| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 LAccepted-AOC | ₹1.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹1.5 L+₹7,320.93 (5.00%)Rejected-AOC | ₹1.5 L+₹7,320.93 (5.00%) | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | G MOHAMMED L1 | ABDUL JALEEL A L2 |
|---|---|---|---|---|---|
| 1.00IMPROVEMENT WORKS TO AGALPADY HEALTH SUB CENTRE | |||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 2.11 | cum | 242.36 ₹510.89 Lowest | 254.48 ₹536.44 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 0.2 | cum | 7,462.79 ₹1,492.56 Lowest | 7,835.93 ₹1,567.19 |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 1.26 | sqm | 363.27 ₹457.72 Lowest | 381.43 ₹480.6 |
| 1.00 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 2.34 | sqm | 948.78 ₹2,220.15 Lowest | 996.22 ₹2,331.15 |
| 1.00 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 13.38 | sqm | 717.68 ₹9,603.99 Lowest | 753.56 ₹10,084.14 |
| 1.01 | 5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for:
Edges of slabs and breaks in floors and wallsUnder 20 cm wide | 11.52 | metre | 214.61 ₹2,472.31 Lowest | 225.34 ₹2,595.92 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 165.07 | kilogram | 105.76 ₹17,457.7 Lowest | 111.05 ₹18,330.91 |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.05 | cum | 9,867.22 ₹10,390.18 Lowest | 10,360.58 ₹10,909.69 |
| 1.01 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.18 | cum | 12,015.31 ₹2,114.69 Lowest | 12,616.08 ₹2,220.43 |
Tender Value
₹1.5 L
EMD Value
₹3,660
Closing Date
10 Mar 2026, 6:00 pmClosed
DEEPAK M
Office of the Assistant Engineer, LID EW Section Kumbadaje Grama Panchayat
IMPROVEMENT WORKS TO AGALPADY HEALTH SUB CENTRE
2026_LSGD_842832_5
AE/LIDEW/KDJ/ET-07/2025-26
Open Tender
Civil Works - Roads
Item Rate
150 days
KUMBADAJE GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹555
Yes
₹3,660
Yes
7 Sept 2026
3 Mar 2026
11 Mar 2026
3 Mar 2026
10 Mar 2026
3 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1IMPROVEMENT WORKS TO AGALPADY HEALTH SUB CENTRE | |||||
| 1.001 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 2.11 | cum | - | - |
| 1.002 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 0.2 | cum | - | - |
| 1.003 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 1.26 | sqm | - | - |
| 1.004 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 2.34 | sqm | - | - |
| 1.005 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 13.38 | sqm | - | - |
| 1.006 | 5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for:
Edges of slabs and breaks in floors and wallsUnder 20 cm wide | 11.52 | metre | - | - |
| 1.007 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 165.07 | kilogram | - | - |
| 1.008 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.05 | cum | - | - |
| 1.009 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.18 | cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.28 MB
Tendernotice_2.pdf
PDF • 0.25 MB
Tendernotice_3.pdf
PDF • 0.25 MB
BOQ_1422436.xls
BOQ • 0.31 MB
PA.pdf
Tender Documents • 0.26 MB
SBD.pdf
Tender Documents • 0.96 MB
FOT.pdf
Tender Documents • 0.25 MB
AFF.pdf
Tender Documents • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .