Hammal Nallah- Construction of Masonry Protection Wall on Upper belt from RD 1000 to 5000 mtrs at Kandi Rafiabad (IRRSS2627100222)
2026_IFC_321801_1
e-NIT No 12 of 2026-27
Open Tender
Civil Works
Percentage
90 days
Executive Engineer IandFC Division Baramulla
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,000
Executive Engineer I and FC Division Baramulla
₹1.6 L
21 Aug 2026
21 Aug 2026
8 Sept 2026
21 Aug 2026
7 Sept 2026
21 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil | 969.62 | cum | 187.3 | ₹1,81,609.83 |
| 2 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil | 171.11 | cum | 592.9 | ₹1,01,451.12 |
| 3 | Dumping stone including cost of stones.
in Horizontal on level | 43.69 | cum | 937.9 | ₹40,976.85 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 25.7 | cum | 5,202.9 | ₹1,33,714.53 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level
1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 94.45 | cum | 7,788.4 | ₹7,35,614.38 |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level
Thermo-Mechanically Treated bars of grade Fe-500D or more. | 6,048.94 | kg | 123.2 | ₹7,45,229.41 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form work for:
Foundations, footings, bases for columns | 137.35 | sqm | 286.35 | ₹39,330.17 |
| 8 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) | 530.82 | cum | 7,677.35 | ₹40,75,290.93 |
| 9 | Random Rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including levelling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) and curing complete at window sills, ceiling level and the like: Cement mortar 1:6 (1 Cement : 6 coarse sand) | 133.57 | cum | 9,131.9 | ₹12,19,747.88 |
| 10 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete. 50 mm thick with 20mm nominal size stone aggregate. | 115.2 | sqm | 562.15 | ₹64,759.68 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.17 MB
BOQ_1076044.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].