Tender Value
₹43.9 L
EMD Value
₹87,800
Closing Date
28 Sept 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Deposit Work
Above/Below/Par
TRD
12 conditions · 1 needing a document upload
Tenderer has to submit attested copy of valid electrical contractor's license as per CEA Regulation Clause 31, which can be in his own name or in the name of his firm issued by any State Govt. under Clause 31 of compilation of rule of Central Electricity Authority Regulation 2023 or as amended from time to time.
I/we the tenderer (s) am/are signing this document after carefully reading the contents.
I/We the tenderer(s) also accept all the conditions of the tender and have signed all the pages in confirmation thereof.
I/we hereby declare that I/we have downloaded the tender documents from Indian Railway website www.ireps.gov.in . I/we have verified the content of the document from the website and there is no addition, no deletion or no alteration to the content of the tender document. In case of any discrepancy noticed at any stage i.e. evaluation of tenders, execution of work or final payment of the contract, the master copy available with the railway Administration shall be final and binding upon me/us.
I/we declare and certify that I/we have not made any misleading or false representation in the forms, statements and attachments in proof of the qualification requirements.
I/We also understand that my/our offer will be evaluated based on the documents/credentials submitted along with the offer and same shall be binding upon me/us.
I/We declare that the information and documents submitted along with the tender by me/us are correct and I/we are fully responsible for the correctness of the information and documents, submitted by us.
I/we certify that I/we the tenderer(s) is/are not blacklisted or debarred by Railways or any other Ministry / Department of Govt. of India from participation in tender on the date of submission of bids, either in individual capacity or as a HUF/ member of the partnership firm/LLP/JV/Society/Trust.
I/we understand that if the contents of the certificate submitted by us are found to be forged/false at any time during process for evaluation of tenders, it shall lead to forfeiture of the Bid Security and may also lead to any other action provided in the contract including banning of business for a period of upto two year. Further, I/we and all my/our constituents understand that my/our offer shall be summarily rejected.
I/we also understand that if the contents of the certificate submitted by us are found to be false/forged at any time after the award of the contract, it will lead to termination of the contract, along with forfeiture of Bid Security/Security Deposit and Performance guarantee and may also lead to any other action provided in the contract including banning of business for a period of upto two year.
I/We have read the clause regarding restriction on procurement from a bidder of a country which shares a land border with India and certify that I am/We are not from such a country or, if from such a country, have been registered with the competent Authority. I/We hereby certify that I/we fulfil all the requirements in this regard and am/are eligible to be considered (evidence of valid registration by the competent authority is enclosed)
10 conditions · 8 needing a document upload
Please submit your bank details i.e. Name of the Bank along with Bank Branch Code, Account Number, IFSC Code, PAN Number, Mobile Number and e-mail address
At the time of submission of bid, if you have any special Condition then upload in scanned pdf copy.
Please furnish list of personal, organization available on hand and proposed to be engaged for the subject work.
Please furnish list of plant and Machinery available on hand own and proposed to be inducted own and hired to be given separately for the subject work.
Please furnish list of Works completed in last Seven years (Ending last day of month previous to the one in which tender is invited) giving Description of Work, Organization for whom executed, approximate value of contract at time of award, Date of award and Date of Completion. Date of actual Start, Actual Completion and Final value of Contract shall also be given.
Please furnish list of works on hand indicating description of works, contract value, Approximate value of balance work yet to be done and date of award.
Tenderer has to submit attested copy of valid electrical contractor's license, which can be in his own name or in the name of his firm issued by any as per Clause 31 of compilation of Regulation of CEA2023 or as amended from time to time. They shall keep valid license throughout the period of execution of work by getting it renewed at suitable intervals and submit an attested copy of the same to the Railways.
The tenderer whether sole proprietor/ a company or a partnership firm / joint venture (JV) / registered society / registered trust/HUF/ LLP etc. if they want to act through agent or individual partner(s), should submit along with the tender, a copy of power of attorney duly stamped and authenticated by a Notary Public or by Magistrate in favour of the specific person whether he/they be partner(s) of the firm or any other person specifically authorizing him/them to sign the tender, submit the tender, and further to deal with the Tender/Contract up to the stage of signing the agreement except in case where such specific person is authorized for above purposes through a provision made in the partnership deed/ Memorandum of understanding/ Article of Association/ Board resolution, failing which tender shall be summarily rejected.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Tenderer has to submit attested copy of valid electrical contractor's license, which can be in his own name or in the name of his firm issued by any as per Clause 31 of compilation of Regulation of CEA2023 or as amended from time to time. They shall keep valid license throughout the period of execution of work by getting it renewed at suitable intervals and submit an attested copy of the same to the Railways.
OHE modification work in connection with Shifting of point nos. 150, 151 and 152 at GSECL siding, sikka.
DRM-RJT-EL-TRD-26-27-03R2~WR
DRM-RJT-EL-TRD-26-27-03R2
Open
Works - General
4 Months
Rajkot, Gujarat
₹0
₹87,800
28 Sept 2026
3 Sept 2026
14 Sept 2026
97 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 43,91,155.95 | ||
| — | 2.00 | — | — | ||
| Survey, Design and preparation of layout plan and SED as per technical specifications | — | — | — | 42,275 | |
| — | 36.00 | — | — | ||
| Preparation of TSWR diagram Board along with caption diagram as per explanatory notes | — | — | — | 11,287.08 | |
| — | 12.00 | — | — | ||
| Supply of fabricated galvanised steel structure and SPS as per technical specifications | — | — | — | 17,31,782.88 | |
| — | 12.00 | — | — | ||
| Erection of fabricated galvanised steel structure and SPS as per explanatory notes | — | — | — | 1,33,179.84 | |
| — | 12.00 | — | — | ||
| Power block charges on erection of fabricated galvanised steel structure and SPS | — | — | — | 39,954 | |
| — | 80.00 | — | — | ||
| Concrete for foundation and plinth in all types of soil incl. hard/rocky soil (incl. excavation and supply of materials viz. cement, sand and ballast) | — | — | — | 6,07,441.6 | |
| — | 15.00 | — | — | ||
| Supply of cantilever/Bracket assembly complete with insulator as per technical specification | — | — | — | 4,06,683.9 | |
| — | 15.00 | — | — | ||
| Erection of cantilever/Bracket assembly complete with insulator as per explanatory notes | — | — | — | 41,039.85 | |
| — | 15.00 | — | — | ||
| Power block charges on Erection of cantilever/Bracket assembly complete with insulator | — | — | — | 12,312 | |
| — | 3.00 | — | — | ||
| Supply of regulating equipment 3 pulley type complete with all accessories as per technical specifications | — | — | — | 1,91,506.14 | |
| — | 3.00 | — | — | ||
| Erection of regulating equipment 3 pulley type complete with all accessories as per technical specifications | — | — | — | 34,112.97 | |
| — | 3.00 | — | — | ||
| Power block charges on erection of regulating equipment 3 pulley type complete with all accessories | — | — | — | 10,233.9 | |
| — | 3.00 | — | — | ||
| Splicing and extension of anchored OHE as per technical specification and explanatory notes | — | — | — | 24,804.03 | |
| — | 20.00 | — | — | ||
| Supply of new droppers complete with clips etc. for the new span | — | — | — | 1,00,529.8 | |
| — | 15.00 | — | — | ||
| Transfer of OHE and adjustment of dropper for the new span as per explanatory notes. | — | — | — | 1,07,971.95 | |
| — | 15.00 | — | — | ||
| Power block charges on Transfer of OHE and adjustment of dropper | — | — | — | 32,391.6 | |
| — | 2.00 | — | — | ||
| Supply of section insulator assembly including core and cut in insulator as per technical specifications | — | — | — | 1,20,874.52 | |
| — | 2.00 | — | — | ||
| Erection of section insulator assembly including core and cut in insulator as per explanatory notes | — | — | — | 14,472.72 | |
| — | 2.00 | — | — | ||
| Power block charges on erection of Section insulator assembly | — | — | — | 4,341.82 | |
| — | 3.00 | — | — | ||
| Supply of material for termination of Double conductor (including supply of 9 ton cut in insulator) as per technical specifications | — | — | — | 41,793.87 | |
| — | 3.00 | — | — | ||
| Erection of material for termination of Double conductor (including supply of 9 ton cut in insulator) as per explanatory notes | — | — | — | 6,095.52 | |
| — | 3.00 | — | — | ||
| Power block charges on Erection of material for termination of Double conductor (including supply of 9 ton cut in insulator) as per explanatory notes | — | — | — | 1,828.68 | |
| — | 3.00 | — | — | ||
| Supply of Guy Rod assembly complete as per technical specification for high rise OHE | — | — | — | 33,421.65 | |
| — | 3.00 | — | — | ||
| Erection of Guy Rod assembly complete as per explanatory notes for high rise OHE | — | — | — | 6,117.78 | |
| — | 3.00 | — | — | ||
| Power block charges on Erection of Guy Rod assembly complete as per explanatory notes for high rise OHE | — | — | — | 1,835.34 | |
| — | 5.00 | — | — | ||
| Supply of 9 tonne cut in insulator as per technical spec. | — | — | — | 44,604.05 | |
| — | 5.00 | — | — | ||
| Erection of 9 tonne cut in insulator as per explanatory notes. | — | — | — | 6,149.3 | |
| — | 5.00 | — | — | ||
| Power block charges on Erection of 9 tonne cut in insulator as per explanatory notes | — | — | — | 1,844.8 | |
| — | 15.00 | — | — | ||
| Supply of 160 sq mm jumpers with fittings as per technical specifications | — | — | — | 38,320.95 | |
| — | 200.00 | — | — | ||
| Supply of all types of galvanized bonds as per technical specifications | — | — | — | 56,094 | |
| — | 200.00 | — | — | ||
| Erection of all types of galvanized bonds as per explanatory notes | — | — | — | 13,608 | |
| — | 10.00 | — | — | ||
| Supply of different types of caution boards as per technical specifications | — | — | — | 12,744.8 | |
| — | 15.00 | — | — | ||
| Supply of retro reflective number plates as per technical specifications | — | — | — | 11,686.8 | |
| — | 10.00 | — | — | ||
| Dismantling of mast, portal, TTC & other small part steel as per explanatory notes | — | — | — | 88,948.3 | |
| — | 3.00 | — | — | ||
| Dismantling of Regulating equipment as per technical specification & explanatory note | — | — | — | 22,942.65 | |
| — | 3.00 | — | — | ||
| Power block charges on Dismantling of Regulating equipment as per technical specification & explanatory note | — | — | — | 6,882.78 | |
| — | 3.00 | — | — | ||
| Dismantling and removal of Guy rod assembly and terminations as per explanatory note | — | — | — | 4,334.34 | |
| — | 3.00 | — | — | ||
| Power block charges on Dismantling and removal of Guy rod assembly and terminations as per explanatory note | — | — | — | 1,300.29 | |
| — | 15.00 | — | — | ||
| Breaking of Concrete/ foundation/PCC of Mast, Portal and TTC as per explanatory notes | — | — | — | 55,555.95 | |
| — | 15.00 | — | — | ||
| Transportation of material from Railway depot to work site or released material from work site to railway depot | — | — | — | 84,622.35 | |
| — | 15.00 | — | — | ||
| Dismantling of cantilever with complete assembly as per explanatory notes | — | — | — | 23,576.55 | |
| — | 15.00 | — | — | ||
| Power block charges on Dismantling of cantilever with complete assembly as per explanatory notes | — | — | — | 7,072.95 | |
| — | 15.00 | — | — | ||
| Supply of contact wire ending clamp | — | — | — | 6,888.45 | |
| — | 15.00 | — | — | ||
| Supply of contact wire splice | — | — | — | 21,318.45 | |
| — | 15.00 | — | — | ||
| Supply of catenary wire ending clamp. | — | — | — | 8,555.4 | |
| — | 15.00 | — | — | ||
| Supply of catenary wire splice | — | — | — | 8,319.45 | |
| — | 30.00 | Each Span | — | ||
| Tower wagon checking and adjustment of OHE/Turn out/ Cross over/ Overlap as per technical specifications | — | — | — | 82,689.9 | |
| — | 30.00 | Each Span | — | ||
| Power block charges on Tower wagon checking and adjustment of OHE as per technical specifications | — | — | — | 24,807 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCCACS1to11.pdf
ATTACHMENT
GCCApril2022.pdf
ATTACHMENT
Tenderdocument.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .