Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹1,100
Closing Date
27 Dec 2021, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE EDC BHADOHI
OFFICE OF SE EDC BHADOHI
WORK OF THE INCREASING CAPACITY T/F AND INSTALLATION OF ADDITIONAL T/F AT EDD I BHADOHI UNDER B.P-2021-22
2021_PVVNV_650445_1
44/EDC(BH)/2021-22
Open Tender
Electrical Works
Lump-sum
90 days
BHADOHI
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
EE EDD I BHADOHI
₹1,100
30 Dec 2021
2 Dec 2021
29 Dec 2021
2 Dec 2021
27 Dec 2021
2 Dec 2021
90 days
fctul Iyku o"kZ 2021&22 esa tuin Hknksgh dss fo|qr forj.k [k.M iz0 Hknksgh ds vUrxZr vfrHkkfjr ifjorZdksa ds {kerk o`f) ,oa vfrfjDr ifjorZd dh Lfkkiuk gsrq fo|qr Hk.Mkj dsUnz ls LoLFk ifjorZdksa ,oa lEcfU/kr vU; vko';d lkexzh;ksa dks lkbZV rd lqjf{kr <qykbZ vkSj iqjkus ifjorZd dks mrkjdj Hk.Mkj daUnz esa tek djus vkSj fIyUFk dk fuekZ.k dj u;s ifjorZd dh LFkkiuk dj ,y0Vh0@,p0Vh0 ykbZu dks tksM+us rFkk mthZdj.k ls lEcfU/kr leLr dk;ZA
increasing of 25 kva to 63 kva
increasing of 63 kva to 100 kva
100 KVA addititinal Transformer stablished
250 kva additional transformer stablished
11 KV PP Metering Cubical
11 KV O/D, D/P CT/PT Double Metering unit
25 KVA Transformer
100 KVA Transformer
Erection of Single PCC Pole with all fitting and Pole Grouting
Erection of Single ST Pole with all fitting and Pole Grouting
Erection of Double PCC Pole with all fitting and Pole Grouting
Erection of Double ST Pole with all fitting and Pole Grouting
Earthing of Pole
Spreading of Conductor, Mounting on Insulator Tightening with sagging and binding on each pole HT Line 3 phase 3 wire
Mounting of 11/0.4 KVA Transformer with all fitting require in LT Substation complete work 25 KVA Transformer on Double Pole
Mounting of 11/0.4 KVA Transformer with all fitting require in LT Substation complete work 100 KVA Transformer on Double Pole
Stay Erection Grouting nozzling and Tightening work
Fitting of T-OFF Channel Size 125x65x1300 mm with Pole
11 KV Cabel Jointing
Erection of 11 KV PP Metering Cubical
Mounting of 11 KV O/D, D/P CT/PT Double Metering unit complete work
Replacement by 3 km Raccon Cond after Dismentling of JarJar ACSR Weasal Cond and Cartage of Scrap from Site to Store Bhadohi
Dismentling of 0.140 Line km of Dog and Cartage of Scrap from Site to Store Bhadohi
M/S HARI OM ASSOCIATE
Urmila Associates
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .