| 1 | L-1₹4.2 LAccepted-Finance | L-1 | Accepted-Finance Due to L-1 | |
| 2 | L-2₹4.3 L+₹9,680 (2.32%)Rejected-Finance | L-2 | Rejected-Finance Due to L-2 | |
| 3 | L-3₹4.9 L+₹69,050 (16.6%)Rejected-Finance | L-3 | Rejected-Finance Due to L-3 |
| Sl No | Description | Qty | Unit | M/S MOHMMED AKHLAK L1 | Vikram Singh L2 | M/S AYUB CONTRACTOR L3 |
|---|---|---|---|---|---|---|
| 1.00 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 14 | Cum | 10,500 ₹1,47,000 | 10,250 ₹1,43,500 Lowest | 11,000 ₹1,54,000 |
| 2.00 | Centering and shuttering including strutting, propping etc. and removal of form for: RCC Shelves / slabs / RCC walls (Cast in Situ) | 39 | Sqm | 900 ₹35,100 Lowest | 910 ₹35,490 | 1,000 ₹39,000 |
| 3.00 | Steel reinforcement(Labour work only) for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete at site(excluding the cost of reinforcement): Cold twisted bars | 1,400 | Kg | 20 ₹28,000 Lowest | 22 ₹30,800 | 30 ₹42,000 |
| 4.00 | Centering and shuttering including strutting, propping etc. and removal of form for : Lintels, beams, plinth beams, girders, bressumers and cantilevers | 32 | Sqm | 700 ₹22,400 Lowest | 710 ₹22,720 | 900 ₹28,800 |
| 5.00 | Centering and shuttering including strutting, propping etc. and removal of form for : Columns, Pillars, Piers, Abutments, Posts and Struts | 24 | Sqm | 900 ₹21,600 Lowest | 900 ₹21,600 Lowest | 1,100 ₹26,400 |
| 6.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level : Cold twisted bars | 825 | Kg | 100 ₹82,500 Lowest | 110 ₹90,750 | 130 ₹1,07,250 |
| 7.00 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, dmixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete.: Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement : All works upto plinth level, Concrete of M25 grade with minimum cement content of 330 kg /cum | 6 | Cum | 10,000 ₹60,000 Lowest | 10,200 ₹61,200 | 11,000 ₹66,000 |
| 8.00 | Laying Autoclaved Areated Concrete (AAC) block masonary with 150mm to 300mm thick with Grade -1 AAC block of density 551 to 650 kg/cum confirming to IS:2185(Part 3) in superstructure above plinth level up to floor V level with RCC band at sill level and lintel level with approved block laying polymer modofied adhisive mortar all complete as per direction of engineer incharge. | 11 | Cum | 1,800 ₹19,800 Lowest | 1,820 ₹20,020 | 2,000 ₹22,000 |
Tender Value
Refer Docs
EMD Value
₹8,500
Closing Date
14 Nov 2025, 5:00 pmClosed
Director CSIR CBRI Roorkee
CSIR CBRI Roorkee
civil works item
2025_CSIR_254804_1
193(680)EST-2025
Open Tender
Civil Works
Item Rate
45 days
Director CSIR CBRI Roorkee
Please refer Tender documents.
9 documents required · 9 mandatory
₹590
Director CSIR CBRI Roorkee
₹8,500
19 Nov 2025
8 Nov 2025
17 Nov 2025
8 Nov 2025
14 Nov 2025
8 Nov 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.24 MB
BOQ_293485.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .