| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.4 LAccepted-AOC MADAVOOR PO KOZHIKODE KERALA KL | KOZHIKODE | KERALA | 673585 | L1 | Accepted-AOC L1 | |
| 2 | L2₹13.8 L+₹1.4 L (11.2%)Rejected-AOC KANNADIKKUZHI HOUSE RAMANATTUKARA VAZHAYUR EAST PO | L2 | Rejected-AOC L2 | |
| 3 | L3₹14.1 L+₹1.7 L (13.7%)Rejected-AOC KERALA KL KERALA | L3 | Rejected-AOC L3 | |
| 4 | L4₹15.9 L+₹3.5 L (28.2%)Rejected-AOC | L4 | Rejected-AOC L4 |
Tender Value
₹14.3 L
EMD Value
₹35,665
Closing Date
11 Mar 2024, 6:55 pmClosed
O/O Executive Engineer ,KyIP Division Perambra
O/O Executive Engineer ,KyIP Division Perambra
Construction of drainage
2024_Irrig_662056_1
EE/KyIP/51/2023-24
Open Tender
Civil Works - Others
Item Rate
180 days
Chevarambalam
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹35,665
Yes
19 Jul 2024
29 Feb 2024
13 Mar 2024
29 Feb 2024
11 Mar 2024
29 Feb 2024
29 Feb 2024 - 11 Mar 2024
Amount
Construction of Drainage
15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar
15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
2.33.3:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyond 120 cm girth up to and including 240 cm girth
OD35006/2023-2024:Filling with Quarry Muck Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for: Edges of slabs and breaks in floors and wallsUnder 20 cm wide
5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
16.92:Providing and fixing 10x10x7.50 cm Granite stone block hand cut and chisel dressed on top, for paving in floors, drains etc. laid over 20mm thick base mortar 1:4 (1 cement : 4 coarse sand) with joints 10 mm wide filled with same mortar including ruled pointing etc. complete as per direction of engineer-in-charge
16.21:Engraving letters in hard stone
19.6.2:Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 ( 1 cement : 2 fine sand) including testing of joints etc. complete:150 mm dia R.C.C. pipe
HAREESH KUMAR V K
VK BALAN
RAJEEVAN K P
Bidder Name
VK BALAN
RAJEEVAN K P
HAREESH KUMAR V K
ABDUL AZEEZ N K
tech_eval.pdf
fin_eval.pdf
aoc.PDF
finance_1026077.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .