Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 LAccepted-AOC | L1 | Accepted-AOC Lowest bidder | |
| 2 | L2₹1.3 L+₹20,156.09 (17.7%)Rejected-Finance 679334 | MALAPPURAM | KERALA | 679334 | L2 | Rejected-Finance L2 | |
| 3 | L3₹1.5 L+₹34,160.65 (30.0%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹1.6 L+₹48,348 (42.4%)Rejected-Finance | L4 | Rejected-Finance L4 |
| Sl No | Description | Qty | Unit | CRYSTAL INFRATECH L1 | ARUN S L3 | SUNIL KUMAR L2 | G SURESH L4 |
|---|---|---|---|---|---|---|---|
| 1.00Working Charge for laying 40mm PVC inside the Compound | |||||||
| 1.00 | OD81001/2025-2026:Tacking out interlock work in roads and paving interlock after completing the work including<br>stacking material within 50 metres lead. | 31.5 | per sqm | 553.42 ₹17,432.73 Lowest | 588.82 ₹18,547.83 | 651.37 ₹20,518.16 | 788.34 ₹24,832.71 |
| 1.00 | 100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. | 43.2 | cum | 481.81 ₹20,814.19 Lowest | 686.96 ₹29,676.67 | 567.08 ₹24,497.86 | 686.33 ₹29,649.46 |
| 1.00 | 100.9.4:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 40 mm nominal outside diameter pipes. | 195 | metre | 40.33 ₹7,864.35 Lowest | 57.07 ₹11,128.65 | 47.46 ₹9,254.7 | 57.45 ₹11,202.75 |
| 1.00 | 100.60.1.3.2:Providing 20mm (3/4 inch) house connection with 15mm (1/2 inch) water meter from existing PVC / HDPE mains up to 110 mm dia., up to a length of 5 m using 25mm Indian Standard Class 6 uPVC pipe and uPVC / GM / Brass specials viz. brass ferrule, GM full way wheel valve, Elbow, MTA, FTA, couplers, PVC Service Saddle of suitable size etc. and connecting with the mains, testing the joints etc. complete including trenching and refilling in all kinds of soil up to a depth of 1.50m for main line tracing and trench of average cross section 0.3m x 0.75m for laying connection pipe and service pipe, fixing water meter, lighting, watching, providing caution boards, traffic control etc. complete including cost of materials, hire for tools, cost of consumables and labour charges, including the cost of tested Class B Multijet water meter with ISI mark and weather resistant PP / PE meter box of minimum size 300mm x 200mm x 150mm, but excluding charges for cutting the concrete / tarred / bituminous roads etc, and as per the direction of the departmental officers. | 10 | no | 5,068.91 ₹50,689.1 Lowest | 5,754.7 ₹57,547 | 5,966 ₹59,660 | 7,220.48 ₹72,204.8 |
| 1.00 | 100.60.12.4.1:Providing 15mm PVC Tap in the water meter assembly for 20mm connection, using 25mm Indian Standard Class 6 uPVC pipes and specials including cost of materials, consumables, hire charges for tools and labour charges etc. complete and as per the direction of departmental officers. | 10 | no | 493.96 ₹4,939.6 Lowest | 570.7 ₹5,707 | 581.38 ₹5,813.8 | 703.63 ₹7,036.3 |
| 1.01 | 100.60.3.2.1:Providing additional length of house connection pipe using 25mm Indian Standard Class 6 uPVC pipe and specials and testing the joints etc., by trenching and refilling in all kinds of soil with trench of average cross section 0.3m x 0.75m for laying of connection pipe and service pipe, lighting, watching, providing caution boards, traffic control etc., including cost of materials, hire for tools, cost of consumables and labour charges etc. complete, but excluding the cost of cutting of concrete / tarred / bituminous roads etc., and as per the directions of the department officers | 20 | metre | 157.32 ₹3,146.4 Lowest | 228.25 ₹4,565 | 185.17 ₹3,703.4 | 224.11 ₹4,482.2 |
| 1.01 | OD81023/2025-2026:Interconnection work for connecting newly laid pipe to the existing line including cost of specials, charges for controlling valves, all labour charges for connection as per the direction of departmental officers. | 1 | each | 1,009.55 ₹1,009.55 Lowest | 6,182 ₹6,182 | 1,188.22 ₹1,188.22 | 1,438.07 ₹1,438.07 |
| 1.01 | 4.1.4:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded
stone aggregate 40 mm nominal size derived from natural sources) | 0.25 | cum | 6,438.52 ₹1,609.63 Lowest | 6,892 ₹1,723 | 7,578 ₹1,894.5 | 9,171.42 ₹2,292.86 |
| 2.00Supply of Materials | |||||||
Tender Value
₹1.6 L
EMD Value
₹4,097
Closing Date
21 Aug 2025, 5:00 pmClosed
AEE
WSSDN Attingal
DEPOSIT-Connections for shops in sreepadam stadium-sports counsil-General Civil Work
2025_KWA_785934_1
WRDKWACE(SR)/TR/14005/2025 -5111
Open Tender
Civil Works - Others
Item Rate
Attingal
Please refer Tender documents.
6 documents required · 6 mandatory
₹555
₹4,097
22 Sept 2025
13 Aug 2025
23 Aug 2025
13 Aug 2025
21 Aug 2025
13 Aug 2025
13 Aug 2025 - 21 Aug 2025
Amount
Working Charge for laying 40mm PVC inside the Compound
OD81001/2025-2026:Tacking out interlock work in roads and paving interlock after completing the work including<br>stacking material within 50 metres lead.
100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil.
100.9.4:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 40 mm nominal outside diameter pipes.
100.60.1.3.2:Providing 20mm (3/4 inch) house connection with 15mm (1/2 inch) water meter from existing PVC / HDPE mains up to 110 mm dia., up to a length of 5 m using 25mm Indian Standard Class 6 uPVC pipe and uPVC / GM / Brass specials viz. brass ferrule, GM full way wheel valve, Elbow, MTA, FTA, couplers, PVC Service Saddle of suitable size etc. and connecting with the mains, testing the joints etc. complete including trenching and refilling in all kinds of soil up to a depth of 1.50m for main line tracing and trench of average cross section 0.3m x 0.75m for laying connection pipe and service pipe, fixing water meter, lighting, watching, providing caution boards, traffic control etc. complete including cost of materials, hire for tools, cost of consumables and labour charges, including the cost of tested Class B Multijet water meter with ISI mark and weather resistant PP / PE meter box of minimum size 300mm x 200mm x 150mm, but excluding charges for cutting the concrete / tarred / bituminous roads etc, and as per the direction of the departmental officers.
100.60.12.4.1:Providing 15mm PVC Tap in the water meter assembly for 20mm connection, using 25mm Indian Standard Class 6 uPVC pipes and specials including cost of materials, consumables, hire charges for tools and labour charges etc. complete and as per the direction of departmental officers.
100.60.3.2.1:Providing additional length of house connection pipe using 25mm Indian Standard Class 6 uPVC pipe and specials and testing the joints etc., by trenching and refilling in all kinds of soil with trench of average cross section 0.3m x 0.75m for laying of connection pipe and service pipe, lighting, watching, providing caution boards, traffic control etc., including cost of materials, hire for tools, cost of consumables and labour charges etc. complete, but excluding the cost of cutting of concrete / tarred / bituminous roads etc., and as per the directions of the department officers
OD81023/2025-2026:Interconnection work for connecting newly laid pipe to the existing line including cost of specials, charges for controlling valves, all labour charges for connection as per the direction of departmental officers.
4.1.4:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 40 mm nominal size derived from natural sources)
Supply of Materials
100.98.209:Supply of PVC Pipe, 6kg/cm2, 40mm Dia.
SUNIL KUMAR (BID ID -2300327)
ARUN S (BID ID -2293825)
G SURESH (BID ID -2301058)
Bidder Name
G SURESH
SUNIL KUMAR
ARUN S
CRYSTAL INFRATECH
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .