| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹30.7 LAccepted-AOC | 1 | Accepted-AOC 1st lowest | |
| 2 | 2₹32.9 L+₹2.2 L (7.29%)Rejected-AOC | 2 | Rejected-AOC 2nd lowest | |
| 3 | Rejected-Technical KACHEETTI PUTHEN VEEDU PALIYODE KUNNATHUKAL ANAVOOR P O TRIVANDRUM 695124 | THIRUVANANTHAPURAM | THIRUVANANTHAPURAM | KERALA | 695124 | - | Rejected-Technical 3rd lowest | |
| 4 | Rejected-Technical | - | Rejected-Technical 4th lowest |
Tender Value
₹34.0 L
EMD Value
₹50,000
Closing Date
5 Jan 2024, 5:00 pmClosed
Executive Engineer
WS Division NTA
Jal Jeevan Mission (JJM)-JJ 2023 -24 Kunnathukal Grama Panchayath - Phase III Balance work . Manavari Plant road cement concrete work
2023_KWA_634557_1
59/2023-24/WSD/NTA
Open Tender
Civil Works - Water Works
Item Rate
60 days
Neyyattinkara
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,760
Yes
₹50,000
Yes
8 Apr 2024
21 Dec 2023
8 Jan 2024
21 Dec 2023
5 Jan 2024
21 Dec 2023
Amount
Working Charges
100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil.
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.22.5:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelHard drawn steel wire fabric
5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
OD194692/2023-2024:Fixing 20mm Thickness bitumen pad for expansion joint
OD194999/2023-2024:Vibratory Roller 8 tonne for intermediate rolling
10.26.3:Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approves steel primer.G.I. pipes
Granular Sub base
4.1.A.1:Granular Sub-base with Well Graded Material (Table 400.1) (A) By Mix in Place Method Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. (i) For Grading I Material
S SUJIKUMAR
MOHANAKUMAR V
VINAYADHANAN D S
Bidder Name
MOHANAKUMAR V
Simon TJ
VINAYADHANAN D S
S SUJIKUMAR
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_962818.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .