Loading…
Loading…
Tender Value
₹23.8 L
EMD Value
₹47,563
Closing Date
23 Jul 2026, 10:00 amClosed
CGMT, BSNL, Rajasthan, Jaipur
O/o CGMT, BSNL, Sardar Patel Marg, C-Scheme, Jaipur (Rajasthan)-302008
OFC rehabilitation and patch work in Kota , Bundi and Jhalawar OA of Kota BA
2026_BSNL_282656_1
RJCO-23/11(11)/17/2025-TX AND MM dated 02.07.2026
Open Tender
Miscellaneous Services
Tender cum Auction
365 days
RAJASTHAN
Please refer tender documents.
7 documents required · 7 mandatory
₹590
Yes
ACCOUNTS OFFICER (Cash), O/o CGMT, BSNL, Jaipur
₹47,563
Yes
AGM (TP), C.O., Jaipur, Room No. 67, Ist Floor
1 Aug 2026
2 Jul 2026
24 Jul 2026
2 Jul 2026
23 Jul 2026
2 Jul 2026
2 Jul 2026 - 9 Jul 2026
8 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1EXCAVATION OF TRENCHES | |||||
| 1.01 | Excavation trenches in Normal/Soft soil to a standard depth of 1.65 m as specified in laying practices of OF Cable and back filling the excavated trenches after laying the HDPE/PLB Pipe with or without protection | - | per M | 99 | - |
| - | Excavation trenches in Hard/Morum soil to a standard depth of 1.65 m as specified in laying practices of OF Cable and back filling the excavated trenches after laying the HDPE/PLB Pipe with or without protection | - | per M | 120 | - |
| - | Excavation trenches in Soft Rocky soil to a standard depth of 1.65 m as specified in laying practices of OF Cable and back filling the excavated trenches after laying the HDPE/PLB Pipe with or without protection | - | per M | 232 | - |
| - | Excavation trenches in Hard Rocky soil to a standard depth of 1.65 m as specified in laying practices of OF Cable and back filling the excavated trenches after laying the HDPE/PLB Pipe with or without protection | - | per M | 784 | - |
| - | Excavation trenches in Hard Rocky soil to a standard depth of 1.00 m as specified in laying practices of OF Cable(Blasting prohibited),
and back filling the excavated trenches after laying the HDPE/PLB Pipe | - | per M | 475.15 | - |
| - | Horizontal Directional Drilling for laying U/G PLB/HDPE Pipes up to 50mm dia to a standard depth of 1.65m as specified in laying practices of OF Cable by HDD method | - | per M | 180 | - |
| - | For pulling each additional pipe up to 50mm dia by HDD beyond one pipe. | - | per M | 15 | - |
| 2LAYING OF PLB UP TO 50mm DIAMETER AND JOINTING WITH COUPLER (Material to be supplied by BSNL) | |||||
| 2.01 | (ii) 1st pipe | - | per M | 8 | - |
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.25 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
BidDocKotaBA.pdf
Tender Documents • 1.63 MB
BOQ_329757.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .