Loading…
Loading…
Tender Value
₹14.4 Cr
EMD Value
₹28.8 L
Closing Date
28 Apr 2026, 11:00 amClosed
Execution of Balance Civil works like Vacuum Dewatering Concrete works, platform walls & surfaces, execution of drain works, P. Way linking and Circulating area works of stations between DNV to GTLM in connection with construction of 3rd line works between TIG-VZM in Waltair Division of East Coast Railway
Bal_Works_Pkg-6B_SLT_4
Bal_Works_Pkg-6B_SLT_4
Special Limited
12 Months
Unknown (Unspecified Location)
₹0
₹28.8 L
10 Apr 2026
10 Apr 2026
22 Apr 2026
(Standard Rates)
5006: Transportation of rails, switches, crossings, etc. (supplied by RVNL) from point of issue to
their final location of laying in track.
S No. Item Description of Item Unit Qty Rate Amount
upto the middle point of location of laying in
each KM, upto 10 KM
KM under item 5006 (a) above
5026: Dismantling of existing BG track, turnouts, derailing switches, dead ends, sand humps, etc. of
any rail section and any type of sleepers of any density and transporting all released material
including sleepers, rails, switches, crossings and fittings & fastenings to the nearest station or
manned level crossing or road loading point as directed by the Engineer.
S No. Item Description of Item Unit Qty Rate Amount
1 1 5026a: Plain track including SEJ and Glued Track 1353.00 175.81 237870.93
Joints and track at level crossing, bridge & metre
bridge approaches and sharp curves with
PIU-WALTAIR-1-CIVIL/RVNL
5036: unning and maintenance of RVNL Trolley, including consumables maintenance etc. with
contractor's men, materials, tools & plants and as directed by Engineer-in-charge. Note: 1. Log
Item- 22 book to be maintained duly obtaining the signature of the inspecting officials. 2. For light motor
trolley, one motor trolley driver and three labour to be provided. 3. For heavy duty motor trolley,
one motor trolley driver and four labour to be provided.
S No. Item Description of Item Unit Qty Rate Amount
2 2 (b) Extra over above item for operating heavy Day 50.00 310.50 15525.00
duty motor Trolley
5045: Shifting of P. Way materials such as rails, sleepers, points and crossings, fastenings etc. and
Item- 27 stacking at the nominated place upto 250 m lead as directed by Engineer-in-Charge including all
lift, labour, tools and machinery etc. complete
S No. Item Description of Item Unit Qty Rate Amount
thereof beyond initial 50 m
NS-11/5A: Painting 2 coats to various P.Way Reference Post, Structures etc. with enamel paint of
approved make with 2 coats of different colours & letters, as directed by Engineer in-charge.
S No. Item Description of Item Unit Qty Rate Amount
NS-13/5A: Fixing of fish plates with fish bolts on a joint of all rail sections duly lubricating fish
plates/bolts with contractor's grease graphite in running track condition including transportation of
fish plates and fish bolts from nearest station / store / level crossing. Note: Rail cutting & drilling to
be paid separately.
S No. Item Description of Item Unit Qty Rate Amount
NS-18/5A: Loading, leading and unloading of 52Kg / 60Kg rail up to 13 metre length by Railway's
Item- 42 Rail Dolly / Dip Lorry to the nominated location under traffic with line protection in case road
carriage is not possible with different lead with a lift up to 5 metre during block period.
S No. Item Description of Item Unit Qty Rate Amount
beyond 1 Km for every subsequent Km or
part thereof and up to 10 Km
contractor's Rail Dolly / Dip Lorry
NS-20/5A: Loading, leading and unloading of PSC Sleepers of 52Kg / 60Kg by Railway's Rail Dolly/
Item- 44 Dip Lorry to the nominated location in case road carriage is not possible for different leads and lift
up to 5 metres.
S No. Item Description of Item Unit Qty Rate Amount
beyond 1 Km for every subsequent Km or
part thereof and up to 10 Km
PIU-WALTAIR-1-CIVIL/RVNL
contractor's Rail Dolly/Dip Lorry.
Schedule 7A1-BILL No.7: PLATFORM, PASSENGER AMEINITIES AND MISCELLANEOUS WORKS Bill No.
Schedule 7A.1: Platform, Passenger amenities and miscellaneous works (Other than Steel Items) (standard
7022: Dismantling work including removal and disposal of dismantled material outside railway
boundary as directed by the Engineer. Dismantled material will be removed by the contractor at his
own cost and the same will become the property of the contractor. Note: Measurement will be done
before dismantling the structure.
S No. Item Description of Item Unit Qty Rate Amount
Item Breakup - 9-Bill No.9.1 : Site Facilities (Standard Rates)
9003 a: INNOVA, MAHINDRA XUV500 or Vehicle- similar Month
9003b: MARAZZO or similar Month
Per 9003c: Extra for running and maintenance of kilometre every additional km over and above 4000 Per kms as specified in item 9003 (a) Month
Per 9003d: Extra for running and maintenance of kilometre every additional km over and above 4000 Per kms as specified in item 9003 (b) Month Total 6336672.96
Item Breakup - 1B-BILL No.1.2 : EARTHWORK IN FORMATION (Site Specific Rates)
a) Girth above 30 CM and up to 60 CM
b) Girth above 60 CM and up to 90 CM
c) Girth above 90 CM and up to 180 CM Total 25380.40 Schedule 5B-BILL No.5 : PERMANENT WAY LINKING Bill No. 5B.1 : P.Way Linking (Supply and
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
CoverPageandPreamble.PDF
ATTACHMENT
Section1ITB.pdf
ATTACHMENT
Section 2 and 3
ATTACHMENT
4-Sec4BF.pdf
ATTACHMENT
5-Sec-5_WRQ.pdf
ATTACHMENT
Section6GCC.pdf
ATTACHMENT
Secition-7APCC.PDF
ATTACHMENT
7b-Sec_7B.pdf
ATTACHMENT
Section8CF.pdf
ATTACHMENT
COVERPAGESBOQPreamble.pdf Cover Page and Preamble BOQ
ATTACHMENT
BoQ_1.pdf
ATTACHMENT
Section-2BDSandSection-3EQC.PDF
ATTACHMENT
COVERPAGESBOQPreamble.pdf
ATTACHMENT
Download all tender documents and submit your bid