Loading…
Loading…
Tender Value
₹3.2 Cr
EMD Value
₹17.9 L
Closing Date
9 Jul 2026, 12:00 pm4d left
SE MZP CIRCLE PWD MIRZAPUR
SE MZP CIRCLE PWD MIRZAPUR
BUILDING
2026_CEMRZ_1164955_4
2582/53 MZP CIRCLE/2025-26 Dt 16-06-2026
Open Tender
Civil Works
365 days
MIRZAPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,720
Yes
₹17.9 L
Yes
SE MZP CIRCLE PWD MIRZAPUR
30 Jun 2026
30 Jun 2026
9 Jul 2026
30 Jun 2026
9 Jul 2026
30 Jun 2026
30 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width aswell as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge.All kinds of soil. as per DSR No. 2.6.1 | 489.44 | CUM | 125 | ₹61,180 |
| 2 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete.. as per DSR No. 2.25,a | 1,610 | CUM | 505 | ₹8,13,050 |
| 3 | Sand filling in plinth under floors including watering, ramming, consolidating and dressing complete including lead up to 50m and lift upto 1.5m and including cost of sand.. as per DSR No. 2.27 | 72.63 | CUM | 1,540 | ₹1,11,850.2 |
| 4 | Construction of drain along apron.Size 150 X 150mm.. as per AR-I | 137.35 | RM | 800 | ₹1,09,880 |
| 5 | Providing and laying in cement concrete 1:4:8 (1 cement :4 coarse sand :8 graded stone aggregate 40 mm nominal size) and curing complete,including cost of form- work, in foundation and floors.. as per DSR No. 4.1.8 | 88.91 | CUM | 4,955 | ₹4,40,549.05 |
| 6 | Providing and injecting chemical emulsion for preconstructional antitermite treatment and creating a chemical barrier under and around the column pits wall trenches basement excavation top surface if plinth filling junction of wall and floor, along the the external perimeter of binding expansion joints, surrounding of pipes and conduits etc, complete (plinth area of the building at ground floor only shall be measured as per I.S.6313(PartII 1981)Alderine emulsifiable concentrate or any other approved material such as Heptrachlor or Chlordane will be used. The rate of application of chemical emulsion shall be as follows : (1)Treatment for masonary & foundation 5 liters per sqm. (2) Back fill in immediate contact with foundation 7.5 liters/sqm (3) Treatment of top surface of plinth filling 5 liters/sqm (4) Treatment of soil along external perimeter of building 7.5 liters/sqm. (5) Treatment of soil under apron along external perimter 5 liters/sqm.. as per DSR No. 2.35.3 | 534.47 | SQM | 220 | ₹1,17,583.4 |
| 7 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-lll) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) R.C.C. work in Plinth Band Ground floor. as per DSR No. 5.1.2 | 150.74 | CUM | 6,580 | ₹9,91,869.2 |
| 8 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chaijjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-lll) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). R.C.C. work in Lintel. as per DSR No. 5.3 | 277.78 | CUM | 8,375 | ₹23,26,407.5 |
| 9 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement 1:1.5:3 (1 cement : 1.5 coarse sand(zone-lll) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) First floor. as per DSR No. 5.2.2 | 35.83 | CUM | 7,900 | ₹2,83,057 |
| 10 | Class 150 brick work in 1:6 (one cement and six coarse sand sand of 2.25 fineness modulus) mortar in foundation & plinth including supply of all materials, labour and T & P etc required for proper completion of the work.. as per DSR No. 6.1.2 | 102.95 | CUM | 5,190 | ₹5,34,310.5 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.54 MB
BOQ_2184717.xls
BOQ • 0.59 MB
Download all tender documents and submit your bid