| Sl No | Description | Qty | Unit | M/S INDER SINGH BISHT L2 | PRIYANKA CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.01 | Earth work in excavation by mechanical means (Hydraulic Excavator)/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.in all kinds of soil. | 648.3 | Cum | 216 ₹1,40,032.8 | 214.5 ₹1,39,060.35 |
| 2.01 | Filling available excavated earth (excluding rock) in trenches, plinthsides of foundations etc. in layers not exceeding 20cm in depth,consolidating each deposited layer by ramming and watering, leadup to 50 m and lift upto 1.5 m. | 168.14 | Cum | 162 ₹27,238.68 | 161.5 ₹27,154.61 |
| 3.01 | Supplying and filling in plinth with Jamuna sand under floors, includingwatering, ramming, consolidating and dressing complete | 39.56 | Cum | 1,753 ₹69,348.68 | 1,751 ₹69,269.56 |
| 4.01 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - -All work upto plinth level in 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | 101.21 | Cum | 5,618.5 ₹5,68,648.39 | 5,617 ₹5,68,496.57 |
| 5.01 | Providing and laying in position cement concrete of 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 1.87 | Cum | 6,498.6 ₹12,152.38 | 6,496 ₹12,147.52 |
| 6.01 | Brick work with F.P.S. bricks of class designation 75 in foundation and plinth inCement mortar 1:4 (1 cement : 4 coarse sand) | 41.14 | Cum | 6,079.4 ₹2,50,106.52 | 6,077.55 ₹2,50,030.41 |
| 7.01 | Random rubble masonry with hard stone in foundation and plinth ncluding levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with :Cement mortar 1:6 (1 cement : 6 coarse sand | 79.35 | Cum | 6,030.1 ₹4,78,488.44 | 6,028.5 ₹4,78,361.48 |
| 8.01 | Brick work with F.P.S. bricks of class designation 75 in foundation and plinth inCement mortar 1:6 (1 cement : 6 coarse sand | 10.23 | Cum | 5,882.2 ₹60,174.91 | 5,881 ₹60,162.63 |
| 9.01 | 15 mm cement plaster 1:3 (1 cement: 3 coarse sand) finished with a floating coat of neat cement on the rough side of single or half brick wall. | 95.4 | Sqm | 418 ₹39,877.2 | 417.5 ₹39,829.5 |
| 10.01 | Brick work with F.P.S. bricks of class designation 75 in superstructure above plinth level upto floor V level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) | 190.13 | Cum | 7,509.8 ₹14,27,838.27 | 7,508.5 ₹14,27,591.11 |
Tender Value
₹2.6 Cr
EMD Value
₹5.2 L
Closing Date
23 Jun 2026, 12:30 pmClosed
S.E R.W.D Circle Pauri
Superintending Engineer Rural Works Department Circle Pauri Tehsil Road Near Gas Agency Pauri
Construction work of the building of Government Inter College Ujjwalpur Chamoli under district Chamoli
2026_RES_96322_1
239/RWD/T.I/2026-27
Open Tender
Civil Works - Buildings
450 days
Chamoli
Technical Qualification as per SBD
3 documents required · 3 mandatory
₹5,900
As per SBD
₹5.2 L
S.E R.W.D Circle Pauri
2 Jul 2026
5 Jun 2026
23 Jun 2026
5 Jun 2026
23 Jun 2026
5 Jun 2026
11 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Earth work in excavation by mechanical means (Hydraulic Excavator)/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.in all kinds of soil. | 648.3 | Cum | - | - |
| 2.01 | Filling available excavated earth (excluding rock) in trenches, plinthsides of foundations etc. in layers not exceeding 20cm in depth,consolidating each deposited layer by ramming and watering, leadup to 50 m and lift upto 1.5 m. | 168.14 | Cum | - | - |
| 3.01 | Supplying and filling in plinth with Jamuna sand under floors, includingwatering, ramming, consolidating and dressing complete | 39.56 | Cum | - | - |
| 4.01 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - -All work upto plinth level in 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | 101.21 | Cum | - | - |
| 5.01 | Providing and laying in position cement concrete of 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 1.87 | Cum | - | - |
| 6.01 | Brick work with F.P.S. bricks of class designation 75 in foundation and plinth inCement mortar 1:4 (1 cement : 4 coarse sand) | 41.14 | Cum | - | - |
| 7.01 | Random rubble masonry with hard stone in foundation and plinth ncluding levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with :Cement mortar 1:6 (1 cement : 6 coarse sand | 79.35 | Cum | - | - |
| 8.01 | Brick work with F.P.S. bricks of class designation 75 in foundation and plinth inCement mortar 1:6 (1 cement : 6 coarse sand | 10.23 | Cum | - | - |
| 9.01 | 15 mm cement plaster 1:3 (1 cement: 3 coarse sand) finished with a floating coat of neat cement on the rough side of single or half brick wall. | 95.4 | Sqm | - | - |
| 10.01 | Brick work with F.P.S. bricks of class designation 75 in superstructure above plinth level upto floor V level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) | 190.13 | Cum | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.61 MB
Tendernotice_2.pdf
PDF • 1.63 MB
BOQ_113833.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid