Loading…
Loading…
Tender Value
₹13.0 Cr
EMD Value
₹8.0 L
Closing Date
26 Mar 2026, 3:00 pmClosed
Yes (up to 3 members)
Yes (up to 3 members)
Two Packet System
Normal Tender
Yes
26/02/2026 11:00
Lowest to Highest
120 days
Expenditure
Capital (Works)
GENERAL
13 conditions · 2 needing a document upload
Financial Capacity: as per Clause no 3.1.2 (B) of RFP.
Technical Capacity: as per Clause no 3.1.2 (A) of RFP.
33 conditions · 19 needing a document upload
The Bid Security shall be deposited as per Clause 2.3 of RFP Document either in cash through e-payment gateway or submitted as Bank Guarantee bond from a scheduled commercial bank of India. The Bank Guarantee bond shall be as per Annexure- 5 and shall be valid for a period of 90 days beyond the bid validity period. The original Bank Guarantee should be delivered in person to Dy.CE/C/Plg./SC, Room no.206A, 2nd floor, Rail Nirman Nilayam, S.C. Railway, Secunderabad - 500025. Note: As per Railway Board letter No.2022/CE-I/CT/GCC- 2022/Policy dt.20.10.2023, "The original Bank Guarantee should be delivered in person to the official nominated as indicated in the tender document before closing date for submission of bids (i.e., excluding the last date of submission of bids (Authority: PCE/SC's lr.no.W.496/Policy/Vol.IX, dt:31.05.2024).
Annexure-5(BID SECURITY/EMD, Para 2.3 to instructions to Bidders of RFP)--(REFER CLAUSE 2.30 of RFP)The Bidder shall furnish as part of its Bid, through e- payment Gateway of Authority OR in form of Bank Guarantee from a Bank as per format at Annexure-5
APPENDIX I-(Technical Bid form-7): FINACIAL CAPACITY OF THE BIDDER: refer 3.1.2 of RFP-- The Bidder must satisfy the condition specified in Clause 3.1.2(B), and provide details as per format at APPENDIX-I( Technical Bid form-7).
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
STUDY OF DRAWINGS AND LOCAL CONDITIONS: The drawings for the works can be seen in the office of the Chief Administrative Officer, Construction, S.C.Railway, Secunderabad - 500071 or in the office of the concerned field Deputy Chief Engineer / Construction / S.C.Railway . It should be noted that these drawings are meant for general guidance only and Railway may suitably modify them during the execution of work according to the circumstances without making the Railways liable for any claims on account of such changes. If there is any variation between the description in the tender and the detailed plans, the Engineer-in-Charge will operate the correct description and his decision is final and binding on the tenderer/ Contractor. The Tenderer/Contractor is required to inspect the sites of works and acquaint himself with the site conditions, availability of approaches for transporting of men and materials, space and other factors relating to the works, availability of labour, electricity and water, etc., before quoting his rates. The extent of lead and lift involved in the execution of works and any difficulties involved in the execution of work should also be examined before formulating the rates for complete items of works described in the schedule. The Tender submitted will be deemed to have been made after such inspection.
CORRIGENDUM NOTICE ON IREPS: [I]Railway may modify the tender document by issuing online corrigendum through "www.ireps.gov.in" 15 days prior to the tender closing date. For the purpose of CORRIGENDUM in the tender, NIT period is splitted as under: (a) ADVERTISEMENT PERIOD: The time during which all information pertaining to tender shall be available but offers cannot be submitted (b) OFFER SUBMISSION PERIOD: 15 days prior to closing of tender, during which tenderers can submit their offer.
Applicable for the tenders with eligibility criteria: The offer of Tenderer(s) who do not enclose Work Experience Certificate & Financial eligibility Certificate with requisite details, and supporting documents along with their Tender to establish their credentials shall be summarily rejected, even though they are working contractors or contractors on approved list.
The offer shall be evaluated only from the certificates/documents submitted along with the tender offer.
Any Certificate /Documents offered / submitted / received after the tender opening shall not be given any credit and shall not be considered.
Railway reserves the right to verify the authenticity of the documents/information furnished.
Tenderer(s) shall note that conditional/alternate offer will not be considered and will summarily be rejected, even though such condition makes them as the lowest tenderer.
SCR Construction Organization - Appointment of Authority Engineer for providing Project Management Services for Construction of new railway BG line between Chainage 77.000 Km and Chainage 147.500 Km between Siddipet (Excl.) & Pro. Kothapalli (Excl.) Stations
PMS-01-CAO-C-SC-2026
PMS-01-CAO-C-SC-2026
Open
(Project Management Services)
30 Months
Unknown (Unspecified Location)
₹0
₹8.0 L
26 Mar 2026
19 Feb 2026
12 Mar 2026
26 Feb 2026
35 items across 2 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 12,95,06,110 | ||
| — | 30.00 | — | — |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
NEFTForm.pdf
ATTACHMENT
PublicprocurementMakeinIndia.pdf
ATTACHMENT
EPCDocumentforEPC-03-CAO-C-SC-2023.pdf
ATTACHMENT
EPCDocumentforEPC-10-CAO-C-SC-2024.pdf
ATTACHMENT
EPCDocumentforEPC-17-CAO-C-SC-2024.pdf
ATTACHMENT
RFPPMSSIPTKPHI.pdf
ATTACHMENT
PrebidConferenceLink.pdf
ATTACHMENT
RFPPMSSIPTKPHIREVISED.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .