| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC 2239 1ST FLOOR GARIA STATION RD KALITALA VILLAGE TOWN GARIA CITY KOLKATA KOLKOTA WEST BENGAL 700084 INDIA | 24 PARAGANAS SOUTH | WEST BENGAL | 700084 | ₹1.5 Cr | L1 | Accepted-AOC As L1 Bidder |
| 2 | L2₹1.5 Cr+₹50,150 (0.33%)Rejected-AOC 16 12A SWAMIJI ROAD NEAR SABUJ SANGHA KOLKATA WEST BENGAL 700060 | KOLKATA | WEST BENGAL | 700060 | ₹1.5 Cr+₹50,150 (0.33%) | L2 | Rejected-AOC As L2 Bidder |
| 3 | Rejected-Technical | - | - | Rejected-Technical Technocommercially not admitted |
Tender Value
₹1.8 Cr
EMD Value
₹3.1 L
Closing Date
20 Sept 2021, 12:00 pmClosed
GM(BTPS)
Administrative Building, Bandel Thermal Power Station, Tribeni, Dist Hooghly Pin712503
Service contract for overhauling of Boiler Pressure Parts of Unit#5 under BandA, BTPS, WBPDCL
2021_WBPDC_340953_1
WBPDCL/BTPS/NIT/E1938/21-22
Open Tender
Support/Maintenance Service
Item Rate
30 days
Bandel Thermal Power Station
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹3.1 L
Administrative Building, Bandel Thermal Power Stn.
4 Jan 2022
20 Aug 2021
22 Sept 2021
20 Aug 2021
20 Sept 2021
6 Sept 2021
2 Sept 2021
Amount
Overhauling of Pressure parts
Cleaning of furnace Zone, PLSH, FSH, FRH by HP water Jet.
Supply and errection of scaffolding materials for furnace and other areas.
Scaffolding of FSH, PLSH, FRH area upto roof top
Pent house and dead chamber cleaning
Penthouse & dead chamber repairing by 3mm ms plate welding
Overhauling of boiler drum
Insertion joint of water wall tube Size: 63. 5X5. 4, Mat: BS3059/45S2 or SA210Gr. C, including replacement of bend
Insertion of division wall tube Size: 82.5X7, Mat: BS3059/45S2 or SA210Gr.C
Insertion joint of furnace roof tube Size: 63. 5X4. 8, Mat: BS3059/620S2 or SA213T11
Insertion joint of Bleed tube
Insertion joint of PLSH and FSH inlet tube Size: 44. 5X7, Mat: SA213T22
Insertion joint of FSH & FRH tube Size: 50. 8X3. 6/6. 3, Mat: SA213T91
Platen SH, Final SH, Final RH coil pulling , inspection and proper alignment of coil and panel with clit and support welding (by SS bar and clamp)
D-metering of boiler tubes in all the high pressure zones of the boiler viz. platen SH, Final R/H, Final S/H, Screen and cage wall, furnace wall, roof tubes, PSH tube, economiser tube etc. and in boiler 1st & 2nd pass (minimum 4500 points)
Radiography of pressure parts weld joint (including old joints)
Stress relieving of welding joints
Inspection and Correction of buck stay and Steelwork (including T and channel connecting joint with tube)
Replacement of stub at different header
Skin casing welding by MS Electrode
Welding of membrane strip
Deposition of weld metal on tubes/stubs/header etc.
Sealing at top of bottom ash hopper by wooden planks, GI sheet and gunny bags
Servicing of Valve size above 40 mm upto 80 mm
Servicing of Valve size above 80 mm upto 100 mm
Servicing of Main steam Stop Valve
Servicing of Eco Inlet Isolating Valve
Servicing of Eco Inlet NRV
Servicing of Start-up vent Isolating v/v
Servicing of FCS Isolating valve
Main steam safety valve 75 mm
Drum safety valve 75 mm
Cold reheat safety valve 153 mm
Trivy test and Assistance to trivy test for Drum, SH, CRH&HRH safety valve
Servicing and repairing of seal plate, dipper plate and tough seal box
Arrangement of require crane/hydra with fuel and operator
Safety valve sheet cutting
Refractory work (manholes, peep hole, wall blower, burner quarl, goose neck to straight tube, etc. )
Scaffolding of Economiser Zone PSH & PRH and cleaning of same by LP water
Inspection and run welding of economiser Hopper, All bracing pipe inspection, changing as per requirement, guard angle fitting upto APH inlet damper
Removal and fitting of guard tube guard plate
Economiser coil lifting, inspection and fitting with proper alignment (including connection joint and RT)
PSH coil lifting, inspection and fitting with proper alignment (including 4 nos. joint/coil and RT)
Insertion joint of PSH bottom bank tube Size: 63. 5X6. 3, Mat: BS3059/45S2 or SA210Gr. C
Insertion joint of PSH middle bank tube Size: 63. 5X8. 8, Mat: BS3059/45S2 or SA210Gr. C
Insertion joint of PSH top bank tube Size: 57. 1X6, Mat: BS3059/620S2 or SA213T11
Insertation joint of Economiser tube 38. 1 x 3. 6 mm, Material BS 3059/45S2
Fabrication of different sizes of bends U-loops etc.
Insulation work (de-insulation and re-insulation)
Replacement of economiser side wall RHS (including replacement of 08 nos. manhole, and PRH I/L header entry bend)
Fixing of manhole at water wall tube (63. 5 x 5. 4, Mat : SA 210 Gr C) including all steel works, fins welding, refractory box repairing/replacement, refractory work, door fixing etc. as per requirement
Man hole/ peep hole door servicing (other than complete manhole/peep hole replacement job)
Eco coil replacement/dismentling repairing and refitting
Engagement of 2 nos. Ex BHEL expert (Age less than 65 yrs. ) for pressure parts checking
Restoration of MS Safety Valve escape including rectification of hanger support
RLA Assitance
GST (if any)
TECHNO ENGINEERING
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .