Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance KOYILANDY MUNICIPALITY KOYILANDY KERALA | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹19.5 L
EMD Value
₹48,850
Closing Date
16 May 2026, 6:00 pmClosed
Executive Engineer,Minor Irrigation Division, KKD
Office of the Executive Engineer,MI Division, KKD
Construction of VCB and Field channel of Elembilath Muzhi at Pilathara in Perambra Panchayath, Kozhikode District Balance Work
2026_Irrig_849668_1
EE MI/EQ- 01/2026-27
Open Tender
Civil Works - Others
Item Rate
60 days
perambra panchayath
Please refer Tender documents.
11 documents required · 11 mandatory
₹0
₹48,850
Yes
18 May 2026
8 May 2026
18 May 2026
8 May 2026
16 May 2026
8 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | 60.2.2 Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete | - | Hour | - | - |
| 1.02 | 2.6.1 Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 150 cm, disposed earth to be levelled and neatly dressed.All kinds of soil | 1 | cum | - | - |
| 1.03 | 60.7.4 DR PACKING FOR APRONS - Rough stone dry packing for apron with good quality blasted rubble including packing to compactness to lines levels cost and conveyance of all materials labour charges etc comple as per the direction of departmental officers at site. | 1 | Cum | - | - |
| 1.04 | 4.1.3 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 2 cm nominal size) | - | Cum | - | - |
| 1.05 | 5.1.3 Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | - | Cum | - | - |
| 1.06 | 5.1.2 Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement -All work up to plinth level:1:1:5:3 (1cement 1.5 coarse sand :3 graded stone aggregate 2.0cm nominal size ) | 1 | Cum | - | - |
| 1.07 | 4.1.5 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 nominal size ) | - | Cum | - | - |
| 1.08 | 4.3.1 Centering and shuttering including strutting, propping etc. and removal of form work
for:Foundations, footings, bases for columns | - | Sqm | - | - |
| 1.09 | 5.9.2 Centering and shuttering including strutting, etc. and removal of form for:Walls (any
thickness) including attached pilasters, butteresses, plinth and string courses etc | - | Sqm | - | - |
| 1.1 | 5.9.3 Centering and shuttering including strutting, etc. and removal of form for:Suspended
floors, roofs, landings, balconies and access platform | - | Sqm | - | - |
stage.html
html • 0.02 MB
finance_1435713.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.08 MB
form8384.pdf
Tender Documents • 1.50 MB
BOQ_1435713.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .