Tender Value
₹469.2 Cr
EMD Value
₹9.4 Cr
Closing Date
16 Sept 2026, 3:00 pm
Yes (up to 3 members)
Two Packet System
EPC [ Single Stage ]
No
Not Applicable
Lowest to Highest
120 days
Expenditure
Capital (Works)
DY.CE/C/II
13 conditions · 2 needing a document upload
The Bidder shall have a minimum Net Worth (the "Financial Capacity") of 15% (Fifteen percent) of the Estimated Project Cost at the close of the preceding Financial Year.
Technical Capacity- For demonstrating Technical Capacity and experience (the "Technical Capacity"), the Bidder shall, over the past 5 (five) Financial Years preceding the Bid Due Date,received payments for construction of Eligible Project(s) such that the amount is atleast; (a) 60 (sixty percent) of Estimated Project Cost from One Eligible Project, OR, (b)40% (forty percent) of Estimated Project Cost from each of the Two Eligible Projects OR, (c)30% (thirty percent) of Estimated Project Cost from each of the Three Eligible Projects For the purpose of Technical Capacity, the projects shall qualify as Eligible Projects, the "Eligible Projects" if they meet both of the following criteria; 1)Projects where works contract are directly given to the Bidder by a Govt. Department; or by a Public listed company having average annual turnover of Rs 500 crore and above in last 3 financial years excluding the current financial year, listed on National Stock Exchange or Bombay Stock Exchange, registered at least 5 years back from the date of submission of Bid by the Bidder to the Authority. AND 2)Projects where the Bidder have received payments for not less than 75 (seventy-five) per cent value of awarded project cost of such project as per the original agreement under the following categories: (i)Passenger terminals shall mean having a minimum passenger handling capacity of 5000 persons /day in railway stations, metro stations, airport terminals (with or without related airport infrastructure works), ports, integrated check posts, and bus terminals; (ii) Social and Commercial infrastructure shall mean: (a)Commercial real estate project (such aseducational institution, hospital, hotel, convention centre, mall/shopping complex, sports complex, office complex) at a single site with a minimum built up area of 15,000 (Fifteen thousand) square metres; or (b)Residential real estate project /residential township at a single site with a minimum built up area of 30,000 (Thirty thousand) square metres;
16 conditions · 14 needing a document upload
DSC should be in the name of the authorized signatory as authorized in Appendix II of this RFP or person executing/delegating such Appendix III in favour of Authorized Signatory. It should be in corporate capacity (that is in Bidder capacity / in case of Consortium /JV in the Lead Member capacity, as applicable). The Bidder shall submit document in support of the class III DSC.
APPENDIX-V (BID SECURITY)--(REFER CLAUSE 2.20) The Bidder shall furnish as part of its Bid, a Bid Security, referred to in Clause 1.2.4 hereinabove through [e- payment Gateway of Authority OR in form of Bank Guarantee from a Bank as per format at Appendix V].
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
ANNEXURE II TO APPEDIX IA(TECHNICAL CAPACITY OF THE BIDDER)- Refer CLAUSE 2.2.2.1, 2.2.2.6 (CLAUSE 2.2.2.3)-Submission in support of Technical Capacity (i)The Bidder should furnish the details of Eligible Projects over the past five financial years and upto bid due date (excluding bid due date) (ii)The Bidder must provide the necessary information relating to Technical Capacity as per format at Annex-II of Appendix-IA.
ANNEXURE III TO APPENDIX IA- (FINANCIAL CAPACITY OF THE BIDDER)- (Refer clause 2.2.2.2, 2.2.2.5) (Clause 2.2.2.4-(iii)) The Bidder must establish the minimum Net Worth specified in Clause 2.2.2.2, and provide details as per the format at Annex-III of Appendix-IA.
ANNEXURE IV TO APPENDIX IA (DETAILS OF ELIGIBLE PROJECTS)- (Refer Clause 2.2.2.1, 2.2.2.6) Clause 2.2.2.3- Submission in support of Technical Capacity (i)The Bidder should furnish the details of Eligible Projects over the past five financial years and upto bid due date (excluding bid due date) (ii)The Bidder must provide the necessary information relating to Technical Capacity as per format at Annex-II of Appendix-IA. (iii)The Bidder should furnish the required Project-specific information and evidence in support of its claim of Technical Capacity, as per format at Annex -IV of Appendix-IA.
ANNEXURE V TO APPENDIX IA- (STATEMENT OF LEGAL CAPACITY) - (CLAUSE 2.11.1)The Bidder shall first upload all the project details, including Technical Capacity, Financial Capacity, Net Worth details, turnover details, and all other details required in this RFP for technical qualification. The Bidder shall ensure that all the details are updated as of the due date of submission of this Bid. The Bidder shall then apply for the RFP by submitting the documents mentioned below along with the supporting documents, which shall comprise the Technical Bid on the Procurement Portal: Technical Bid (a) Appendix-IA (Letter comprising the Technical Bid) including Annexure I-V and supporting certificates/documents.
ANNEXURE 1 TO APPENDIX IA-(DETAILS OF BIDDER)- (CLAUSE 2.11.1) The Bidder shall first upload all the project details, including Technical Capacity, Financial Capacity, Net Worth details, turnover details, and all other details required in this RFP for technical qualification. The Bidder shall ensure that all the details are updated as of the due date of submission of this Bid. The Bidder shall then apply for the RFP by submitting the documents mentioned below along with the supporting documents, which shall comprise the Technical Bid on the Procurement Portal: Technical Bid (a) Appendix-IA (Letter comprising the Technical Bid) including Annexure I-V and supporting certificates/documents. (CLAUSE 3.1.6.1)- As a first step towards evaluation of Technical Bids, the Authority shall determine whether each Technical Bid is responsive to the requirements of this RFP. A Technical Bid shall be considered responsive only if: (a) the Technical Bid is received online as per the format at Appendix-IA including Annexure I, II, III, IV, V and Appendix-VI;
APPENDIX VI- FORMAT FOR AFFIDAVIT TO BE UPLOADED BY BIDDER WITH THE BID (CLAUSE 3.1.6.1) As a first step towards evaluation of Technical Bids, the Authority shall determine whether each Technical Bid is responsive to the requirements of this RFP. A Technical Bid shall be considered responsive only if: (a) the Technical Bid is received online as per the format at Appendix-IA including Annexure I, II, III, IV, V and Appendix-VI;
APPENDIX IA (LETTER COMPRISING THE TECHNICAL BID) - (Clause 2.14 of RFP)-The Bid shall be furnished in the format exactly as per Appendix-IA & IB i.e., Technical Bid as per Appendix IA and Financial Bid as per Appendix IB, and it shall be signed by the Bidder's authorized signatory. (Para 2.11.1 of RFP)-The bidder shall first upload all the project details including Technical Capacity, Financial Capacity, Net Worth details, turnover details, and all other details required in this RFP for technical qualification. The Bidder shall ensure that all the details are updated as of the due date of submission of this Bid. The Bidder shall then apply for the RFP by submitting the documents mentioned below along with the supporting documents which shall comprise the Technical Bid on the Procurement Portal: Technical Bid (a) Appendix-IA (Letter comprising the Technical Bid) including Annexure I-V and supporting certificates/documents (Para 3.1.6 of RFP)-As a first step towards evaluation of Technical Bids, the Authority shall determine whether each Technical Bid is responsive to the requirements of this RFP. A Technical Bid shall be considered responsive only if: (a) the Technical Bid is received online as per the format at Appendix-IA including Annexure I, II, III, IV, V and Appendix-VI;
APPENDIX IB (LETTER COMPRISING THE FINANCIAL BID)-- (Para 2.14 of RFP)- The Bid shall be furnished in the format exactly as per Appendix-IA & IB, i.e., Technical Bid as per Appendix IA and Financial Bid as per Appendix IB, and it shall be signed by the Bidder's authorized signatory. (Para 2.11.1 of RFP)- The Bidder shall first upload all the project details including Technical Capacity, Financial Capacity, Net Worth details, turnover details, and all other details required in this RFP for technical qualification. The Bidder shall ensure that all the details are updated as of the due date of submission of this Bid. The Bidder shall then apply for the RFP by submitting the documents mentioned below along with the supporting documents, which shall comprise the Technical Bid on the e-Procurement Portal: Financial Bid (l)Appendix-IB (Letter comprising the Financial Bid) shall be submitted online through the e-Procurement Portal on or before the Bid Due Date.
APPENDIX-II (FORMAT FOR POWER OF ATTORNEY FOR SIGNING OF BID) - The Bidder should submit a Power of Attorney as per the format in Appendix-II, authorizing the signatory of the Bid to commit the Bidder.
APPENDIX-III (FORMAT FOR POWER OF ATTORNEY FOR LEAD MEMBER OF (CONSORTOIUM/ JOINT VENTURE)- (CLAUSE 2.1.6)) - In case the Bidder is a consortium/Joint Venture, the Members thereof should furnish Power of Attorney in favour of the Lead Member in the format at Appendix-III and Joint Bidding Agreement in the format at Appendix-IV.
APPENDIX IV (FORMAT FOR JOINT BIDDING AGREEMENT FOR (CONSORTIUM/ JOINT VENTURE)) - (Refer Clause 2.1.11)-(f) Members of the Consortium/Joint Venture shall have entered into a binding Joint Bidding Agreement, substantially in the form specified at Appendix IV (the "Jt. Bidding Agreement"), for the purpose of making the Bid. The Jt. Bidding Agreement, to be submitted along with the Bid.
Execution of Balance Works for Major Redevelopment of Jodhpur Railway Station of North Western Railways on Engineering Procurement & Construction (EPC)
DyCE-C-II-JU-EPC~NWR
DyCE-C-II-JU-EPC
Open
Works - General
30 Months
Jodhpur, Rajasthan
₹0
₹9.4 Cr
14 Aug 2026
14 Aug 2026
2 Sept 2026
3 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 4,69,20,14,371.64 | ||
| — | — | — | 4,69,20,14,371.64 | ||
| Q (Lump | :- Schedule | Sum cost of the | — |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Vol-IIPart-02ScheduleAtoQ1-compressed.pdf
ATTACHMENT
Vol-IIPart-02ScheduleDAdated14.08.2026.pdf
ATTACHMENT
MasterPlan.pdf
ATTACHMENT
Vol-I_RFPDocument_V2_R1.pdf
ATTACHMENT
GADARRIVALCONCOURSE-1RKBENDFLOORPLAN_1.PDF
ATTACHMENT
GADARRIVALCONCOURSE-1RKBENDTYPICALELEVATION_1.PDF
ATTACHMENT
TEMPORARYSHIFTINGOFMSBRHSINAC-11-Model_1.pdf
ATTACHMENT
GFCAC-1FIRSTFLOORFIREFIGHTINGLAYOUTR004.06.2025.pdf
ATTACHMENT
GFCAC-1GROUNDFLOORFIREFIGHTINGLAYOUTR004.06.2025.pdf
ATTACHMENT
GFCAC-1SECONDFLOORFIREFIGHTINGLAYOUTR004.06.2025.pdf
ATTACHMENT
GFCAC-1TERRACEFLOORFIREFIGHTINGLAYOUTR004.06.2025.pdf
ATTACHMENT
GFCAC-1FIRSTFLOORDRAINAGELAYOUTR025.04.2025.pdf
ATTACHMENT
GFCAC-1GROUNDFLOORDRAINAGELAYOUTR025.04.2025.pdf
ATTACHMENT
GFCAC-1SECONDFLOORDRAINAGELAYOUTR025.04.2025.pdf
ATTACHMENT
GFCAC-1TERRACEFLOORDRAINAGELAYOUTR025.04.2025.pdf
ATTACHMENT
GFCAC-1GROUNDFLOORWATERSUPPLYLAYOUTR025.04.2025.pdf
ATTACHMENT
GFCAC-1FIRSTFLOORWATERSUPPLYLAYOUTR025.04.2025.pdf
ATTACHMENT
GFCAC-1SECONDFLOORWATERSUPPLYLAYOUTR025.04.2025.pdf
ATTACHMENT
GFCAC-1TERRACEFLOORWATERSUPPLYLAYOUTR025.04.2025.pdf
ATTACHMENT
GADARRIVALCONCOURSE-2BGKTENDFLOORPLAN.PDF
ATTACHMENT
GADARRIVALCONCOURSE-2BGKTENDTYPICALELEVATION.PDF
ATTACHMENT
GFCAC-2FIRSTFLOORFIREFIGHTINGLAYOUTR004.06.2025.pdf
ATTACHMENT
GFCAC-2GROUNDFLOORFIREFIGHTINGLAYOUTR004.06.2025.pdf
ATTACHMENT
GFCAC-2SECONDFLOORFIREFIGHTINGLAYOUTR004.06.2025.pdf
ATTACHMENT
GFCAC-2TERRACEFLOORFIREFIGHTINGLAYOUTR004.06.2025.pdf
ATTACHMENT
GFCAC-2FIRSTFLOORDRAINAGELAYOUTR025.04.2025.pdf
ATTACHMENT
GFCAC-2GROUNDFLOORDRAINAGELAYOUTR025.04.2025.pdf
ATTACHMENT
GFCAC-2SECONDFLOORDRAINAGELAYOUTR025.04.2025.pdf
ATTACHMENT
GFCAC-2TERRACEFLOORDRAINAGELAYOUTR025.04.2025.pdf
ATTACHMENT
GFCAC-2GROUNDFLOORWATERSUPPLYLAYOUTR025.04.2025.pdf
ATTACHMENT
GFCAC-2FIRSTFLOORWATERSUPPLYLAYOUTR025.04.2025.pdf
ATTACHMENT
GFCAC-2SECONDFLOORWATERSUPPLYLAYOUTR025.04.2025.pdf
ATTACHMENT
GFCAC-2TERRACEFLOORWATERSUPPLYLAYOUTR025.04.2025.pdf
ATTACHMENT
FOB-06ApprovedGADLocationplan.pdf
ATTACHMENT
GADFOBDEPARTUREAIRCONCOURSEATCONCOURSELEVEL.pdf
ATTACHMENT
GADFOBDEPARTUREAIRCONCOURSEELEVATIONSECTION-1.pdf
ATTACHMENT
GADFOBDEPARTUREAIRCONCOURSEELEVATIONSECTION-2.pdf
ATTACHMENT
GADFOBDEPARTUREAIRCONCOURSEPLANATPLATFORMLEVEL.pdf
ATTACHMENT
GADFOBAIRCONCOURSECOPCOLUMNSPLANATPLATFORMLVLR129.10.2025.pdf
ATTACHMENT
GADELEVATEDROADLAYOUTPLAN06.11.20241.pdf
ATTACHMENT
GADHOLIDAYHOMEELEVATION.pdf
ATTACHMENT
GADHOLIDAYHOMEFLOORPLAN.pdf
ATTACHMENT
GFCHOLIDAYHOMEFIRSTFLOORDRAINAGELAYOUTR025-02-2025.PDF
ATTACHMENT
GFCHOLIDAYHOMEGROUNDFLOORDRAINAGELAYOUTR025-02-2025.PDF
ATTACHMENT
GFCHOLIDAYHOMETERRACEFLOORDRAINAGELAYOUT-R025-02-2025.PDF
ATTACHMENT
GFCHOLIDAYHOMEFIRSTFLOORWATERSUPPLYLAYOUTR025-02-2025.PDF
ATTACHMENT
GFCHOLIDAYHOMEGROUNDFLOORWATERSUPPLYLAYOUTR025-02-2025.PDF
ATTACHMENT
GFCHOLIDAYHOMETERRACEFLOORWATERSUPPLYLAYOUT-R025-02-2025.PDF
ATTACHMENT
4.GADMSBELEVATIONANDSECTION.PDF
ATTACHMENT
GFCMAINSTATIONBUILDINGGROUNDFLOORPLANPART-1R613.11.2025.pdf
ATTACHMENT
GFCMAINSTATIONBUILDINGGROUNDFLOORPLANPART-2R613.11.2025.pdf
ATTACHMENT
MSBFIRSTFLOORPLANCEsigned.pdf
ATTACHMENT
MSBFOURTHANDTERRACEPLANCEsigned.pdf
ATTACHMENT
MSBSECONDANDTHIRDFLOORPLANCEsigned.pdf
ATTACHMENT
GFCMSBGROUNDFLOORFIREFIGHTINGLAYOUTPART-1R010.11.2025.pdf
ATTACHMENT
GFCMSBFIRSTFLOORFIREFIGHTINGLAYOUTPART-1R010.11.2025.pdf
ATTACHMENT
GFCMSBSECONDFLOORFIREFIGHTINFLAYOUTPART-1R010.11.2025.pdf
ATTACHMENT
GFCMSBTHIRDFLOORFIREFIGHTINGLAYOUTPART-1R010.11.2025.pdf
ATTACHMENT
GFCMSBFOURTHFLOORFIREFIGHTINGLAYOUTPART-1R010.11.2025.pdf
ATTACHMENT
GFCMSBTERRACEFLOORFIREFIGHTINGLAYOUTPART-1R010.11.2025.pdf
ATTACHMENT
GFCMSBGROUNDFLOORFIREFIGHTINGLAYOUTPART-2R010.11.2025.pdf
ATTACHMENT
GFCMSBFIRSTFLOORFIREFIGHTINGLAYOUTPART-2R010.11.2025.pdf
ATTACHMENT
GFCMSBSECONDFLOORFIREFIGHTINGLAYOUTPART-2R010.11.2025.pdf
ATTACHMENT
GFCMSBTHIRDFLOORFIREFIGHTINGLAYOUTPART-2R010.11.2025.pdf
ATTACHMENT
GFCMSBFOURTHFLOORFIREFIGHTINGLAYOUTPART-2R010.11.2025.pdf
ATTACHMENT
GFCMSBTERRACEFLOORFIREFIGHTINGLAYOUTPART-2R010.11.2025.pdf
ATTACHMENT
GFCMSBGROUNDFLOORDRAINAGELAYOUTR108.05.2025.pdf
ATTACHMENT
GFCMSBFIRSTFLOORDRAINAGELAYOUTR026.04.2025.pdf
ATTACHMENT
GFCMSBSECONDFLOORDRAINAGELAYOUTR026.04.2025.pdf
ATTACHMENT
GFCMSBTHIRDFLOORDRAINAGELAYOUTR026.04.2025.pdf
ATTACHMENT
GFCMSBFOURTHFLOORDRAINAGELAYOUTR026.04.2025.pdf
ATTACHMENT
GFCMSBTERRACEFLOORDRAINAGELAYOUTR026.04.2025.pdf
ATTACHMENT
GFCMSBGROUNDFLOORWATERSUPPLYLAYOUTR108.05.2025.pdf
ATTACHMENT
GFCMSBFIRSTFLOORWATERSUPPLYLAYOUTR026.04.2025.pdf
ATTACHMENT
GFCMSBSECONDFLOORWATERSUPPLYLAYOUTR026.04.2025.pdf
ATTACHMENT
GFCMSBTHIRDFLOORWATERSUPPLYLAYOUTR026.04.2025.pdf
ATTACHMENT
GFCMSBFOURTHFLOORWATERSUPPLYLAYOUTR026.04.2025.pdf
ATTACHMENT
GFCMSBTERRACEFLOORWATERSUPPLYLAYOUTR026.04.2025.pdf
ATTACHMENT
GADMASTERPLANWITHCOVEROFPLATFORMSHELTERR301.03.2025.pdf
ATTACHMENT
GFCMASTERPLANWORKINGSUPERIMPOSEDPLANR302.09.2025.pdf
ATTACHMENT
MASTERPLANEXTERNALSERVICESFIREFIGHTINGLAYOUTR016.08.2025.pdf
ATTACHMENT
MASTERPLANEXTERNALSERVICESSEWERLAYOUTR016.08.2025.pdf
ATTACHMENT
MASTERPLANEXTERNALSERVICESSTORMLAYOUTR016.08.2025.pdf
ATTACHMENT
MASTERPLANEXTERNALSERVICESWATERSUPPLYLAYOUTR016.08.2025.pdf
ATTACHMENT
GADMLCPBGKTELEVATION12.pdf
ATTACHMENT
GADMLCPBGKTELEVATION34.pdf
ATTACHMENT
GADMLCPBGKTFIRSTANDTHIRDFLOORPLAN.pdf
ATTACHMENT
GADMLCPBGKTFOURTHFLOORPLAN.pdf
ATTACHMENT
GADMLCPBGKTGROUNDFLOORPLAN.pdf
ATTACHMENT
GADMLCPBGKTSECONDFLOORPLAN.pdf
ATTACHMENT
GADMLCPBGKTSECTIONS.pdf
ATTACHMENT
GADMLCPBGKTTERRACEFLOORPLAN.pdf
ATTACHMENT
GFCMLCPBGKTGROUNDFLOORFIREFIGHTINGLAYOUTR013.03.2025.PDF
ATTACHMENT
GFCMLCPBGKTFIRSTTHIRDFLOORFIREFIGHTINGLAYOUTR013.03.2025.PDF
ATTACHMENT
GFCMLCPBGKTSECONDFLOORFIREFIGHTINGLAYOUTR013.03.2025.PDF
ATTACHMENT
GFCMLCPBGKTFOURTHFLOORFIREFIGHTINGLAYOUTR013.03.2025.PDF
ATTACHMENT
GFCMLCPBGKTTERRACEFLOORFIREFIGHTINGLAYOUTR013.03.2025.PDF
ATTACHMENT
GFCMLCPBGKTENDGROUNDFLOORDRAINAGELAYOUTR118.04.2025.pdf
ATTACHMENT
GFCMLCPBGKTENDFIRSTFLOORDRAINAGELAYOUTR118.04.2025.pdf
ATTACHMENT
GFCMLCPBGKTENDSECONDFLOORDRAINAGELAYOUTR118.04.2025.pdf
ATTACHMENT
GFCMLCPBGKTENDTHIRDFLOORDRAINAGELAYOUTR118.04.2025.pdf
ATTACHMENT
GFCMLCPBGKTFOURTHFLOORDRAINAGELAYOUTR118.07.2025.pdf
ATTACHMENT
GFCMLCPBGKTGROUNDFLOORWATERSUPPLYLAYOUTR024.03.2025.PDF
ATTACHMENT
GFCMLCPBGKTFIRSTTHIRDFLOORWATERSUPPLYLAYOUTR024.03.2025.PDF
ATTACHMENT
GADMLCPRKBELEVATION12.PDF
ATTACHMENT
GADMLCPRKBELEVATION34.PDF
ATTACHMENT
GADMLCPRKBFIRSTFLOORPLAN.PDF
ATTACHMENT
GADMLCPRKBGROUNDFLOORPLAN_1.PDF
ATTACHMENT
GADMLCPRKBSECONDFLOORPLAN.PDF
ATTACHMENT
GADMLCPRKBSECTIONS.PDF
ATTACHMENT
GADMLCPRKBTERRACEFLOORPLAN.PDF
ATTACHMENT
GADMLCPRKBTHIRDANDFOURTHFLOORPLAN.PDF
ATTACHMENT
GFCGFCMLCPRKBENDFIRSTFLOORFIREFIGHTINGLAYOUTR010.06.2025.pdf
ATTACHMENT
GFCGFCMLCPRKBENDFOURTHFLOORFIREFIGHTINGLAYOUTR010.06.2025.pdf
ATTACHMENT
GFCGFCMLCPRKBENDGROUNDFLOORFIREFIGHTINGLAYOUTR010.06.2025_1.pdf
ATTACHMENT
GFCGFCMLCPRKBENDSECONDFLOORFIREFIGHTINGLAYOUTR010.06.2025.pdf
ATTACHMENT
GFCGFCMLCPRKBENDTERRACEFLOORFIREFIGHTINGLAYOUTR010.06.2025.pdf
ATTACHMENT
GFCGFCMLCPRKBENDTHIRDFLOORFIREFIGHTINGLAYOUTR010.06.2025.pdf
ATTACHMENT
GFCMLCPRKBENDFIRSTFLOORDRAINAGELAYOUTR017.05.2025.pdf
ATTACHMENT
GFCMLCPRKBENDGROUNDFLOORDRAINAGELAYOUTR017.05.2025.pdf
ATTACHMENT
GFCMLCPRKBENDSECONDFLOORDRAINAGELAYOUTR017.05.2025.pdf
ATTACHMENT
GFCMLCPRKBENDTERRACEFLOORDRAINAGELAYOUTR017.05.2025.pdf
ATTACHMENT
GFCMLCPRKBENDTHIRDFOURTHFLOORDRAINAGELAYOUTR017.05.2025.pdf
ATTACHMENT
GFCMLCPRKBENDFIRSTFLOORWATERSUPPLYLAYOUTR017.05.2025.pdf
ATTACHMENT
GFCMLCPRKBENDGROUNDFLOORWATERSUPPLYLAYOUTR017.05.2025.pdf
ATTACHMENT
GFCMLCPRKBENDSECONDFLOORWATERSUPPLYLAYOUTR017.05.2025.pdf
ATTACHMENT
GFCMLCPRKBENDTERRACEFLOORWATERSUPPLYLAYOUTR017.05.2025.pdf
ATTACHMENT
GFCMLCPRKBENDTHIRDFOURTHWATERSUPPLYLAYOUTR017.05.2025.pdf
ATTACHMENT
GADPROPOSEDHOLIDAYHOME-2INSCHOOLBUILDING01.03.2025.pdf
ATTACHMENT
GFCHOLIDAYHOME2GROUNDFLOORDRAINAGELAYOUTR015.07.2025.pdf
ATTACHMENT
GFCHOLIDAYHOME2FIRSTFLOORDRAINAGELAYOUTR015.07.2025.pdf
ATTACHMENT
GFCHOLIDAYHOME2TERRACEFLOORDRAINAGELAYOUTR015.07.2025.pdf
ATTACHMENT
GFCHOLIDAYHOME2GROUNDFLOORWATERSUPPLYLAYOUTR015.07.2025.pdf
ATTACHMENT
GFCHOLIDAYHOME2FIRSTFLOORWATERSUPPLYLAYOUTR015.07.2025.pdf
ATTACHMENT
GFCHOLIDAYHOME2TERRACEFLOORWATERSUPPLYLAYOUTR015.07.2025.pdf
ATTACHMENT
SESBExternalDevelopmentPlan.pdf
ATTACHMENT
GADSESBELEVATION.pdf
ATTACHMENT
GADSESBSECTIONS.pdf
ATTACHMENT
SESBGADFIRSTFLOORPLAN.pdf
ATTACHMENT
SESBGADGROUNDFLOORPLAN.pdf
ATTACHMENT
SESBGADSECONDFLOORPLAN.pdf
ATTACHMENT
SESBGADTHIRDFLOORPLAN.pdf
ATTACHMENT
GFCSSBGROUNDFLOORFIREFIGHTINGLAYOUTPLANR1.pdf
ATTACHMENT
GFCSSBFIRSTFLOORFIREFIGHTINGR013.05.2025.pdf
ATTACHMENT
GFCSSBFIRSTFLOORFIREFIGHTINGLAYOUTPLANPART-2R106.11.2025.pdf
ATTACHMENT
GFCSSBSECONDFLOORFIREFIGHTINGR013.05.2025.pdf
ATTACHMENT
GFCSSBSECONDFLOORFIREFIGHTINGLAYOUTPLANPART-2R131.10.2025.pdf
ATTACHMENT
GFCSSBTHIRDFLOORFIREFIGHTINGLAYOUTPLANPART-1R106.11.2025.pdf
ATTACHMENT
GFCSSBTHIRDFLOORFIREFIGHTINGLAYOUTPLANPART-2R106.11.2025.pdf
ATTACHMENT
GFCSSBTERRACEFLOORFIREFIGHTINGR013.05.2025.pdf
ATTACHMENT
GFCSSBGROUNDFLOORDRAINAGEPLANR116.04.2025.pdf
ATTACHMENT
GFCSSBFIRSTFLOORDRAINAGEPLANR116.04.2025_2.pdf
ATTACHMENT
GFCSSBSECONDFLOORDRAINAGEPLANR116.04.2025_1.pdf
ATTACHMENT
GFCSSBTHIRDFLOORDRAINAGEPLANR116.04.2025_1.pdf
ATTACHMENT
GFCSSBTERRACEFLOORDRAINAGEPLANR116.04.2025.pdf
ATTACHMENT
GFCSESBGROUNDFLOORWATERSUPPLYLAYOUTPLANR018.04.2025.pdf
ATTACHMENT
GFCSESBFIRSTFLOORWATERSUPPLYLAYOUTPLANR026.03.25.PDF
ATTACHMENT
GFCSESBSECONDFLOORWATERSUPPLYLAYOUTPLANR018.04.2025.pdf
ATTACHMENT
GFCSESBTERRACEFLOORWATERSUPPLYLAYOUTPLANR018.04.2025.pdf
ATTACHMENT
DETAILEDLAYOUTPLANFORSTP104.09.2025.pdf
ATTACHMENT
DETAILEDLAYOUTPLANFORSTPR125.08.2025.pdf
ATTACHMENT
UGT-1DETAILS2320MSBSIDER025.08.2025.pdf
ATTACHMENT
UGT-2DETAILS510SESBSIDER025.08.2025.pdf
ATTACHMENT
AIRCONCOURSECONNECTIONDETAILS07AR206.11.2025.pdf
ATTACHMENT
AIRCONCOURSECONNECTIONDETAILSR206.11.2025.pdf
ATTACHMENT
AIRCONCOURSEFOUNDATIONPLANDETAILSR206.11.2025.pdf
ATTACHMENT
AIRCONCOURSEFRAMINGPLANATAIRCONCOURSELVLR206.11.2025.pdf
ATTACHMENT
AIRCONCOURSEFRAMINGPLANATROOFLVLR206.11.2025.pdf
ATTACHMENT
AIRCONCOURSEPEDESTALLAYOUTPLANR206.11.2025.pdf
ATTACHMENT
AIRCONCOURSESECTIONSR206.11.2025.pdf
ATTACHMENT
AIRCONCOURSESHEARWALLSCHEDULER206.11.2025.pdf
ATTACHMENT
AC1BEAMDETAILSATPLINTHLEVEL.pdf
ATTACHMENT
AC1BEAMDETAILATFIRSTFLOORLEVEL1_compressed.pdf
ATTACHMENT
AC1BEAMDETAILAT2NDFLOORLEVEL.pdf
ATTACHMENT
AC1BEAMDETAILATTERRACEFLOORLEVEL.pdf
ATTACHMENT
AC1COLUMNSHEARWALLSCHEDULE.pdf
ATTACHMENT
AC1COLUMNLAYOUTPLAN.pdf
ATTACHMENT
AC1DOUBLEHT.STAIRCASEPLANANDDETAILSR2.pdf
ATTACHMENT
AC1FOUNDATIONPLANSECTIONDETAILS.pdf
ATTACHMENT
AC1FRAMINGPLANAT1STFLOORLEVEL-1.pdf
ATTACHMENT
AC1FRAMINGPLANATPLINTHLEVEL-1.pdf
ATTACHMENT
AC1FRAMINGPLANATSECONDFLOORLEVEL-1.pdf
ATTACHMENT
AC1FRAMINGPLANATTERRACELEVEL-1.pdf
ATTACHMENT
AC-1OHTPLANDETAILR0UPDATED26.08.2025.pdf
ATTACHMENT
ARRIVALCONCOURSE-2BGKTENDBEAMDETAILSAT1STFLOORLVLR118.04.2025.pdf
ATTACHMENT
ARRIVALCONCOURSE-2BGKTENDBEAMDETAILSAT2NDFLOORLVLR118.04.2025.pdf
ATTACHMENT
ARRIVALCONCOURSE-2BGKTENDBEAMDETAILSATPLINTHLVLR118.04.2025.pdf
ATTACHMENT
ARRIVALCONCOURSE-2BGKTENDBEAMDETAILSATTERRACEFLOORLVLR118.04.2025.pdf
ATTACHMENT
ARRIVALCONCOURSE-2BGKTENDCOLUMNANDSHEARWALLSCHEDULER118.04.2025.pdf
ATTACHMENT
ARRIVALCONCOURSE-2BGKTENDCOLUMNLAYOUTPLANR118.04.2025.pdf
ATTACHMENT
ARRIVALCONCOURSE-2BGKTENDDOUBLEHT.AREASTAIRCASEPLANANDDETAILSR018.04.2025.pdf
ATTACHMENT
ARRIVALCONCOURSE-2BGKTENDFOUNDATIONPLANSECTIONDETAILSR118.04.2025.pdf
ATTACHMENT
ARRIVALCONCOURSE-2BGKTENDFRAMINGPLANAT1STFLOORLVLR118.04.2025.pdf
ATTACHMENT
ARRIVALCONCOURSE-2BGKTENDFRAMINGPLANAT2NDFLOORLVLR118.04.2025.pdf
ATTACHMENT
ARRIVALCONCOURSE-2BGKTENDFRAMINGPLANATPLINTHLVLR118.04.2025.pdf
ATTACHMENT
ARRIVALCONCOURSE-2BGKTENDFRAMINGPLANATTERRACELVLR118.04.2025.pdf
ATTACHMENT
ARRIVALCONCOURSE-2BGKTENDOHTPLANDETAILSR018.04.2025.pdf
ATTACHMENT
ELEVATEDROADATSECONDFLOORLEVEL06.09.2025R1.pdf
ATTACHMENT
ELEVATEDROADFERAMINGPLANANDBEAMDETAILAT4thFLOORLVL06.09.2025R1.pdf
ATTACHMENT
ELEVATEDROADFOUNDATIONPLANANDDETAILS06.09.2025R1.pdf
ATTACHMENT
ELEVATEDROADFOUNDATIONSECTIONSANDDETAIS06.09.2025R1.pdf
ATTACHMENT
ELEVATEDROADFRAMINGATPLINTH06.09.2025R1.pdf
ATTACHMENT
ELEVATEDRODACOLUMNLAYOUTPALNANDCOLUMNSCHEDULLE06.09.2025R1.pdf
ATTACHMENT
FOBSESBFOUNDATIONPEDESTALLAYOUTPLANDETAILSR2DT28.12.23.PDF
ATTACHMENT
FOB-1FOBTOSECONDENTRYSTATIONBUILDINGTYPICALSPLICEPLATEDETAILR019.09.2025.pdf
ATTACHMENT
FOB1TOSSBFRAMINGPLAN.PDF
ATTACHMENT
SESBFOBSESBFOUNDATIONDETAILSR0DT05.03.2024.PDF
ATTACHMENT
FOB-2PART-AFRAMINGPLANATAIRCONCOURSELVLR227.10.2025.pdf
ATTACHMENT
FOB-2PART-APEDESTALCOLUMNFOUNDATIONDETAILSR227.10.2025.pdf
ATTACHMENT
FOB-2PARTBPEDESTALCOLUMNFOUNDATIONDETAILR206.10.2025.pdf
ATTACHMENT
FOB-2BFOB-3FRAMINGPLANATAIRCONCOURSELVLR229.12.2025.pdf
ATTACHMENT
FOB-2BFOB-3FRAMINGPLANATROOFLVLR229.12.2025.pdf
ATTACHMENT
FOB-2BFOB-3PEDESTALANDCOLUMNLAYOUTDETAILSR229.12.2025.pdf
ATTACHMENT
FOB4FRAMINGPLANATCONCOURSELEVELDETAILSOF.PDF
ATTACHMENT
FOB4FRAMINGPLANATROOFLEVELDETAILS.PDF
ATTACHMENT
FOB4PEDESTALFOUNDATIONLAYOUTPLANANDDETAILOF.PDF
ATTACHMENT
FOB5CONNECTIONDETAILSR128.01.2026.pdf
ATTACHMENT
FOB5FRAMINGPLANOF.PDF
ATTACHMENT
FOB5PEDESTALFOUNDATIONLAYOUTPLANANDDETAIL.PDF
ATTACHMENT
FOB5PEDESTALANDDECKFINISHPLANCONNECTINGMLCPRKBENDR026.07.2025.pdf
ATTACHMENT
FOB6FOUNDATIONPLANANDDETAILSR129.12.2025.pdf
ATTACHMENT
FOB6FRAMINGPLANANDDETAILATROOFLVL.R129.12.2025.pdf
ATTACHMENT
FOB6PEDESTALDETAILSANDPLINTHDETAILSR129.12.2025.pdf
ATTACHMENT
FOB6SECTIONDETAILSR129.12.2025.pdf
ATTACHMENT
FOB-7BGKTSIDEFOB-7BFRAMINGPLANATAIRCONCOURSELVLR027.10.2025.pdf
ATTACHMENT
FOB-7BGKTSIDEFOB-7BFRAMINGPLANATROOFLVLR027.10.2025.pdf
ATTACHMENT
FOB-7BGKTSIDEFOB-7BPEDESTALANDCOLUMNDETAILSR027.10.2025.pdf
ATTACHMENT
FOB-7RKBSIDEFOB-7AFOUNDATIONPLANANDDETAILSR227.10.2025.pdf
ATTACHMENT
FOB-7RKBSIDEFOB-7AFRAMINGPLANATROOFLVLR227.10.2025.pdf
ATTACHMENT
FOB7ARKBENDPEDESTALANDCOLUMNDETAILSR405.05.2026.pdf
ATTACHMENT
FOB7BBGKTSIDEFOUNDATIONPLANDETAILSR405.05.2026.pdf
ATTACHMENT
HHBEAMDETAILATFIRSTFLOORLVL.PDF
ATTACHMENT
HHBEAMDETAILATPLINTHLVL.PDF
ATTACHMENT
HHBEAMDETAILATTERRACELVL.PDF
ATTACHMENT
HHCOLUMNLAYOUTPLAN.PDF
ATTACHMENT
HHCOLUMNSCHEDULE.PDF
ATTACHMENT
HHFOUNDATIONPLANDETAIL.PDF
ATTACHMENT
HHFOUNDATIONSECTION.PDF
ATTACHMENT
HHFRAMINGPLANATFIRSTFLLVL.PDF
ATTACHMENT
HHFRAMINGPLANATPLINTHLVL.PDF
ATTACHMENT
HHFRAMINGPLANATTERRACELVL.PDF
ATTACHMENT
HHPLANDETAILATMUMTYLVL.PDF
ATTACHMENT
HHSTAIRCASEPLANDETAIL.PDF
ATTACHMENT
27-12-2024MSBBeamDetailsAt2ndFloorLv5AlR1.PDF
ATTACHMENT
27-12-2024MSBBeamDetailsAt2ndFloorLv5BlR1.PDF
ATTACHMENT
27-12-2024MSBBeamDetailsAt3rdFloorLvlR0.PDF
ATTACHMENT
27-12-2024MSBFramingPlanAt2ndFloorLvl5R1.PDF
ATTACHMENT
27-12-2024MSBFramingPlanAt3rdFloorLvlR0.PDF
ATTACHMENT
MAINSTATIONBUILDINGBEAMDETAILAT4THFLOORLVL07AR021.03.2025.PDF
ATTACHMENT
MAINSTATIONBUILDINGBEAMDETAILAT4THFLOORLVL07BR021.03.2025.PDF
ATTACHMENT
MAINSTATIONBUILDINGBEAMDETAILATTERRACELVLR021.03.2025.PDF
ATTACHMENT
MAINSTATIONBUILDINGFRAMINGPLANBEAMDETAILSATMUMMTYLVL01R003.04.2025.pdf
ATTACHMENT
MAINSTATIONBUILDINGFRAMINGPLANBEAMDETAILSATMUMMTYLVL02R003.04.2025.pdf
ATTACHMENT
MAINSTATIONBUILDINGFRAMINGPLANAT4THFLOORLVLR021.03.2025.PDF
ATTACHMENT
MAINSTATIONBUILDINGFRAMINGPLANATTERRACELVLR021.03.2025.PDF
ATTACHMENT
MSBBeamdetailsat1stfloorlvlR114-12-2024.PDF
ATTACHMENT
MSBBeamdetailsatplinthlvlR114-12-2024.PDF
ATTACHMENT
MSBColumnshearwallscheduleR114-12-2024.PDF
ATTACHMENT
MSBColumnlayoutplanR114-12-2024.PDF
ATTACHMENT
MSBDoubleht.areasstaircaseplananddetailsR014-12-2024.PDF
ATTACHMENT
MSBFoundationplandetailsR114-12-2024.PDF
ATTACHMENT
MSBFramingplanat1stfloorlvlR114-12-2024.PDF
ATTACHMENT
MSBFramingplanatplinthlvlR114-12-2024.PDF
ATTACHMENT
27.12.2024MLCPBGKTFOURTHFLOORBEAM07AR0.PDF
ATTACHMENT
27.12.2024MLCPBGKTFOURTHFLOORBEAM07BR0.PDF
ATTACHMENT
27.12.2024MLCPBGKTFOURTHFLOORFRAMINGPLAN07R0.PDF
ATTACHMENT
27.12.2024MLCPBGKTTERRACEBEAM08AR0.PDF
ATTACHMENT
27.12.2024MLCPBGKTTERRACEBEAM08BR0.PDF
ATTACHMENT
27.12.2024MLCPBGKTTERRACEFRAMING08R0.PDF
ATTACHMENT
MLCPBGKTENDTAPICALO.HTANK2PLANANDDETAILSR119.01.2026.pdf
ATTACHMENT
MLCPBGKTENDO.HTANK1PLANANDDETAILSR119.01.2026.pdf
ATTACHMENT
MLCPBGKTENDBeamDetailsAt1stFloorLvl4B.PDF
ATTACHMENT
MLCPBGKTENDBeamDetailsAt1stFloorLvl4A.PDF
ATTACHMENT
MLCPBGKTENDBeamDetailsAt2ndFloorLvl5A.PDF
ATTACHMENT
MLCPBGKTENDBeamDetailsAt2ndFloorLvl5B.PDF
ATTACHMENT
MLCPBGKTENDBeamDetailsAt3rdFloorLvl6A.PDF
ATTACHMENT
MLCPBGKTENDBeamDetailsAt3rdFloorLvl6B.PDF
ATTACHMENT
MLCPBGKTENDBeamDetailsAtPlinthLvl.PDF
ATTACHMENT
MLCPBGKTENDFramingDetailsAt1stFloorLvl.PDF
ATTACHMENT
MLCPBGKTENDFramingPlanAt2ndFloorLvl.PDF
ATTACHMENT
MLCPBGKTENDFramingPlanAt3rdFloorLvl.PDF
ATTACHMENT
MLCPBGKTENDFramingPlanAtPlinthLvl.PDF
ATTACHMENT
MLCPBGKTENDFRAMINGPLANBEAMDETAILSATMUMMTYLVL01R016.04.2025.pdf
ATTACHMENT
MLCPBGKTENDFRAMINGPLANBEAMDETAILSATMUMMTYLVL02R016.04.2025.pdf
ATTACHMENT
MLCPBGKTENDFRAMINGPLANBEAMDETAILSATMUMMTYLVL03R016.04.2025.pdf
ATTACHMENT
MLCPBGKTENDFRAMINGPLANBEAMDETAILSATMUMMTYLVL04R016.04.2025.pdf
ATTACHMENT
MLCPCOLUMNLAYOUTPLANR0DT04.11.2023.PDF
ATTACHMENT
MLCPCOLUMNSCHEDULER0DT04.11.2023.PDF
ATTACHMENT
MLCPFOUNDATIONPLANR0DT04.11.2023.PDF
ATTACHMENT
MLCPFOUNDATIONSECTIONDETAILR1DT04.11.2023.PDF
ATTACHMENT
MLCPRAFTPLANSHOUWINGEXTRARFTOPR0DT04.11.2023.PDF
ATTACHMENT
MLCPRAFTPLANSHOWINGEXTRARFINBOTTOMR0DT04.11.2023.PDF
ATTACHMENT
MLCPRKBENDBEAMDETAILAT2NDFLOORLVL5BR103.04.2025.pdf
ATTACHMENT
MLCPRKBENDBEAMDETAILAT3RDFLOORLVL6AR103.04.2025.pdf
ATTACHMENT
MLCPRKBENDBEAMDETAILAT3RDFLOORLVL6BR103.04.2025.pdf
ATTACHMENT
MLCPRKBENDBEAMDETAILAT4THFLOORLVL7AR003.04.2025.pdf
ATTACHMENT
MLCPRKBENDBEAMDETAILAT4THFLOORLVL7BR003.04.2025.pdf
ATTACHMENT
MLCPRKBENDBEAMDETAILATTERRACEFLOORLVL8AR003.04.2025.pdf
ATTACHMENT
MLCPRKBENDBEAMDETAILATTERRACEFLOORLVL8BR003.04.2025.pdf
ATTACHMENT
MLCPRKBENDBEAMDETAILSAT1STFLOORLVL4AR126-2-2025.pdf
ATTACHMENT
MLCPRKBENDBEAMDETAILSAT1STFLOORLVL4BR126-2-2025.pdf
ATTACHMENT
MLCPRKBENDBEAMDETAILSATPLINTHLVL3AR226-2-2025.pdf
ATTACHMENT
MLCPRKBENDBEAMDETAILSATPLINTHLVL3BR226-2-2025.pdf
ATTACHMENT
MLCPRKBENDBEAMDETALAT2NDFLOORLVL5AR103.04.2025.pdf
ATTACHMENT
MLCPRKBENDCOLUMNLAYOUTPLANR126-2-2025.pdf
ATTACHMENT
MLCPRKBENDCOLUMNSCHEDULE1AR126-2-2025.pdf
ATTACHMENT
MLCPRKBENDCOLUMNSCHEDULE1BR126-2-2025.pdf
ATTACHMENT
MLCPRKBENDFOUNDATIONPLANR126-2-2025.pdf
ATTACHMENT
MLCPRKBENDFOUNDATIONSECTIONDETAILS2AR126-2-2025.pdf
ATTACHMENT
MLCPRKBENDFRAMINGPLANBEAMDETAILSATMUMMTYLVL01R003.04.2025.pdf
ATTACHMENT
MLCPRKBENDFRAMINGPLANBEAMDETAILSATMUMMTYLVL02R003.04.2025.pdf
ATTACHMENT
MLCPRKBENDFRAMINGPLANBEAMDETAILSATMUMMTYLVL03R003.04.2025.pdf
ATTACHMENT
MLCPRKBENDFRAMINGPLANBEAMDETAILSATMUMMTYLVL04R003.04.2025.pdf
ATTACHMENT
MLCPRKBENDFRAMINGPLANAT1STFLOORLVLR126-2-2025.pdf
ATTACHMENT
MLCPRKBENDFRAMINGPLANAT2NDFLOOR5LVLR103.04.2025.pdf
ATTACHMENT
MLCPRKBENDFRAMINGPLANAT3RDFLOORLVL6R103.04.2025.pdf
ATTACHMENT
MLCPRKBENDFRAMINGPLANAT4THFLOORLVL7R003.04.2025.pdf
ATTACHMENT
MLCPRKBENDFRAMINGPLANATPLINTHLVLR226-2-2025.pdf
ATTACHMENT
MLCPRKBENDFRAMINGPLANATTERRACEFLOORLVL8R003.04.2025.pdf
ATTACHMENT
MLCPRKBENDSHEARWALLSCHEDULE1CR126-2-2025.pdf
ATTACHMENT
SCHOOLBUILDINGBEAMDETAILATFIRSTFOOLLVL.PDF
ATTACHMENT
SCHOOLBUILDINGBEAMDETAILATPLINTLVL.PDF
ATTACHMENT
SCHOOLBUILDINGBEAMDETAILATTERRACELVL.PDF
ATTACHMENT
SCHOOLBUILDINGCOLUMNLAYOUTPLAN.PDF
ATTACHMENT
SCHOOLBUILDINGCOLUMNSCHEDULE.PDF
ATTACHMENT
SCHOOLBUILDINGFOUNDATIONPLANDETAIL.PDF
ATTACHMENT
SCHOOLBUILDINGFOUNDATIONSECTION.PDF
ATTACHMENT
SCHOOLBUILDINGFRAMINGPLANATFIRSTFLOORLVL.PDF
ATTACHMENT
SCHOOLBUILDINGFRAMINGPLANATPLINTHLVL.PDF
ATTACHMENT
SCHOOLBUILDINGFRAMINGPLANATTERRACELVL.PDF
ATTACHMENT
SCHOOLBUILDINGPLANDETAILATMUMTYLVL.PDF
ATTACHMENT
SCHOOLBUILDINGSTAIRCASEPLANDETAIL.PDF
ATTACHMENT
27.12.2024SESBTERRACEBEAM07AR0.PDF
ATTACHMENT
27.12.2024SESBTERRACEFRAMING07R0.PDF
ATTACHMENT
27-12-2024SESBBeamDetailsAt3rdFloorLvlR1.PDF
ATTACHMENT
27-12-2024SESBFramingPlanAt3rdFloorLvlR1.PDF
ATTACHMENT
SESBBeamDetailsAt1stFloorLvl.PDF
ATTACHMENT
SESBBeamDetailsAt2ndFloorLvl.PDF
ATTACHMENT
SESBBeamDetailsAtPlinthLvl.PDF
ATTACHMENT
SESBCOLUMNLAYOUTPLANR0DT03.11.2023.PDF
ATTACHMENT
SESBCOLUMNSHEARWALLSCHEDULER0DT03.11.2023.PDF
ATTACHMENT
SESBFOUNDATIONPLANR0DT03.11.2023.PDF
ATTACHMENT
SESBFOUNDATIONSECTIONR0DT03.11.2023.PDF
ATTACHMENT
SESBFOUNDATIONSECTIONG-GR0DT03.11.2023.PDF
ATTACHMENT
SESBFramingPlanAt1stFloorLvl.PDF
ATTACHMENT
SESBFramingPlanAt2ndFloorLvl.PDF
ATTACHMENT
SESBFRAMINGPLANATMUMMTYLVL01R025.04.2025.pdf
ATTACHMENT
SESBFRAMINGPLANATMUMMTYLVL02R025.04.2025.pdf
ATTACHMENT
SESBFRAMINGPLANATMUMMTYLVL03R025.04.2025.pdf
ATTACHMENT
SESBFRAMINGPLANATMUMMTYLVL04R025.04.2025.pdf
ATTACHMENT
SESBFramingPlanAtPlinthLvl.PDF
ATTACHMENT
SESBOHT-1PLANDETAILSR125.04.2025.pdf
ATTACHMENT
SESBOHT-2PLANDETAILSR125.04.2025.pdf
ATTACHMENT
MASTERPLANSTP100KLDDETAIL-2SESBR104.08.2025.pdf
ATTACHMENT
MASTERPLANSTP410KLDDETAIL-1MSBR104.08.2025.pdf
ATTACHMENT
MASTERPLANUGTDETAIL-1MSBR104.08.2025.pdf
ATTACHMENT
MASTERPLANUGTDETAIL-2SESBR104.08.2025.pdf
ATTACHMENT
HPSC0682.pdf
ATTACHMENT
HPSC0684.pdf
ATTACHMENT
JodhpurFOB1994.pdf
ATTACHMENT
2NDFLOOR.pdf
ATTACHMENT
GROUNDFLOOR.pdf
ATTACHMENT
MASTERPLANWITHACCESSCONTROLSYSTEMDOORR111.12.2025.pdf
ATTACHMENT
MASTERPLANWORKINGSUPERIMPOSEDPLANR302.09.2025.pdf
ATTACHMENT
FOBCONCOURSECCTVSYSTEMLAYOUT.pdf
ATTACHMENT
FOBCONCOURSEIPISSYSTEMLAYOUT.pdf
ATTACHMENT
FOBCONCOURSEPASYSTEMLAYOUT.pdf
ATTACHMENT
GFFIRSTELVLAYOUTR212.11.2025.pdf
ATTACHMENT
MLCPBGKTCCTVGORUNDFLOORR0120.04.2026.pdf
ATTACHMENT
MLCPBGKTCCTVFIRSTFLOORR0120.04.2026.pdf
ATTACHMENT
MLCPBGKTCCTVSECONDFLOORR0120.04.2026.pdf
ATTACHMENT
MLCPBGKTCCTVTHIRDFLOORR0120.04.2026_1.pdf
ATTACHMENT
MLCPBGKTCCTVFOURTHFLOORR0120.04.2026_1.pdf
ATTACHMENT
BGKTMLCPITSYSTEM4THFLOORLAYOUT.pdf
ATTACHMENT
00.PADrawingGroundfloorBGKT.pdf
ATTACHMENT
01.PADrawing1STFloorBGTK.pdf
ATTACHMENT
02.PADrawing2NDFloorBGTK.pdf
ATTACHMENT
03.PADrawing3RDFloorBGTK.pdf
ATTACHMENT
04.PADrawing4THFloorBGTK.pdf
ATTACHMENT
MLCPRKBGROUNDFLOORCCTVSYSTEMLAYOUTWITHOUTCOVERAGER0111.04.2026.pdf
ATTACHMENT
MLCPRKBFIRSTFLOORCCTVSYSTEMLAYOUTWITHOUTCOVERAGER0111.04.2026.pdf
ATTACHMENT
MLCPRKBSECONDFLOORCCTVSYSTEMLAYOUTWITHOUTCOVERAGER0111.04.2026.pdf
ATTACHMENT
MLCPRKBTHIRDFLOORCCTVSYSTEMLAYOUTWITHOUTCOVERAGER0111.04.2026.pdf
ATTACHMENT
MLCPRKBFOURTHFLOORCCTVSYSTEMLAYOUTWITHOUTCOVERAGER0111.04.2026.pdf
ATTACHMENT
01.GroundfloorPApdf.pdf
ATTACHMENT
02.FirstfloorPApdf.pdf
ATTACHMENT
03.SecondfloorPA-pdf.pdf
ATTACHMENT
04.ThirdfloorPApdf.pdf
ATTACHMENT
MLCPRKBGROUNDFLOORITSYSTEM-EL-GROUNDFL..pdf
ATTACHMENT
MLCPRKB1STFLOORITSYSTEM-EL-1STFLOOR.pdf
ATTACHMENT
MSBGROUNDFLOORCCTVSYSTEMLAYOUTPLANR0114.04.2026.pdf
ATTACHMENT
MSBFIRSTFLOORCCTVSYSTEMLAYOUTPLANR0114.04.2026.pdf
ATTACHMENT
MSBTHERDFLOORCCTVSYSTEMLAYOUTPLANR0114.04.2026.pdf
ATTACHMENT
MSBFOURTHFLOORFIREALARMSYSTEMLAYOUTPLANR0115.04.2026.pdf
ATTACHMENT
MSBSECONDFLOORIPISSYSTEMLAYOUTPLANR014.04.2026.pdf
ATTACHMENT
MSBFIRSTFLOORITSYSTEMLAYOYTPLANR126.03.2026.pdf
ATTACHMENT
MSBTHIRDFLOORITSYSTEMLAYOUTPLAN.pdf
ATTACHMENT
MSBFOURTHFLOORITSYSTEMLAYOYTPLANR126.03.2026.pdf
ATTACHMENT
FIRSTFLOORPASYSTEMLAYOUTR0115.04.2026.pdf
ATTACHMENT
GROUNDFLOORPASYSTEMLAYOUTR0115.04.2026.pdf
ATTACHMENT
THIRDFLOORPASYSTEMLAYOUTR0115.04.2026.pdf
ATTACHMENT
FOURTHFLOORPASYSTEMLAYOUTR0115.04.2026.pdf
ATTACHMENT
MSBGROUNDFLOORRACEWAYLAYOUTPLANR014.04.2026.pdf
ATTACHMENT
JODHPURRAILWAYPLAFORMAREAIPISSYSTEMLAYOUT06.05.2026.pdf
ATTACHMENT
JODHPURRAILWAYPLAFORMAREAITSYSTEMLAYOUT.pdf
ATTACHMENT
JODHPURRAILWAYPLAFORMAREAPASYSTEMLAYOUT.pdf
ATTACHMENT
SSBFIRSTFLOORCCTVSYSTEMLAYOUTR026.03.2026.pdf
ATTACHMENT
SSBSECONDFLOORCCTVSYSTEMLAYOUTR028.03.2026.pdf
ATTACHMENT
SSBGROUNDFLOORIPISSYSTEMLAYOUTR0114.04.2026.pdf
ATTACHMENT
SSBSECONDFLOORIPISSYSTEMLAYOUTR014.04.2026.pdf
ATTACHMENT
MSBFIRSTFLOORITSYSTEMLAYOYTPLANR126.03.2026_1.pdf
ATTACHMENT
SSBSECONDFLOORITSYSTEMLAYOYTR126.03.2026.pdf
ATTACHMENT
SSBTHIRDFLOORITSYSTEMLAYOUTR126.03.2026.pdf
ATTACHMENT
SSBGROUNDFLOORPASYSTEMLAYOUTR026.03.2026.pdf
ATTACHMENT
SSBSECONDFLOORPASYSTEMLAYOUTR026.03.2026.pdf
ATTACHMENT
SSBGROUNDFLOORRACEWAYLAYOUTR014.04.2026.pdf
ATTACHMENT
SSBFIRSTFLOORRACEWAYLAYOUTR014.04.2026.pdf
ATTACHMENT
SSBSECENDFLOORRACEWAYLAYOUTR014.04.2026.pdf
ATTACHMENT
APPROVEDLOPofAirConcourse.pdf
ATTACHMENT
ApprovedLOPofFOB-3.pdf
ATTACHMENT
AC-1FIRSTFLOORELECTRICALLIGHTINGCONDUITLAYOUTPLANR015.04.2025.pdf
ATTACHMENT
AC-1FIRSTFLOORELECTRICALLIGHTINGLAYOUTPLANR015.04.2025.pdf
ATTACHMENT
AC-1FIRSTFLOORELECTRICALPOWERCONDUITLAYOUTR104.06.2025.pdf
ATTACHMENT
AC-1FIRSTFLOORELECTRICALPOWERLAYOUTR004.06.2025.pdf
ATTACHMENT
AC-1GROUNDFLOORDBDETAILR015.04.2025.pdf
ATTACHMENT
AC-1GROUNDFLOORELECTRICALLIGHTINGCONDUITLAYOUTPLANR015.04.2025.pdf
ATTACHMENT
AC-1GROUNDFLOORELECTRICALLIGHTINGLAYOUTPLANR015.04.2025.pdf
ATTACHMENT
AC-1GROUNDFLOORELECTRICALPOWERCONDUITRACEWAYLAYOUTPLANR104.06.2025.pdf
ATTACHMENT
AC-1GROUNDFLOORELECTRICALPOWERLAYOUTR004.06.2025.pdf
ATTACHMENT
AC-1GROUNDFLOORLIGHTDIMENSIONLAYOUTR004.06.2025.pdf
ATTACHMENT
AC-1SECONDFLOORDBDETAILLAYOUTR113.11.2025.pdf
ATTACHMENT
AC-1SECONDFLOORELECTRICALPOWERLAYOUTPLANR004.06.2025.pdf
ATTACHMENT
AC-1SECONDFLOORLIGHTDIMENSIONLAYOUTPLANR004.06.2025.pdf
ATTACHMENT
AC-1SECONDFLOORPLANELECTRICALLIGHTCONDUITLAYOUTR004.06.2025_1.pdf
ATTACHMENT
AC-1SECONDFLOORPLANELECTRICALLIGHTINGLAYOUTR104.06.2025.pdf
ATTACHMENT
AC-1SECONDFLOORPLANPOWERCONDUITLAYOUTR004.06.2025.pdf
ATTACHMENT
AC-1TERRACEFLOORELECTRICALLIGHTCONDUITLAYOUTPLANR011.06.2025.pdf
ATTACHMENT
AC-1TERRACEFLOORELECTRICALLIGHTINGLAYOUTPLANR011.06.2025.pdf
ATTACHMENT
AC-2FIRSTFLOORELECTRICALLIGHTDIMENSIONLAYOUTPLANR321.11.2025.pdf
ATTACHMENT
AC-2FIRSTFLOORELECTRICALLIGHTLAYOUTPLANR321.11.2025.pdf
ATTACHMENT
AC-2FIRSTFLOORELECTRICALLIGHTINGLAYOUTPLANR321.11.2025.pdf
ATTACHMENT
AC-2GROUNDFLOORDBDETAILLAYOUTR005.06.2025.pdf
ATTACHMENT
AC-2GROUNDFLOORELECTRICALLIGHTCONDUITLAYOUTPLANR321.11.2025.pdf
ATTACHMENT
AC-2GROUNDFLOORELECTRICALLIGHTDIMENSIONLAYOUTPLANR321.11.2025.pdf
ATTACHMENT
AC-2GROUNDFLOORELECTRICALLIGHTINGLAYOUTPLANR321.11.2025.pdf
ATTACHMENT
AC-2GROUNDFLOORELECTRICALPOWERCONDUITRACEWAYLAYOUTPLANR005.06.2025.pdf
ATTACHMENT
AC-2GROUNDFLOORELECTRICALPOWERLAYOUTPLANR005.06.2025.pdf
ATTACHMENT
AC-2SECONDFLOORDBDETAILR321.11.2025.pdf
ATTACHMENT
AC-2SECONDFLOORELECTRICALLIGHTDIMENSIONLAYOUTPLANR321.11.2025.pdf
ATTACHMENT
AC-2SECONDFLOORELECTRICALLIGHTLAYOUTPLANR321.11.2025.pdf
ATTACHMENT
AC-2SECONDFLOORELECTRICALLIGHTINGLAYOUTR321.11.2025.pdf
ATTACHMENT
AC-2SECONDFLOORELECTRICALPOWERLAYOUTPLANR005.06.2025.pdf
ATTACHMENT
AC-2SECONDFLOORPLANPOWERCONDUITLAYOUTR005.06.2025.pdf
ATTACHMENT
AC-2TERRACEFLOORELECTRICALLIGHTCONDUITLAYOUTPLANR005.06.2025.pdf
ATTACHMENT
AC-2TERRACEFLOORELECTRICALLIGHTINGLAYOUTPLANR005.06.2025.pdf
ATTACHMENT
HOLIDAYHOME1GROUNDFIRSTFLOORDBDETAILR107.08.2025.pdf
ATTACHMENT
HOLIDAYHOME1GROUNDFIRSTFLOORLIGHTINHCONDUITLAYOUTR107.08.2025.pdf
ATTACHMENT
HOLIDAYHOME1GROUNDFIRSTFLOORPOWERCONDUITLAYOUTR107.08.2025.pdf
ATTACHMENT
HOLIDAYHOME1TERRACELIGHTINGLAYOUTR107.08.2025.pdf
ATTACHMENT
HOLIDAYHOMEGFFIRSTFLOORSUBMIANLAYOUTR019.09.2025.pdf
ATTACHMENT
HOLIDAYHOMESLDLAYOUTR007.08.2025.pdf
ATTACHMENT
HOLIDAYHOME2GROUNDFIRSTFLOORLIGHTINGLIGHTINGCONDUITLAYOUTR207.08.2025.pdf
ATTACHMENT
HOLIDAYHOME2GROUNDFIRSTFLOORPOWERPOWERCONDUITLAYOUTR207.08.2025.pdf
ATTACHMENT
HOLIDAYHOME2GROUNDFLOORFIRSTFLOORDBDETAILR207.08.2025.pdf
ATTACHMENT
HOLIDAYHOME2TERRACEFLOORLIGHTINGLAYOUTR022.07.2025.pdf
ATTACHMENT
HOLIDAYHOME2TERRACELIGHTINGLAYOUTR207.08.2025.pdf
ATTACHMENT
MSBFIRSTFLOORELECTRICALDBDETAILLAYOUTPLANR107.08.2025.pdf
ATTACHMENT
MSBFIRSTFLOORELECTRICALDIMENSIONLAYOUTPLANR107.08.2025.pdf
ATTACHMENT
MSBFIRSTFLOORELECTRICALLIGHTCONDUITLAYOUTPLANR107.08.2025.pdf
ATTACHMENT
MSBFIRSTFLOORELECTRICALLIGHTLAYOUTPLANR107.08.2025.pdf
ATTACHMENT
MSBFIRSTFLOORELECTRICALPOWERCONDUITLAYOUTPLANR107.08.2025.pdf
ATTACHMENT
MSBFIRSTFLOORELECTRICALPOWERLAYOUTPLANR107.08.2025.pdf
ATTACHMENT
MSBFOURTHFLOORELECTRICALLIGHTLAYOUTPLANR325.02.2026.pdf
ATTACHMENT
MSBFOURTHFLOORELECTRICALPOWERCONDUITLAYOUTPLANR325.02.2026.pdf
ATTACHMENT
MSBFOURTHFLOORELECTRICALDBDETAILR325.02.2026.pdf
ATTACHMENT
MSBFOURTHFLOORELECTRICALDIMENSIONLAYOUTPLANR325.02.2026.pdf
ATTACHMENT
MSBFOURTHFLOORELECTRICALLIGHTCONDUITLAYOUTPLANR325.02.2026.pdf
ATTACHMENT
MSBFOURTHFLOORELECTRICALPOWERLAYOUTPLANR325.02.2026.pdf
ATTACHMENT
MSBGROUNDFLOORELECTRIALDBDITAILLAYOUTPLANR225.08.2025.pdf
ATTACHMENT
MSBGROUNDFLOORELECTRICALFIREPALAYOUTPLANR225.08.2025.pdf
ATTACHMENT
MSBGROUNDFLOORELECTRICALLIGHTCONDUITLAYOUTPLANR225.08.2025.pdf
ATTACHMENT
MSBGROUNDFLOORELECTRICALLIGHTLAYOUTPLANR225.08.2025.pdf
ATTACHMENT
MSBGROUNDFLOORELECTRICALPOWERCONDUITLAYOUTPLANR225.08.2025.pdf
ATTACHMENT
MSBGROUNDFLOORELECTRICALPOWERLAYOUTPLANR225.08.2025.pdf
ATTACHMENT
MSBELECTRICALDBDETAILLAYOUTSECONDFLOORPLANR019.09.2025.pdf
ATTACHMENT
MSBELECTRICALDIMWNSIONLAYOUTSECONDFLOORPLANR019.09.2025.pdf
ATTACHMENT
MSBELECTRICALFIREPASYSTEMLAYOUTSECONDFLOORPLANR019.09.2025.pdf
ATTACHMENT
MSBELECTRICALLIGHTCONDUITLAYOUTSECONDFLOORPLANR019.09.2025.pdf
ATTACHMENT
MSBELECTRICALLIGHTLAYOUTSECONDFLOORPLANR019.09.2025.pdf
ATTACHMENT
MSBELECTRICALPOWERCONDUITLAYOUTSECONDFLOORPLANR019.09.2025.pdf
ATTACHMENT
MSBELECTRICALPOWERLAYOUTSECONDFLOORPLANR019.09.2025.pdf
ATTACHMENT
MSBDBDETAILLAYOUTTHIRDFLOORR215.1.2026.pdf
ATTACHMENT
MSBDIMENSIONLAYOUTFLOORR215.1.2026.pdf
ATTACHMENT
MSBELECTRICALLIGHTCONDUITLAYOUTTAHIRDFLOORPLANR215.1.2026.pdf
ATTACHMENT
MSBELECTRICALLIGHYINGLAYOUTTHIRDFLOORPLANR215.1.2026.pdf
ATTACHMENT
MSBELECTRICALPOWERCONDUITLAYOUTTHIRDFLOORPLANR215.1.2026.pdf
ATTACHMENT
MSBELECTRICALPOWERLAYOUTTHIRDFLOORPLANR315.1.2026.pdf
ATTACHMENT
MSBFIREPASYSTEMLAYOUTTHIRDFLOORR215.1.2026.pdf
ATTACHMENT
MLCPBGKTDIMENSIONLAYOUTPLANFIRSTFLOORPLANR016.09.2025.pdf
ATTACHMENT
MLCPBGKTELECTRICALCABLETRAYLAYOUTFIRSTFLOORPLANR316.09.2025.pdf
ATTACHMENT
MLCPBGKTELECTRICALDBDETAILLAYOUTFIRSTFLOORPLANR316.09.2025.pdf
ATTACHMENT
MLCPBGKTELECTRICALLIGHTINGCONDUITPLANFIRSTFLOORR026.03.25.PDF
ATTACHMENT
MLCPBGKTELECTRICALLIGHTINGLAYOUTFIRSTFLOORPLANR216.09.2025.pdf
ATTACHMENT
MLCPBGKTELECTRICALPOWERCONDUITLAYOUTFIRSTFLOORPLANR216.09.2025.pdf
ATTACHMENT
MLCPBGKTCABLETRAYLAYOUTFOURTHFLOORPLANR104.06.2025.pdf
ATTACHMENT
MLCPBGKTDBDETAILLAYOUTFOURTHFLOORPLANR216.09.2025.pdf
ATTACHMENT
MLCPBGKTDIMENSIONLAYOUTPLANFOURTHFLOORPLANR016.09.2025.pdf
ATTACHMENT
MLCPBGKTELECTRICALLIGHTINGCONDUITLAYOUTFOURTHFLOORPLANR216.09.2025.pdf
ATTACHMENT
MLCPBGKTELECTRICALLIGHTINGLAYOUTFOURTHFLOORPLANR216.09.2025.pdf
ATTACHMENT
MLCPBGKTELECTRICALPOWERCONDUITLAYOUTFOURTHFLOORPLANR104.06.2025.pdf
ATTACHMENT
MLCPBGKTPOWERLAYOUTFOURTHFLOORPLANR104.06.2025.pdf
ATTACHMENT
MLCPBGKTCABLETRAYLAYOUTGROUNDFLOORPLANR104.06.2025.pdf
ATTACHMENT
MLCPBGKTDIMENSIONLAYOUTGROUNDFLOORPLANR004.06.2025.pdf
ATTACHMENT
MLCPBGKTELECTRICALDBDETAILLAYOUTGROUNDFLOORPLANR316.09.2025.pdf
ATTACHMENT
MLCPBGKTELECTRICALLIGHTINGCONDUITPLANGROUNDFLOORR026.03.25.PDF
ATTACHMENT
MLCPBGKTELECTRICALLIGHTINGLAYOUTGROUNDFLOORPLANR221.07.2025.pdf
ATTACHMENT
MLCPBGKTELECTRICALPOWERCONDUITLAYOUTGROUNDFLOORPLANR104.06.2025.pdf
ATTACHMENT
MLCPBGKTELECTRICALPOWERLAYOUTGROUNDFLOORPLANR316.09.2025.pdf
ATTACHMENT
MLCPBGKTCABLETRAYLAYOUTSECONDFLOORPLANR316.09.2025.pdf
ATTACHMENT
MLCPBGKTDBDETAILLAYOUTSECONDFLOORPLANR316.09.2025.pdf
ATTACHMENT
MLCPBGKTDIMENSIONLAYOUTPLANSECONDFLOORPLANR016.09.2025.pdf
ATTACHMENT
MLCPBGKTELECTRICALLIGHTINGCONDUITPLANSECONDFLOORR026.03.25.PDF
ATTACHMENT
MLCPBGKTELECTRICALLIGHTINGLAYOUTSECONDFLOORPLANR216.09.2025.pdf
ATTACHMENT
MLCPBGKTELECTRICALPOWERLAYOUTSECONDFLOORPLANR216.09.2025.pdf
ATTACHMENT
MLCPBGKTELECTRICALEARTHINGLAYOUTTERRACEFLOORR026.03.25.PDF
ATTACHMENT
MLCPBGKTELECTRICALLIGHTINGCONDUITLAYOUTTERRACEFLOORPLANR216.09.2025.pdf
ATTACHMENT
MLCPBGKTCABLETRAYLAYOUTTHIRDFLOORPLANR316.09.2025.pdf
ATTACHMENT
MLCPBGKTDBDETAILLAYOUTTHIRDFLOORPLANR316.09.2025.pdf
ATTACHMENT
MLCPBGKTDIMENSIONLAYOUTPLANTHIRDFLOORPLANR016.09.2025.pdf
ATTACHMENT
MLCPBGKTELECTRICALLIGHTINGLAYOUTTHIRDFLOORPLANR216.09.2025.pdf
ATTACHMENT
MLCPBGKTELECTRICALLIGHTINGCONDUITPLANTHIRDFLOORR026.03.25.PDF
ATTACHMENT
MLCPBGKTELECTRICALPOWERCONDUITLAYOUTTHIRDFLOORPLANR216.09.2025.pdf
ATTACHMENT
MLCPRKBELECTRICALDBDETAILFIRSTFLOORR103.10.2025.pdf
ATTACHMENT
MLCPRKBELECTRICALDIMENSIONLAYOUTFIRSTFLOORR003.10.2025.pdf
ATTACHMENT
MLCPRKBELECTRICALLIGHTINGCONDUITLAYOUTFIRSTFLOORR103.10.2025.pdf
ATTACHMENT
MLCPRKBELECTRICALLIGHTINGLAYOUTFIRSTFLOORR103.10.2025.pdf
ATTACHMENT
MLCPRKBELECTRICALPOWERCONDUITLAYOUTFIRSTFLOORR103.10.2025.pdf
ATTACHMENT
MLCPRKBELECTRICALPOWERLAYOUTFIRSTFLOORR103.10.2025.pdf
ATTACHMENT
MLCPRKBELECTRICALDBDETAILFOURTHFLOORR103.10.2025.pdf
ATTACHMENT
MLCPRKBELECTRICALDIMENSIONLAYOUTFOURTHFLOORR003.10.2025.pdf
ATTACHMENT
MLCPRKBELECTRICALLIGHTINGCONDUITLAYOUTFOURTHFLOORR103.10.2025.pdf
ATTACHMENT
MLCPRKBELECTRICALLIGHTINGLAYOUTFOURTHFLOORR103.10.2025.pdf
ATTACHMENT
MLCPRKBELECTRICALPOWERCONDUITLAYOUTFOURTHFLOORR103.10.2025.pdf
ATTACHMENT
MLCPRKBELECTRICALPOWERLAYOUTFOURTHFLOORR103.10.2025.pdf
ATTACHMENT
MLCPRKBELECTRICALCABLETRAYCABLEROUTELAYOUTGROUNDFLOORR103.10.2025.pdf
ATTACHMENT
MLCPRKBELECTRICALDBDETAILGROUNDFLOORR103.10.2025.pdf
ATTACHMENT
MLCPRKBELECTRICALDIMENSIONLAYOUTGROUNDFLOORR003.10.2025.pdf
ATTACHMENT
MLCPRKBELECTRICALLIGHTINGCONDUITLAYOUTGROUNDFLOORR103.10.2025.pdf
ATTACHMENT
MLCPRKBELECTRICALLIGHTINGLAYOUTGROUNDFLOORR103.10.2025.pdf
ATTACHMENT
MLCPRKBELECTRICALPOWERCONDUITLAYOUTGROUNDFLOORR103.10.2025.pdf
ATTACHMENT
MLCPRKBELECTRICALPOWERLAYOUTGROUNDFLOORR103.10.2025.pdf
ATTACHMENT
MLCPRKBELECTRICALDBDETAILSECONDFLOORR103.10.2025.pdf
ATTACHMENT
MLCPRKBELECTRICALDIMENSIONLAYOUTSECONDFLOORR003.10.2025_1.pdf
ATTACHMENT
MLCPRKBELECTRICALLIGHTINGCONDUITLAYOUTSECONDFLOORR103.10.2025.pdf
ATTACHMENT
MLCPRKBELECTRICALLIGHTINGLAYOUTSECONDFLOORR103.10.2025.pdf
ATTACHMENT
MLCPRKBELECTRICALPOWERCONDUITLAYOUTSECONDFLOORR103.10.2025.pdf
ATTACHMENT
MLCPRKBELECTRICALPOWERLAYOUTSECONDFLOORR103.10.2025.pdf
ATTACHMENT
MLCPRKBELECTRICALLIGHTINGLAYOUTTERRACEFLOORR103.10.2025.pdf
ATTACHMENT
MLCPRKBELECTRICALLIGHTINGCONDUITLAYOUTTERRACEFLOORR103.10.2025.pdf
ATTACHMENT
MLCPRKBELECTRICALDBDETAILLAYOUTTHIRDFLOORR103.10.2025.pdf
ATTACHMENT
MLCPRKBELECTRICALDIMENSIONLAYOUTTHIRDFLOORR003.10.2025.pdf
ATTACHMENT
MLCPRKBELECTRICALLIGHTINGCONDUITLAYOUTTHIRDFLOORR103.10.2025.pdf
ATTACHMENT
MLCPRKBELECTRICALLIGHTINGLAYOUTTHIRDFLOORR103.10.2025.pdf
ATTACHMENT
MLCPRKBELECTRICALPOWERCONDUITLAYOUTTHIRDFLOORR103.10.2025.pdf
ATTACHMENT
MLCPRKBELECTRICALPOWERLAYOUTTHIRDFLOORR103.10.2025.pdf
ATTACHMENT
SSBFIRSTFLOORDBDETAILR223.04.2025.pdf
ATTACHMENT
SSBFIRSTFLOORELECTRICALCABLETRAYPOWERLAYOUTR223.04.2025.pdf
ATTACHMENT
SSBFIRSTFLOORELECTRICALLIGHTINGCONDUITLAYOUTR223.04.2025.pdf
ATTACHMENT
SSBFIRSTFLOORELECTRICALLIGHTINGLAYOUTR223.04.2025.pdf
ATTACHMENT
SSBFIRSTFLOORELECTRICALPOWERCONDUITLAYOUTR223.04.2025.pdf
ATTACHMENT
SSBGROUNDFLOORDBDETAILR214.04.2025.pdf
ATTACHMENT
SSBGROUNDFLOORELECTRICALCABLETRAYPOWERLAYOUTR214.04.2025.pdf
ATTACHMENT
SSBGROUNDFLOORELECTRICALLIGHTINGCONDUITLAYOUTR214.04.2025.pdf
ATTACHMENT
SSBGROUNDFLOORELECTRICALLIGHTINGLAYOUTR214.04.2025.pdf
ATTACHMENT
SSBGROUNDFLOORELECTRICALPOWERCONDUITLAYOUTR214.04.2025.pdf
ATTACHMENT
SSBSECONDFLOORDBDETAILR123.04.2025.pdf
ATTACHMENT
SSBSECONDFLOORDIMENSIONLAYOUTR123.04.2025.pdf
ATTACHMENT
SSBSECONDFLOORELECTRICALCABLETRAYPOWERLAYOUTR123.04.2025.pdf
ATTACHMENT
SSBSECONDFLOORELECTRICALLIGHTINGCONDUITLAYOUTR123.04.2025.pdf
ATTACHMENT
SSBSECONDFLOORELECTRICALLIGHTINGLAYOUTR123.04.2025.pdf
ATTACHMENT
SSBSECONDFLOORELECTRICALPOWERCONDUITLAYOUTR123.04.2025.pdf
ATTACHMENT
SSB3RDFLOORDBDETAILR05-3-2025.PDF
ATTACHMENT
SSB3RDFLOORELECTRICALLIGHTINGLAYOUTPLANR15-3-2025.PDF
ATTACHMENT
SSB3RDFLOORLIGHTINGCONDUITLAYOUTPLANR15-3-2025.PDF
ATTACHMENT
SSB3RDFLOORELECTRICALPOWERCONDUITLAYOUTPLANR15-3-2025.PDF
ATTACHMENT
VOL-II_PART-01_EPCAGREEMENTGENERAL_part_1.pdf
ATTACHMENT
VOL-II_PART-01_EPCAGREEMENTGENERAL_part_2.pdf
ATTACHMENT
DBRapproved.pdf
ATTACHMENT
TopographicalSurveyPlan.pdf
ATTACHMENT
SOILTESTREPORTS.pdf
ATTACHMENT
ScheduleDBupdated.pdf
ATTACHMENT
ScheduleDC01updated_1.pdf
ATTACHMENT
Vol-II_Part-02_EPCScheduleDC-02.pdf
ATTACHMENT
DPR_2026.08.10_compressed.pdf
ATTACHMENT
JODHPUR_MP_2026.08.10_.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].