| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L 1₹8.5 LAccepted-AOC | L 1 | Accepted-AOC L1 | |
| 2 | L2₹10.0 L+₹1.6 L (18.5%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
₹8.5 L
EMD Value
₹21,181
Closing Date
12 Feb 2025, 6:00 pmClosed
ARYA SANKAR M S
Office of the Assistant Executive Engineer, LIDEW Sub Division, Ranni Block Panchayat,Ranni
Annual Plan-Ranni BP Pro No 41/24-25 Prematric Hostel Compound Wall Construction-General Civil Work
2025_LSGD_732475_7
02/2024/AE/LIDEW/RNIBP/I PHASE
Open Tender
Civil Works - Others
Item Rate
270 days
RANNI BLOCK PANCHAYAT
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,870
Yes
₹21,181
Yes
25 Apr 2025
1 Feb 2025
13 Feb 2025
1 Feb 2025
12 Feb 2025
1 Feb 2025
Amount
Compound wall construction
15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar
15.17.1:Dismantling steel work in single sections including dismembering and stacking within 50 metes lead in:R.S. Joists
OD262761/2024-2025:Engaging man coolie for cleaning the site
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
OD262625/2024-2025:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
50.6.2.1:Solid block masonry using pre cast solid blocks (Factory made) of size 30x20x15 cm or nearest available size confirming to IS 2185 part I of 1979 for foundation and plinth with thickness 15cm in: CM 1:6 ( 1 cement :6 coarse sand) etc complete
13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
13.46.1:Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
10.25.2:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
13.52.1:Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work
13.33.1:Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing
OD262737/2024-2025:Supplying and fixing name board as per direction of Engineer in charge
Jithin V (BID ID -2102114)
Bidder Name
PRESIDENT PERUNAD LABOUR CONTRACT CO- OPERATIVE SOCIETY LTD NO PT.174
Jithin V
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1170597.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .