| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 CrAccepted-Finance | ₹1.8 Cr | L1 | Accepted-Finance Lowest Amount |
| 2 | L2₹2.6 Cr+₹81.9 L (46.1%)Accepted-Finance OFF SAKI VIHAR ROAD SAKINAKA ANDHERI EAST MUMBAI 400072 MAHARASHTRA ANDHERI EAST MUMBAI MAHARASHTRA 400072 | MUMBAI SUBURBAN | MAHARASHTRA | 400072 | ₹2.6 Cr+₹81.9 L (46.1%) | L2 | Accepted-Finance Second Lowest Amount |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹4 L
Closing Date
28 Mar 2023, 3:00 pmClosed
Director of Municipal Administration
No. 75, Santhom High Road,MRC Nagar, Chennai -28.
Selection of Third Party Inspection TPI Agency for inspection of Energy saving measures taken on Street Light System through Conversion to LED lamps and fittings in Urban Local bodies in Tamil Nadu
2023_MAWS_290905_1
35871/2014/SS2
Open Tender
Consultancy
Item Rate
2190 days
Director of Municipal Administration
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹4 L
Director of Municipal Administration
7 Apr 2023
25 Feb 2023
28 Mar 2023
25 Feb 2023
28 Mar 2023
25 Feb 2023
9 Mar 2023
Amount
Conducting Physical Material Verification on LED street light Fittings equal to 10% of quantity of each item, against the supplied quantity in a single lot, which inclusive of (i) 20 watts LED fitting built with minimum 300mm length of 3 core 1sq.mm copper cable, male connector and supplied with 1.2 meter length, 32mm dia GI Bracket and 2 set of GI clamps and necessary bolts and nuts. (ii) 25 watts LED fitting built with minimum 300mm length of 3 core 1sq.mm copper cable, male connector and supplied with 1.2 meter length, 32mm dia GI Bracket and 2 set of GI clamps and necessary bolts and nuts. (iii) 40 watts LED fitting built with minimum 300mm length of 3 core 1sq.mm copper cable, male connector and supplied with 1.2 meter length, 32mm dia GI Bracket and 2 set of GI clamps and necessary bolts and nuts. (iv) 45 watts LED fitting built with minimum 300mm length of 3 core 1sq.mm copper cable, male connector and supplied with 1.2 meter length, 32mm dia GI Bracket and 2 set of GI clamps and necessary bolts and nuts. (v) 60 watts LED fitting built with minimum 300mm length of 3 core 1sq.mm copper cable, male connector and supplied with 1.2 meter length, 40mm dia GI Bracket and 2 set of GI clamps and necessary bolts and nuts. (vi) 72 watts LED fitting built with minimum 300mm length of 3 core 1sq.mm copper cable, male connector and supplied with 1.2 meter length, 40mm dia GI Bracket and 2 set of GI clamps and necessary bolts and nuts. (vii) 90 watts LED fitting built with minimum 300mm length of 3 core 1sq.mm copper cable, male connector and supplied with 1.2 meter length, 50 mm dia GI Bracket and 2 set of GI clamps and necessary bolts and nuts. (viii) 120 watts LED fitting built with minimum 300mm length of 3 core 1sq.mm copper cable, male connector and supplied with 1.2 meter length, 50 mm dia GI Bracket and 2 set of GI clamps and necessary bolts and nuts. (ix) 150 watts of flood light LED fitting built with minimum 300mm length of 3 core 1sq.mm copper cable, male connector (x) 200 watts of flood light LED fitting built with minimum 300mm length of 3 core 1sq.mm copper cable, male connector and to issue test certificate conducting the required test as per the recommended standards after ascertain the quality, specification and standards insisted as in the agreement executed with work contractor. Including the cost of key personnel and cost of other staff, cost of travel and cost of accommodation, and stationeries required for the key person and the staff assigned for the task.
Conducting Physical Material Verification on 10% of quantity of Single Phase / Three Phase – RF+4G gateway streetlight controller against the supplied quantity in single lot and to issue test certificate conducting the required test as per the recommended standards after ascertain the quality, specification and standards insisted as in the agreement executed with work contractor. Including the cost of key personnel and cost of other staff, cost of travel and cost of accommodation, and stationeries required for the key person and the staff assigned for the task.
Conducting Physical Material Verification on 10% of quantity of Individual Lamp Monitoring devices (ILM) with Radio frequency with dimming device ,against the supplied quantity in single lot and to issue test certificate conducting the required test as per the recommended standards after ascertain the quality, specification and standards insisted as in the agreement executed with work contractor. Including the cost of key personnel and cost of other staff, cost of travel and cost of accommodation, and stationeries required for the key person and the staff assigned for the task.
Conducting Physical Material Verification on one number of Central control monitoring Centre (CCMC) software with device and to issue test certificate conducting the required test as per the recommended standards after ascertain the quality, specification and standards insisted as in the agreement executed with work contractor. Including the cost of key personnel and cost of other staff, cost of travel and cost of accommodation, and stationeries required for the key person and the staff assigned for the task.
Ascertain the saving in energy consumption on quarterly basis in 6 years, after the implementation of Energy saving measures by conversion of LED lamps fittings through the CCMS with reference to the Base line energy determined by the Investment grade auditors and to issue energy saving certificate to the 94 Municipalities and in 9 Corporations Including the cost of key personnel and cost of other staff, cost of travel and cost of accommodation, and stationeries required for the key person and the staff assigned for the task.
TUV SUD South Asia Private Limited
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .