Tender Value
₹15.1 Cr
EMD Value
₹3.8 L
Closing Date
7 Apr 2026, 4:00 pmClosed
Additional Chief Engineer (P&C)
Supply, Laying, Erection, Testing and Commissioning 132kV 1Cx800sq mm 2*(3+0) XLPE U/G cable from 132kV Itola TSS to Termination tower DD+0 (route length 0.5 Rkms) & from 220 kV Jambuva SS to Termination tower DD+0 (route length 1.250 RKms).
285979
ACE(P&C)/Contract/E-408/TL/UG/132kV/S&L,E
Open
Electrical Works
Works
Vadodara
33 documents required · 23 mandatory · 10 optional
₹11,800
Gujarat Energy Transmission Corporation Limited
₹3.8 L
17 Mar 2026
17 Mar 2026
17 Mar 2026
7 Apr 2026
17 Mar 2026
Estimated Cost of laying of two equal lengths of FOAC (Fiber Optic Approach Cable) ( DWSM - Dual window single mode, 48F) - with installation hardware like ties / clips / cleats, conduits, HDPE
ducts, supports, fittings, accessories etc with required arrangement to lay along side of U/G cable - (Annexure-B1 (Supply) & B2 (Erection))
Estimated Cost (Supply Part) (Annexure-B1)
Sr.No. Name of Line FOAC Nos. of such sigle Total length of
Single length of FOAC FOAC (DWSM 48F)
Length required (meter)
1 Itola TSS End 680 2
2 Jambuva S/S End 1430 2
Estimated Cost (Erection Part) (Annexure-B2)
Sr.No. Name of Line FOAC Nos. of such sigle Total length of
Single length of FOAC to be FOAC (DWSM 48F)
Length laid (meter)
1 Itola TSS End 680 2
2 Jambuva S/S End 1430 2
Following points are important from work execution perspective, same may please be noted.
i) Fiber optic approach cable (FOAC) shall be laid with 132 kV cable system strictly as per approved method of construction i.e MOC. Each run of FOAC shall be of continuous length, no in between splicing is allowed.
ii) Two to Three rings of extra loop length shall be kept buried underground at foot of both end termination tower after laying FOAC cable with 132 kV cable as per MOC.
iii) FOAC cable length remain outside and above the ground level shall be 2 times the height of each termination tower at both end. Each run of FOAC cable coming out after laying in underground section should be brought up to
third cross arm of termination tower after passing it through HDPE pipes and properly tying up with tower. Also, each run of FOAC cable shall be terminated in individual joint box on each termination tower.
iv) Balance length of each FOAC cable (i.e. Approximately half of tower height) after bringing out the FOAC cable above from ground level and up to third cross arm of termination tower, it shall be managed in rings properly with
fixing clamp arrangement to hold up it on end termination tower.
v) As per standard GETCO format of "End to End test.pdf" , after laying FOAC cable, each length shall be tested for end to end test using power meter and OTDR. Original copy of Test report duly sealed and signed with date, name
& designation of testing person, executing contractor and witnessing officer one each from telecom as well as TR/Const. nominated from respective EE(Telecom) and EE(TR)/EE(const.) respectively, shall be submitted to under
signed & one copy to respective telecom unit, invariably without fail
vi) Only after getting clearance on validity of test report submitted to this office, filed officer will take further necessary action on commercial part.
vii) DRS (Data requirement sheet) and drawing approval shall be taken for FOAC & joint box before kick starting any erection activity. The work executing contractor must have to do correspondence on eamil to concern EE (Const.)
with copy to project & engineering department, corporate office, GETCO for necessary concurrence and intimation about to start erection/laying.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
EMD BG Format.pdf
EMD BG Format.pdf
Public Procurement Circular of GOI.pdf
SD cum PBG Format.pdf
Form for Networth Annual turnover LA.pdf
132 kV 1Cx800 sq. mm UG cable - R3 june 2023.pdf
132 MOC tender drg- 14.08.2024.pdf
400 220 132 kV LA R6 June 22.pdf
Amendment- Structure weight.pdf
G.I. EARTHING STRIPS.PDF
OPGW (48F) specs final-R2-11.09.2023 final.pdf
Standard MQP GI Tower material for issuence to SUPPLIER COPY.PDF
SUPPLY and ERECTION OF 220KV LINES WO COND..pdf
TS SS STR R12 11.03.2024.pdf
E-408 Annx-II PLCC BOQ for FOAC.pdf
E-408 Erection BOQ.pdf
Part-I E-408 132KV Jambuva to Itola TSS UG Line.pdf
Amendment -I Part-I Tender Specifications E-408 132KV Jambuva to Itola TSS UG Line.pdf
Tender Notice-E-408 132KV Jambuva to Itola TSS UG Line.pdf
E-408 Supply BOQ.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .