOTE ::-
1) Technical Bid along with EMD & Tender fee must be sealed & super scribed and shall be
submitted to the Executive Engineer, Futuristic Planning Cell (FPC) Vadodara Municipal
Corporation, Khanderao Market Building, Rajmahal Road, Vadodara–390001 by Speed
Post/Registered Post only on or before up to 16.00 hours of due date . In absence of
physical & On Line Technical bid the tender is liable to be rejected.
2) Tenders received after due date will be rejected. Tender received or due to be received
after the time limit is over will not be accepted and if inadvertently accepted will not be
opened and will be returned unopened. The tenders who may get opened before the due
date with no indication having been given on the outside of the envelope are liable to be
3) On Line Technical Bid and Price Bid shall be submitted on or before 13:00 hr. on the due
4) If EMD & Tender Fee are not found enclosed in part-I, than the tender will be out right
5) Price- Bid will be opened after scrutiny of pre-Qualification Bid. Price bid shall not be
opened if Tenderer is disqualified at pre- qualification stage.
6) Evaluation of Technical Bid (P.Q. Bid) shall be done on the basis of submitted authentic
documents only.
7) Once the pre-qualification bid is opened the Tenderer shall not submit any documents/
clarifications without request/approval of authority. Conditional Tenders shall not be
accepted & shall be rejected.
8) Demand Draft of tender fee should separately attached with prequalification documents
only in case the Tenderer who download tenders from website.
9) The Cost of Bid Document will not be refunded under any circumstance.
10) Tender copy should be reached only by Registered post / Speed post at Executive
Engineer, Futuristic Planning Cell (FPC) Vadodara Municipal Corporation, Khanderao
Market Building, Rajmahal Road, Vadodara–390
11) The Tenderer are advised to read carefully & study all the pages of tender document
which forms part & parcel of the contract Document.
12) Tender shall visit the site before quoting tender to understand site condition to execute
the work and if required get necessary data at their own cost.
13) Municipal Commissioner reserves right to accept any or reject all tenders without
assigning any reason thereof.
14) Original manufacturer / their sole selling agents /authorized distributers /dealers
/channel partner shall not be required to registered in appropriate class for electrical
category in Vadodara Municipal Corporation. If make of the material is not registered in
VMC, vendor registration of material shall be required in VMC after receiving work order.
15) Tenderer shall have to submit checklist with pre-qualification Bid. It should be
properly typed with seal & signature. Checklist should be as per format given in this tender
16) Bidder submit online Tender PQ bid but not submit hardcopy of Tender PQ Bid at
Schedule time period than Bidder have Abeyance 06 month for fill up tender in VMC
HOD Futuristic Planning Cell
Municipal Corporation
INSTRUCTIONS TO BIDDERS
1.1 QUALIFICATION CRITERIA:
Experience of having successfully completed similar works during last 7(Seven) years
ending last day of month previous to the one in which applications are invited should be
either of the following: -
Three similar completed works costing not less than the amount equal to 40% of the
estimated cost of SETC Work (Rs. 199.41 lac).
Two similar completed works costing not less than the amount equal to 50% of the
estimated cost of SETC Work (Rs. 249.27 lac).
One similar completed works costing not less than the amount equal to 80% of the
estimated cost of SETC Work (Rs.398.83 lac).
Similar work means “Design, Engineering, Supply Installation testing and
commissioning of Solar Trees in Municipal Corporation, Central / State / PWD / M.E.S.
/ Semi Govt.” Copies of work order and completion certificate from the concerned
organization in the name of tenderer shall be submitted. Following enhancement
factors will be use for the cost of work executed and financial figures to common base
for the value of work order.
4.5.1 Qualification will be based on Applicant’s meeting all the following minimum pass/
fail criteria regarding the Applicant’s general and particular experience, personnel
and equipment capabilities and financial positions, as demonstrated by the
applicant’s responses in the forms attached to the letter of application ( specified
requirement for joint ventures are given under para 4.6 below ) Subcontractors
experience and resources shall not be taken in to account in determining the
applicants compliance with the qualifying criteria
To qualify for more than one contract, the applicant must demonstrate having
experience and resources sufficient to meet the aggregate of the qualification criteria
for each contract given in paragraphs 4.5.4, 4.5.5 and 4.5.9 below
4.5.2 Base year and Escalation
The base year shall be taken as Current financial year
Following enhancement factors will be used for the costs of works executed and the
financial figure to a common base value for works completed in India.
Year Financial Year Multiplying factor
Base year of inviting tender 2024-2025
Applicant should indicate actual figures of costs and amount for the works executed by
them without accounting for the above-mentioned factors.
In case the financial figures and value of completed works are in foreign currency the
above enhanced multiplying factors will not be applied. Instead, the current market
exchange rate (State Bank of India BC Selling rate as on the last date of submission of the
bid) will be applied for the purpose of conversion of the amount in foreign currency into
4.5.3. General Experience.
The Applicant shall meet with the following minimum criteria:
o Average Annual Financial Turnover during the last 3 years, should be
at least 30% of the estimated cost
4.5.4. Personnel Capabilities.
o Availability for his work of personnel with adequate experience as
required; as per Appendix.
4.5.5. Financial Position
The Applicant should give undertaking that he has access to, or has available,
liquid assets (aggregate of working capital, cash in hand and uncommitted
bank guarantees) and / or credit facilities up to 25 percent of the value of the
contract / contracts applied.
4.5.6. The audited balance sheets for the last five years should be submitted, which must
demonstrate the soundness of the applicant’s financial position, showing long – term
profitability including an estimated financial projection for the next two years If
necessary, the employer will make inquiries with the applicant’s bankers.
4.5.7. Litigation History
The Applicant should provide accurate information on any litigation or
arbitration resulting from contracts completed or under execution by him
over the last five years. A consistent history of awards against the Applicant
or any partner of a joint venture may result in failure of the applicant.
4.5.8. Disqualification
Even though the applicants meet the above criteria, they are subject to be
disqualified if they have:
Made misleading or false representation in the forms, statements submitted,
and / or Record of poor performance such as abandoning the work,
rescinding of contract for which the reasons are attributable to the non –
performance of the contractor; consistent history of litigation awarded
against the applicant or financial failure due to bankruptcy. The rescinding of
contract of a joint venture on account of reasons other than non –
performance, such as Most Experienced partner of joint venture pulling out,
court directions leading to breaking up of a joint venture before the start of
work, which are not attributable to the poor performance of the contractor
will, however, not affect the qualification of the individual partners.
4.8 Even though the bidders meet the above qualifying criteria, they are subject to
be disqualified if they have:
- Made misleading or false representation in the forms, statements and
Attachments the submitted in proof the qualification requirements; and / or
Record of poor performance such as abandoning the works, not properly
completing the contract, inordinate delay in completion, litigation history, or
financial failures etc.; and/ or
- Participated in the previous bidding for the same work and had quoted
unreasonably high bid prices and could not furnish rational justification to the
2. One bid per bidder
5.1. Each bidder shall submit only one bid for one package. A bidder who submits or
participates in more than one bid (other than as a subcontractor or in cases of
alternatives that have been permitted or requested) will cause all the proposals with
the bidder’s participation to be disqualified.
3. Cost of Bidding
6.1. The bidder shall bear all costs associated with the preparation and submission of his
Bid, and the Employer will in no case be responsible and liable for those costs.
7.1. The Bidder, at the Bidder’s own responsibility and risk is encouraged to visit and
examine the Site of work and its surrounding and obtain all information that may be
necessary for preparing the Bid and entering into a contract for construction of the
The costs of visiting the site shall be at the Bidder’s own expense.
B. BIDDING DOCUMENTS
5. Content of Bidding Documents
5.1 The set of bidding documents comprises the documents listed below and addenda
issued in accordance with Clause 10:
Section Particulars Volume No.
- Invitation for Bids
1 Instructions to Bidders I
2 Qualification Information, and other forms
3 Conditions of Contract
4 Contract Data
5 Technical Specifications II
6 Form of Bid III
7 Bill of Quantities
8 Securities and other forms
10 Documents to be furnished by bidder V
8.2. Volumes I, II, III and IV are available online and documents to be furnished by the
bidder in compliance to section 2 will be prepared by him and furnished as Volume-
V in two parts (refer clause 12).
8.3. The bidder is expected to examine carefully all instructions, conditions of contract,
contract data, forms, terms, and technical specifications, bill of quantities, forms,
Annexes and drawings in the Bid Document. Failure to comply with the requirements
of Bid Documents shall be at the bidder’s own risk. Pursuant to clause 26 hereof,
bids which are not substantially responsive to the requirements of the Bid
Documents shall be rejected.
6. Clarification Bidding Documents
6.1 A prospective bidder requiring any clarification of the bidding documents may
notify the Employer in writing or through E-mail at the Employer’s address
indicated in the invitation to bid. The Employer will respond to any request for
clarification which he received earlier than 15 days prior to the deadline for
submission of bids. Employer’s response will be published on website including a
description of the enquiry but without identifying its source.
7. Amendment of Bidding Documents
7.1 Before the deadline for submission of bids, the Employer may modify the bidding
documents by issuing addenda.
10.2. Any addendum thus issued shall be part of the bidding documents. The Employer
will assume no responsibility for the same.
10.3. To give prospective bidders reasonable time in which to take an addendum into
account in preparing their bids, the Employer may, at his discretion, extend as
necessary the deadline for submission of bids, in accordance with Sub-Clause
PREPARATION OF BIDS
8. Language of the Bid
8.1 All documents relating to the bid shall be in the English language.
9. Documents Comprising the Bid
12.1. The bid be submitted by the bidder as Volume V of the bid document (refer Clause
8.1) shall be in two separate parts:
Part I shall be named “Technical Bid” and shall comprise
(i) Bid Security in the form specified in Section
(ii) Qualification Information and supporting documents as specified in Section
(iii) Certificates, undertakings, affidavits as specified in Section
(iv) Any other information pursuant to Clause 4.5 of these instructions
(v) Undertaking that the bid shall remain valid for the period specified in Clause
Part II shall be named “Financial Bid” and shall comprise
(i) Form of Bid as specified in Section
(ii) Priced Bill of Quantities for items specified in Section
12.2. The Bidder shall submit the details / information pertaining to each part i.e.
technical as well as financial and must be submitted online only.
12.3. Following documents will be deemed to be part of the bid.
Section Particulars Volume No.
Invitation for Bids (IFB)
1 Instruction to Bidders Volume I
3 Conditions of Contract
4 Contract Data
5 Specifications Volume II
9 Drawings Volume IV
10.1 The Contract shall be for the whole works as described in Sub-Clause 1.1, based on
the priced Bill of Quantities submitted by the Bidder.
10.2 The bidder shall fill in rates and prices and line item total (both in figures and words)
for all items of the Works described in the Bill of Quantities along with total bid price
(Both in figures and words). Items for which no rate or price is entered by the bidder will not
be paid for by the Bill of Quantities.
10.3 All duties, taxes, and other levies except GST payable by the contractor under the
contract, or for any other cause shall be included in the rates, prices and total Bid
Price submitted by the Bidder. (GST will be including)
10.5 The rates and prices quoted by the bidder are subject to adjustment during the
performance of the Contract in accordance with the provisions of Clause 47 of the
Condition of Contract (Irrespective of the time limit and Bid Amount)
11. Currencies of Bid and Payment
11.1 The unit rates and the prices quoted by the bidder shall be entirely in Indian Rupees.
All payments shall be made in Indian Rupees.
12. Bid Validity
Tenders submitted by Tenderer shall remain valid for acceptance for a period
of 120 days from the date of opening of the Price-Bid. The Tenderer shall not
be entitled during the said period of 120 days, without the consent of writing of
the owner to revoke or cancel his tender or to vary the tender given or any
terms thereof. In case of tenderer revoking or cancelling his tender or vary any
term in regard to thereof without the consent of owner in writing, the owner
shall forfeit earnest money paid by him along with the tender.
12.1 In exceptional circumstances, prior to expiry of the original time limit, the
Employer may request that the bidders may extend the period of validity for a
specified period. A bidder may refuse the request without forfeiting his bid
security. A bidder agreeing to the request will not be required or permitted to
modify his bid, but will be required to extend the validity of his security for a
period of the extension, and in compliance with Clause 16 in all respects.
#16. Bid Security
EARNEST MONEY DEPOSIT
The Tenderer must pay earnest money as given in the notice inviting Tenders and
attach with the technical bid of Tender. The earnest money can be paid Nationalized
Bank’s Demand draft/Pay Order/Bank Guarantee (Validity period minimum
months after award the work order BG validity period is 5 Years) in favor of
Municipal Commissioner; Vadodara EMD shall be attached with Technical Bid.
Nationalized Bank or banks approved as per government of Gujarat finance
department GR NO FD/MSM/E-file04/2023/4020/DMO Date 11/03/2024 and GR
No FD/MSM/e-File/4/2023/0057/D.M.O Date 21/04/2023It will be released after
one year from the completion of the O&M work After award the work order
contractor should be submit renew or new BG which validity period is 5 Years
Note: No interest shall be paid on the earnest money deposit. The earnest money of
the unsuccessful Tenderer will be refunded within reasonable period without any
The earnest money deposited by successful Tenderer will be retained towards the
Security Deposit for the fulfillment of the Contract, but shall be forfeited, if the
Tenderer fails to execute the agreement within 15 days after the letter of acceptance
SECURITY DEPOSIT
The person/persons whose tender is accepted (herein after called the contractor)
shall pay 3% Security Deposit of the order value within 15 days from the date of
receipt of the order in the form of D.D./Bank Guarantee (validity period minimum
Years of any Nationalized Bank in favour of Municipal commissioner, Vadodara
Municipal Corporation. It will be released after completion of the 5 Years of
Maintenance work.
16.1. Any bid not accompanied by an acceptable Bid Security and not secured as
indicated in Sub-Clauses 16.1 and 16.2 above shall be rejected by the Employer as
non-responsive.
16.2. The Bid Security of unsuccessful bidders will be returned within 28 days of the end
of the bid validity period specified in Sub-Clause 15.1 except L2 Agency.
16.5 The Bid Security of the successful bidder will be discharged when the bidder has
signed the Agreement and furnished the required Performance Security.
16.6. The bid Security may be forfeited
(a) If the Bidder withdraws the bid after Bid opening during the period of Bid
(b) If the Bidder does not accept the correction of the Bid Price, if any or
(c) In the case of a successful Bidders, if the Bidder fails the specified time limit to
(i) Sign the Agreement; or
(ii) Furnish the requirement Performance Security.
(iii) #If found necessary, the bidder will be intimated for negotiation, He will be
intimated maximum three times within the validity period for negotiation,
If contractor does not respond in time, his Bid Security (EMD) will be
forfeited and his tender will be rejected. Punitive action will be taken on
such contractors. (As per GoG R&B Dept’s Gr. No. S/22/2017/6369/D,
17. Alternative Proposals by Bidders.
17.1. Bidders shall submit offers that fully comply with the requirements of the bidding
documents, including the conditions of contract (including mobilization advance or
time for completion), basic technical design as indicated in the drawing and
specifications. Conditional offers or alternative offers will not be considered further
in the process of tender evaluation.
18. Format and Signing of Bid
18.1. The Bidder shall prepare documents comprising the bid as described in Clause 12 of
these Instructions to bidder as the “Technical Bid” and “Financial Bid” in separate
parts to be uploaded.
C. SUBMISSION OF BIDS
20. Deadline for Submission of the Bids
20.1. Complete Bids must be received online by the Employer at the tender website
specified above not later than the date indicated in appendix.
20.2. The Employer may extend the deadline for submission of bids by issuing an
amendment in accordance with Clause 10, in which case all right and obligation of
the Employer and the bidders previously subject to the original deadline will then be
subject to the new deadline.
22. Modification and Withdrawal of Bids
22.1. Bidders may modify or withdraw their bids online before the deadline prescribed in
Clause 20 or pursuant to Clause
22.3. No bid shall be modified or withdrawn after the deadline for submission of Bid.
22.4. Withdrawal or modification of a bid between the deadline for submission of bids
and the expiration of the original period of bid validity specified in Clause
above or as extended pursuant to Clause 15.2 may result in the forfeiture of the Bid
security pursuant to Clause
D. BID OPENING AND EVALUATION
23. Bid Opening
23.1 The Employer will open all the Bids received including modifications made pursuant
to Clause 22, in the presence of the Bidders or their representatives who choose to
attend at time, date and the place specified in Appendix in the manner specified in
Clauses 20 and 23.3, In the event of the specified date of Bid opening being declared
a holiday for the Employer, the Bids will be opened at the appointed time and
location on the next working day.
23.3. The “Technical Bid” shall be opened. The amount, form and validity of the bid
security furnished with each bid will be announced. If the bid security furnished does
not conform to the amount and validity period as specified in the invitation for bid
(ref. Column 4 and paragraph 3), and has not been furnished in the form specified in
Clause 16, the technical bid will not be opened.
23.4. (i) Subject to confirmation of the bid security by the issuing Bank, the bids
accompanied with valid bid security will be taken up for evaluation with
respect to the Qualification information and other information furnished in
part I of the bid pursuant to Clause 12.1.
(ii) If required, the bidder will be asked in writing to clarify his Qualification
Documents with respect to any required clarification.
(iii) The bidders will respond in not more than 7 days of issue of the clarification
(iv) Immediately (usually within 3 or 4 days), on receipt of these clarification the
Evaluation Committee will finalize the list of responsive bidders whose
financial bids are eligible for consideration.
23.6 At the time of opening of “Financial Bid”, the names of the bidders were found
responsive in accordance with Clause 23.4(iv) will be announced. The bids of only
these bidders will be opened. The responsive Bidders’ names, the Bid prices, the
total amount of each bid, any discount and such other details as the Employer may
total amount of each bid, any discount and such other details as the Employer may
consider appropriate, will be announced by the Employer at the opening.
23.7 the time of opening of “Financial Bid”, the names of the bidders were found
responsive in accordance with Clause 23.4(iv) will be announced. The bids of only
these bidders will be opened. The responsive Bidders’ names, the Bid prices, the
total amount of each bid, any discount, and such other details as the Employer may
total amount of each bid, any discount, and such other details as the Employer may
consider appropriate, will be announced by the Employer at the opening.
23.8 In case bids are invited for more than one package, the order for opening of the
“Financial Bid” shall be in order of Estimated amount of Bids from highest to lowest.
23.9 The Employer shall prepare minutes of the Bid opening, including the information
disclosed to those present in accordance with Sub-Clause 23.6.
24.1 Information relating to the examination, clarification, evaluation, and comparison of
Bids and recommendations for the award of a contract shall not be disclosed to
Bidders or any other persons not officially concerned with such process until the
award to the successful Bidder has been announced. Any effort by Bidder to
influence the Employer’s processing of Bids or award decisions may result in the
rejection of his Bid.
25. Clarification of Financial Bids
25.1. To assist in the examination, evaluation, and comparison of Bids, the Employer may,
at his discretion, ask any Bidder for clarification of his Bid, including breakdowns of
unit rates. The request for clarification and the response shall be in writing or by e-
mail, but no change in the price or substances of the Bid shall be sought, offered, or
permitted except as required to confirm the correction of arithmetic errors
discovered by the Employer in the evaluation of the Bids.
25.2 Subject to sub-clause 25.1, no Bidder shall contact the Employer on any matter
relating to his Bid opening to the contract is awarded. If the Bidder wishes to bring
additional information to the notice of the Employer, it should do so in writing.
25.3. Any effort by the Bidder to influence the Employer in the Employer's bid evaluation,
bid comparison or contract award decision may result in the rejection of the Bidders’
26. Examinations of Bids and Determination of Responsiveness
26.1 During the detail evaluation of "Technical Bid", the Employer will determine whether
each Bid (a) meets the eligibility criteria defined in Clause 3 and 4; (b) has been
properly signed; (c) is accompanied by the required securities and; (d) is
substantially responsive to the requirements of the Bidding document. During the
detailed evaluation of the “Financial Bid”, the responsiveness of the bids will be
further determined with respect to the remaining bid conditions, i.e., priced bill of
quantities, technical specifications, and drawings.
26.2 A substantially responsive “Financial Bid” is one which confirms all the terms,
conditions and specifications of bidding documents, without material deviation or
reservation. A material deviation or reservation is one (a) which affects in any
substantial way the scope, quality, or performance of the Works; (b) which limits in
any substantial way, inconsistent with the Bidding documents, the Employer’s rights
or the Bidder’s obligations under the Contract; or (c) whose rectification would affect
unfairly the competitive position of other Bidders presenting substantially
responsive Bids.
26.3 If a “Financial Bid” is not substantially responsive, it will be rejected by the
Employer, and may not subsequently be made responsive by correction or
withdrawal of the non-conforming deviation or reservation.
29. Evaluation and Comparison of Financial Bids
29.1. The Employer will evaluate and compare only the Bids determined to be substantially
responsive in accordance with Sub-Clause 26.2.
29.3. The Employer reserves the right to accept or reject any variation or deviation.
Variation and deviations and other factors, which are in excess of the requirements of
the Bidding documents or otherwise result in unsolicited benefits for the Employer,
shall not be taken in to account in Bid evaluation.
29.4. The estimated effect of the price adjustment conditions under Clause 47 of the
Conditions of Contact, during the period of implementation of the Contract, will not
be taken in to account in Bid evaluation.
29.5. If the Bid of the successful Bidder is seriously unbalanced in relation to the Engineer’s
estimate of the cost of work to be performed under the contract the Employer may
require the Bidder to produce detailed consistency of those prices with the
construction methods and schedule proposed. After evaluation of the price analyses,
the Employer may require that the amount of the performance security set forth in
Clause 34 be increased at the expense of the successful /bidder to a level sufficient to
protect the Employer against financial loss in the event of default of the successful
Bidder under the Contract.
29.6. A bid which contains several items in the bill of Quantities which are unrealistically
priced low and which cannot be substantiated satisfactorily by the bidder may be
rejected as non-responsive.
E. AWARD OF CONTRACT
31. Award Criteria
31.1. Subject to Clause 32, the Employer will award the contract to the Bidder whose Bid
has been determined.
(i) to be substantially responsive to the Bidding documents and who has offered
the lowest evaluated Bid Price; and
(ii) to be within the available bid capacity adjusted to account for his bid price
which is the lowest evaluation in any of the packages opened earlier than the
one consideration.
In no case, the contract shall be awarded to any bidder whose available bid
capacity is less than the evaluated bid price, even if the said bid is the lowest
evaluated bid. The contract will in such cases be awarded to the next lowest bidder
at his evaluation bid price.
32. Employer’s Right to Accept any Bid and to Reject any or all Bids
32.1. Notwithstanding Clause 31, the Employer reserves the right to accept or reject any
Bid, and to cancel the Bidding process and reject all Bids, at any time prior to the
award of contract, without thereby incurring any liability to the affected bidder or
Bidder or any obligation to inform the affected Bidder or Bidders of the grounds for
the Employer’s action.
33. Notification of Award and Signing of Agreement
33.1. The Bidder whose Bid has been accepted will be notified of the award by the
Employer prior to expiration of the Bid validity period by cable, telex or facsimile
confirmed by registered letter. This letter (hereinafter and in the condition of
contract called the “Letter of Acceptance”) will state the sum that the Employer will
pay the Contractor in consideration of the execution, completion, and maintenance of
the Works by the Contractor as prescribed by the Contract (hereinafter and in the
Contract called the “Contract Price”).
33.2 The notification of award will constitute the formation of the contract, subject only to
the furnishing of a performance security in accordance with the provisions of Clause.
33.3. The Agreement will incorporate all agreements between the Employer and the
successful Bidder. It will be signed by the Employer and to the successful Bidder,
within 28 days following the notification of award along with the Letter of
Acceptance. Within 21 days of receipt, the successful Bidder will sign the Agreement
and deliver it to the Employer.
33.4. Upon the furnishing by the successful Bidder of the Performance Security, the
Employer will promptly notify the other Bidders that their Bids have been
37. Corrupt of Fraudulent Practices
37.1 The Employer will reject a proposal if it determines that the Bidder recommended
for award has engaged in corrupt or fraudulent practices in completing for the
contract in question and will declare the firm ineligible, either indefinitely or for a
stated period of time, to be awarded a contract with National Highways Authority of
India/ State PWD and any other agencies, if it at any time determines that the firm
has engaged in corrupt or fraudulent practices in completing for the contractor, or
37.2 Furthermore, Bidders shall be aware of the provision stated in Sub- Clause 59.2 of
the Conditions of Contract.
APPENDIX TO ITB
Clause Reference
With respect to
1. The Name of the Employer is ………………………. [ Cl.1.1]
2. The last Seven years.
Base Year 2025-2026
3. This Annual Financial Turnover Amount is Rs……… [Cl.4.5.3 (a)]
4. Value of Work is Rs. 4,98,53,281/-
6. The cost of electrical work is Rs.
7. The cost of water supply / sanitary works is Rs.
8. Liquid assets and / or availability of credit facilities is 25% of [Cl.4.5.6 ]
9. Price level of the financial year 2025-26 [Cl. 4.5.2]
10. The pre-bid meeting will take place at The Executive Engineer on [Cl. 9.2.1]
11. The technical Bid will be intimated later after evaluation.
12. Address of the Employer:
The Executive Engineer , Futuristic Planning Cell (FPC),
2nd floor, Vadodara Municipal Corporation, Khanderao Market
Building, Rajmahal Road, Vadodara-390001
14. The bid should be submitted latest by As stated on online [Cl. 20.1 & 20.2]
15. The bid will be opened at the office of the The Executive Engineer, [Cl. 23.1 ]
Water Works : Ele/Mech., As stated on online NIT
16. The Bank Draft in favor of Municipal Commissioner, Vadodara
Municipal Corporation, Vadodara.
18. Escalation factors (for the cost of works executed and financial [Cl.4.5.2]
figure to a common base value) for works completed
Year Financial Year Multiplying factor
Base year of inviting tender
List of Key Personnel to be deployed on Contract Work
(Reference Cl. 4.5.4)
# Employment of a qualified site Engineer by the Contractor.
The Contractor shall employ full-time technically qualified staff during the execution of this
work as under: -
1. One graduate Electrical Engineers and three diploma Electrical Engineer when cost of
the work to be executed is more than Rs.50 lakhs.
2. One graduate & two Diploma, Electrical Engineers when the cost of the work to be
executed is more than Rs.15 lakhs but less than Rs.50 lakhs.
3. One graduate & one Diploma, Electrical Engineers when the cost of work is less than
Rs.15 lakhs but more than Rs.5 lakhs.
4. Minimum one Diploma Electrical Engineers for the work when the cost of work to be
executed is less than Rs. 5 lakhs. The Engineer so employed for the Government work
must have sufficient experience to handle the work independently. Such an Engineer
shall have to stay at the site of work and he shall not be entrusted with other duty
except this work.
In case the contractor or partner of the contractor firm is a Graduate Engineer in
respective field, Employment of a separate Engineer will not be necessary provided
that the Engineer partner himself attends the execution of the work on the site.
Within 15 days of issue of work-order the Contractor will have to furnish to the Deputy
Executive Engineer-in-charge of the work the Name, Qualifications, copy of mark sheet,
Colour Photograph and the appointment order issued such engineers engaged for this
contract work. If 15 days after issue of work order such designated Site Engineers do
not resume or do not remain present on site of work, the recovery at the rate of
Rs.15000/Month per Engineer will be made from the bills/deposit/dues of the
contractor. Such recovery shall be non-refundable.
QUALIFICATION INFORMATION
QUALIFICATION INFORMATION
The information to be filled in by the Bidder in the following pages will be used for
the purpose of post qualification as provided for in Clause 4 of the Instruction to Bidders.
This information will not be incorporated in the Contract.
1. For Individual Bidders
1.1 Constitution or legal status of Bidder
Place of registration
Principal place of business
Power of attorney of signatory of Bid
1.2 Total value of Electrical engineering 2025-26
Work performed in the last Seven years 2023-24
(in Rs. Lakhs) 2022-23
1.3.1 Work performed as prime contractor, work performed in the past as a nominated
sub-contractor will also be considered the sub-contract involved execution of all
main items of work described in the bid documents, provided further that all other
qualification criteria are satisfied (in the same name) on works of a similar nature
over the last Seven years** and in current year before the submission of the bid.
Project Name of Description Contract Value of Date Stipulated Actual date Remark
Name the of work No. contract of period of of explaining
Employer (Rs. issue completion completion* reasons for
Crore) of delay &
order Completed
*Attach certificate(s) from the Engineer(s)in-charge
** Immediately preceding the financial year in which bids are received.
1.4 Information on Bid Capacity (works for which bids have been submitted and works
which are yet to be completed) as on the date of this bid.
(A) Existing commitments and on-going works:
Descriptio Plac Contrac Name & Value Stipulate Value of Anticipate
n of e& t No. Address Contrac d Period Works* d of
works Stat of t (Rs. of remainin completio
e Employe Cr) Completio g to be n
*Attach certificate (s) from the Engineer(s) in-charge
** Immediately preceding the financial year in which bids are received.
1.5 Availability of key items of Contractors Equipment for carrying out the works (Ref.
Clause 4.5.5). The Bidder should list all the information requested below.
Item of Requirement Availability Proposals Remarks
Equipment NO Capacity Owned/ Nos/. Age/ (from
Leased to be Capacity Conditions whom to
1.6 Qualifications and experience of key personnel required for administration and
execution of the contract. Attach biographical data. Refer also to Sub Clause 9.1 of
the Conditions of Contract.
Position Name Qualification Year of Year of
Experience experience in
(General) the proposed
Project Manager
1.7 Financial reports for the last five years: balance sheets, profit and loss statements,
auditors’ reports (in case of companies/corporations), etc. List them below and
1.8 Evidence of access to financial resources to meet the qualification requirements:
cash in hand, lines of credit, etc. List them below and attach copied documents.
1.9 Name, address, and telephone, telex, and fax numbers of the Bidders bankers who
may provide references if contacted by the Employer.
1.10 Information on Litigation history in which the Bidder is involved.
Other Party Employer Cause of Amount Remarks
(ies) Dispute Involved showing
1.12. Statement of compliance under the requirements of Sub Clause 3.2 of the instruction
to Bidders. (Name of Consultant engaged for project preparations is * ............................. )
1.13 Proposed work method and schedule. The Bidder should attach descriptions,
drawings and charts as necessary to comply with the requirements of the Bidding
documents. (Refer ITB Clause 4.1)
3. Additional Requirements
3.1 Bidders should provide any additional i n fo r ma t i o n required to fulfill the
requirements of Clause 4 of the Instructions to the Bidders, if applicable.
(ii) Undertaking
SAMPLE FORMAT FOR EVIDENCE OF ACCESS TO OR
AVAILABILITY OF CREDIT FACILITIES
(CLAUSE 4.5.6 OF ITB)
BANK CERTIFICATE
This is to certify that M/s. is a reputed company
with a good financial standing.
If the contract for the work, namely is awarded to the
above firm, we shall be able to provide overdraft/credit facilities to the extent of Rs. …………………
to meet their working capital requirements for executing the above during the contract period.
(Signature) Name of Bank
Senior Bank Manager Address of the Bank
1. I, the undersigned, do hereby certify that all the statements made in the required
attachments are true and correct.
2. The undersigned also hereby certifies that neither our firm M/s.
_ have not abandoned any work
of Government of Gujarat/Government of India/any Board or Corporation under
Government of Gujarat/Government of India nor any contract awarded to us for such
works have been rescinded, during last five years prior to the date of this bid.
3. The undersigned hereby authorize(s) and request (s) any bank, person, firm or
corporation to furnish pertinent information deemed necessary and requested by the
Department to verify this statement or regarding any (our) competence and general
4. The Undersigned understands and agrees that further qualifying information may be
requested, and agrees to furnish any such information at the request of the Department/
Project implementing agency.
(Signed by an Authorized Officer of the Firm)
Title of Officer
I, the undersigned do hereby undertake that our firm
up to 25% of the value of the work during implementation of the contract.
(Signed by an Authorized officer of the firm)
Title of officer
CONDITIONS OF CONTRACT
Conditions of Contract
Table of Contents
A General Page D. Cost Control
1 Definitions 39 37 Bill of Quantities
2 Interpretation 40 38 Changes in the Quantities
3 Language and Law 41 39 Variations
4 Engineer’s Decisions 41 40 Payments for Variations
5 Delegations 41 41 Cash Flow Forecasts
6 Communications 41 42 Payment Certificates
7 Sub-Contractors 41 43 Payments
8 Other Contractors 41 44 Compensations Events
9 Personnel 42 45 Tax
10 Employer’s & Contractor Risk 42 46 Currencies
11 Employers Risks 42 47 Price Adjustment
12 Contractor’s Risk 42 48 Retention
13 Insurance 44 49 Liquidated damages
14 Site Investigations Reports 43 50 Bonus
15 Queries about the Contract 43 51 Advance Payment
16 Contractors to Construct the 43 52 Securities
17 The Works to be Completed By 43 53 Deleted
the Intended Completion Date
18 Approval by the Engineer 43 54 Cost of Repair
20 Discoveries 44 E. Finishing the Contract
21 Possession of the Site 44 55 Completion
22 Access to the Site 44 56 Taking Over
23 Instructions 44 57 Final Account
24 Disputes 44 58 Operating and Maintenance
25 Procedure for Disputes 44
26 Deleted 45 59 Terminations
60 Payment upon Terminations
B. Time Control 61 Property
27 Programme 46 62 Release from Performance
28 Extensions of the Intended
completion date
29 Deleted 46 F. Special Conditions of
30 Delays Ordered by The 47 63 Labour
Engineer 64 Compliance with labour
31 Management Meetings 47 65 Arbitration
32 Early Warning
C. Quality Control
33 Identifying Defects
35 Correction of Defects
36 Uncorrected Defects
CONDITIONS OF CONTRACT
1.1 Terms which are defined in the Contract Data are not also defined in the Conditions of
Contract but keep their defined meaning.
Bill of Quantities means the priced and completed Bill of Quantities forming part of
Compensation Events are those defined in Clause 44 hereunder.
The Completion Date is the date of completion of the Works as certified by the
Engineer in accordance with Sub Clause
The Contract is the contract between the Employer and Contractor to execute,
complete and maintain the Works till the completion of Defects Liability Period. It
consists of the documents listed in Clause 2.3 below.
The Contract data defines the documents and other information which comprise the
The Contractor is a person or corporate body whose Bid to carry out the Work has
been accepted by the Employer.
The Contractor’s Bid is the completed Bidding document submitted by the Contractor
to the Employer and includes Technical and Financial Bids.
The Contract Price is the price stated in the Letter of Acceptance and thereafter as
adjusted in accordance with the provisions of the Contract.
Days are calendar days: months are calendar months.
The Defects Liability Period is the period named in the Contract Data and calculated
from the Completion Date.
The Employer is the party who will employ the Contractor to carry out the Works.
The Engineer is the person named in the Contract Data (or any other competent
person appointed and notified to the contractor to act in replacement of the Engineer)
who is responsible for supervising the Contractor, administering the Contract,
certifying payments due to the Contractor, issuing and valuing Variations to the
Contract, awarding extensions of time, and valuing the Compensations Events.
Equipment is Contractor’s machinery and vehicles brought temporarily to the site to
construct the Works.
The Initial Contract Price is the Contract Price listed in the Employer’s Letter of
The Intended Completion Date is the date on which it is intended that the Contractor
shall complete the Works. The Intended Completion Date is specified in the Contract
Data. The Intended Completion Date may be revised only by the Engineer by issuing
an extension of time.
Materials are all supplies, including consumables, used by the contractor for
incorporation in the works.
Plant is any integral part of the work which is to have mechanical, electrical, electronic
or chemical or biological functions.
The Site is the area defined as such in the Contract Data.
Site Investigation Reports are those which were included in the Bidding documents
and are factual interpretive reports about the surface and subsurface conditions at the
Specifications means the Specifications of the works included in the Contract and any
modification or addition made or approved by the Engineer.
The Start Date is given in the Contract Data. It is the date when the Contractor shall
commence execution of the works. It does not necessarily coincide with any of the Site
Possession Dates.
A Subcontractor is a person or corporate body who has a Contract with the Contractor
to carry out a part of the work in the Contract which includes work on the Site.
Temporary Works are works designed, constructed, installed, and removed by the
Contractor which are needed for construction or installation of the Works.
A Variation is an instruction given by the Engineer, which varies the Works. The
Works are what the Contract requires the Contractor to construct, install,
and turn over to the Employer, as defined in the Contract Data.
2. Interpretation
2.1 In interpreting these Conditions of Contract, singular also means plural, male
also means female or neuter and the other way around. Heading have no
significance. Words have their normal meaning under the language of the
Contract unless specifically defined. The Engineer will provide instructions
clarifying queries about Conditions of Contract.
2.2 If sectional completion is specified in the Contract Data, references in the
Conditions of Contract to the Works, the Completion date, and Intended
Completion Date apply to any Section of the Works (other than references to
the Completion Date and Intended Completion date for the whole works)
2.3 The documents forming the Contract shall be interpreted in the following
order of priority
(2) Letter of Acceptance, notice to proceed with works
(3) Contractor’s Bid
(4) Contract Data
(5) Conditions of Contract including Conditions of Contract
(6) Specifications
(8) Bills of quantities and
(9) Any other document listed in the Contract Data as forming part of the
3. Language and Law
3.1 The language of the Contract and the law governing the Contract are stated in
the Contract Data.
4. Engineers Decisions
4.1 Except where otherwise specifically stated, the Engineer will decide
contractual matters between the Employer and the Contractor in the role
representing the Employer.
5.1 The Engineer may delegate any of his duties and responsibilities to other
people after notifying the Contractor and may cancel any delegation after
notifying the Contractor.
6. Communications
6.1 Communications between parties which are referred to in the conditions are
effective only when in writing. A notice shall be effective only when it is
delivered (in terms of Indian Contract Act).
7. Sub-Contracting
7.1 The Contractor may subcontract any portion of work, up to a limit specified in
contract data, with the approval of the engineer but may not assign the
Contract without the approval of the Employer in writing. Subcontracting
shall not alter the Contractor’s obligations. Sub-contracting of supply or
specific items of work is not allowed.
7.2 The sub-contractor must be registered in appropriate class and category for
the part of work to be subcontracted.
8. Other Contractors
8.1 The Contractor shall cooperate and share the site with other contractors,
public authorities, utilities and the Employer between the dates given in the
Schedule of other Contractor. The Contractors shall as refer to in the Contract
Data, also provide facilities and services for them as described in the
Schedule. The employer may modify the schedule of other contractors and
shall notify the contractor of any such modifications.
9.1 The Contractor shall employ the key personnel named in the Schedule of Key
Personnel as referred to in the Contract Data to carry out the functions stated
in the Schedule or other personnel approved by the Engineer. The Engineer
will approve any proposed replacement of key personnel only if their
qualifications, abilities, and relevant experience are substantially equal to or
better than those of the personnel listed in the Schedule.
9.2 If the engineer asks the Contractor to remove a person who is a member of
the Contractor Staff or his work force stating the reasons the Contractor shall
ensure that the person leaves the Site within seven days and has no further
connection with the work in the Contract.
10. Employer’s and Contractors Risks
10.1 The Employer carries the risk which these Contract states are Employer’s risks,
and the Contractor carries the risks which these Contracts states are
Contractors risk.
11. Employer’s Risks
11.1 The employer is responsible for the excepted risks which are (a) in so far as
they directly affect the execution of the Works, the risks of war, hostilities,
invasion, act of foreign enemies, rebellion, revolution, insurrection or military
or usurped power, civil war, riot commotion or disorder (unless restricted to
the Contractor’s employees), and contamination from any nuclear fuel or
nuclear waste or radioactive toxic explosive.
12. Contractor’s Risks
12.1 All risks of loss of or damages to physical property and of personal injury and
death which arise during and in consequence of the performance of the
Contract other than the excepted risks are the responsibility of the
13.1 The Contractor shall provide, in the joint names of the Employer and the
Contractor, insurance cover from the Start date to the end of the Defects
Liability Period, in the amounts and deductibles stated in the Contract data
for the following events which are due to the Contractor’s risks:
(a) Loss of or damage to the works, Plant and materials,
(b) Loss of or damage to Equipment
(c) Loss of or damages of property (expect the Works, Plant, Materials and
Equipment) in connection with the Contract; and
(d) Personal injury or death.
13.2 Policies and certificates for insurance shall be delivered by the Contractor to
the Engineer for the Engineer’s approval before the Start Date. All such
insurance shall provide for compensation to be payable in the types and
proportions of currencies required to rectify the loss or damage incurred.
13.3 If the Contractor does not provide any of the policies and certificates required,
the Employer may affect the insurance which the Contractor should have
provided and recover the premiums the Employer has paid from payments
otherwise due to the Contractor or, if no payment is due, the payment of the
premiums shall be a debt due.
13.4 Alterations to the terms of insurance shall not be made without the approval
of the Engineer.
13.5 Both parties shall comply with any conditions of the insurance policies.
13.6 Contractor has to submit Contractor All Risk policy for the project.
14. Site Investigation Report
14.1 The Contractor in preparing the Bid shall rely on any site Investigation
reports referred to in the Contract Data, supplemented by any information
available to the Bidder.
15. Queries about the Contract data
15.1 The engineer will clarify queries on the Contract Data
16. Contractor to Construct the Works
16.1 The Contractor shall construct and install the works in accordance with the
specification and Drawings.
17. The Works to be completed by the Intended Completion Date
17.1 The Contractor may commence execution of the Works on the Start Date and
shall carry out the Works in accordance with the programme submitted by
the Contractor, as updated with the approval of the Engineer, and complete
them by the Intended Completion date
18. Approval by the Engineer
18.1 The Contractor shall submit Specifications and Drawings showing the
proposed Temporary works to the Engineer, who is to approve them if they
comply with the Specifications and drawings.
18.2 The Contractor shall be responsible for design of temporary works.
18.3 The Engineer’s approval shall not alter the contractor responsibility for
design of the Temporary works.
18.4 The Contractor shall obtain approval of third parties to the design of the
Temporary works where required.
18.5 All Drawings prepared by the Contractors for the execution of the temporary
or permanent work are subject to prior approval by the Engineer before their
19.1 The Contractor shall be responsible for the safety of all activities on the Site.
SAFETY MEASURES
a) The Contractor shall be responsible for the safety of all workmen and other
persons entering or in the Works and shall take all measures necessary to ensure
their safety to the approval of the Engineer’s Representative.
b) Provision of efficient safety helmets for all personnel including the Engineer’s
Representative and each of his staff and any authorised visitors to site;
c) Provision and maintenance of suitable lighting to provide adequate illumination of
Works with appropriate spares and standby equipment;
d) Provision and maintenance of safe, sound mechanical equipment, each item of
having an up-to- date testing certificates;
e) Provision and maintenance of safe, sound ropes, slings, pulleys and other lifting
tackle, each appliance having an up-to-date testing certificate where appropriate;
f) Provision of notices 1.25m x 1.5 m size written in bold letters in English, Gujarati
and Hindi to be erected on existing footpaths and at points of access likely to be
used by the public, which shall warn the public of the existence of the Works.
These notices shall be in addition to any statutory requirements demanded of the
g) Provision of safety rails (wherever instructed by Engineer in charge)
h) The Contractor shall ensure that all his employees are fully conversant with the
regulation, emergency and rescue procedures etc. and the Contractor shall enforce
the rule that any employee committing a serious breach of such a regulations shall
be instantly dismissed and shall not be re-employed.
i) Contractor shall provide and maintain at his own expenses all lights, guards,
fencing and necessary watchmen when and where necessary or as required by
Owner/Engineer for the protection of the works or for the safety and convenience
of those employed on the works and the public.
j) Contract to shall also provide at his cost traffic barricades, men for diverting and
controlling traffic, necessary signboards for diversion of traffic, in night LED
Blinkers LED rope Light near Excavated trench in the event of failure on the part of
Contractor, Owner may with or without notice to Contractor put up a fence or
improve a fence already put up or provide and/or improve the lighting or adopt
such other measures as he may deem necessary, and all the cost of such work and
procedures as may be adopted by Owner/Engineer shall be borne by Contractor.
Maintenance of adequate warning and general lighting at nights at place of work is
k) Contractor shall take the necessary permission and clearance of all the authorities
like department of Roads, Traffic, Water Supply and Drainage; Electricity Board,
Telephone Company, etc. wherever necessary and observe the regulations
regarding the execution of work in congested areas, heavy traffic areas, etc.
20. Discoveries
20.1 Anything of historical or other interest or of significant value unexpectedly
discovered on the site is the property of the Employer. The contractor is to
notify the engineer of such discoveries and carry out the Engineer’s
instructions for dealing with them.
21. Possession of the Site
21.1 The Employer shall give possession of all parts of the site to the Contractor. If
possession of a part is not given by the date stated in the Contract Data the
Employer is deemed to have delayed the start of the relevant activities and
this will be a Compensation Event.
21.2 If within 25% of the time limit of the project, 80% of possession of the site is
not handed over to the Contractor, then contractor/ Employer may fore-close
the contract. Contractor/Employer has to foreclose the work within 30 days
after lapse of 25%-time limit and after 30 days foreclosure option will be
22. Access to the Site
22.1 The Contractor shall allow the Engineer and any person authorized by the
Engineer access to the Site, to any place where work in connection with the
Contract is being carried out or is intended to be carried out and to any place
where materials or plants are being manufactured/ fabricated/ assembled for
23. Instructions
23.1 The Contractor shall carry out all instructions of the Engineer pertaining to
works which comply with the applicable laws where the site is located.
23.2 The Contractor shall permit the Employer to inspect the Contractor’s accounts
and records relating to the performance of the Contractor and to have them
audited by auditors appointed by the Employer, if so required by the
24.1 If the Contractor is of the view that a decision taken by the Engineer was
either outside the authority given to the Engineer by the Contract or that the
decision was wrongly taken, the decision
(A) Should be referred to as Designated and defined officer as
Dy.MC/HOD/CE/ACE of repetitive Department and also as per GAD
circular No.498/98-99/Dt.07.07.98 with revision time to time in future.
(B) In case disputes remains unsolved it shall be refer to Municipal
25. Procedure for Disputers
25.1 The arbitration shall be conducted in accordance with the arbitration
procedure stated in the Special Conditions of Contract.
B. TIME CONTROL
27.1 Within the time stated in the Contract Data the Contractor shall submit to the
Engineer for approval a Programme showing the general methods,
arrangements orders, and timing for all the activities in the works along with
monthly cash flow forecast.
27.2 An update of the Programme shall be a programme showing the actual
progress achieved on each activity and the effect of the progress achieved on
the timing of the remaining work including any changes to the sequence of the
27.3 The Contractor shall submit to the Engineer, for approval an updated
programme at intervals no longer than the period stated in the Contract data.
If the Contractor does not submit an updated programme within this period,
the Engineer may withhold the amount stated in the Contract data from the
next payment after the date on which the overdue programme has been
27.4 The Engineer’s approval of the programme shall not alter the Contractor’s
obligations. The Contractor may revise the programme and submit it to the
Engineer again at any time. A revised programme is to show the effect of
Variations and Compensations events.
28. Extension of the Intended Completion Date
28.1 The Engineer shall extend the Intended Completion Date if a compensation
Event occurs or a Variation is issued which makes it impossible for
completion to be achieved by the Intended Completion Date without the
Contractor taking steps to accelerate the remaining work and which would
cause the Contractor to incur additional cost.
28.2 The Engineer shall decide whether and by how much stoppage to provided/
to extend the Intended Completion Date within 35 days of the Contractor
asking the Engineer for a decision upon the effect of a compensation event or
Variation and submitting full supporting information. If the Contractor has
failed to give early warning of a delay or has failed to cooperate in dealing
with a delay, the delay by this failure shall not be considered in assessing the
new Intended Completion Date.
28.3 The Engineer shall within 14 days of receiving full justification from the
contractor for extension of Intended Completion Date refer to the Employer
his decision. The employer shall in not more than 21 days communicate to the
engineer the acceptance or otherwise of the Engineer’s decision. If the
employer fails to give his acceptance, the Engineer shall not grant the
extension and the contractor may refer the matter under Clause
30. Delays Ordered by the Engineer
30.1 The Engineer may instruct the Contractor to delay the start or progress of any
activity within the works.
31. Management Meetings
31.1 Either the Engineer or the Contractor may require the other to attend a
management meeting. The business of a management meeting shall be to
review the plans for remaining work and to deal with matters raised in
accordance with the early warning procedure.
31.2 The Engineer shall record the business of management meetings and is to
provide copies of his record to those attending the meeting and to the
Employer. The responsibility of the parties for actions to be taken is to be
decided by the Engineer either at the management meeting or after the
management meeting and stated in writing to all who attended the meeting.
32. Early Warning
32.1 The Contractor is to warn the Engineer at the earliest opportunity of specific
likely future events or circumstances that may adversely affect the quality of
the work, increase the Contract price or delay the execution of works. The
Engineer may require the contractor to provide an estimate of the expected
effect of the future event or circumstance on the contract price and
completion date. The estimate is to be provided by the Contractor as soon as
reasonably possible.
32.2 The Contractor shall cooperate with the Engineer in making and considering
proposals for how the effect of such an event or circumstance can be avoided
or reduced by anyone involved in the work and in carrying out any resulting
instruction of the Engineer.
33. TIME SCHEDULE
Work Completion period will be 6 Months (Excluding Monson) from the date
of issue of work order. Required to complete the work immediately.
Contractor shall have to fail the complete of work in stipulated time VMC have
to take first action for penalty for delay of works. After giving notice for
completion of work, if contractor even not complete the work against time
period mention in notice. VMC have to take action against the contractor for
black list in VMC
C. QUALITY CONTROL
# 33. Identifying Defects/ Defect liability period
PERIOD OF LIABILITY & GUARANTEE
The Contractor shall be liable for a period of 5(Five) years after the date of issue of
the certificate of completion of work issued by the HOD Futuristic Planning Cell
(FPC) (after Completion of Work). This period shall be deemed as guarantee period
during which, the contractor shall be responsible for rectifying any defects that
may develop in his workmanship & materials (against manufacturing defect)
within the time specified by the Owner. If contractor fails to rectify that defect,
owner reserves the right to complete that job at the risk and cost of the contractor
and such cost will be adjusted against the security deposit, the contractor shall be
liable during guarantee period of one year to rectify any defects that may develop
after erection of supplied materials at the risk and cost of the contractor.
33.1 : Defect liability period:
The contractor shall be responsible to make good and remedy at his own
expense any defect which may develop or may be noticed before the period
mentioned hereunder from the certified date of completion. The Engineer in
charge shall give the contractor a notice in writing about the defects and the
contractor shall make good the same within 15 days of receipt of the notice. In
the case of failure on the part of the contractor, the Engineer- in-charge may
rectify or remove or re-execute the work at the risk & cost of the contractor.
The Engineer-in-charge shall be entitled to appropriate the whole or any part
of the amount of security deposit towards the expenses, if any, Incurred by
him in rectification, removal or re-execution. The Defects Liability period shall
The defect liability period shall of duration mentioned in contract data and
shall start from date of final completion of entire work and acceptance of
work by VMC. During defect liability period, the Contractor shall make good
any defect whatsoever nature observed in different works equipment, or in
part of plant or equipment by modifying/replacing/repairing of such
defective units or parts there at his own cost within a period of ten days on
hearing from Engineer-in-charge/VMC about such defect during liability
period. In case, if Contractor’s fails to do so, it will be got done by VMC and
entire cost shall be recovered from Contractor’s Security
deposit/performance guarantee or other dues as may be possible.
(a) For all works costing up to Rs. 50,000 (amount put to tender), the period shall
be 3 Months from the certified date of completion.
(b) For all works costing more than Rs. 50,000 and up to Rs. 1 crore (amount put
tender), the period shall be 12 (Twelve) months from the certified date of
completion or one monsoon, whichever is later.
(c) For major projects costing more than Rs. 1 crore, the period shall be
Months from the certified date of completion which should include three
(d) For original building works the defect liability period will be 4 years or elapse
of 4 monsoon period following date of possession of building taken over by
user agency following the certified date of completion, whichever is later.
For the purpose of deciding the monsoon period, the 30th September shall be
treated as the last date.
Modified vide R & B D Circular No. PAC-11-102008-2076-N dated 31/8/2009,
PRCH/102013(2976) 2759-N, Dated 27/05/2013 and Circular
No.TNC/10/2016/Clause 17A (Correction/(1)C Dated 12/05/2016]
34.1 If the engineer instructs the Contractor to carry out a test not specified in the
Specification to check whether any work has a Defect and the test shows that
it does, the Contractor shall pay for the test and any samples. If there is no
defect the test shall be a Compensation Event.
34.2 All test and types of tests to be performed as per IS specifications and
instruction of EIC. In case if it is not done or up to the mark by bidder, 1%
deduction form the work done in particular RA bill should be done.
34.3 THIRD PARTY INSPECTION
All the Major Electrical Equipment/Materials /works shall be subjected third
party inspection as stated in technical specifications from approved TPI
Agency by VMC only at manufacturer’s works with their test certificates
satisfying the IS requirements. Third party inspection charges for all above
material shall be borne by the bidder.
If VMC/ PMC/ TPI Engineers intend to witness the testing at manufacturer’s
works Entire expenses of said testing, including to & from traveling by Air,
lodging and boarding etc. of maximum Two VMC/ PMC Engineers and 1 Third
Party Inspector shall be borne by the bidder.
35. Correction of defects
35.1 The engineer shall give notice to the Contractor of any defects before the end
of the defects Liability Period, which begins at Completion and is defined in
the contract data. The Defects Liability Period shall be extended for as long as
Defects remain to be corrected.
35.2 Every time notice of a Defect is given, the Contractor shall correct the notified
defect within the length of time specified by the Engineer’s notice.
36. Uncorrected Defects
36.1 If the Contractor has not corrected a defect within the time specified in the
Engineer’s notice, the Engineer will assess the cost of having the Defect
corrected, and the Contractor will pay this amount.
D. COST CONTROL
37. Bill of Quantities
37.1 The bill of Quantities shall contain items for the constructions, installation,
testing and commissioning work to be done by the Contractor.
37.2 The bill of Quantities is used to calculate the Contract price. The Contractor is
paid for the quantity of the work done at the rate in the Bill of Quantities for
38. Change in the Quantities
38.1 The Engineer shall have power to make any alterations in or addition to the
original specifications , drawings, designs and instructions that may appear to
him to be necessary or advisable during the progress of the work and the
contractor shall be bound to carry out the work in accordance with any
instruction in this connection which may be given to him in writing signed by
the Engineer and such alteration shall not invalidate the contract and any
additional work which the contractor may be directed to do in the manner
above specified as part of the work shall be carried out by the contractor on
the same conditions in all respects on which he agreed to do the main work
and at the same rate as are specified in the tender for the main work.
Except that when the quantity of any item exceeds the quantity as in the
tender by more than 130%, the contractor will be paid for the quantity in
excess of 130%, at the rate entered in the SOR of the year during which the
excess in quantity is first executed.
39.1 All Variations shall be included in updated programmes produced by the
40. Payments for Variations
40.1 If the additional or altered work includes any class of work for which no rate
is specified in this contract, then such class of work shall be carried out as
(i) At the rate derived from the item within the contract which is comparable to
the one involving additional or altered class of work; where there are more
than one comparable items, the item of the contract which is nearest in
comparison with regard to class or classes of the work involved shall be
selected and the decision of the Add. City Engineer as to the nearest
comparable item shall be final and binding on the contractor.
(ii) If the rate cannot be derived in accordance with (i) above, such class of works
shall be carried out at the rate entered in the Schedule of Rates of the division
for the year in which the tender was received, increased or decreased by the
percentage by which the tender amount is more or less as compared to the
amount arrived at the rates in the “Schedule of Rates” of the Division in the
year in which the tender was received. If the Schedule of rates of the Division
does not contain all the items, the percentage increase or decrease of the
tender shall be calculated considering such items which were included in the
“Scheduled Rates” of the division for the year and for materials consumed on
such item the rate to be charged would be the basic rate taken into account
for fixing the rate in S.O.R. referred to above.
(iii) If it is not possible to arrive at the rate from (i) and (ii) above, such class of
work shall be carried out at the rate decided by the competent authorities on
the basis of detailed rate analysis after hearing the contractor as per powers
delegated to VMC officials.
40.2 If the additional or altered work, for which no rate is entered in the “Schedule
of Rates” of the Division is ordered to be carried out before the rate is agreed
upon, then the contractor shall within seven days of the date of receipt by him
of the order to carry out the work, inform the Engineer-in-charge of the rate,
which it is his intention to charge for such class of work and if the Engineer in
charge does not agree to this rates, he shall by notice in writing be at liberty
to cancel his order to carry out such class of work and arrange to carry it out
in such manner as he may consider it advisable, provided always that if the
contractor shall commence work or incur any expenditure in regard thereof
before the rates shall have been determined as lastly herein before
mentioned, then in such cases he shall only be entitled to be paid in respect of
the work carried out or expenditure incurred by him prior to the date of the
determination of the rate as aforesaid according to such rate or rates as shall
be fixed by the Engineer-in-charge. In the event of the dispute, the decision of
the HOD of the Futuristic Planning Cell (FPC) shall be final.
Where, however, the work is to be executed according to the designs,
drawings and specifications recommended by the contractor and accepted by
the competent authority, the alternation above referred to shall be within the
scope of such designs, drawings and specifications appended to the tenders.
The time limit for the completion of the work shall be extended in the
proportion that the increase in the cost occasioned by alterations bears to the
cost of the original work and the certificate of the Engineer-in-charge as to
such proportion shall be final and conclusive.
41. Cash Flow Forecasts
41.1 When the programme is updated, the contractor is to provide the engineer
with an updated cash flow forecast.
43. Compensation events
43.1 The following are compensation Events unless they are caused by the
(a) The Employer does not give access to a part of the Site by the site
Possession date stated in Contract data to the Contractor
43.2 In case of compensation event occurs and it prevents the work being
completed beyond the Intended Completion Date then Authority will
approve EOT (Extension of Time) with eligible contractual price escalation.
44.1 The rates quoted by the Contractor must be inclusive of all taxes. However,
any subsequent changes in the tax structure by Government after due date of
bid submission will be compensated (+/-) on availability or submission of
actual documentation. Contractor will have to intimate Engineer regarding
changes occurred in the tax structure after bid submission. If the contractor
fails to provide such information and if any financial obligation may arise due
to change in tax structure, same will be recovered from the contractor.
44.2 GST will be paid by contractor on the bills. Hence, it is the responsibility of the
contractor to pay the GST to the concerned Authority.
45. Currencies.
45.1 All payment shall be made in Indian Rupees.
46. Price Adjustment
47.1 The Employer shall retain from each payment due to Contractor the
proportion stated in the Contract Data until Completion of the whole of the
47.2 On Completion of the whole of the Works half the total amount retained is
47.2 On Completion of the whole of the Works half the total amount retained is
repaid to the Contractor and half when the Defects Liability Period has passed
and the Engineer has certified that all Defects notified by the Engineer to the
Contractor before the end of this period have been corrected.
47.3 On completion of the whole works, the contractor may substitute retention
money with an “on demand” Bank guarantee.
In case, Contractor requests for refund of the Retention Money
deducted by the Employer under the provision of this clause, Employer shall
consider the said request of the Contractor provided that the refund
hereunder shall be made in tranches of not less than 1% (One Percent) of the
Contract Price and Contractor furnishes an irrevocable and unconditional
Bank guarantee for an equal amount substantially in the format of Bank
Guarantee for Performance Guarantee enclosed with SBD and valid up to
day beyond the scheduled / extended Defects Liability Period. On completion
of the whole works, the contractor has however an option to submit a fresh
irrevocable and unconditional Bank Guarantee for an amount equal to 2.5% of
the total value of work executed substantially in the format of Bank Guarantee
for Performance Guarantee enclosed with SBD and valid up to 60 days beyond
the Defect Liability Period and yet refund the Retention Money Bank
Guarantee submitted for refund of Retention Money.
48. Liquidated Damages
48.1 The Contractor shall pay liquidated damages to the Employer at the rate per
day stated in the Contract Data for each day that the Completion Date is later
than the Intended Completion Date (for the whole works or the milestone as
stated in the contract data). The total amount of liquidated damages shall not
stated in the contract data). The total amount of liquidated damages shall not
exceed the amount defined in the Contract Data. The Employer may deduct
liquidated damages from payment due to the Contractor. Payment of
liquidated damages does not affect the Contractor’s liabilities.
48.2 If the Intended Completion Date is extended after liquidated damages have
been paid, the Engineer shall correct any overpayment of liquidated damages
by the Contractor by adjusting the next payment certificate. The Contractor
shall not be entitled for any interest on the over payment calculated from the
date of payment to the date of repayment.
48.3 If the contractor fails to comply with the time for completion as stipulated in
the tender, then the contractor shall pay to the employer the relevant sum
stated in the Contract Data as Liquidated damages for such default and not as
penalty for everyday or part of day which shall elapse between relevant time
for completion and the date stated in the taking over certificate of the whole
of the works on the relevant section, subject to the limit stated in the contract
The employer may, without prejudice to any other method of recovery
deduct the amount of such damages from any monies due or to become due to
the contractor. The payment or deduction of such damages shall not relieve
the contractor from his obligation to complete the works on from any other of
his obligations and liabilities under the contract.
48.4 If, before the Time for Completion of the whole of the Works or, if applicable
any Section, a Taking Over Certificate has been issued for any part of the
Works or of a Section, the liquidated damages for delay in completion of the
remainder of the Works or of that Section shall, for any period of delay after
the date stated in such Taking-Over-Certificate, and in the absence of
alternative provisions in the Contract, be reduced in the proportion which the
value of the part so certified bears to the value of the whole of the Works or
Section, as applicable. The provisions of this Sub-clause shall only apply to the
rate of liquidated damages and shall not affect the limit thereof.
51. Advance Payment.
54. Cost of Repairs.
Loss or damage to the Works or Materials to be incorporated in the Works
between the Start date and the end of Defects Correction periods shall be
remedied by the Contractor at the Contractor’s cost if the loss or damages
arises from the Contractor’s acts or omissions.
E. FINISHING THE CONTRACT
The Contractor shall request the Engineer to issue a Certificate of Completion
of the works and the Engineer will do so upon deciding that the work is
56. Taking Over
The Employer shall take over the Site and the Works within seven days of the
Engineer issuing a certificate of Completion.
57. Final Account
The Contractor shall supply to the Engineer a detailed final account of the
total amount that the Contractor considers payable as full and final settlement
total amount that the Contractor considers payable as full and final settlement
of all claims under the Contract for items before the end of the Defects
Liability Period. The Engineer shall issue a Defect Liability Certificate and
certify any final payment that is due to the Contractor within 56 days of
receiving the Contractor's account if it is correct and complete. If it is not, the
Engineer shall issue within 56 days a schedule that states the scope of the
corrections or additions that are necessary. If the Final Account is still
unsatisfactory after it has been resubmitted, the Engineer shall decide on the
amount payable to the Contractor and issue a payment certificate, within
days of receiving the Contractor’s revised account.
If reversal in characteristic of tender (L1 becoming L2) on account of excesses
and savings in final account is observed, the Engineer/Employer shall be at
liberty to restrict the final payment of BOQ items to the lowest amount
evaluated of the bids considering the final quantities and the rates quoted
including the rebates if any. Payment of variation items shall however be
made at the rates approved by the Employer, within 90 days from the physical
completion of work.
58. Operating and Maintenance Manuals
If “as built” drawings and/or operating and maintenance manuals are
required, the Contractor shall supply them by the dates stated in the Contract
If the Contractor does not supply the Drawings and/or manuals by the dates
stated in the Contract data, or they do not receive the Engineer’s approval, the
Engineer shall withhold the amount stated in the Contract Data from
payments due to the Contractor.
59. Termination
The Employer or the Contractor may terminate the Contract if the other party
causes a fundamental breach of the Contract.
Fundamental breaches of Contract include, but shall not be limited to the
The contractor stops work for 28 days when no stoppage of work is
shown on the current programme and the stoppage has not been
authorized by the Engineer
The Engineer instructs the Contractor to delay the progress of the Works
and the instructions is not withdrawn within 28 days;
The Employer or the Contractor is made bankrupt or goes into liquidation
other than for a reconstructions or amalgamation
A payment certified by the Engineer is not paid by the Employer to the
Contractor within 56 days of the date of the Engineer’s certificate
The Engineer gives Notice that failure to correct a particular Defect is a
fundamental breach of Contract and the Contractor fails to correct it
within a reasonable period of time determined by the Engineer;
The Contractor does not maintain a security which is required;
The Contractor has delayed the completion of works by the number of
days for which the maximum amount of liquidated damages can be paid as
defined in the Contract data; and
If the Contractor, in the judgment of the Employer has engaged in corrupt
or fraudulent practices in competing for or in executing the Contract.
For the purpose of this paragraph: “corrupt practice” means the
offering, giving, receiving or soliciting of anything of value to influence the
action of a public official in the procurement process or in contract execution.
“Fraudulent practice” means a misrepresentation of facts in order to influence
a procurement process or the execution of a contract to the detriment of the
borrower, and includes collusive practice among Bidders (prior to or after bid
submission) designed to establish bid prices at artificial non-competitive
levels and to deprive the Borrower of the benefits of free and open
When either party to the Contract gives notice of a breach of contract to the
Engineer for a cause other than those listed under Sub Clause 59.2 above, the
Engineer shall decide whether the breach is fundamental or not.
Notwithstanding the above, the employer may terminate the Contract for
60. Payment upon Termination
If the Contract is terminated because of a fundamental breach of Contract by
the Contractor, the Engineer shall issue a Certificate for the value of the work
done less advance payments received up to the date of the issue of the
certificate, less other recoveries due in terms of the contract, less taxes due to
deducted at source as per applicable law and less the percentage to apply to
the work not completed as indicated in the Contract data. Additional
Liquidated Damages shall not apply. If the total amount due to the Employer
Liquidated Damages shall not apply. If the total amount due to the Employer
exceeds any payment due to the Contractor the difference shall be a debt
payable to the Employer.
If the Contract is terminated at the Employer’s convenience or because of a
fundamental breach of Contract by the Employer, the Engineer shall issue a
certificate for the value of the work done, the cost of balance material brought
by the contractor and available at site, the reasonable cost of removal of
equipment, repatriation of the Contractor’s personnel employed solely on the
works, and the Contractor’s cost of protecting and securing the Works and
less advance payment received up to the date of the certificate, less other
recoveries due in terms of the contract and less taxes due to deducted at
source as per applicable law.
All materials on the Site, Plant Equipments, Temporary Works and Works are
deemed to be property of the Employer, if the Contract is terminated because
of a Contractor’s default.
62. Release from Performance
If the Contract is frustrated by the outbreak of war of by any other event
entirely outside the control of either the Employer or the Contractor the
Engineer shall certify that the Contract has been frustrated. The Contractor
shall make the Site safe and stop work as quickly as possible after receiving
this certificate and shall be paid for all work carried out before receiving it
and for any work carried out afterwards to which commitment was made.
F. SPECIAL CONDITIONS OF CONTRACT
The Contractor shall, unless otherwise provided in the Contract, make
his own arrangements for the engagement of all staff and labour, local or
other, and for their payment of housing, feeding and transport.
The Contractor shall, if required by the Engineer, deliver to the
Engineer a return in detail, in such form and at such intervals as the Engineer
may prescribe, showing the staff and the numbers of the several classes of
labour from time to time employed by the Contractor on the site and such
other information as the Engineer may require.
64. COMPLIANCE WITH LABOUR REGULATIONS
During continuance of the contact, the Contractor and his sub-
contractor shall abide at all times by all existing labour enactments and rules
made thereunder, regulations, notification and bye laws of the State or central
Government or local authority and any other labour law (including rules),
regulations, bye laws that may be passed or notifications that may be issued
under any labour law in future either by the State or the Central Government
or the local authority. Salient features of some of the major labour laws that
are applicable to the construction industry are given below. The Contractor
shall keep the Employer indemnified in case any action is taken against the
Employer by the competent authority on account of contravention of any of
the provisions of any Act or rules made thereunder, regulations or
notifications including amendments. If the Employer is caused to pay or
reimburse, such amounts as may be necessary to cause or observe, or for
observance of the provisions stipulated in the notifications/bye
laws/Acts/Rules/regulations including amendments, if any, on the part of the
Contractor, the Engineer/employer shall have the right to deduct any money
due to the Contractor including his amount of performance security. The
Employer/Engineer shall also have the right to recover from the Contractor
any sum required or estimated to be required for making good the loss or
damage suffered by the Employer.
The employees of the Contractor and the Sub-Contractor in no case shall be
treated as the employees of the Employer at any point to time.
SALIENT FEATURES OF SOME MAJOR LABOUR AND OTHER LAWS APPLICABLE TO
ESTABLISHMENTS ENGAGED IN BUILDING AND OTHER CONSTRUCTIONS WORK
A) Workmen Compensation Act 1923 :- The Act provides for compensation in
case of injury by accident arising out of and during the course of employment.
B) Payment of Gratuity Act. 1972 :- Gratuity is payable to an employee under the
Act on satisfaction of certain conditions on separation if an employee has
completed 5 years’ service or more on death, the rate of 15 days wages for every
completed year of service. The Act is applicable to all establishments employing
10 or more employees.
C) Employees P.F. and Miscellaneous Provision Act 1952:- The Act Provides for
monthly contributions by the employer plus workers @ 10% or 8.33% The
benefits payable under the Act are :
1. Pension or family pension on retirement or death, as the case may be.
2. Deposit linked insurance on the death in harness of the worker.
3. Payment of P.F. accumulation on retirement/death etc.
D) Maternity Benefit Act 1951 :- The Act provides for leave and some other
benefits to women employees in case of confinement or miscarriage etc.
E) Contract Labour (Regulation & Abolition) Act 1970 : The Act provides for
certain welfare measures to be provided by the Contractor to contract labour and
in case the Contractor fails to provide, the same are required to be provided, by
the Principal Employer by Law. The principal Employer is required to take
Certificate of Registration and the Contractor is required to take license from the
designated Officer. The Act is applicable to the establishments or Contractor of
Principal Employer, if they employ 20 or more contract labour.
F) Minimum Wages Act 1948 :- The Employer is supposed to pay not less than the
Minimum Wages fixed by appropriate Government as per provisions of the Act, if
the employment is a scheduled employment. Construction of Building, Roads,
Runways are scheduled employment.
G) Payments of wages Act 1936:- It lays down as to by what date the wages are to
be paid, when it will be paid and what deductions can be made from the wages
of the workers.
H) Equal remunerations Act 1979 :- The Act provides for payment of equal
wages for work of equal nature to Male and Female workers and for not making
discrimination against female employees in the matter of transfer, training and
promotions etc.
I) Payments of Bonus Act 1965 :- The Act is applicable to all establishments
employing 20 or more employees. The Act provides for payments of annual
bonus subject to a minimum of 8.33% of wages and maximum of 20 % of wages
to employees drawing Rs. 3500/- per month or less. The bonus to be paid to
employees getting Rs, 2500/- per month or above Rs. 3500/- per month shall be
worked out by taking wages as Rs. 2500/- per month only. The Act does not
apply to certain establishments. The newly set-up establishments are exempted
for five years in certain circumstances. Some of the State Governments have
reduced the employment size from 20 to 10 for the purpose of applicability of
J) Industrial Disputes Act 1947 :- The Act lays down the machinery and
procedure for resolutions of Industrial disputes, in what situations a strike or
lock-out becomes illegal and what are the requirements for laying off or
retrenching the employees or closing down the establishment.
K) Industrial employment (standing Orders) Act 1946 :- It is applicable to all
establishments employing 100 or more workmen (employment size reduced by
some of the State and Central Government to 50). The Act provides for laying
down rules governing the conditions of employment by the Employer on
matters provided in the Act and get the same certified by the designated
L) Trade Unions Act 1926:- The Act lays the procedure for registration of trade
unions of workmen and employers. The Trade Unions registered under the Act
have given certain immunities from civil and criminal liabilities.
M) Child Labour (Prohibition & Regulation Act 1986 :- The Act prohibits
employment of children below 14 years of age in certain occupations and
process and provides for regulation of employment of children in all other
occupations and processes. Employment of Child labour is prohibited in Building
and Construction Industry.
N) Inter – State Migrant workmen’s (Regulation of Employment & Conditions
of service) Act 1979:- The Act is applicable to an establishment which employs
5 or more inter-state migrant workmen through an intermediary (who has
recruited workmen in one state for employment in the establishment situated in
another state).The inter-state migrant workmen, is an establishment to which
this Act becomes applicable, are required to be provided certain facilities such as
housing, medical aid, traveling expenses from home upto the establishment and
O) The Building and Other Construction workers (Regulation of employment
and Conditions of Service) Act 1996 and the Cess Act of 1996:- All the
establishments who carry on any building or other constructions work and
employ 10 or more workers are covered under this Act.
All such establishments are required to pay cess at the rate not exceeding 2% of
the cost of construction as may be modified by the government. The Employer of
the establishment is required to provide safety measures at the Building or
construction work and other welfare measures, such as canteens, First Aid
facilities, Ambulance, Housing accommodations for workers near the workplace
etc. The Employer to whom the Act applies has to obtain a registration
certificate from the Registering Officers appointed by the Government.
P) Factories Act 1948 :- The Act lays down the procedure for approval of plans
before setting up a factory, health and safety provisions, welfare provisions,
working hours, annual earned leave and rendering information regarding
accidents or dangerous occurrences to designated authorities. It is applicable to
premises employing 10 persons or more with aid of power or 20 or more
persons without the aid of power engaged in the manufacturing process.
Q) Royalty charges-The contractor shall pay the royalty to the competent
authority as per rule. The royalty charges paid shall be borne by the
contractor and shall not be reimbursed by the Employer.
R) Following Pollution Control Acts and amendments made thereof
from time to time shall be applicable.
1. Water (Preservation and control of Pollution) Act,
2. Air (Prevention and Control of Pollution Act
3. Environmental (Protection) Act
The contractor must commit to adopting Environmental management
plan for best energy use, waste management, the reduction of pollution as
in EMS (Environmental Management system) ISO-14001-
65. ARBITRATION (GCC Clause 24)
The procedure for arbitration will be as follows: -
24.1 If the Contractor is of the view that a decision taken by the Engineer was either
outside the authority given to the Engineer by the Contract or that the decision
was wrongly taken, the decision shall be referred to HOD-Futuristic Planning
Cell (FPC) within 14 days of the notification of the Engineer's decision. If the
issue is not resolved, any party can refer the matter for conciliation within
days from the decision given by the HOD – FPC.
(a) For the work up to Rs.100 Cr., if any of the parties is not satisfied with the
decision of the Add. City Engineer, both the parties have to refer to the
Municipal Commissioner, Vadodara concerned for the conciliation
If the dispute is not resolved through the conciliation process, contractor
may refer the dispute to Arbitration. Arbitration and legal
matters/proceedings associated within this scope/tender shall be subject
to Vadodara Court’s Jurisdiction only. If the Contractor fails to refer a claim
/ dispute to the Higher Authority within 14 days of the notification of the
Engineer's decision, the Contractor shall not be entitled to any additional
payment/claim if he doesn’t follow the above sequence in stipulated time.
However, during such period, he would not stop the work in any case.
1) The Tenderer shall have to give twelve months guarantee of all items
against manufacturing defect from the date of commissioning.
2) The Tenderer shall make necessary storage arrangement with security.
3) Erection of all materials, sundries will be carried out as per technical
specification. In absence of specification, work shall be carried out as per
instruction of Engineer- in-charges.
4) The contractor shall provide all necessary materials, equipment’s,
labours, etc. for erection, testing and commissioning work at his own cost
and risk till completion.
5) In case of any dispute in the specification, term and conditions, the
decision of the HOD Futuristic Planning Cell shall be final and binding to
the contractors.
6) The tender shall remain valid for acceptance for a period of 120 days
from the date of opening of the price bid. The Tenderer shall not be
entitled during the said period of 120 days to revoke or cancel his tender
or to vary the tender or to vary the given or any term thereof. In case of
tender revoking or canceling his tender or revoking the same or vary in
term in regard to thereof, the Owner shall forfeit the earnest money
paid by him along with the tender.
7) 2% EMD & 3% S.D shall be paid as per Clause no.16
8) Penalty for the late work completion shall be at the rate of 0.5% of
the work order value per week and maximum up to 10%.
9) The rates quoted by the Tenderer shall be inclusive of all taxes and duties.
10) The successful Tenderer shall be required to execute an agreement
within 15 days from the date of issue of the work order. In the event of
failure on the part of the successful Tenderer to sign the agreement
within the above stipulated time period the earnest money or his initial
Security Depositwill be forfeited andthe acceptance of the tender shall be
considered as cancelled.
11) Conditional tender will not be accepted.
12) The price escalation or variation clause will not be accepted.
13) The material shall be dispatched only after third party inspection is
completed and issuance of release note when it requires. The
Tenderer shall have to arrange necessary storage arrangements at his
cost if corporation will not have suitable place for storage.
14) VMC reserves the right to issue work order in part or full to the
successful bidder. Successful bidder will have no right to claim loss of
business in this regard Contractor will not be allowed to start work
before installing the caution board on both the end & all major crossing
of the road. Caution boards shall be installed before commencement of
the work and it shall be removed after commissioning of the work.
15) If safety measures will not be observed by the contractors then he will
be responsible for any accident occur due to his negligence.
16) In case of site clearance is not available due to any reason; suitable
extension shall be given to the contractor to carry out the work.
17) In case of Wrong / Misleading / Misappropriate information /
Certificate and references submitted by the Tenderer, then his tender is
liable to be rejected, EMD shall be forfeited and he will not be allowed to
participate in future tenders.
Item marked “N/A” do not apply to this Contract.
Clause Reference With respect To section
1. The Employers is [CL.1.1]
Name: THE EXECUTIVE ENGINEER
Address: 2nd floor, Futuristic Planning Cell (FPC)
Vadodara Municipal Corporation,
Khanderao Market Building,
Vadodara-390001
Name of authorized Representative (will be intimated later)
2. The Engineer is The Executive Engineer, Futuristic Planning Cell (FPC),
Vadodara Municipal Corporation.
Name of Authorized Representative: The Executive Engineer, Futuristic
Planning Cell (FPC), Vadodara Municipal Corporation,
3. The Defect Liability Period is 60 Moths from the date of [CL.1.1&33]
4. The Start Date shall be 1st days for the date of issue of the Notice to [CL.1.1]
proceed with the work.
5. The Intended Completion Date for the whole of the works is [CL.1.1,17&2]
6 Months after start of work
6. The Site is located at Across Vadodara city and Outside city area. [CL.1.1]
7. The name and identification number of the Contract is: [CL.1.1]
1. The scope of works consists of “SITE SURVEY, DESIGN, ENGINEERING, SUPPLY,
INSTALLATION, TESTING, COMMISSIONING, SYNCHRONIZING WITH THE GRID
OF GRID CONNECTED SOLAR TREE SOLAR PV SYSTEMS ON CAPEX MODEL NET
METERING BASIS ON THE FABRICATED TREE STRUCTURE OF IDENTIFIED
LOCATIONS WITH COMPREHENSIVE MAINTENANCE OF SAME FOR 5(FIVE)
YEARS INCLUDING DEFECT LIABILITY PERIOD OF 5 YEARS”
2. Bidder shall visit the respective sites and carry out survey for assessing the
generation capacity details & data sheets, calculations, Generation assessment
report, and Good for Construction (GFC) drawings including General Equipment
layout, cable schedule, tray layout, earthing layout, lightning protection layout,
Single Line Diagram (SLDs), etc. shall be submitted to VMC for approval. The bidder
shall assist VMC in entering into a PPA/ wheeling agreement with MGVCL which
shall be executed in line with the PPA recommended by Ministry of New and
Renewable Energy duly vetted by all concerned Govt. Departments.
3. Testing of materials at manufacturer’s works according to relevant IS/tender
4. Corporation will appoint Third Party agency for inspection of materials at
manufacturing work/on site and site works. Inspecting charges shall be paid
by the Contractor.
5. As per VMC required materials shall be delivered to site after third party inspection
and without any damage during transportation and handling.
6. Material shall be dispatched FOR Vadodara in the store or at site within the
Municipal limit as per instruction of Engineer-In-Charged.
7 The detailed Scope of Work in accordance with this specification is elaborated
below. Scope of Supply & Work includes all design, engineering, manufacture,
procurement & supply of equipments and materials, testing at manufacturers works,
inspection, testing at works, packing and forwarding, supply, transportation, receipt,
unloading and storage at site (indoor and outdoor), associated civil works, Module
mounting structure, PV Modules, Cables, Power Conditioning Units/Inverters, ACDB,
associated protection system, remote monitoring system, other associated
equipments for Solar Trees, permits, licenses, insurance at all stages, erection, testing
and commissioning of Grid Connected Photovoltaic Solar Tree PV and Performance
demonstration with associated equipment and materials on EPC basis for
cumulative approx. 325 kW Solar
In grid-connected solar photo-voltaic (PV) systems, electricity generated is fed into
the VMC’s Premises as well as existing equipment’s loads that are connected to the
grid through a service connection with surplus energy being fed into the grid and
shortfall being drawn from the grid. Grid-connected solar PV systems have no battery
storage and will not work during grid outage. For buildings with grid- connected
solar PV systems, the service connection meter needs to be of the bidirectional type,
whereby import kWh and export kWh are separately recorded and the Main meter
shall be replaced by as per Discom suggested meter with necessary equipment’s and
structures. All the items in the systems should meet the Technical specification and
standards mentioned in TENDER. Bidder shall also provide fixed/folding staircase to
access all building's terrace/Roof for solar panel installation, cleaning and
All materials, fixtures, accessories to be provided shall be of best quality and as per
relevant IS standard. For all concrete works, unless and otherwise specified in soil
investigation report, 53 grade ordinary portland cement, TMT reinforcement bar of
Fe500(D) and structural steel of approved make to be used however prior approval
of the make shall be obtained from VMC. Structural steel of Hot rolled steel with
minimum Yield stress shall be 250 Mpa or Cold form with minimum yield stress shall
be 350 MPa is to be used.
The EPC Contractor shall be obligated to perform following Scope of Work in
relation to the Project. The Scope of Work of the EPC Contractor includes, but is not
limited to, the following:
(A) Design, develop, procure, supply, construct, testing and commission, operate and
maintain of W (AC) Grid Connected Rooftop, but is not limited to the following:
1) Solar PV modules.
2) Components and parts used in Solar Ground Mounted and Rooftop Systems should
conform to the BIS or IEC or other international specifications, wherever such
specifications are available and applicable.
3) (Module Mounting Structures (MMS), Mounting frames, structures, array
foundation Piles in ground / grouting on terrace), earthing grid design, and moduleinter-
4) All System Junction boxes.
5) Grid interactive Power Conditioning Unit/Inverters with web based Remote
Monitoring System
6) MPPT – Max power point tracking built in the PCU
7) Appropriate AC power evacuation panels or inverters, according to Project Site
requirements, with bus bars (in-built or otherwise) and circuit breakers.
8) The nominal steady electrical characteristic of the system are as follows:
a. Single/ Three phase AC at 50 Hertz plus or minus 0.5 Hertz
b. Nominal voltage of 230 V/415V/11KV with +10% to -12.5% variations.
9) Protection/isolation systems.
10) Power and Control Cables, Cables & connectors of solar grade, which can withstand
harsh environment conditions (high temperature, UV Radiation, rain, dirt, microbes
etc for 25 years).
11) Earthing system for PV Array, DC power system, lightning protection system.
12) Data monitoring system with remote monitoring facilities (Completely in scope of
13)Transportation, unloading, and loading of all equipment at Project Site.
14) Project Management including adherence to all requisite safety practices.
15) The Project shall be designed and capable of being synchronized and within a
frequency range of 47.5 to 52 Hz and voltage of 230V/415V with single/three phase.
16) Short circuit rating: As a part of the detailed design process, the Solar Company
shall calculate the short circuit rating (minimum and maximum), and supply this
information to the Procurer
17) Fire fighting (fire extinguisher and sand bucket with stand)
18) Making arrangements for module cleaning in the Solar plant area with cleaning
19) The existing meter room can be utilized after proper designing and approvals of
VMC, Inverters, ACDB,s, DCDB,s and other equipment’s can be kept in the shade type
20) The Bidder/ EPC Contractor shall also provide fixed / folding staircase to access
building’s terrace/roof for Solar Panel Installation, cleaning and maintenance.
21) Confirm feasibility of mentioned Solar PV System capacity along with site visit
report, design and construction of foundations/grouting for holding module
mounting structures without puncturing the roof. If also as per site requirement, the
roof needs to be punctured, the EPC Contractor shall repair the same as per existing
roof design and shall ensure the aestheticity.
22) Triming of tree branches or part of a tree affecting sufficient irradiation on the
system with modules mounted on it or causing shadow on the modules over the
installation and commissioning time period or in future may be allowed only after
approval from VMC.
23) Maintaining proper drainage of rain water over terrace throughout the installation
area and ensuring installation of proper piping systems on rooftops where there is
high probability of water logging. Installation of the same shall be in the scope of the
the EPC Contractor.
24) Water arrangement for module cleaning should be solely in the scope of the EPC
Contractor. EPC Contractor shall ensure that good quality of water available for the
cleaning of module.
25) Cables to be laid over GI/SS trays not obstructing the movement on the terrace as per
site requirement, installation of insulated clamps at places where the cables need
perfectly horizontal climbing and ensuring that the cables do not run away from the
trays by tying the cables along with the tray using SS cable tie(s).
26) Before commencement of work, the EPC contractor has to obtain all approvals for
related drawings to be obtained from the concerned authorities including
GEDA/Gujarat State Designated Agency, CEI, DISCOM, VMC etc..
27) All drawings shall conform to relevant IS/IEC standards.
28) Special care to be taken while designing all structures for modules to cater to heavy
rainfall, strong winds and earthquake that may be prevalent in the area.
29) Serial Number (identification mark) must be permanently marked on all major
components of the SPV systems and shall be fixed with strong adhesive on each
equipment, as approved by VMC/ TPE Agency.
30) Undertake Pre-commissioning and Commissioning of all supplied equipment.
31) Test running of the grid-connected solar Facility including load trials at Project Site,
prior to handover and commencing energy export for metering.
32) Grid commissioning; the plant needs to be grid interactive. Interconnection points to
be checked and certified by VMC/ TPE Agency for accuracy and safety.
33) Installation of Main Meter and Back up Meter shall be done by the EPC Contractor and
the EPC Contractor shall submit drawings for grid interface for each individual power
pack and get approved prior to commencement of work on Project Site. Necessary
approvals and testings of all energy meters shall be as per standardsof CEIG/ DISCOM
34) Commissioning certificate from GEDA/Gujarat State Designated Agency/
DISCOM/GoG designated authority for the Facility.
(B) General Instructions:
1) Construction water and construction power shall be the responsibility of the EPC
Contractor. The water needed and the power consumed during construction phase
shall be taken from sources on a chargeable basis by the EPC Contractor.
2) Security, safety, watch, and ward of all materials at sites shall be the responsibility of
the EPC Contractor.
3) The EPC Contractor to obtain comprehensive insurance cover for the Project.
4) Liaison with statutory authorities as applicable for all the Project approvals.
5) Expenses for any other works, supply of material, and providing services requiredfor
the successful commissioning and operation of the Facility, but not specifically
mentioned in this document.
6) “Contractor Safety Management” to be strictly complied with by the EPC Contractor
throughout Project activity as per safety rules of VMC.
7) First-aid medical facilities at the Project Site during construction to be provided bythe
EPC Contractor.
8) All local labour, employment, and other issues shall be handled independently bythe
EPC Contractor.
9) The entire responsibility and risk relating towards the workforce working at the
Project Site, and compliance of different statutory regulations like Workman
Compensation Act, ESIC, Factory Act 1948, Contract Labour Regulation, and
Abolition Act 1970, Shop and Establishment Act 1948, and other Statutory
regulatory bodies shall solely lie with the EPC Contractor. The EPC Contractor shallalso
be solely responsible for payment of Wages, PF, Bonus, Retrenchment
Compensation Leave etc. applicable as per various statutory regulations to their
entire workforce, and keep Railways indemnified in this regard against any Claim.
(C) Statutory Clearances:
The following Statutory Clearances to be obtained by the EPC Contractor from CEIG /
DISCOM / GEDA/Gujarat State Designated Agency as directed by VMC/ TPE Agency:
1) Nodel Agency Approval (GEDA / DISCOM Registration/Gujarat State Designated
2) Building and Architectural Drawings approvals from relevant authorities, wherever
3) Factory inspector approval for drawings, wherever required
4) Electrical system approval (Electrical Inspector) - CEIG
5) Fire System approval, wherever required
6) DISCOM Approval (Connectivity & Metering- Main)
7) All equipment, accessories, materials, civil construction & erection works should
comply with statutory requirements and IS standards.
8) All statutory requirements for working at the project site like labour registration,
workman compensation policy, ESIC etc. to be complied with by the Contractor
before deployment of resources at the Project Site.
9) All Statutory approval and other Charges (Such as GEDA/Gujarat State Designated
Agency Registration Charges, Main Meter Testing Charges & DISCOM Connectivity
Charges, Any CEIG Registration Charges, etc) shall be pay by Successful Bidder first
after reimbursed the same charges from the VMC.
10) All liaising work shall be in scope of Successful Bidder.
(D) Undertaking:
The EPC Contractor shall give undertaking that for the plant period of 1 0 (Ten) years all
thepower packs covered under this project will be operated, maintained and repaired
whenevernecessary so that all Units are operative and export maximum possible
energy to the gridThis shall be ensured through undertaking services that include,
but are not limited to, thefollowing: -
1) Daily monitoring of plant performance.
2) Supply of all technical, production/operation data and information through a
monthly report.
3) Planned visits on a monthly, quarterly, and annual basis for preventative and
corrective maintenance which include, but are not limited to the following:
a. Clean solar panels on weekly basis or as appropriate to get maximum output from the
b. Check inverter cabinets (ventilation openings, lighting, leakages in inverter cabinets
and cleaning of filters) and inverter maintenance. EPC Contractor will keep the
necessary spares at the Project Site.
c. Check security and fire protection system.
d. Check parts for corrosion.
e. Check the state of tightness of connections, fuses, main junction boxes, etc.
4) Adequate spares to ensure uninterrupted operation and minimum downtime during
the entire period.
5) Comprehensive Maintenance for Five (05) years of the Facility up tothe energy meter
shall be the responsibility of the EPC Contractor.
6) Comprehensive Maintenance for Five (05) years during entire life of the systems
shall include supply of spares, consumables, machine breakdown insurance,
transpiration, and general comprehensive insurance covering fire, earthquake and
provision of security personnel with the insurance policy which shall be taken in the
VMC’s as the primary beneficiary. Copies of the Insurance Policies are to be given to
the concerned department, as and when taken/renewed.
7) All risks associated with lapses or delays in insurance coverage, during the
construction period, shall be at the EPC Contractor’s cost.
8) The EPC Contractor shall ensure efficient operation of the Project and the associated
facilities to achieve the maximum power generation from the Project. For this
purpose the EPC Contractor shall engage the services of adequate number of
Engineers and Technicians. The EPC Contractor shall also attend to all failures,
rectifications, breakdown, comprehensive maintenance checks. Daily Management
Information System (MIS) reports with generation and downtime analysis data shall
be made available to VMC by E-mail.
9) The EPC Contractor should not misuse the area and/or assign responsibility for the
safety of machinery within the premises.
During the execution of work, Success full Bidder may propose Design & Detailed
Project for additional AC Capcity other than mentioned (maximum up to 25%)
subject to technical acceptance & administrative approval of VMC.
CLAUSE: CLEANING AND MAINTENANCE OF SOLAR TREE PANELS
1. Scope of Work
The successful bidder shall be responsible for comprehensive cleaning and
maintenance of all solar panels installed on Solar Trees at designated locations
within Vadodara Municipal Corporation limits throughout the contract period.
2. Cleaning Frequency
The contractor shall carry out cleaning of solar panels at a minimum frequency of
twice per month or as directed by the Engineer-in-Charge, depending upon dust
accumulation, bird droppings, and prevailing weather conditions. Additional
cleaning may be required during summer months or post-monsoon period as
3. Provision of Dedicated Vehicle
The successful bidder shall arrange and deploy a separate dedicated vehicle
exclusively for solar panel cleaning operations. The vehicle shall meet the following
a) The vehicle shall be equipped with adequate water storage tank of minimum
litres capacity, high-pressure water pump, telescopic cleaning equipment, soft
brushes, squeegees, and all necessary accessories required for cleaning solar panels
at elevated heights of Solar Trees.
b) The vehicle shall be maintained in good working condition throughout the
contract period at the contractor's own cost.
c) All fuel, maintenance, insurance, and operational expenses of the vehicle shall be
borne by the contractor.
d) The vehicle shall be available on all working days and as per the cleaning
schedule approved by the Engineer-in-Charge.
e) The contractor shall provide trained and skilled manpower along with the vehicle
for safe cleaning operations at height.
4. Cleaning Methodology
The contractor shall use only demineralised or soft water for cleaning purposes. Use
of hard water, detergents, or abrasive materials that may damage the anti-reflective
coating of solar panels is strictly prohibited. The cleaning shall be carried out
preferably during early morning or late evening hours to avoid thermal shock to
5. Safety Requirements
The contractor shall ensure all safety measures including provision of safety
harnesses, helmets, and other personal protective equipment to the cleaning
personnel. The contractor shall be solely responsible for any accidents or mishaps
during cleaning operations.
6. Records and Reporting
The contractor shall maintain a log book recording date, time, location, and details of
each cleaning activity. Monthly reports shall be submitted to the Engineer-in-Charge
for verification and payment certification.
7. Penalty for Non-Compliance
In case of failure to carry out scheduled cleaning or non-availability of the dedicated
vehicle, a penalty of ₹500 per day per location shall be levied and deducted from the
contractor's running bills.
KEY COMPONENTS OF SOLAR TREE SYSTEM
The Key components of solar Ground Mounted and rooftop system are as follows: -
Solar Panels - A solar panel (also solar module, photovoltaic module or photovoltaic
panel) is a packaged, connected assembly of photovoltaic cells and it is used as a
component of a Solar Rooftop Solar System to generate and supply electricity. Solar
panels usually form a part of a large solar array (multiple panels connected
Junction box - An electrical junction box is a container for electrical connections,
usually intended to conceal them from sight and tampering. A small metal or plastic
junction box may form part of an electrical conduit wiring system in a building, or
may be buried in the plaster of a wall, concealed behind an access panel or cast into
concrete with only thelid showing. It also includes terminals for joining wires.
Inverter / Power Control Unit - A solar inverter converts the variable direct current
output of a photovoltaic (PV) solar panel into a utility frequency alternating current
that can befed into a commercial electrical grid or used by a local, off-grid electrical
network. It is a critical component in a photovoltaic system, allowing the use of
ordinary commercial appliances. Solar inverters have special functions adapted for
use with photovoltaic arrays, including maximum power point tracking and anti-
islanding protection.
Manual/Automatic disconnect switch - It is an automatically/manually operated
electrical switch designed to protect an electrical circuit from damage caused by
overload or short circuit. Its basic function is to detect a fault condition and, by
interrupting continuity, to immediately discontinue electrical flow.
The proposed Solar Tree and Ground Mounted System shall be developed across an
available branch of tree and Ground Space. Rooftop and Ground Mounted shall have
an individual solar PV based power plant (also called power pack) and each power
plant shall be connected to the grid at an appropriate voltage based on the size of
the plant andthe availability of the grid.
Indicative Schematic Single Line Diagram
GENERAL SYSTEM DESIGN GUIDELINES
Each individual solar PV system shall be developed based on the actual availability of space
on the Ground Mounted, rooftop and convenience of the VMC. The broad general
guidelines for the development of individual plants shall follow the following key points:
i) Each individual plant capacity may vary based on Ground/ roof sizes or system sizes.
Individual plant capacity may vary as per the technical feasibility of the location as per
the Solar Policy.
ii) Solar rooftop plant on VMC’s different building shall feed AC power to the distribution
grid of the VMC, Vadodara as per power evacuation and interconnection requirements.
iii) Each plant shall consist of a solar PV array, a fixed solar PV array support structure,junction
box, DC cabling, DC distribution box, inverter and power control unit, AC cabling, AC
distribution box, main distribution panel and meters.
iv) The individual Solar PV arrays shall be installed on existing locations of land, buildings &
gardens using fixed solar PV array support structures.
v) The individual junction boxes and DC cabling shall be installed on the existing locations
of the installed PV power plants.
vi) The individual inverter and the power control units (PCU’s) shall be installed either in a
control room/closed but air ventilated space provided in the respective buildings or next to
the panel arrays in case of large buildings based on considerations like safety, efficiency
and loss reduction.
vii) Individual DC and AC distribution boxes, DC and AC cabling, energy meters and main
distribution panel shall be installed either in the control room or in an appropriate open
space provided in the respective building.
viii) Solar PV system must be able to synchronize with Diesel Generator set. Necessary
arrangement for DG-PV controller shall be incorporated in to the design as per VMC/
local DISCOM requirement.
ix) DG-PV controller shall be able to monitor the load on the DG and in any case shouldnot allow
to inject PV power into DG set. Necessary protection for the installation to be provided by
EPC contractor.
x) A weather monitoring system shall be installed by the Contractor for measurementsof plane
and global irradiance, ambient and module temperature, wind etc. these data shall be used
for calculating the adjusted NEEGG and performance calculation of solar plant. The weather
monitoring system has to be installed on any of the central buildings or open grounds, location
shall be decided by VMC.
Net Electrical Energy Generation Guarantee (NEEGG)
The Bidder shall be given undertaking (As per Annexure) the Net Electrical Energy
Generation Guarantee (NEEGG) for Ten (10) years period at the solar metering point.
Solar meter shall be placed near to interconnection panel at customer LT Panel. The
Bidder shall confirm NEEGG per annum (i.e. Summation of Net Energy Generation from
Solar System) after considering proposed configuration and all local conditions, solar
insolation, wind speed and direction, air temperature & relative humidity, barometric
pressure, rainfall, sunshine duration, grid availability and grid related all other factors
and losses due to near shading, incidence angle modifier, irradiance level, temperature
loss, array loss, module quality loss, module array mismatch loss, soiling loss and various
inverter losses etc. Minimum NEEGG given in Annexure has to be confirmed and agreed
by Bidder. No deviation is allowed.
It would be the responsibility of the bidder to maintain the SPV based power plant and
it’s all the equipment’s in perfect condition at his own cost for the entire period of
Years for which VMC shall pay the agreed O&M charges only. The replacement/ repair/
modification of any/ all equipments has to be carried out by the contractor at his own
cost for the entire period of contract, so as to give the min. 95% of claimed net energy
generation (NEEGG) for particular year “i.e., NEEGG as per Annexure. VMC shall not be
responsible for any break down/ failure of any equipment to any reason there of and that
the contractor shall maintain requisite stock of spares of various equipments. The bidder
may take a suitable type of insurance to meet out the above purpose.
Bidders are expected to undertake their own study of solar profile and other related
parameters of the area and make sound commercial judgment about power output i.e.,
Net Electrical Energy Guaranteed Generation It shall be the responsibility of the Bidder
to access the corresponding solar installation values and related factors of solar plant
along with expected grid availability. The Bidder should access all related factors about
the selected Site for the Project and then give acceptance of the NEEGG for the proposed
The EPC contractor shall submit Declaration for acceptance of NEEGG for 5 years O&M
period as per the Annexure at the time of technical submission of Bid on Rs 300 Non-
Judicial Stamp paper with notarized. mandatory for technical qualification
The degradation in NEEGG quoted for any year shall not be more than 1% of the quoted
for the immediate previous year. If the Bidder anticipates any degradation of the modules
during the first year, it shall be taken care of to provide additional capacity of solar PV
modules to meet guaranteed generation at the end of first year to avoid liquidated
damages/compensation on account of Performance Guaranteed Generation. The NEEGGof
consecutive year should not be more than the previous year’s NEEGG. Bids not following
these conditions shall be summarily rejected.
Maintenance Work :
The Contractor shall undertake comprehensive Maintenance activities for a period of
years from the date of completion of SETC work.
Signature of Tenderer(s) with the seal of the firm.
(C) Other Items [CL.1.1]
Any Other Items as required to fulfill all contractual obligations as per the
10. The following documents also form part of the Contract: [CL.2.3(9
As per clause 2-3 )]
The law which applies to the Contract is the law of Union of India [CL.3.1]
The language of the Contract documents is English [CL.3.1]
Limit of subcontracting 25% of the Initial Contract Price [CL.7.1]
The Schedule of Other Contractors [CL.8]
The Schedule of Key Personnel As per Annex – II to Section I [CL.9]
The minimum insurance cover for physical property, injury and death is [CL13]
Rs. 5 lakhs per occurrence with the number of occurrences limited to four.
After each occurrence, the contractor will pay an additional premium
necessary to make insurance valid for four occurrences always.
Contractor has to submit CAR policy for the project.
Hon.Supreme Court/High Court guideline as well as implementation of
manual Scavenging Act & Rules(2013 including latest amendment) must
be strictly followed by bidder for Drainage wok for better safety
workmen.all Work must be carried out by using safety equipment and by
mechanical equipment by the bidder.
The Bidder will be responsible to pay minimum Rs.30Lakhs in addition to
the compensation paid by the Government in case of Death of Workman
while execution of the work.
Site Investigation report : VMC did not have any data readily available. Same [CL.14]
shall be assessed by bidder before bidding.
18. The Site Possession dates shall be …………………….. [CL.21]
19. The period for submission of programme for approval of the engineer shall [CL. 27.1]
be 21 days from the issue of Letter of Acceptance.
20. The period between program updates will bedays. [CL.27.3]
TECHNICAL SPECIFICATION
TECHNICAL SPECIFICATIONS
TECHNICAL SPECIFICATIONS
DESIGN, ENGINEERING, SUPPLY, INSTALLATION, TESTING, COMMISSIONING,
SYNCHRONIZING WITH THE GRID OF GRID CONNECTED SOLAR TREE SOLAR PV
SYSTEMS ON CAPEX MODEL NET METERING BASIS ON THE FABRICATED TREE
STRUCTURE OF IDENTIFIED LOCATIONS WITH COMPREHENSIVE MAINTENANCE OF
SAME FOR 5(FIVE) YEARS INCLUDING DEFECT LIABILITY PERIOD OF 5 YEARS
The proposed projects shall be commissioned as per the technical specifications given below.
A Grid-connected Solar Tree consists of SPV array, Module Mounting Structure, Power
Conditioning Unit (PCU) consisting of Maximum Power Point Tracker (MPPT), Inverter, and
Controls & Protections, interconnect cables and switches. PV Array is mounted on a suitable
structure. Grid tied SPV system is without battery and should be designed with necessary
features to supplement the grid power during day time. Components and parts used in the SPV
power plants including the PV modules, metallic structures, cables, junction box, switches,
PCUs, Weather Monitoring Systems, Discom approved Energy Meters etc., should conform to
the BIS or IEC or international specifications, wherever such specifications are available and
applicable. Solar PV system shall consist of following equipment’s/components.
Solar PV modules consisting of required number of Crystalline Bifacial PV
modules for Solar Tree project.
Grid interactive Power Conditioning Unit with web based Remote Monitoring System
Module Mounting Structures
Junction Boxes.
Earthing and lightening protections.
IR/UV protected PVC Cables, pipes and accessories
Civil Works, etc.
SOLAR PHOTOVOLTAIC MODULES
The Solar PV modules used must qualify to the latest edition of IEC PV module qualification
test or equivalent BIS standards Crystalline Silicon Solar Cell Modules IEC 61215 and IS14286.
In addition, the modules must conform to latest edition of IEC/IS 61730 Part 1 requirements
for construction & Part 2 – requirements for testing, for safety qualification or equivalent IS.
For the PV modules to be used in a highly corrosive atmosphere throughout their lifetime, they
must qualify to IEC/IS
All modules shall be certified as per the IEC 62804 Certified PV modules should be PID free,
documents for the same should be submitted with conditions of the PID test should be for a
humidity of 85 % and a cell temperature of 85 °C at 1000 Volts, IEC
The certified Bill of Material (BOM) to be used in the PV Modules should be the same as used
during the IEC certification of reference PV Module certified by renowned agency like TUV, UL,
The total solar PV array capacity (kWp) should not be less than allocated capacity (kW) and
should comprise of solar crystalline Bifacial Solar PV modules of not less than 500Watts and
with minimum 19% efficiency to be used. Wattage range of PV module is 500 W to 600 W.
Protective devices against surges at the PV module shall be provided. Low voltage drop bypass
diodes shall be provided.
PV modules must be tested and approved by one of the IEC/MNRE authorized test centers.
Bidder shall submit Type test report as mentioned in the Tender from approved IEC / MNRE
authorized test lab. VMC/ TPE Agency may depute their engineer for material inspection at
OEM factory prior to dispatch.The module frame shall be made of corrosion resistant
materials, preferably having anodized aluminum.
SPV module shall have module safety class-II and should be highly reliable, light weight and
must have a service life of more than 25 years
The bidder shall carefully design & accommodate requisite numbers of the modules to achieve
the rated power in his bid.
The rated output power of any supplied module shall have tolerance up to + 3%. No negative
tolerance in the rated capacity of solar PV module is allowed.
The module mismatch losses for modules connected to an inverter should be less than 1%.
The SPV module shall be made up of high transmissivity glass & front surface shall give high
encapsulation gain and the module shall consists of impact resistance, low iron and high
transmission toughened glass. The module frame shall be made of corrosion resistant material,
which shall be electrically compatible with the structural material used for mounting the
All materials used for manufacturing solar PV module shall have a proven history of reliability
and stable operation in external applications. It shall perform satisfactorily in relative
humidity up to 85% with temperature between -40°C to +85°C and shall withstand adverse
climatic conditions, such as high-speed wind, blow with dust, sand particles etc for wind speed
of 180 km/hr on the surface of the panel as per IEC
Modules only with the same rating and manufacturer shall be connected to inverter. Modules
shall compulsorily bear following information in the form of ID encapsulated with solar cell in
the manner so as not to cast shadow on the active area and to be clearly visible from the top.
The SPV modules shall have suitable encapsulation and sealing arrangements to protect the
silicon cells from environment. The encapsulation arrangement shall ensure complete
moisture proofing for the entire life of solar modules.
The peak-power point voltage and the peak-power point current of any supplied module
and/or any module string (series connected modules) shall not vary by more than 2 (two) per
cent from the respective arithmetic means for all modules and/or for all module strings, as the
The module shall be provided with a junction box with provision of sealed type and with
arrangement for provision of min. 3 by-pass diode. The box shall have hinged, weather proof
lid with captive screws and cable gland entry points or may be of sealed type and IP- 67 rated.
IV curves at STC for each PV module should be provided by bidder.
VMC or its authorized representative reserves the right to inspect the modules at the
manufacturer’s site prior to dispatch.
Plants installed in high dust geographies in Gujarat must have the solar modules tested with
relevant dust standards (Applicable standard would be IEC 60068-2-68 or equivalent).
Before finalization of Solar PV Module Vendor, QAP along with Grade A PV Cell shall be
approved by VMC.
Modules deployed must use a RF identification tag. The following information must be
mentioned in the RFID used on each module. RFID tag shall be inside laminate only and must
contain following information.
Name of the manufacturer of the PV module
Name of the manufacturer of Solar Cells.
Month & year of the manufacture (separate for solar cells and modules)
Country of origin (separately for solar cells and module)
I-V curve for the module Wattage, Im, Vm and FF for the module
Unique Serial No and Model No of the module
Date and year of obtaining IEC PV module qualification certificate.
Name of the test lab issuing IEC certificate.
Other relevant information on traceability of solar cells and module as per ISO
Material Warranty:
Material Warranty is defined as: The manufacturer should warrant the Solar Module(s) to be
free from the defects(including Potential-induced degradation [PID] effect) and/or failures
specified below for a period not less than twenty five (25) years from the date of sale to the
original customer ("Customer")
Defects and/or failures due to manufacturing
Defects and/or failures due to quality of materials
Non conformity to specifications due to faulty manufacturing and/or inspection processes. If
the solar Module(s) fails to conform to this warranty, the manufacturer will repair or replace
the solar module(s), at the Owners sole option.
Performance Warranty:
The predicted electrical degradation of power generated not exceeding 20% of the minimum
rated power over the 25 year period and not more than 10% after ten years period of the full
rated original output. De gradation in first year shall be allowed up to 2.5% and in any
subsequent year degradation shall not be more than 0.7 % per annum.
The manufacturer should warrant the output of Solar Module(s) If, Module(s) fail(s) to exhibit
such power output in prescribed time span, the Contractor will either deliver additional PV
Module(s) to replace the missing power output with no change in area of roof used or repair or
replace the PV Module(s) with no change in area of roof used at VMC’s sole option. Total roof
available from VMC is fixed and the bidder shall design the plant so that in this case he has
enough space within this roof to accommodate additional capacity.
MODULE MOUNTING STRUCTURE (ARRAY STRUCTURE)
Scope of work under this section covers the provision of labour, tools, materials and
performance of work necessary for the design, manufacture, quality assurance, quality control,
shop assembly, shop testing, delivery at site, and preservation, installation, commissioning,
performance and acceptance testing of Module Mounting Structures as per the specifications
here under, complete with all auxiliaries, accessories, spare parts and warranting a trouble
free safe operation of the installation.
The Module Mounting Structure (MMS) should be designed for an optimum seasonal tilt angle
so as to meet the offered NEEGG. The angle should be systematically optimized for maximum
energy generation throughout the year based on location and local weather variables for each
module technology. Bidder has to carry out propoer shadow analysis of proposed area to meet
offered NEEGG. MMS structure design is combination of two elements named Substructure
(Foundation) and Super structure. Bidder must submit the all the quality test documents and
test certificates complying with the requirement of the structure. Suitable provision for
mounting DWC pipes for routing DC cable from Array to Inverter must be provided (Separate
DWC Pipe for Positive and Negative DC Cables as mentioned elsewhere in this tender
Consideration for Solar PV installation on Solar Tree Structure.
Below mentioned consideration are to be kept in mind by contractor for design of total roof
top installation.
Contractor has to ensure the roof strength by carrying out necessary Nondestructive test like
Ultraviolet test and Rebound hammer test for RCC and for Sheet metal roof ensure the
strength of underlying structural members strength for above proposed systems dead load
and wind load by necessary calculations wherever required.
Contractor has to consider that maximum permissible load of total proposed
installation on the RCC as well as Sheet metal roof shall not be more than 90 kg/sqmtr and
kg/Sq.mtr respectively.
Contractor can use Precast Reinforced Blocks and concrete foundations, anchor fasteners for
stability of the proposed systems. For using anchor fastener permission from VMC is required.
VMC has right to reject or accept the proposal of using anchor fastener on RCC roof and it shall
be binding to contractor.
In case of using anchor fasteners Method Company’s (VMC’s) decision shall be binding on
In case of installation on sheet metal roof, contractor has to ensure that installation is water
tight. Contractor has to fill the hole drilled in sheet metal for anchor fastener with proper
In case of installation on sheet metal, contractor has to ensure the strength, location and
spacing of underlying the structural members.
In case of installation on sheet metal contractor has to follow PPE regulations.
Contractor has to repair all damaged structure after completion of the installations as per
existing structure.
Curing of concrete foundations shall be done thrice a day and be maintained for a period of
seven days from the date of casting. Concrete foundation is to be painted as per existing
All design and drawing are to be submitted for approval in Editable, AutoCAD, STAAD file &
PDF format to Company or its designated agency before starting
the work. The submitted drawing and design shall be certified and stamped by licensed
structure designer.
Design of the foundation and structure shall be done for 25 years life such that structure
strength shall not reduce for designed life.
The Contractor has to ensure and arrange sufficient lighting arrangement for all activities
during night time.
Structure shall be earthed separately by maintenance free earthing.
Factor of safety shall be considered as 1.5 for designing the system.
Below mentioned consideration are to be kept in mind by contractor for design of
Superstructure for MMS:
The MMS should be safe, and designed to allow easy replacement of any module and easy
access to the O&M staff. It should be designed for simple mechanical and electrical installation,
should support Solar PV modules at a given orientation, absorb and transfer the mechanical
loads to the ground properly and there should be no requirement of welding or complex
machinery at site.
Irrespective of design, none of the components shall be less than 2mm in thickness.
The array structure shall be so designed that it will occupy minimum space without sacrificing
the output from Solar PV panels at the same time it will withstand desing wind speed as per
wind zone of the plant location.
It shall support Solar PV modules at a given orientation, absorb and transfer the mechanical
loads to the ground properly. There shall be no requirement of welding or complex machinery
at site and is strictly not allowed.
The frames and leg assemblies of the array structures shall be made of hot dip galvanized steel
All design and drawing are required to be submitted in Editable, AutoCAD, STAAD file & PDF
format for approval to Company or its designated agency before starting of work. The
submitted drawing and design shall be certified and stamped by licensed structure designer.
Design of the super structure (Mounting steel structure) shall be done for 25 years life such
that structure strength shall not reduce for designed life.
In case of galvanization of structures, specific requirement for thickness of galvanization
should be at least minimum 80 microns at any point of the galvanized structure. No averaging
is allowed for measuring the thickness of galvanization. Inner side galvanization with same
specification of any hollow components of module mounting structure is mandatory
Galvanised structure is required to be sent to third party laboratory test for confirmation of
the mass of zinc applied on structure.
All nuts and bolts (fasteners) shall be made up of very good quality stainless steel of grade SS
304 required for module fixing. Other fasteners shall be of HDG of
Modules shall be clamped / bolted with the structure properly. The material of construction of
clamps/bolts shall be Al / Steel. Clamps / bolts shall be designed in such a way so as not to cast
any shadow on the active part of a module.
Module mounting structures shall also be earthed through proper separate earthing
Factor of safety shall not be taken less than 1.5 for all design calculation.
For multiple module mounting structures located in a single row, the alignment of all modules
shall be within an error limit of 10 mm in vertical / horizontal line.
The Module Mounting Structure design shall be certified by a structural engineer and it is
Minimum clearance between RCC roof and lowest edge of module shall be minimum 300 mm.
Irrespective of design, none of the components shall be less than 2 mm in thickness
All the cables were aesthetically tied to module mounting structure
All AC and DC cables shall be laid in HDG cable tray. All string cables shall be passed from
UPVC and DWG pipes.
The Contractor has to ensure and arrange sufficient lighting arrangement for all activities
during night time.
Company will provide water connection at one point, contractor has to take extend UPVC pipe
li ne from the provided connection for module cleaning.
Pre-dispatch Inspection of MMS (Solar Tree ):
The Contractor shall provide pre-dispatch inspection call to VMC for inspection at
manufacturer works, as per VMC approved drawings, for all fabricated items such as steel
structure members, galvanization process etc. Prior to inviting VMC for pre - dispatch
inspection, vendor shall submit detailed quality assurance plan (QAP) for VMC approval. QAP
shall include type tests, routine tests, factory acceptance tests, sampling plan, applicable
standards etc. After the inspection, complete set of test reports shall be submitted. For all
bought out items, test certificates as per relevant standards shall be submitted.
JUNCTION BOXES (JBS)
The junction boxes are to be provided in the PV array for termination of connecting cables. The
Junction Boxes (JBs) shall be made of GRP/FRP/Powder Coated Aluminum /cast aluminum
alloy with full dust, water & vermin proof arrangement. All wires/cables must be terminated
through cable lugs. The JBs shall be such thatinput & output termination can be made through
suitable cable glands.
Copper bus bars/terminal blocks housed in the junction box with suitable termination threads
Conforming to IP67 standard and IEC 62208 Hinged door with EPDM rubber gasket to prevent
water entry. Single / double compression cable glands. Provision of earthings. It should be
placed at suitable heightor above for easeof accessibility.
The array junction box will also have suitable surge protection devices installed inthe AJB.
The junction boxes should be able to combine groups of modules into independent charging
Each Junction Box shall have High quality Suitable Capacity Min. Type -2 SPDs Fuses and
connectors. The Junction Boxes shall have suitable arrangement of monitoring and
disconnection for each of the groups. If Inverter having built-in adequate protection such as
SPDs, Over Current Protections, Monitoring, DC Disconnector etc, then DC junction box is not
required. ACDB shall be mandatory for all protection mentioned in the Tender except SPD if it
is built-in the Inverter.
Suitable markings shall be provided on the bus bar for easy identification and the cable ferrules
must be fitted at the cable termination points for identification
All fuses shall have DIN rail mountable fuse holders and shall be housed in thermoplastic IP
enclosures with transparent covers.
It should provide a test point for each sub- group for quick fault location to provide group array
The current carrying rating of the junction box shall be suitable with adequate safety factor to
inter connect the Solar PV array.
The junction boxes shall have suitable cable entry points fitted with cable glands of appropriate
size for both incoming & outgoing cables
Suitable markings shall be provided on the bus bar for easy identification & cable ferules shall
be fitted at the cable termination points for identification.
Junction boxes and solar panel terminal boxes shall be of the thermo plastic type with IP
protection for outdoor use and IP 54 protection for indoor use.
Cable terminations shall be taken through thermo-plastic cable glands. Cable ferrules shall be
fitted at the cable termination points for identification.
DC DISTRIBUTION BOARD
DC Distribution panel to receive the DC output from the array field.
DC DPBs shall have sheet from enclosure of dust & vermin proof conform to IP 67 protection.
The bus bars are made of copper of desired size. Suitable capacity MCBs/MCCB/ Fuses shall be
provided for controlling the DC power output to the PCU along with necessary surge protection
devises (SPD’s).
AC DISTRIBUTION PANEL BOARD
AC Distribution Panel Board (DPB) shall control the AC power from PCU/ inverter and should
have necessary surge arrestors. Interconnection from ACDB to mains at LT Bus bar while in
grid tied mode.
All switches and the circuit breakers, connectors should conform to IEC 60947, part I, II and III/
IS60947 part I, II and III.
ACDB shall be provided with MCCB, Instrument transformers, Multifunction meters, indication
lamps, 5/15A Socket with minimum 20 percent spare terminal and Disconnectors.
The changeover switches, cabling work should be undertaken by the bidder as part of the
All the Panel’s shall be metal clad, totally enclosed, rigid, wall mounted/floor mounted, air -
insulated, cubical type suitable for operation on three phase / single phase, 415 or 230 volts,
The panels shall be designed for minimum expected ambient temperature of 50 degrees
Celsius, 85 percent humidity and dusty weather.
All indoor panels will have protection of IP54 or better. All outdoor panels will have protection
Shall be of Metal Sheet with powder Coating
Should conform to Indian Electricity Act and rules (till last amendment).
All the 415 AC or 230 volts devices / equipment like bus support insulators, circuit breakers,
SPDs, VTs etc., multifunction meters, mounted inside the switchgear shall be suitable for
continuous operation and satisfactory performance under the following supply conditions;
viii- 1 Variation in supply voltage +/- 10 %
Viii- 2 Variation in supply frequency +/- 3 Hz
Panel shall be totally enclosed dust and vermin proof, best quality synthetic / neoprene rubber
gasket shall be provided around doors covers and other cut-outs.
All Cable Entry Shall be from Bottom Only. Gland plate shall be provided on ACDB compartment
with required holes and spare holes. Party shall supply best quality grommet to plug the holes.
Panel shall have excellent aesthetic look and finish.
Two nos of earthing bolts shall be provided on each side of panel.
Holes on Gland plate shall be provided with proper grommets.
Finish and Surface Preparation:
Surface is to be prepared with Sand / Shot Blasting.
Epoxy Power coating (Exterior and interior) after seven tank process with minimum thickness
Interior – White (Preferred) or RAL
All doors shall be provided with adequate number of best quality cam type locking knobs.
Concealed Hinges of good quality shall be provided. Location of Hinges (right or left side) shall
be as per GA drawing. Doors shall be removal type.
All labels shall comprise white letters engraved on Black background.
Labels shall be made of 3 ply lamicoid or Anodized Aluminium.
Size of lettering shall be minimum 50 mm for panel description and designation.
(As shown in GA Drawing)
Size of lettering shall be minimum 5 mm for component designation.
Live terminal shall be protected with proper insulating front barrier.
CAUTION , Name plate “CAUTION LIVE TERMINAL “ Shall be provided at all
points where the terminals are likely to remain live and isolation is required
before opening.
415 V Hazard Board shall be provided on the panel appropriately.
PCU/ARRAY SIZE RATIO
The combined wattage of all inverters should not be less than rated capacity of power plant
under STC. However extra DC capacity can be installed by EPC Contractor to achieve higher
CUF within the limit of the land/roofs/terrace of the proposed office premises/buildings.
Maximum power point tracker shall be integrated in the PCU/inverter to maximize energy
drawn from the array.
Power Conditioning Unit (PCU) / Grid-Tied Inverter
The Contractor has to provide sufficient information to the satisfaction of VMC and approval,
before placing the final order for PCU(s)/Inverter(s). Power Conditioning Unit
(PCU)/Inverter shall consist of an electronic inverter with latest technology available in the
market along with associated control, protection and data logging devices.
As SPV array produce direct current electricity, it is necessary to convert this direct current
into alternating current and adjust the voltage levels to match the grid voltage. Conversion shall
be achieved using an electronic Inverter and the associated control and protection devices. All
these components of the system are termed the “Power Conditioning Unit (PCU)”. In addition,
the PCU shall also house MPPT (Maximum Power Point Tracker), an interface between Solar PV
array & the Inverter, to maximize Solar PV array energy input into the System,to the power
conditioning unit/inverter should also be DG set interactive. If necessary. Inverter output
should be compatible with the grid frequency.
Typical technical features of the inverter for Roof top Solar System shall be as follows:
Sr. Description Specification
1 Switching devices IGBT
2 Control Microprocessor /DSP
3 Nominal AC output voltage and 415V, 3 Phase, 50 Hz (In case single phase inverters
frequency are offered, suitable arrangement for balancing the
phases must be made.)
4 Output frequency 50 Hz
5 Grid Frequency (+) 3 Hz or more
Synchronization range
6 Ambient temperature (-) 20° C to (+) 50° C
7 Humidity 95 % Non-condensing
8 Protection of Enclosure IP-54 (Minimum) for indoor IP-67 (Minimum) for
9 Grid Frequency Tolerance (+) 3 or more
10 Grid Voltage tolerance (-) 20% & (+) 15 %
11 No-load losses Less than 1% of rated power
12 Inverter Efficiency (Maximum) > 98%
13 MPPT Efficiency > 90%
14 THD at rated power < 3%
15 PF 0.9 lag to 0.9 lead
16 LED/LCD Display : Indications Display shall indicate system functional parameters
and protection functional indicator i.e. Inverter ON,
Grid ON, Inverter Under/Overvoltage, Inverter
Overload, Inverter Over Temperature, etc.
17 Data monitor and display Communication Port for Serial Communication RS-
controls 485 using Modbus RTU or ModbusTCP Protocol
Ethernet Port for Web based remote Montitoring
18 Protections Input over voltage
Low/high frequency
AC Short circuit Protection
Under/over output voltage
Over Temperature
Grid Input under voltage / over voltage with auto
DC disconnect device
DC reverse polarity
Anti Islanding Protection as per the standard
Surge Protection
Insulation Resistance Protection
19 Standards IEC 62103 : Electronic equipment for use in power
IEC 62109 Part 1 &
Galvanic Isolation at input & output through
IEC 61727/ VDE 0126 For Grid Interface
IEC 61683 for Efficiency of PCU
IEC 60068 for Environment Testing
IEC 62116 for Anti Islanding
IEEE 519-1992 for Harmonic Control in Electric
20 Display on Front Panel Instantaneous & cumulative array power (W),
Instantaneous &cumulative output power (W)
Cumulative energy (Wh),
DC voltage (V),
DC current (A),
AC voltage (V) (all three phases)
AC frequency (Hz),
AC current (A),
Cumulative hours of operation (h),
Daily energy produced
Ambient temperature
Solar radiation
Data logging facility
Three phase PCU/ inverter shall be used with each power plant system.PCU/inverter shall be
capable of complete automatic operation including wake-up, synchronization & shutdown.
The output of power factor of PCU inverter is suitable for all voltage ranges or sink of reactive
power; inverter should have internal protection arrangement against any sustainable fault in
feeder line and against the lightning on feeder.Built-in meter and data logger to monitor plant
performance through external computer shall be provided.
DC Overloading of PCU/inverter is allowed upto 10% of the rated capacity of the inverter
provided no loss in efficiency. OEM specification or recommendation for % DC overloading of
Inverter shall be submitted by the Contractor. The up-time of PCU/Inverter should be of 99%
in a year, in case of failing to achieve this due to failure of any component of inverter the
Contractor shall either replace the inverter or the component at his own cost. Anti-islanding
(Protection against Islanding of grid): The PCU shall have anti islanding protection in
conformity to IEEE 1547/UL 1741/ IEC 62116 or equivalent BIS standard. In PCU/Inverter,
there shall be a direct current isolation provided at the output by means of a suitable isolating
transformer. If Isolation Transformer is not incorporated with PCU/Inverter, there shall be a
separate Isolation Transformer of suitable rating provided at the output side of PCU/PCU units
for capacity more than 100 kW if made mandatory by DISCOM.The PCU/ inverter generated
harmonics, flicker, DC injection limits, Voltage Range, Frequency Range and Anti-Islanding
measures at the point of connection to the utility services should follow the latest CEA
(Technical Standards for Connectivity Distribution Generation Resources) Guidelines.
The power conditioning units / inverters should comply with applicable IEC/ equivalent BIS
standard for efficiency measurements and environmental tests as per standard codes IEC
61683/IS 61683 and IEC 60068- 2(1,2,14,30) /Equivalent BIS Std. The MPPT units
environmental testing should qualify IEC 60068-2(1, 2, 14, 30)/Equivalent BIS std. The junction
boxes/ enclosures should be IP 67 (for outdoor)/ IP 54 (indoor) and as per IEC
specifications. The PCU/ inverters shall be tested from the MNRE approved test centres / NABL
/BIS /IEC accredited testing- calibration laboratories. In case of imported power conditioning
units, these should be approved by international test houses.
Grid Connectivity: Relevant CERC/GERC regulations and grid code as amended and revised
from time to time shall be complied. The system shall incorporate a uni- directional inverter
and should be designed to supply the AC power to the grid at load end. The power-conditioning
unit shall adjust the voltage & frequency levels to suit the Grid.
INTEGRATION OF PV POWER WITH GRID
The output power from SPV would be fed to the inverters which converts DC produced by SPV
array to AC and feeds it into the main electricity grid after synchronization. In case of grid
failure, or low or high voltage, solar PV system shall be out of synchronization and shall be
disconnected from the grid. Once the DG set comes into service PV system shall again be
synchronized with DG supply and load requirement would be met to the extent of availability of
power. 4 pole isolation of inverter output with respect to the grid/ DG power connection need
to be provided. Necessary controlling arrangement for DG set shall be incorporated in to
DATA ACQUISITION SYSTEM / PLANT MONITORING
Data Acquisition System shall be provided for the Rooftop Solar PV Power Plant All the
generation data shall be accessible remotely. The contractor shall make necessary
arrangements for remote monitoring at all the locations where data can be viewed at a single
location. Web based Remote Monitoring System shall be provided for monitoring and logging
the real time data for each of the Solar PV plants.
Data Logging Provision for plant monitoring, time and date stamped system data logs for
analysis on remote PC. Metering and Instrumentation for display of systems parameters and
status indication to be provided.
Contractor shall provide the data over remote web-server through appropriate arrangements.
The Contractor shall provide all necessary latest Software and hardware (except PC), with
active SIM card and appropriate data plan for 10 Yr for transmitting the data, so as to make the
system complete in all respect.
The Remote Monitoring System shall have capability to log and send data from Pyrano meters,
used for Operational Acceptance Test (OAT).
Solar Irradiance: An integrating Pyrano meter / Solar cell based irradiation sensor (along with
calibration certificate) provided, with the sensor mounted in the plane of the array along with
measurement of GHI. It should be installed at any location as given/ suggested by VMC/TPE
Temperature: Temperature sensors for measuring and recording the Solar panel temperature
and ambient temperature to be provided complete with readouts integrated with the data
The following parameters are accessible via the operating interface display in real time
separately for Rooftop Solar PV Power Plant Project.
AC Output current.
DC Input Voltage.
DC Input Current.
Energy Generation Today
Energy Generation Totalizer (Since Commissioning)
Total Harmonic Distortion
Protective function limits (Viz-AC Over voltage, AC Under voltage, Over frequency, Under
frequency ground fault, PV starting voltage, PV stopping voltage
All major parameters available on the digital bus and logging facility for energy auditing
through the internal microprocessor and read on the digital front panel atany time) and logging
facility (the current values, previous values for up to a monthand the average values) should be
made available for energy auditing through the internal microprocessor and should be read on
the digital front panel.
The Remote Monitoring System shall continuously record power output, fault messages, alarms
etc. in Indian Standard Time.
All data shall be recorded chronologically date wise. The data file should be MS Excel
The contractor shall provide all administrative rights/ privileges/ passwords of theRMS system
The Contractor shall configure Remote Monitoring System with VMC/ State Govt./ Central Govt.
The Contractor shall provide configuration of parameters which are going to monitor as per
VMC Instruction.
It will be added advantage, if Web based remote monitoring system is capable to periodically
transfer the selected parameter value over File Transfer Protocol (FTP)to the VMC selected
server or mail.
Additionally, Inverter must provide data on serial communication over RS485 using Modbus
RTU or Modbus TCP protocol. Vendor must provide the memory map of all the parameters.
Inverter must have feature to connect in “daisy chain configuration” for RS485 Communication.
PV array energy production: Digital Energy Meters to log the actual value of AC/DC voltage,
Current & Energy generated by the PV system provided. Energy meter along with CT/PT should
be of 0.5 accuracy class& better.
DC String/Array monitoring and AC output monitoring shall be provided as part ofthe inverter
and/or string/array combiner box or separately.
AC energy monitoring shall be in addition to the digital AC energy meter.
The data shall be recorded in a common work sheet chronologically date wise. The data file
shall be MS Excel compatible. The data shall be represented in both tabular and graphical form.
All instantaneous data shall be shown on the cloud based platform..
Software shall be provided for USB download and remote monitoring for analysis of DC and AC
parametric data for the plant. Provision for interfacing these data on VMC server and portal in
future shall be kept.
Provision for instantaneous Internet monitoring and download of data shall be also
METERING & GRID CONNECTIVITY
EPC Contractor shall provide an energy meter for accurate periodical readings of AC energy
generated and fed to the grid along with all metering arrangement such as instrument
transformners and structure. EPC Contractor shall be responsible for inspection, testing and
calibration of Energy Meter(as per Discom ) at the time of installation and also during
operation lifetime of Facility.
The Bi-Directional electronic energy meter shall be installed for the measurement of
Import/Export of energy. Following GERC’s orders on solar metering, solar projects will have
“Energy Meter compliant meters at the interface points” and conform to the CEA (Installation
and Operation Meters) Regulations, 2006. An energy meter shall be of approved make of the
DISCOM and shall conform to the requirements laid down by the CEA’s (Installation and
Operation of Meters) Regulation, 2010. This shall be inspected, tested and calibrated at the
time of installation and also during operation lifetime of power plant.
For accounting of solar generation after inverter/ ACDB from individual feeder solar meter
shall be installed. Minimum two no. of solar meter shall be considered for plant. Solar meters
shall be installed near ground floor of the building.
The bidder must take approval/NOC from the Concerned DISCOM for the connectivity,
technical feasibility, and synchronization of SPV plant with distribution network and submit
the same to VMC/TPE Agency before commissioning of SPV plant.
Solar PV s system must be able to synchronize with Diesel Generator set. Necessary
arrangement for DG-PV controller shall be incorporated in to the design as per VMC/ local
DISCOM requirement.
The Parties agree that the installation, sealing, inspection, calibration, maintenance and testing
of Main Meters and the Back Up Meters shall be as per TENDER and shall also conform to the
Central Electricity Authority (Installation and Operation Meters) Regulation, 2006 as amended
from time to time.
The meters will be sealed in the presence of representatives of the EPC Contractor and VMC /
DISCOM. Any seal(s) of Main Meter or Backup Meter will be broken only by DISCOM’s
representative in the presence of the EPC Contractor’s representative whenever such Meter is
to be inspected, tested, adjusted, repaired or replaced.
In case of any change in the Delivery Point as mutually agreed between VMC/DISCOM and the
EPC Contractor will automatically apply to this Agreement without any further action.
Metering System including CT’s (Wherever applicable) shall be as approved by DISCOM and
STU. All approval, testing and required Liaison work shall be in the scope of Bidder. Testing
Charges of Solar Generation Energy Meter, Net Energy Meter, and Current Transformer shall be
carried out and borne by the Bidder. Meter Box shall be as per DISCOM/STU requirement.
The system should be provided with all necessary protections like earthing, Lightning, grid
islanding, DC Earth Fault, AC Earth fault, AC Under and Over voltage, Over current, Short Circuit
and over load protection as follows:
LIGHTNING PROTECTION
The SPV power plants shall be provided with ESE Type lightning & overvoltage protection. The
main aim in this protection shall be to reduce the over voltage to a tolerable value before it
reaches the PV or other sub system components. The source of over voltage can be lightning,
atmosphere disturbances etc. The entire space occupying the SPV array shall be suitably
protected against Lightning by deploying required number of Lightning Arrestors.
Lightning protection should be provided as per IEC 62305standard.
The protection against induced high-voltages shall be provided by the use of SPD’s and suitable
earthing such that induced transients find an alternate route to earth. Minimum 2 (two) nos. of
earthpits are required for lightning arrestors. ESE type lightning arrestors shall be used for the
protection of solar rooftop installations. Details Design Calculation shall be submitted for
SURGE PROTECTION
Internal surge protection shall consist of three MOV type surge-arrestors connected from
+ve and –ve terminals to earth (via Y arrangement). Both AC and DC side minimum type- II SPD
shall be provided.
EARTHING PROTECTION
Each array structure of the PV yard should be grounded/ earthed properly as per IS:3043-
1987. In addition the lighting arrester/masts should also be earthed inside the array field.
Earth Resistance shall be tested in presence of the representative of VMC / DISCOM as and
when required after earthing by calibrated earth tester. PCU, ACDB and DCDB should also be
earthed properly.
The PV module structure components shall be electrically interconnected and shall be
Earthing shall be done as per RE Norms, provided that earthing conductors shall have a
minimum size of 6.0 mm2 copper, 10 mm2 aluminium or 75 mm2 hot dip galvanized steel.
Unprotected aluminium or copper-clad aluminium conductors shall not be used for final
underground connections to earth electrodes.
A minimum of two separate dedicated and interconnected earth electrodes must be used for
the earthing of the solar PV system support structure with a total earth resistance not
exceeding 1 Ohm. It shall be ensured that all the earthing points are bonded together to make
them at the same potential.
Earthpit shall be maintenance free chemical earthpit with chemical compound and 16 mm
meter copper coated (min 250 micron) electrode. The earth electrodes shall have a
brick/RCC/precast concrete enclosure with a removable cast iron for inspection and
maintenance. The entire earthing system shall comprise non- corrosive components.
In the event of a power failure on the electric grid, it is required that any independent power-
producing inverters attached to the grid turn off in a short period of time. This prevents the DC-
to-AC inverters from continuing to feed power into small sections of the grid, known as
“islands.” Powered islands present a risk to workers who mayexpect the area to be unpowered,
and they may also damage grid-tied equipment.The Rooftop PV system shall be equipped with
islanding protection. In addition to disconnection from the grid (due to islanding protection)
disconnection due to under and over voltage conditions shall also be provided.
A manual disconnect 4 pole isolation switch beside automatic disconnection to grid would have
to be provided at utility end to isolate the grid connection by the utility personnel to carry out
any maintenance. This switch shall be locked by the utility personnel.
The following test/Standards can be used for testing the efficacy of the islanding arrangements:
IEC 61727- PV system -characteristic of Utility interface
IEC 62446-Grid connected photovoltaic system-Minimum requirements for system
documentation, commissioning, test and inspection
IEC 62116-Test procedure of islanding prevention measure for utility- interconnected
photovoltaic inverters
Besides the above measures, certain precautions prescribed the CEA in a solar rooftop
technical note shall also be incorporated into the solar PV system design:
PV system shall be provided with adequate rating fuses, fuses on inverter input side (DC) as
well as output side (AC) side for overload and short circuit protection and disconnecting
switches to isolate the DC and AC system for maintenance.
Fuses of adequate rating shall also be provided in each solar array module to protect them
against short circuit.
Cables of appropriate size to be used in the system shall have the following characteristics:
All DC String cables shall meet EN 50618 standard and AC cable shall meet IS 7098- 1-2
Temp. Range: –10Deg C to +80 Deg C.
Voltage rating: 1,100V AC, 1,500V DC
Excellent resistance to heat, cold, water, oil, abrasion, UV radiation
Sizes of cables between array interconnections, array to junction boxes, junction boxes to
Inverter etc. shall be so selected to keep the voltage drop (power loss) of the entire solar
system to the minimum (2%).
For the DC cabling, XLPO insulated and sheathed, UV-stabilized single core multi- stranded
flexible copper cables shall be used; Multi-core cables shall not be used.
For the AC cabling, PVC or, XLPE insulated and PVC sheathed single or, multi-core multi-
stranded flexible copper cables shall be used; Outdoor AC cables shall have a UV-stabilized
The cables (as per IS) should be insulated with a special grade PVC compound formulated for
outdoor use. Outer sheath of cables shall be electron beam cross- linked XLPE type and black in
All the AC power cable for outdoor installation shall be armoured only and the must be earthed
through armoured. Cables for indoor application shall be up to the discretion of VMC.
The DC cables from the SPV module array shall run through GI/SS cable trays with a minimum
thickness as per standard. The DC cables shall be properly dressed by avoiding overlap over
one another and shall be tied by using cable tie(s) in order to ensure that the cables do not run
away from the tray and thereby maintain aesthecity.
Cables and wires used for the interconnection of solar PV modules shall be provided with
solar PV connectors (MC4) and couplers.
All cables and cable trays shall be clamped to the rooftop, walls and ceilings with thermo-
plastic clamps at intervals not exceeding 50 cm; the minimum DC cable size shall be 4.0 mm2
copper; the minimum AC cable size shall be 4.0 mm2 copper. In three phase systems, the size of
the neutral wire size shall be equal to the size of the phase wires. The following colour coding
shall be used for cable wires:
DC positive: red (the outer PVC sheath can be black with a red line marking)
DC negative: black
AC single phase: Phase: red; neutral: black
AC three phase: Phases: red, yellow, blue; neutral: black
Earth wires: green
Cables and conduits that have to pass through walls or ceilings shall be taken through a PVC
Cable Routing/ Marking: All cable/wires are to be routed in a GI cable tray and suitably tagged
and marked with proper manner by good quality ferule or by other means so that the cable can
be easily identified.
In addition, cable drum no. / Batch no. to be embossed/ printed at every one meter.
Cable Jacket should also be electron beam cross-linked XLPO, flame retardant, UV resistant. The
following particulars shall be properly legible embossed on the cable sheath at the intervals of
not exceeding one meter throughout the length of the cable. The cables with poor and illegible
embossing shall be liable for rejection.
Voltage grade Year of manufacture
Manufactures name
Successive Length
All cables and connectors for use for installation of solar field must be of solar grade which can
withstand harsh environment conditions including High temperatures, UV radiation, rain,
humidity, dirt, salt, burial and attack by moss and microbes for25 years and voltages as per
latest IEC standards.
The ratings given are approximate. The EPC Contractor to indicate size and length as per
system design requirement. All the cables required for the plant provided by the bidder. Any
change in cabling sizes if desired by the EPC Contractor/approved after citing appropriate
reasons. All cable schedules/layout drawings approved prior to installation.
EPC contractor shall submit all the details GTP,QAP, VD calculation and type test reports of the
cable for the approval from VMC.
Multi Strand, Annealed high conductivity copper conductor XLPO insulation. All cable trays
including covers to be provided. All cables conform to latest edition of IEC/ equivalent BIS
Standards as specified below: BoQ item / component Standard Description Standard Number
Cables General Test and Measuring Methods, PVC/XLPE insulated cables for working Voltage
up to and including 1100 V ,UV resistant for outdoor installation IS /IEC
The total voltage drop on the cable segments from the solar PV modules to the solar grid
inverter shall not exceed 2.0%.
The total voltage drop on the cable segments from the solar grid inverter to the building
distribution board shall not exceed 2.0%.
Cable conductors shall be terminated with tinned copper end-ferrules to prevent fraying and
breaking of individual wire strands. The termination of the DC and AC cables at the Solar Grid
Inverter shall be done as per instructions of the manufacturer, which in most cases will include
the use of special connectors.
All cables shall be from a reputed manufacturer and shall be in line with IEC 60189/IS 1554 IS
694.These also shall meet following standards.
IEC 62208:- General requirements for empty enclosure for low voltage switch gear and control
gear assemblies
IEC 60947:- Standard test and measurement methods for PVC insulated cables for working
voltages up to and including 1100V, UV resistant for outdoor applications.
IEC 60947:- Connectors for Photovoltaic system-Safety
IEC 50521:- Connectors for Photovoltaic system-Safety
EC 60189-1:-Low frequency cables and wire with PVC insulation and PVC sheath-General test
measuring methods.
IEC 60189-2:- Low frequency cables and wires with PVC insulation and PVC sheath-Cables in
pairs triples, quads and quintuples for inside installations
All string DC cable shall comply with standards: IEC 50618. DC cables shall meet following
minimum requirements:
All module interconnecting cables and those between solar module and array junction boxes
shall be of flexible type. UV protected cables these shall be laid along the module mounting
Size of interconnection for modules and from modules to inverter shall be so selected that loss
would not be more than 2%.
The expected life of cables shall be not less than 30 (thirty) years
The cables shall have suitable insulation and outer sheath:
No fire propagation/flame retardant
Low smoke emission in case of fire
High ambient temperature range -40 deg. C and +90 deg. C
Withstand conductor temperature of 120 C
It shall have high resistance to UV, water, vapour, chemical, corrosion
Should have certification of TUV
The maximum capacity for interconnection with the grid at a specific voltage level shall be as
specified in the Distribution Code/Supply Code of the State and amended from time to time.
Following criteria have been suggested for selection of voltage level in the distribution system
for ready reference of the solar suppliers.
Sr. No. Plant Capacity Connecting voltage
1 Up to 10 kW 415V-three phase at the option of the
2 Above 10 kW and up to 100 kW 415V – three phase
3 Above 100 kW At HT level (11kV) as per DISCOM rules
TOOLS & TACKLES AND SPARES
After completion of installation & commissioning of the power plant, necessary tools & tackles
are to be provided free of cost by the bidder for maintenance purpose. List of tools and tackles
to be supplied by the EPC Contractor for approval of specifications and make from VMC/
A list of requisite spares in case of PCU/inverter comprising of a set of control logic cards, IGBT
driver cards etc. Junction Boxes. Fuses, MOVs / arrestors, MCCBs etc along with spare set of PV
modules be indicated, which shall be supplied along with the equipment. A minimum set of
spares shall be maintained in the plant itself for the entire period of warranty and Operation &
Maintenance which upon its use shall be replenished.
DANGER BOARDS AND SIGNAGES
i) Danger boards should be provided as and where necessary as per IE Act. /IE rules as
amended up to date. Three signage shall be provided one each at battery –cum-control room,
solar array area and main entry from administrative block. Text of the signage may be finalized
in consultation with VMC/ owner.
FIRE EXTINGUISHERS
The firefighting system for the proposed power plant for fire protection shall be consisting
Portable fire extinguishers in the control room for fire caused by electrical short circuits
Sand buckets on rooftop near electrical installations.
The installation of Fire Extinguishers should confirm to TAC regulations and BIS standards. The
fire extinguishers shall be provided in the control room housing PCUs as well as on the Roof or
site where the PV arrays have been installed.
Fire extinguisher shall be placed on all solar rooftop installations from protection of fire caused
by electrical short circuit/ any other means.
DRAWINGS & MANUALS
Two sets of Engineering, electrical drawings and Installation and O&M manuals are to be
supplied. Bidders shall provide complete technical data sheets for each equipment giving
details of the specifications along with make/makes in their bid along with basic design of the
power plant and power evacuation, synchronization along with protection equipment.
Approved ISI and reputed makes for equipment be used.
For complete electro-mechanical works, bidders shall supply complete design, details,
drawings, product specification for approval to SECI/owners before progressing with the
installation work.
PLANNING AND DESIGNING
The bidder should carry out Shadow Analysis at the site and accordingly design strings &
arrays layout considering optimal usage of space, material and labor. The bidder should submit
the array layout drawings along with Shadow Analysis Report to VMC/TPE Agency for
VMC reserves the right to modify the landscaping design, Layout and specification of sub-
systems and components at any stage as per local site conditions/requirements.
The bidder shall submit preliminary drawing for approval & based on any
Modification or recommendation, if any. The bidder submit three sets and soft copy in CD of
final drawing for formal approval to proceed with construction work.
DRAWINGS TO BE FURNISHED BY BIDDER AFTER AWARD OF CONTRACT
The Contractor shall furnish the following drawings Award/Intent and obtain approval
General arrangement and dimensioned layout
Schematic drawing showing the requirement of Solar PV Panel, Power Conditioning Unit(s)/
Inverter, All Cables, Junction Boxes, AC and DC Distribution Boards, Meters etc.
Structural Drawing (GA, Detailed Fabrication Drawing, STAAD File in Soft form, etc) along with
foundation details for the all MMS structures (Rooftop Solar PV Power Plant).
Itemized bill of material for complete SV plant covering all the components and associated
Layout of solar Power Array
Shadow analysis of the roof
SAFETY MEASURES
The bidder shall take entire responsibility for electrical safety of the installation(s) including
connectivity with the grid and follow all the safety rules & regulations applicable as per
Electricity Act, 2003 and CEA guidelines etc.
The bidder has to display a board at the project site mentioning the following:
Plant Name, Capacity, Location, Type of renewable energy plant (Like solar), Date of
commissioning, details of tie-up with distribution companies, Power generation and Export FY
The size and type of board and display shall be approved by Engineer-in-charge before site
IEC standards It is to be mandatorily adhered are as given below:
Quality Certification, Standards and Testing for Grid-connected Rooftop Solar PV Power Plant
Quality certification and standards for grid-connected rooftop solar PV systems are essential
for the successful mass-scale implementation of this technology. It is also imperative to put in
place an efficient and rigorous monitoring mechanism, adherence to these standards. Hence, all
components of grid-connected rooftop solar PV system/ plant must conform to the latest and
updated version of relevant standards and certifications given below:
Solar PV Modules/Panels
IEC 61215/ IS 14286 Design Qualification and Type Approval for Crystalline
Silicon Terrestrial Photovoltaic (PV) Modules
IEC 61646/ IS 16077 Design Qualification and Type Approval for Thin-Film
Terrestrial Photovoltaic (PV) Modules
IEC 62108 Design Qualification and Type Approval for Concent
Photovoltaic (CPV) Modules and Assemblies rator
IEC 61701- As Salt Mist Corrosion Testing of Photovoltaic (PV) Modules
IEC 61853- Part 1/ IS Photovoltaic (PV) module performance testing and energy
16170 : Part 1 rating –: Irradiance And temperature performance
measurements, and power rating
IEC 62716 Photovoltaic (PV) Modules – Ammonia (NH3) Corrosion
(Advisory - As per the site condition like dairies, toilets)
IEC 61730-1,2 Photovoltaic (PV) Module Safety Qualification – Part 1:
Requirements for Construction, Part 2: Requirements for
IEC 62804 (Draft Photovoltaic (PV) modules - Test methods for the detection
Specifications) of potential-induced degradation (PID). IEC TS 62804-1:
Crystalline silicon
(Mandatory for system voltage is more than 600 VDC and
advisory for system voltage is
less than 600 VDC)
IEC 62759-1 Photovoltaic (PV) modules – Transportation testing, Part 1:
Transportation and shipping of module package units
Solar PV Inverters
IEC 62109-1, IEC Safety of power converters for use in photovoltaic power
62109-2 Safety compliance (Protection degree IP 67 for outdoor
mounting, IP 54 for indoor mounting)
IEC/IS 61683 Photovoltaic Systems – Power conditioners: Procedure for
(Forstand Alone Measuring Efficiency (10%, 25%,50%, 75% & 90-100%
System) Loading Conditions)
BS EN 50530 Overall efficiency of grid-connected photovoltaic inverters:
(Will become IEC This European Standard provides a procedure for the
62891) measurement of the accuracy of the maximum power point
(For Grid Interactive tracking (MPPT) of inverters, which are used in grid-
system) connected photovoltaic systems. In that case the inverter
energizes a low voltage grid of stable ACvoltage and
constant frequency. Both the static and dynamic MPPT
efficiency is considered.
IEC 62116/ UL 1741/ Utility-interconnected Photovoltaic Inverters - Test
IEEE 1547 of Islanding Prevention Measures
IEC 60255-27 Measuring relays and protection equipment - Part 27:
Product safety requirements
IEC 60068-2 (1, 2, 14, Environmental Testing of PV System – Power Conditioners
27, 30 & 64) Inverters
IEC 61000- 2,3,5 Electromagnetic Interference (EMI), and Electromagnetic
Compatibility (EMC) testing of PV Inverters (as applicable)
IS/IEC 60947 (Part 1, General safety requirements for connectors,
2 & 3), EN 50521 switches, circuit breakers (AC/DC)
IEC 60269-6 Low-voltage fuses - Part 6: Supplementary
requirements for fuse-links for the protection of
solar photovoltaic energy systems
Surge Arrestors
IEC 61643-11:2011 Low-voltage surge protective devices - Part 11: Surge
/ IS 15086-5(SPD) devices connected to low- voltage power systems -
and test methods
IEC 60227/IS 694, General test and measuring method for PVC
(Polyvinyl chloride)
IEC 60502/IS 1554 insulated cables (for working voltages up to and
(Part 1 & 2) V, and UV resistant for outdoor installation)
BS EN 50618 Electric cables for photovoltaic systems
(BT(DE/NOT)258), mainly for DC cables
Earthing /Lightning
IEC 62561 Series( Part IEC62561-1
1,2 &&) (Chemical Lightning protection system components (LPSC) -
earthing) Requirements for connection components
Lightning protection system components (LPSC) -
Requirements for conductors and earth electrodes
Lightning protection system components (LPSC) -
Requirements for earthing enhancing compounds
IEC 60529 Junction boxes and solar panel terminal boxes shall
be of the thermo plastic type with IP 67 protection
for outdoor use, and IP 54 protection for indoor use
IS 16444 or A.C. Static direct connected watt-hour Smart Meter
asspecified and 2 — Specification (with Import & Export/Net
by the measurements)
Solar PV Roof Mounting Structure
IS 2062/IS 4759 Material for the structure mounting
INTERCONNECTION SCHEME
The project aims to develop a replicable model of decentralized power generation using
photovoltaic plants that feed energy to the grid. The scope would include design,
manufacture, supply, install and commission and operate for 25 years these SPV power
All work must be carried out as per the following:
Indian Electricity Act and rules therein
Indian Electricity Grid Code
Regulations of Chief Electrical Inspector
Besides the above measures, certain precautions prescribed by the CEA shall also be
incorporated into the solar PV system design:
PV systems shall be provided with adequate rating fuses, fuses on inverter input side (DC)
as well as output side (AC) side for overload and short circuit protection as well as
disconnecting switches to isolate the DC and AC system for maintenances.
Fuses of adequate rating shall also be provided in each solar array module to protect them
against short circuit.
Phase Imbalance
Phase imbalance can occur due to varied power injected into different phases of the grid.
Whenever solar power plants (SPPs) of lower capacities with single phase inverters are
used to feed power into the grid using a single phase injection point, they tend to induce
imbalance. This imbalance can be resolved simply by connecting / injecting power to
different phases in the same grid.
The developer shall have to follow the phase imbalance limits imposed by the Off Taker and
shall also have to follow the guidelines before connecting such limits to the grid.
The injection phase for each system to be injected into a single phase shall be approved by
TESTING PROCEDURE
Mandatory check before and after connecting the SPV system with DISCOM Network and
steps for maintenance of network where such connectivity exists.
MANDATORY SAFETY PRECAUTIONS AND FEATURES TO BE TAKEN CARE DURING OEM &
AFTER COMMISSIONING
The following are mandatory safety precautions and features which will be taken care
before and after commissioning of grid connected Solar PV system:
An inbuilt Inverter relay which trips on Discom supply failure and thus prevents any solar
power injection to the Discom when there is no power from Discom. The anti-islanding
protection shall be tested by respective VMC Engineer and the EPC Contractor during the
release of connection.
The Solar PV system should be separately grounded / earthed. A minimum of two Separate
dedicated and interconnected earth electrodes must be used for the Earthing of the PV
system support structure, with a total earth resistance not exceeding 1ohms. There must be
at least three different earth pits, with minimum distance of 3 meters between any two, for
each PV system; one for DC side (panels and structure), second for AC side (also called as
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender Document_Solar Tree_21.01.2026.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .