Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance AT SAUNDA PO SAUNDA DISTT RAMGARH JHARKHAND PIN 829133 | SAUNDA | RAMGARH | JHARKHAND | 829133 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹4.8 L
EMD Value
₹6,100
Closing Date
22 Jun 2026, 3:00 pmClosed
Staff Officer (C) Barka Sayal Area
GM (BS) UNIT BARKA SAYAL AREA
Repair of guard wall along approach road to Regional Store Saunda under GM Unit Barka-Sayal Area
2026_CCL_361010_1
GM(B-S)/Civil/Tender/26-27/180
Open Tender
Civil Works - Others
Percentage
30 days
GM Unit
Please refer Tender documents.
3 documents required · 3 mandatory
₹6,100
23 Jun 2026
11 Jun 2026
23 Jun 2026
12 Jun 2026
22 Jun 2026
12 Jun 2026
12 Jun 2026 - 15 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Item Description/ Heading | |||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means foundation trenches, drain not exceeding 1.5 m in width as well as 10 sqm on plan including dressing of sides and ramming of bottom, lift up to 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. (All kinds of soils). | 38.45 | cum | 205.8 | ₹7,912.6 |
| 1.02 | Providing and laying cement concrete of specified grade excluding the cost of centering and shuttering in all works up to plinth level : 1:4:8 (1cement : 4coarse sand : 8graded stone aggregates 40 mm nominal size). | 4.27 | cum | 6,072.4 | ₹25,941.29 |
| 1.03 | Random rubble masonry with quarry stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement: 6 coarse sand : 12 graded stone aggregate 20mm nominal size) at plinth level with : Cement mortar 1:6 (1 cement: 6 coarse sand)
This includes picking, choosing and carriage of quarry stones all complete to the appropriate site as per the direction of EIC | 74.58 | cum | 3,886.78 | ₹2,89,883.83 |
| 1.04 | Providing and laying cement concrete of specified grade excluding the cost of centering and shuttering in all works up to plinth level : 1:2:4 (1cement : 2coarse sand : 4graded stone aggregates 20 mm nominal size). | 2.56 | cum | 7,424.45 | ₹19,028.87 |
| 1.05 | Pointing on stone work with cement mortar 1:3 (1cement : 3fine sand): Flush / Ruled pointing. | 96.12 | sqm | 249.25 | ₹23,957.91 |
| 1.06 | White washing with lime to give an even shade: New work (three or more coats). | 69.42 | sqm | 25.1 | ₹1,742.44 |
| 1.07 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5m. | 5.34 | cum | 118.65 | ₹633.59 |
| 1.08 | Surface dressing of the ground including removing vegetation and in- equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. All kinds of soil | 2,000 | sqm | 20.5 | ₹41,000 |
| 1.09 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - |
stage.html
html • 0.02 MB
finance_373884.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 3.02 MB
BOQ_373884.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .