Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 CrAdmitted-Finance | ₹2.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.5 Cr+₹1.9 L (0.76%)Admitted-Finance VPO CHAMBI | CHAMBA | HIMACHAL PRADESH | 176207 | ₹2.5 Cr+₹1.9 L (0.76%) | L2 | Admitted-Finance |
| 3 | L3₹2.6 Cr+₹15.0 L (6.07%)Admitted-Finance HIMACHAL PRADESH | ₹2.6 Cr+₹15.0 L (6.07%) | L3 | Admitted-Finance |
| 4 | L4₹2.7 Cr+₹21.1 L (8.52%)Admitted-Finance | ₹2.7 Cr+₹21.1 L (8.52%) | L4 | Admitted-Finance |
| 5 | L5₹2.7 Cr+₹25.7 L (10.4%)Admitted-Finance | ₹2.7 Cr+₹25.7 L (10.4%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SANGRAM NAIK L5 | Smt Ganga Devi L1 | Tek Singh Raghav L2 | puneet angra L4 | Kartike Guleria L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Cutting in earth work and disposal of excavated earth up to lead of 20 mtrs. in all kinds of soil in pick work, jumper work and blasting work complete in all respect as per the direction and to the entire satisfaction of the Engineer-in-charge in all leads and lifts. | 815.19 | Cum | 300 ₹2,44,557 | 199 ₹1,62,222.81 Lowest | 295 ₹2,40,481.05 | 280 ₹2,28,253.2 | 310 ₹2,52,708.9 |
| 2.00 | Excavation in foundations, trenches etc., in earth work , lift up to 1.50 metres stacking the excavated soil not more then 3 metres clear from the edge of excavation and then returning the stacked soil in 15 cm layers, when required in to plinths , sides of foundations etc., consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed within a lead of 20 metres in pick jumper work. | 1,131.49 | Cum. | 300 ₹3,39,447 Lowest | 333 ₹3,76,786.17 | 375 ₹4,24,308.75 | 425 ₹4,80,883.25 | 370 ₹4,18,651.3 |
| 3.00 | Excavation in foundation, trenches ( for pipes & pits) up to all depths in all classicification of earth work such as pick work, jumper work, saturated soil including bailing or pumping out water, blasting soft/hard rock or chieselling soft/hard rock where blasting is prohibited in all lifts including trimming and dressing of sides, leveling of beds to correct grade i/c shoring/strutting, planking, timbering & dewatering where ever required, stacking the useable & unusable material/soil separately & after laying jointing & testing of pipes, returing the useable soil in trenches in 15cm layers including consolidating of such deposited layer by ramming & watering & then disposing of all surplus excavated soil/unusable material as directed with in all leads and lifts including restoration unmetalled surface to its original condition & including cost of diversion for traffic, night signals boards, fixing caution boards, crossing over trenches for access to houses, fencing etc. complete in all respects with in all leads and lifts as per direction of Engineer in charge. | 2,089.8 | Cum | 250 ₹5,22,450 Lowest | 333 ₹6,95,903.4 | 375 ₹7,83,675 | 300 ₹6,26,940 | 340 ₹7,10,532 |
| 4.00 | Providing and laying cement concrete 1:3:6 ( 1cement: 3 Sand : 6 graded stone aggregate, 40mm nominal size) and curing complete excluding cost of centring and shuttering in foundation and plinth. complete in all respects with in all leads and lifts as per direction of Engineer in charge. | 44 | Cum. | 11,500 ₹5,06,000 | 9,200 ₹4,04,800 | 7,995 ₹3,51,780 | 9,100 ₹4,00,400 | 6,900 ₹3,03,600 Lowest |
| 5.00 | Providing and laying cement concrete 1:4:8 ( 1cement: 4 Sand : 8 graded stone aggregate, 40mm nominal size) and curing complete excluding cost of centring and shuttering in foundation and plinth.complete in all respects with in all leads and lifts as per direction of Engineer in charge. | 64.19 | Cum. | 11,000 ₹7,06,090 | 8,100 ₹5,19,939 | 7,595 ₹4,87,523.05 | 8,100 ₹5,19,939 | 6,700 ₹4,30,073 Lowest |
| 6.00 | Providing and laying cement concrete 1:6:12 (1 cement: 6 sand: 12 graded crushed stone aggregate 40mm nominal size) and curing complete excluding cost of form work in foundation and plinth in all leads and lifts and to the enitre satisfaction of Engineer-in- charge. | 33.9 | Cum | 9,000 ₹3,05,100 | 7,000 ₹2,37,300 | 7,195 ₹2,43,910.5 | 7,750 ₹2,62,725 | 5,600 ₹1,89,840 Lowest |
| 7.00Providing form work with steel plates3.15mm thick welded with Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a fairfinish I/c centring , shuttering , strutting and proping etc.with wooden battens and ballies, height of propping and centring below supporting floor to ceiling not exceeding 4m and removal of the same for insitu- reinforced concrete &plain concrete work in : | ||||||||
| 7.01 | Foundation, footings basis of columns etc. and mass concrete. | 127.92 | Sqm | 300 ₹38,376 | 270 ₹34,538.4 Lowest | 325 ₹41,574 | 375 ₹47,970 | 450 ₹57,564 |
| 7.02 | Flat surfaces such as soffits of suspended floors , roofs, landings & the like . Floors etc. up to 200 mm in thickness complete in all respects with in all leads and lifts as per direction of Engineer in charge. | 142.11 | Sqm | 500 ₹71,055 | 350 ₹49,738.5 Lowest | 395 ₹56,133.45 | 525 ₹74,607.75 | 450 ₹63,949.5 |
| 7.03 | Vertical surface such as walls(any thickness) partitions and the like including attached pillasters, butteresses, plinth and string courses and the like complete in all respects with in all leads and lifts as per direction of Engineer in charge. | 1,484.68 | Sqm | 390 ₹5,79,025.2 | 330 ₹4,89,944.4 Lowest | 375 ₹5,56,755 | 440 ₹6,53,259.2 | 415 ₹6,16,142.2 |
Tender Value
₹3.1 Cr
EMD Value
₹3.5 L
Closing Date
16 Dec 2023, 5:00 pmClosed
EE Jal Shakti Division Larji
EE Jal Shakti Division Larji
Filter bed 172 Sqm 3 Units , Pump house stage -1 and Stage 2nd , P/L/J of Rising main , Thrust block 23 Nos , Installation of Pumping machinery with allied accessories. , MDT 80000 Ltrs capacity at Node 1 , Clear water tank MDT 205000 ltrs and
2023_HPIPH_82385_1
14637-14736
Open Tender
Civil Works
Item Rate
365 days
Banjar
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,500
Yes
Kullu
₹3.5 L
Yes
EE Jal Shakti Division Larji
5 Jan 2024
7 Dec 2023
18 Dec 2023
7 Dec 2023
16 Dec 2023
7 Dec 2023
13 Dec 2023
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.67 MB
Terms.pdf
Tender Documents • 0.35 MB
BOQ_122452.xls
BOQ • 0.57 MB
form6.pdf
Tender Documents • 0.66 MB
Form8.pdf
Tender Documents • 1.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .