| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L 1₹21.3 LAccepted-AOC | ₹21.3 L | L 1 | Accepted-AOC LOWEST 1 |
| 2 | L 2₹21.3 LRejected-Finance | ₹21.3 L | L 2 | Rejected-Finance LOWEST 2 |
Tender Value
₹21.4 L
EMD Value
₹43,000
Closing Date
11 May 2026, 1:00 pmClosed
Project Manager
PROJECT MANAGER, UNIT-6, U.P. PROJECTS CORPORATION LTD. Unit Office-14, CHANDRA SHEKHAR NAGAR COLONY,TULASHERPUR, BAREILLY
CONSTRUCTION OF REMAINING BOUNDARY WALL AT COURT CAMPUS SAHASWAN DISTRICTBUDAUN (U.P.)
2026_UPPRC_1145191_1
02/PCL/P.M./UNIT-6/BLY/2026-27
Open Tender
Civil Works
Percentage
90 days
Bareilly
CONSTRUCTION OF
REMAINING
BOUNDARY WALL AT
COURT CAMPUS
SAHASWAN DISTRICTBUDAUN
(U.P.)
2 documents required · 2 mandatory
₹5,900
₹43,000
6 Jun 2026
5 May 2026
11 May 2026
5 May 2026
11 May 2026
5 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.all kind of soil | 95.25 | CUM | 180 | ₹17,145 |
| 2 | Providing and laying in position excluding cement concrete of level: specified grade the cost of centering and shuttering - All work up to plinth 1:4:8 (1 Cement : 4 coarse sand (zone-Ill) derived from natural sources: 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 7.65 | CUM | 4,712 | ₹36,046.8 |
| 3 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources) | 27.4 | CUM | 6,257 | ₹1,71,441.8 |
| 4 | All works above plinth level upto floor V level Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources) | 15 | CUM | 7,507 | ₹1,12,605 |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 65.25 | Qtl | 7,460 | ₹4,86,765 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete | 39 | SQM | 271 | ₹10,569 |
| 7 | Lintels, beams, plinth beams, girders, bressumers and cantilevers | 82.5 | SQM | 509 | ₹41,992.5 |
| 8 | Columns, Pillars, Piers, Abutments, Posts and Struts | 148.5 | SQM | 664 | ₹98,604 |
| 9 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:6(1 cement : 6 coarse sand) | 45 | CUM | 6,298 | ₹2,83,410 |
| 10 | 12 mm cement plaster of mix: 1:6(1 cement: 6 fine sand) | 180 | SQM | 230 | ₹41,400 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 10.18 MB
BARCHART.pdf
Additional Documents • 0.18 MB
BOQ_2140501.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].