Loading…
Loading…
Tender Value
₹50 L
EMD Value
₹50,000
Closing Date
7 Sept 2026, 6:30 pm
PRAVINBHAI HADIYAL
Execution of water network related works at various locations in Indrapuri Ward under different budget heads including laying new water lines, repairing leaks improving pressure and installing new lines to address contamination issues along with maintenance activities drinking water tanker supply, and other ancillary tasks (ARC Tender)
339722
E Tender Notice No.05-2026/27, T.No.265
Open
Civil - All
Works
Ahmedabad
₹1,500
MUNICIPAL COMMISSIONER, AHMEDABAD
₹50,000
27 Aug 2026
27 Aug 2026
27 Aug 2026
7 Sept 2026
27 Aug 2026
5 Estimated Cost put to Rs.50,00,000/-
6 Earnest Money Deposit Rs.50,000.00 /- Demand Draft Or Bank Guarantee in favour of
Municipal Commissioner, Ahmedabad to be submitted as
prescribed in tender.
7 Security Deposit 5 % of the Tender Amount in form of Bank Guarantee / Demand
Draft in favour of Municipal Commissioner, Ahmedabad to be
submitted as prescribed in tender.
8 Tender fees Rs.1500.00 Demand Draft in favour of Municipal Commissioner,
(Non refundable) Ahmedabad)
9 Submission of EMD and In separate sealed cover each for EMD and Tender Fees along with
Tender Fees Tender as described in the invitation of tender and submitted to
Assistant Manager(South zone), South zone office, Rambaug,
Maninagar Ahmedabad.
10 Tenders issue date Tenders from the amc.nprocure.com website shall be downloaded
from AS PER TENDER NOTICE INVITED
11 Last date of receiving As per Notice inviting Tender / Addendum / Corrigendum.The
Tenders. tenders received after latest schedule date and time will not be
entertained under any circumstances.
12 Date of Opening As per Notice inviting Tender / Addendum / Corrigendum to
Assistant Manager / Dy.C.E.(S/Z) office, 2nd Floor, South Zone
Office, Opp. Fire Station, Maninagar, Ahmedabad-380008
13 Mode of sending the Document shall be submitted in sealed envelope systems By
TenderDocuments RPAD/Speed post/ Hand Delivery in sealed covers in Duplicate (
One Original & One Duplicate) duly sign & seal by contractor .
14 Terms, Condition, & All general condition of contract mentioned in tender shall be
Specification applicable.
15 Defect &Liability Period The contractor shall be responsible to make good and remedy at
this own exppence any defect which may developed or may be
noticed before the period mentioned here under from the certified
date of complition, The within 15 days of recipts of the notice. In
the case of failure on the part of the contractor, the Engineer
incharge may rectfy or remove or reexecute the work at the risk &
cost of the contractore. The Engineer incharge shall be entitled to
appropriate the whole or any part of the amount of securitydeposit
towards theexpences, If any, incurred by him in rectification,
removal or re- execution. The defect liability period shall be as
under (a) for all works costing up to Rs. 50,000 (amount put to
tender), the period shall be three months from the cirtified date of
complition. (b) for all workscosting more than Rs. 50,000 and upto
Rs. 1 crore (Amount put to tender) ,the period shall be six (6)
month from the cirtified date of compition or one monsoon , which
ever letter.(c) the major project costing more than Rs. 1 crore , the
period shall be 12 months from the cirtified date of complition
which should include one monsoon.(d) For building works , the
period specified in (a) ,(b) & (c) above or elapse of monsoon
period following cirtifide date of complition.,whichever is letter .
For the purpose of deciding the monsoon period, the 30 september
may be treated as the last date.
16 Compansation for Delay 10 % of the balance work after Time limit expired as Peta
17 Deduction of Retention Retention @ 2% of the value of work done will be deducted from
Money from each RA each RA bill. It will be released along with release of payment of
Bill Final Bill.
18 Addendum/Corrigendum Addendum/Corrigendum If any Shall be Published 48 Hrs. Price
To the Final Submission Time And Date. The Same Shall From a
part Of Tender And The Same As to be Attached Along With The
Tender Document.
19 For E.P.F. Act. As per Account department cicular no.37, date-09/08/2018
20 GST As per AMC Finance Department Circular No. 38 dated 21-11-
2022. The Rates are Exclusive of GST. Prevailing GST will be
paid separately.
Conditional tenders will not be accepted. Municipal Commissionerreserves the rights to reject any
or all the tenders without assigning anyreasons thereof.
Seal and Signature of the Bidder Addl City Engineer
Ahmedabad Municipal Corporation
South Zone - Engineering Department
Schedule of Quantities and Rate
No Item Description Qty. Rate Unit Amount
Providing FoR Cost of Materials &
1 supplying at Materials
Providing TMT Bar FE 415 reinforcement
for R.C.C. work including bending, binding
a and placing in position complete upto floor 0.00 66.59 K.G
two level (R&B Ahmedabad City SOR
2023-24 Item Code 05014BA Page No.54)
Lead (AMC central Stroe i.code
b rate as on dated 21.02.2023) 0.00 214.74 K.G
Jute (Spun Yarn) (AMC central Store i.code
c 18940001 rate as on dated 21.02.2023) 0.00 76.1 K.G
Nut Bolt (AMC central Store i.code
e MS Plate (as per building SOR) 0.00 63.35 K.G
f MS pipe /piece 0.00 75 K.G
g MS Ring flange 0.00 125 K.G
h MS Blank flange 0.00 98.21 K.G
i Rubber Gasket 0.00 71.43 K.G
2 Providing & supplying For Welding Joints
Hiring and operating the 20 KV 3 Phase
Electric Generator for operating desilting
machinery, and lighting and other
requirements with Arranging diesel to run
the D.G. Set Do As Directed. 8 Hrs Shift.
a (No payment should be allowed for non 0.00 2,500.00 SHIFT
working condition of machinery ) (SOR -
(Jan. 2016) Rates for work of Drainage /
SWD pipe line - Machinery Item No.3
b Rent of Welding machine per shift 0.00 893 SHIFT
c Rent for Grinder machine per shift 0.00 304 SHIFT
d Gas Cutting set per shift 0.00 513 SHIFT
e LPG bottle 0.00 1205 NO
f Oxygen bottle 0.00 246 NO
g Rent of Tools & Other Charges 0.00 446 SHIFT
h Rent of Chain pulley block & Tripod 0.00 446 SHIFT
3 Providing For Masonry & RCC Work
a M-Seal 100 gm pack 0.00 26.79 NO
OPC 53 Grade Cement Bag (M143) (R&B
b Ahmedabad City SOR 2023-24 (A) BASIC 0.00 261.70 BAG
RATES OF MATERIALS)
Common Burnt clay Bricks Conventional
size having crushing strength not less than
c 35 kg./Sq.Cm. (M166) (R&B Ahmedabad 0.00 4,712.40
City SOR 2023-24 (A) BASIC RATES OF
Providing and laying controlled cement
concrete M.200 and curing complete
excluding the cost of formwork and
reinforcement for reinforced concrete work
in (A) Foundations,footings, Base of
columns and Mass concrete (R&B
Ahmedabad City SOR 2023-24 Item Code
05024AA Page No.56)
Labour charges for repairing of lekage CI/Di
pipe line of following diameter at different
places incluyding necessary excavation
manually or by machinery, removing of
mud, dewatering, cleaning of pipe, cutting
of pipe, Jointing & repairing using CID
5 joints including CID joints, rubber rings, nut
bolts, hiring excavator, Hydra/ Crane,
dewatering machine, fuel, operator etc
complete ( including cost of jointing
material but excluding cost of pipe)
(GWSSB SOR 22-23 SECTION 1 G I.NO
Labour charges for repairing of lekage CI/Di
pipe line for following dia different places
including necessary excavation manually or
by machinery removing mud dewatering
cleaning of pipe and leakafe portion and
repairing by inserting lead wool jute tools
required for inserting lead wool hiring
charges of excavators Hydra/crane j.c.b
dewatering set fuel operator cost of lead
wool etc complete(including all material but
excluding cost of pipel) (GWSSB SOR 22-
23 SECTION 1 G I.NO 2)
Providing, supplying and fixing check nut
7 for sluice valve. C.I./ M.S./G.M. or Brass.
Instruction of engg. In charge
Labour charges for repiaing of Sluice valve /
Reflux valve inlcuding materials, labours
8 and testing etc. Complete. (i) Replacing of
S.S. Spindle only (GWSSB SOR 22-23 I.no.
Providing and fixing to wall, ceiling and
floor galvanised Mild steel tubes (Medium
grade) of the following nominal bore, tube
fitting and clamps including making good
the wall ceiling and floor.(R&B Ahmedabad
City SOR 2023-24 Page No.162)
a 15 mm dia (Item Code 23001AA) 0.00 244.13 RMT
b 25 mm dia (Item Code 23001CA) 50.00 393.93 RMT
c 50 mm dia (Item Code 23001FA) 50.00 779.6 RMT
Providing, laying and jointing in true line
and level U.P.V.C pipe (SCH - 40) of
following dia. including fittings of standard
make as approved by Engineer - in - charge.
Pipe shall be fixed on the wall with the help
of clamp at every shall be concealed as
directed including necessary Tee ,bend, any
joint & any fittings etc. including testing of
pipe and joints and fixing the same with
adhesive solvent, including cost of all
materials (R&B Ahmedabad City SOR
2023-24 Page No.162)
A 15 mm (I.code no. 23061) 125.00 71.93 RMT
B 25 mm (I.code no. 23062) 100.00 90.93 RMT
D 50 mm (I.code no. 23065) 29.00 193.73 RMT
E 110mm (I.code no. 23067) 10.00 826.88 RMT
Excavation for pipe line trenches for water
supply, sewerage lne, manhole etc. all with
shoring and struting if required as per
required gradient and line including safety
provisions using site rails and stacking
11 excavated stuff including up to all required
lead cleaning the site etc. complete for all
lifts and strata as specified and direction of
engineer incharge. In all sorts of soil and
soft murrum (GWSSB SOR 2022-23 Part 1-
B Item No.1 Page 32)
a Upto 1.50 mt depth 49.00 89 Cmt
b 1.5 mt to 3 mt depth 40.00 98 Cmt
c 3.00 mt to 4.50 mt depth 5.00 103 Cmt
d 4.50 mt to 6.00 mt depth 2.00 109 Cmt
Conveyance charge of earth, lime, murrum,
building rubbish, manure, garbage, sludge,
excavated rock, fly ash, aggregates of any
kind executed outside the road site. Rate
also includes spreading & levelling etc
12 complete. Internal conveyance above 50 mt
done within the work site is not payable.
Note: Quantity Shoud not be more then the
quantity equal to excavation minus back
filling. (no bulkage) (R&B Ahmedabad City
SOR 2023-24 Statement 5 Item Code
030201A2 Page No.6)
a Lead up to 1 Km. 0.00 320.2 Cmt
b Lead From 1Km to 2 Km. 0.00 347.73 Cmt
c Lead From 2 Km to 3 Km. 0.00 370.53 Cmt
d Lead From 3 Km to 4 Km. 0.00 390.56 Cmt
e Lead From 4 Km to 5 Km. 0.00 408.41 Cmt
f Lead From 5 Km to 10 Km. 30.00 417.67 Cmt
g Lead From 10 Km to 15 Km. 0.00 425.87 Cmt
Extra rate over item of excavation of earth
for excavation of asphalt pavement / RCC
of thickness up to 0.20 meter including
13 demolishing the asphalt carpet, metal
soiling/ cutting Reinforcement etc.comp.
with stacking the material as directed. (Road
Project Approved Rate)
a up to 0.20 meter thickness (By Manual) 100.00 71.10 SMT
0.20 to 0.30 meter (By any type of Breaker
Machine or R.C.C.Cutter machine including
cost of operator, fuel, & transportation etc
0.30 meter & above (By any type of Breaker
Machine or R.C.C.Cutter machine
including cost of operator, fuel, &
transportation etc complete.
Providing and Making hole for House
connection on C.I./D.I. or M.S. with labour
14 cost. Instruction of engg. In charge (SOR -
(Jan. 2016) Rates for Labour work for water
pipe line - Item No.12 Page no.2)
Transporting from AMC store and laying
spigot and socket New DI pipe line DI-k-9
pipes of various classes with CI/DI/MS
specials of following diameters. Rate
includes excavation up to minimum 1.0 mt.
depth from top of pipe / as per requirement
15 in any soil, refilling after laying pipe,
covering and temptation of carting surplus
earth up to 30 mt. lead and watering and
compaction. Clearing the site. All Joints
shall be made tight & leak free etc. comp.
(SOR - (Jan. 2016) Rates for Labour work
for water pipe line - Item No.1 Page no.1)
Removing & relaying of existing CI/DI pipe
line & Specials, Cleaning of pipe & Specials
from Inside, including excavation, refilling
16 etc. comp. in line & level with any type of
joints as per instruction of engg. in charge
(SOR - (Jan. 2016) Rates for Labour work
for water pipe line - Item No.3 Page no.1)
Labours charges for collecting specials from
Municipals store loading , transportation,
unloading to the site, laying and fixing CI
specials inclusive of all jointing materials
17 like lead, spun etc.and labour, exacavation 21.43 K.G
re-filling and nece. dewatering as per
instrucation of engg. incharge (SOR - (Jan.
2016) Rates for Labour work for water pipe
line - Item No.7 Page no.2)
Labour charges for installing and jointing
Sluice Valves including loading,
transporting from owner's store, lowering in
location to the required with excavation
refilling alignment by crane/ tripod and
18 chain block including cost of total nos. of
nuts, bolts, Necessary gaskets and excluding
fixing of tail pieces with lead & jute etc
complete as directed by Engg. in charge.
(SOR - (Jan. 2016) Rates for Labour work
for water pipe line - Item No.4 Page no.1)
Cutting of existing pipelines of following
diameters including carting of nece. specials
from AMC store to site and from site to
AMC store (recovered materials) nace.
labours for excavation, jodan & backfilling
fitter, supervisor, etc. complete. Rate also
19 includes electric cutter, dewatering pump
fuel and transportation of machineries, chain
pulley block if requires working at an
instructed specific time of day or night etc.
complete. (SOR - (Jan. 2016) Rates for
Labour work for water pipe line - Item No.6
Supplying, labour for excavation of all types
of soil at any depth including excavation of
asphalt pavement of any thickness,
demolition of brick work in CM of any
proportion including stacking of serviceable
materials and disposal of unserviceable
material etc. comp. as directed. (Rate as per
Labour, Skill Development & Employment
Department, Government of Gujarat
Notification dated 27th March 2023)
Mazdoor At Day/Night (Unskilled Zone-1
A Empl. type -6) 280.00 452 NO
Mukadam At Day/Night (Semi-skilled
B Zone-1 Empl. type -6) 70.00 462 NO
Dewatering by pumping set of required
capacity including temporary platform
carting pumping at site and fixing the same
21 in position including all accessories, and 300.00 18.32
fuel and labour etc. Complete (A) Pump set
of Capacity (GWSSB SOR 22-23 Section
2E-miscellaneous Item no. 1)
Providing & Supplying JCB Machine on
rental basis in case of emergency situation
and break down type work & also during
unavoidable condition as per instruction of
engg.incharge , rate includes all nece.
shifting, fuel and operating charges and
22 stacking of useful & non-useful materials 250.00 535.71 Hour
separately up to store. (No payment should
be allowed for non working condition of
machinery and for pipe line excavation and
laying work) (SOR - (Jan. 2016) Rates for
work of Drainage / SWD pipe line -
Machinery Item No.4 Page no.7)
Supplying Pneumatic Breaker Machine for
RCC Slab or Asphalt Demolishing Work on
site by using Operator, fuel, power Supply
etc. Complete as Directed. (No payment
should be allowed for non working
23 condition of machinery and for pipe line 250.00 535.71 Hour
excavation and M.H. work. Allowed only
for break down work) (SOR - (Jan. 2016)
Rates for work of Drainage / SWD pipe line
- Machinery Item No.10 Page no.7)
Excavation for trail pit of maximum
diamension of 1.5 mt x0.75 x 1.5 mt depth
for location of existing line including
excavation but excluding cost asphalt
cutting but including refilling, watering etc.
comp as per instruction of Engg in charge.
(SOR - (Jan. 2016) Rates for Labour work
for water pipe line - Item No.11 Page no.2)
Labour charges for doing washout of water
pipe line at end including necessary
excavation of pit, allowing the water to flow
for 15 minutes twice or thrice as per site
condition during supply hour, dewatering
the pit and plugging with existing wooden
butch and refilling the pit .etc. comp .as per
instruction (SOR - (Jan. 2016) Rates for
Labour work for water pipe line - Item
No.15 Page no.3)
P/S OF good quality of rubber rings for
following dia meter. (SOR - (Jan. 2016)
Rates for Labour work for water pipe line -
Item No.17 Page no.3)
Supplying wooden taper butches from
jungle wood (Like limda, ambo) Etc. comp.
27 (SOR - (Jan. 2016) Rates for Labour work
for water pipe line - Item No.16 Page no.3)
A 15 Mm dia. to 20 MM dia. 200.00 13.39 NO
B 25 Mm dia. to 37 MM dia. 100.00 17.86 NO
D 80 mm dia to 100 mm dia line 90.00 312.5 NO
Labour charges for repairing of sluice valve
/ reflux valve including materials, labours
28 and testing etc.,complete (B) Replacing of
Glan packing only (GWSSB SOR-22-23)
Providing and supplying ISI markedonly
standord lengh stone ware pipes instandsrd
lenghths of following cass and diameter
including all taxes insurance tronsportion
29 freight charges octroi inspestion charges
loading unioading conveyance to
deportmental stores etc.complete Class AA
(IS-651/1989) (GWSSB W&S sor 22-23
I.No 11 pate 1&2 a material sec)
Lowering laying and jointing Stone Ware
Pipes of following dia meters with cement
joints in C.M 1:1 proportion in proper
position grade and alignment at all level as
30 directed by Engineer in charge including
conveyance fro stores to site of work
jointing material stc.comp (L,L&J OF
STONE WARE PIPES)(W&S sor 22-23
I.No 12 pate 1&2 b labour sec)
A 100mm 15.00 58 Rmt
B 150mm 15.00 88 Rmt
Fixing of valve Road box incl .locating
valve, nece. excavation, tem also inclues
cartring form AMC store to site. Etc.Comp.
as directed (SOR - (Jan. 2016) Rates for
Labour work for water pipe line - Item No.
Providing, laying, spreading and compacting
graded stone aggregate to wet mix macadam
specification including premixing the
Material with water at OMC in mechanical
mix plant carriage of mixed Material by
tipper to site, laying in uniform layers in
sub- base / base course on well prepared
surface and compacting with vibratory roller
to achieve the desired density as per Codal
Provision. (Road Project Approved Rate)
A Production & Supply of WMM 70.00 1708.13 CMT
B Laying of WMM 70.00 31.25 CMT
Hiring of Tractor with trolley considering
Hrs. As working Day hours inclu. Driver
(GWSSB SOR -22-23 Section 2E-
Miscellenous Item no. 7)
Barricading the entire break down or
excavated area on rental basis using wooden
ballies / M.S.angles at max. 2.00 meter
centre to centre, C.G.I. Sheet, reflective
paint / Board out side to avoid accident &
for smooth traffic diversion & movement
including cautionary board etc. Item also
34 includes for making temporary sufficient 0.00 80.36 RMT
nos of lighting arrangement through out the
work with necessary required arrangement.
The same shall be removed after completion
of work. (Only for break down work from
start to complete) (SOR - (Jan. 2016) Rates
for work of Drainage / SWD pipe line
Drainage Work Item No.29 Page 6)
Reinstatement of Asphalt road/any kind of
35 paving/flooring using the same material. (As 300.00 103.57 Smt
per previous ARC tender rates)
Supplying Potable Water Tanker with
Fighter machine to be filled from nearby
water distribution station of AMC. with
meter Delivery Pipe. The tanker should be
supplied as & where reuired & when order
placed by Engineer In - Charge The rate
includes the fuel charge, driver's charge
Labour charges for cleaning of UGWT
sump / GL cistern including cleaning and
removing algae, calcinations, sludg dirt
deposition from bottom and as well as from
37 wall af container, disinfection by bleaching
powder with all necessary tools and plants,
labours and cost of disfentanc etc complete
(GWSSB SOR 22-23, Section G, Item No.
10, page no -77)
Capacity of sump in Ltrs
Labour charges for cleaning of RCC ESR
including cleaning and removing algae,
calcinations, sludge, dirt deposition from
bottom and as well as from wall of
38 container, disinfection by bleaching powder
with all necessary scafolding, tools and
plants, labours and cost of disinfectant etc
complete (GWSSB SOR 22-23, Section G,
Item No. 11, page no -78)
Capacity of ESR in Ltrs
Up to 10,000 litre 0 2276.00 NO
Up to 20,000 litre 0 2276.00 NO
Up to 4,00,000 litre 4 3984.00 NO
Up to 10,00,000 litre 2 7739.00 NO
Up to 20,00,000 litre 4 13087.00 NO
Amount (Rs.) Excluding GST
Total amount say
Total amount say
The Rates are Exclusive of GST. Prevailing GST will be paid separately.
Contractor’s Quoted Rate
IN FIGURE IN WORDS
Net Quoted Tender Amount Rs.
Seal and Signature of the Bidder Additional City Engineer
mobile no. (South Zone)
ftuLx[tfxhle mne - rm¬tu yuze.mexe yuLSlegh
btuctEj lkch mt&u (œrûtK Ítul)
Bank guarantee shall be submitted as per AMC Finance Department Circular No.03 dated 28-04-
A. Guarantees issued by following banks will be accepted as SD/EMD on permanent
All nationalized Banks
B. Guarantees issued by following banks will be accepted as SD/EMD for the period up
to March- 31, 2024. The validity cut-off date in the GR is with respect to the date of
issue of Bank Guarantee irrespective of the date of termination of Bank Guarantee.
1) Commercial Banks :-
1. A U Small Finance Bank 2. Axis Bank
3. City Union Bank 4. DBS Bank India Limited
5. DCB Bank 6. Equitas Small Finance Bank
7. Federal Bank 8. HDFC Bank
9. ICICI Bank 10. IndusInd Bank
11. Kotak Mahindra Bank 12. Standard Chartered Bank
13. Tamilnadu Mercantile Bank 14. Bandhan Bank
15. BNP Paribas 16. CSB Bank
17. HSBC Bank 18. Karnataka Bank
19. Karur Vysya Bank 20. South Indian Bank
21. Utkarsh Small Finance Bank
2) Co-operative and Rural Banks Of Gujarat :-
1. The Ahmedabad Mercantile Co-operative Bank Limited
2. Kalupur Commerical Co-operative Bank Limited
3. Nutan nagrik Sahakari Bank Limited
4. Rajkot Nagarik Sahakari Bank Limited
5. Saraswat Co-operative Bank
6. Saurashtra Gramin Bank
7. The Gujarat State Co-Operative Bank
8. The Mehsana Urban Co-operative Bank Limited
9. The Surat District Co-operative Bank
10. The Surat Peoples Co-operative Bank
11. SVC Co-operative Bank LTD.
Special Note: The issuing branch of all bank guarantees shall of Ahmedabad City only.
Seal and Signature of the Bidder Addl City Engineer(South Zone)
yb>tJt> BGþrlrmrvj ftuvtuohuNl
œrûtK Ítul- Esluh Ftðþ
vtKe, z[ulus, vuJ´d, heEMxuxbuLxlt ftuLx[tfxhu Ftm JtkaJt ylu ægtlbtk htFJtle ctc< leau Bþsc Au.
"yt ftblt œhuf ytExblt sÚ&tbtk ~ËLg &e cMmtu xftle JD^x &Jt mkCJ Au. ftuE ytExbltu CtJ
J^thtu ytvJtbtk ytJNu lrn. yBþf søgtyu swlt vÚ&h s VheJth heEMxux fhJtlt &Nu. <uJe œhuf ytExbbtk
J^^x &tg fu ytExb yufÍefGþx l &tg <uÔþk vK clNu. ytlt btxu ftuEvK «fthle J¤<hle btkdKe fhJtle
hnuNu lrn fu CtJ J^thtu, vK ytvJtltu &Nu lrn. <ult btxu Ãþh<tk mt^ltu ylu bsqhtu ntug, yuf mt&u yluf
søgtytuyu ftb fhJtle ûtb<t ntug <ubKu s rJathelu xuLzh ChÔþk. bsqhtu l&e fu dtbzu s<t hÌtt Au fu ntu¤e,
lJhtºte, rœJt¤e, jøl meÍl fu yLg <nuJthtubkt fu «mkdtubtk bsqhtu ytJ<t l&e <uJt fu ceò ftuEvK cntlt
nuX¤ ftb ck^ htFe NftNu lrn yLg&t htuslt Yt. 250.00 le J^thtle vulÕxe ftb ck^ hnu fu MËalt fh<t
ytuAt bsqhtu ytJu <ulu je^u fhJtbtk ytJNu."
ftuLx[tfxhle mne yuze.mexe.yuLS.
rm¬t ylu btuctEj lkch (œrûtK Ítul)
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
General terms & conditions
1. A booklet of FORM B-1 of Gujarat State Roads & Building Department / Water
Resources Department with the latest correction slips may be referred for quality of
construction & standard of Procedure (SOP). (only English version)
2. In the specification “as directed" / "approved" shall be taken to mean "as directed /
"approved" by the Engineering in charge.
3. Wherever a reference to any Indian standard appears in the specifications, it shall be
taken to mean as reference to the latest edition of the same of force on the date of
4. In "Mode of measurement" in the specifications wherever a dispute arises in the
absence of specific mention for a particulars point / aspect, the same in the relevant
Indian Standards shall be referred to.
5. All measurement and computations, unless otherwise specified shall be carried out
nearest to the following limits :-
i) Length, width and depth, Height 0.01 Meter
ii) Areas 0.01 Sq.mts.
iii) Cubic contents 0.01 Cu. mts.
In recording dimensions of work, the sequence of length, width and height (Depth) or
thickness shall be followed.
6. Definite particulars covered in the items of work, though not mentioned or elucidate in
its specifications shall be deemed to be included therein.
7. Approval of the samples of various materials given by the Engineer in charge or AMC's
Consultant shall not absolve the contractor from the responsibility of replacing
defective materials brought on site or materials used in the work found defective at a
later date. The contractor shall have no claim to any payment or compensation
whatsoever on account of any such materials being rejected by the Engineer in charge.
8. The contractor’s rate for the item of work shall be for the work completed in all respect.
9. All materials including those of electrical shall be got approved by the Engineer in
charge/ Architect before using them in the work.
10. Materials as and when rejected by the Engineer in charge or AMC's Consultant shall be
removed from the site of work within 24 hours.
11. All work shall be carried out in a manner applying the best technique.
12. All tools, templates, machinery and equipment for correct execution of the work as well
as for checking lines, levels, alignment of the works & all precautionary measures
during execution shall have to be kept in sufficient numbers and in good working
condition at the site of the work.
13. Special modes of the construction not adopted in general Engineering practice, if
proposed to be adopted by the contractor shall be considered only if the contractor
provided satisfactory evidence that such special mode of construction and completion of
work to the required strength and quality. Acceptance of the same by the Engineer in
charge shall not however, absolve the contractor from the responsibility of any adverse
effect and concordance of adopting the same in the course of exaction or completion of
14. The contractor shall be responsible for observing the rules and regulation imposed
under the "Minor Mineral Act", and such other laws and rules prescribed by the
Government from time to time.
15. All necessary safety measures and precautions (incl. those laid down in the various
relevant Indian Standard) shall be taken to engrave the safety of men, materials and
machinery on the work and also of the work itself.
16. Quantity measured in the tender is approximate. It may increase or decrease looking to
the quantum of actual work for which no any claim shall be entertained by A.M.C.
17. Contractor shall have to execute extra item if required only after necessary permission
18. The work in general shall be carried out as per standard specifications of the relevant
items to be executed & as per the instruction of Engineer in charge & as per the
guidance of AMC's Consultant for this project.
19. The general terms & conditions of the contract shall be applicable & shall be binding on
the contractor. The contract agreement shall have to be executed between AMC & the
agency to which work is awarded for execution.
20. The time limit shall be reckoned after next day from the date of issue of the written
work order to the contractor after fullfillng the formality life SD & Agreement. No time
extension will be granted under any circumstances.
21. In case of any ambiguity in specifications mentioned in this tender, the interpretation
given by Additional City Engineer /Dy.M.C of A.M.C. will be final and binding to the
22. The contractor shall take no advantage of any apparent error or omission in drawing or
specification and the Engineer -in-charge shall make such corrections and
interpretations as necessary to fulfill the intent of the plants and specifications.
23. The quantities of items in BOQ (Bill of Quantities) may vary in case of necessity arises.
24. All prevailing taxes/duties chargeable by State Govt./Central Govt. and the Municipal
Corporation. will be payable by the contractor.
25. No any kind of price rise / price escalation / price variation for cement , steel or labour
26. Contractor is requested to see the site physically before tendering. He is also requested
to quote the rates keeping in view of all the points mentioned in relevant pages of tender
27. Water Supply: The contractor shall arrange at his own cost, a suitable supply of piped
water for the construction of the works and provide a satisfactory supply of potable
water for drinking, washing, sanitation and cleaning down. The contractor will be
responsible for all the costs where applicable of connection, meter installation, water
consumed, water required for testing purposes, disconnection and the laying,
maintenances and ultimate removal of any distribution system around the site.
28. Electricity: Electric supply will be made available at the site by the Contractor and the
contractor must make his own arrangements with the Corporation and Electricity
Supply Authorities and with other contractors to connect and to take a supply from such
services, paying all costs in connection therewith.
The Contractor shall be entitled to use supply Electricity as may be available on the site
for purpose of the work and shall pay such charges as is fixed by the appropriate supply
In case there is any delay in supply of power site of any interruption or fault in the
power during the work. No compensation shall be paid for idle labor staff, machineries
and for use of diesel operating sets etc. as the case may be.
29. Tenders shall submit all the valid/certified documents in support of their
initial/eligibility criteria mentioned above along with the bid. They shall have also to
submit the income tax clearance certificate and solvency certificate.
30. No advance such as secured advance machinery advance, mobilization advance or
materials advance will be given.
31. The contractor shall get the electrical works executed through the authorized
Government approved licensed electrical person or firm in appropriate category in
accordance to contractual provisions.
32. The electrical works shall be carried out strictly in accordance with the directives issued
by Engineer in charge.
33. Contractors shall not have any dispute or claim for any kind of compensations
(i) If the quantity stipulated in the tender items varies or the scope of work changes
& thereby total amount of work increases/ decreases.
& thereby total amount of work increases/ decreases.
(ii) If the work gets delayed/ postponed for some administrative/ technical decision
34. In case of any dispute, decision of Municipal Commissioner shall be final and binding
on the contractors.
35. Tenders which do not fulfill all or any of conditions or are submitted incomplete in any
respect will be rejected. Municipal Commissioner reserves the right to increase/decrease
the scope of work. No any claim to that effect shall be entertained. The Municipal
Commissioner also reserves the right to reject any or all the tenders without assigning
any reason thereof.
36. The contractors are requested to quote their rates considering above tender conditions.
37. The contractor shall have to paid balance Security Deposit within 10 days from the date
if issue of Letter of Interest (LOI). And after paying the balance S.D. the time limit will
be started & Execution of Agreement to be done than after.
In case of delay in paying balance S.D. by more than 10 days penalty at the rate
of 0.01% of sanction tender amount per day will be deducted from the Bill.
Eventhough in special case, if work is not started because of monsoon or any
other special reason (like site is not available), after evaluation of situation the actual
date of starting of work will be consider after approval of Dy.M.C. (South zone)
38. The Contractor shall not claim for increase or decrease in the quantity of the item or the
39. The payment shall be made as per the A.M.C policy for the work done by the
40. Conditional tenderes will not be accepted.
41. The Contractor must be followed the rules and regulations for COVID-19 as per
guidelines published by WHO/ Center government/State government /Ahmadabad
municipal Corporation.
Signature of contractor with seal Additional City Engineer (S.Z)
Date Ahmedabad Municipal Corporation
FORM OF BANK GUARANTEE
(hereinafter called the Tenderer) is desirous and preferred to tender for works in accordance with
the terms and conditions of tender for the work of
1 .Therefore. We hereby affirm that -we are guarantors on behalf of the Tenderer up to
(in figures) and we undertake to pay to Municipal Commissioner, Ahmedabad
MunicipalCorporation, A'bad specified up to his first written demand, without demur without delay
andwithout the necessity of a previous of judicial or administrative procedures and without
thenecessity to prove to the Bank the defects or short comings or debits of the contractor any
2. We further agree that the Guarantee herein contemned shall remain in full force and effectduring
the period that would be taken for the acceptance of tender.
However unless a demand of claim under this guarantee is made on its in writing on or before the
(Date to be specified will not he less than 180 days from the stipulated date of receiving the
tender)we shall be discharge form all liabilities under the guarantee thereafter.
3. We undertake not to revoke the guarantee during it currency except with the previous consentof
the Municipal Commissioner, Ahmedabad Municipal Corporation, A'bad in writing.
4. We lastly undertake not to revoke the guarantee for any charge in constitution of the Tendereror
Date: Signature & Seal of
5. The contractors shall have to furnish income tax clearance certificate before his tender
isaccepted and intimate assessment number and ward under which he is assessed.
6. Copies of certificate as regards previous experience, if any, must accompany the tender.
Signature of Contractor Add.C.E (S.Z) Dy. Municipal Commissioner (S.Z)
Date Ahmedabad Municipal Corporation
TENDER DECLARATION FORM
The Deputy Municipal Commissioner,
South Zone, Ahemedabad
Name of Works: - ઈ રુ વોડમાં િવિવધ બ ટ હઠળ ુદ ુ દ જ યાએ પાણીના નેટવકના કામ કરવા
I/We the undersigned have carefully gone through and clearly understood the Tender documentsfor
the above work. I/We have satisfied myself/ourselves as to the location of site, examined drawings.I/We
have visited site & fully acquainted with local situations regarding materials, labours & others
factorspertaining to work before submitting tenders.
I/We do hereby offer to execute and complete the whole of the work within the time specified all in
accordance with the specification, designs, drawing and instruction in writing referred to in the
saiddocument and with such materials as are provided for, at the respective rates which I/we have quoted in
theschedule-B or at such other rates as maybe fixed under the provisions of these conditions.In the event of
this tender being accepted I/We agree to enter into an agreement and when required andexecute the contract,
according to your fom1 of agreement as or in default where of I/we bindmyself/ourselves to forfeit the
"Earnest Money Deposit."
I/We understand that if I/WE shall not enter in agreement within ten days or decided by AMC
fromthe date of receipt of letter of acceptance, you will forfeit the earnest money paid by me/us and
takenecessary action as deemed fit.
I/We have enclosed a DEMAND DRAFT or PAY ORDER as an “Earnest Money Deposit", for
thesum as mentioned in tender notice, the full value of which is to be absolutely forfeited to the Employer
IfI/We fail to commence the work specified. Otherwise the said sum shall be retained, by the Employer as
onaccount of such. Security)' Deposit'.' as provided for in the aforesaid documents.
I/We agree not to employ sub-contractors other then those that may be approved in accordance
withConditions in the aforesaid documents.
I/We understand that you are not bound to accept the lowest or any tender which you may receive.
I/We am/are bound to execute the job if the work order is issued within 120 days from the date
ofopening of the tender.
I/We agree to pay the Government income-Tax, Sales-Tax (Central and State) ,Sales Tax on work,
octroiduties and other prevailing Government taxes/charges on such items on which the same are leviable
and therates quoted by me/us are inclusive of the same.
Yours faithfully
Signature of the contractor
ybœtJtœ BGþrlrmvj ftuvotuhuNl
ÆÂûtKÍtul - Esluh Ftðþ
1. mbgbgto>t ykdu yuj.ytu.ytR.ytÃgt ctœ 1૦ rœJm mw^ebtk sÁhe me¾gtuhexe rzvtuÍex Che ðgth ctœ&e dKJtbtkk ytJNu.
<ubs ðgth ctœ Jfo ytuzoh R~gw&gu&e mbtg bgtoœt NY &guje dKtNu.<&t <u mt&u fhthvºt fhJtltu hnuNu. ylu<u bwsc ftb NÁ
fhJtle <theF dKJtbtk ytJNu. yuj.ytu.ytR. ytÃgt ctœ me¾gtuhexe rzvtuÍex ChJtbtkk rœl -1૦ fh<tk J^w rJjkc ltk rfMmt
btk <ubs Jfo ytuzoh ytvu&e ftb NY fhJtbtkk rJjkc &gu&e «r<rœl bkswh xuLzh hfbltk 0.01 % juFu vulÕxe cej btk&e ftvJtbtk
ytJNu. <ub A<tk rJrNÐ rfMmt btk atubtmt ltk fthKu y&Jt yrlJtgo fthKtumh ftb NÁ &R Nfu <ub l ntug <u rfMmt btk
gtuøg<t aftme zu.Bgw.frb©h (œ.Ítul) le bkswhe bu¤Je ftb NÁ fhJtle <theF dKJtbtk ytJNu.
2. xuLzh Jujezexe 120 r>Jm Mþ^ele hnuNu.
3. xuLzh Ch<e JF<u yluoMxble ChJtle hnuNu.
4. S.yum.xe. «J<obtl œh «btKu yjd&e awfJJtbtk ytJNu. xuût fu yLg ftuE vK mhfthe fhJuht ChJtle sJtc>the
ftuLx[tfxhle hnuNu.
5. htsg / fuL÷ mhfth©elt JF<tuJF<lt ftg>t Bþsc su ftuE hfble fvt< fhJtle &Nu <u bwsc ftuLx[tfxlt cejbtk&e fvt<
6. juch JuÕVuh Vkz btxu ntjbtk htsg mhfth©eyu fhuj nwfb Bþsc 1% (yuf xft) hfb cejbtk&e ftve juJtbtk ytJNu.
7. bxehegj xuMxekdltu xuMxekdltu FhuFh &guj Fao ftuLx[tfxh©e vtmu &e Jmwj fhJtbtk ytJNu.
8. ftb ytv<e JF<u su <u ftuLx[tfxhLþk hSMx[uNl ægtlbtk htFelu <ule bgto>tbtk ftb ytvJtbtk ytJNu.
9. yt xuLzh su <u Jdolt btLg gtœe lt ftuLx[tfxhtu Che NfNu. dJobuLxlt btLg ftuLx[tfxhu y.BGþ.ftuvotu.btk btLg ftuLx[tfxhtu le
gtœebtk hSMxuNl fhtJJtLþk hnuNu.
10. yt Wvhtk< y.BGþ.ftuvotu. lt slhj ftuLx[ufx fLzeNl ylu xuLzhle Nh<tu ck^lf<ot hnuNu. su BGþrl.ftuvtuohuNl Juc mtEx
www.ahmedabadcity.gov.inWvh Bþfuj Au.
11. ftuLx[tfxh lu vubuLx - hl´dcej BGþrl.ftuvotu.lt su <u atÕþ mbglt mhfGþjh Bþsc fhJtbtk ytJNu.
12. Nh<e xuLzh MJefthJtbtk ytJNu lrn.
13. xuLzh MJefthÔþ, h> fhÔþ, ftulu ytvÔþ ylu fgt CtJ&e ytvÔþ <u ykdu zu.BGþrl.frbNlh©eltu rlKog ytFhe hnuNu.
14. >huf ytExbltk MvuNeVefuNl ftuvtuohuNlltk bkswh &guj MvuNeVefuNl Bþsc <&t RLzegl MxtLzzo ftuz ytuV «ufxem ltkk btLg ^tht
^tuhKtu Bþsc hnuNu ylu zu.mexe yuLSlegh©eltu rlKog ytFhe hnuNu. Jtuxh´d fhJtbtk lrn ytJu fu >hhtus J^thtltu zucheÍ
WvtzJtbtk lrn ytJu <tu ftuLx[tfxhltk Fauo ylu òuFbu Jdh ltuxemu Jtuxh´d fhtJJtbtk <&t zucheÍ WvtzJtbtk ytJNu ylu
cejbtk&e hfb ftve juJtbtk ytJNu.
15. yufe JF<u yuf fh<tk Jæþ søgtytuyu ftbNY fhJtltu Jfoytuzoh b¤u <tu ftb yuf mt&u s yuf s c<tJuj søgtyu fhJwk vzNu. yuf
ftb ÃþÁ &tg vAe cesw ftb NY fheyu <uÔþk atjNu lrn.
16. atÕþ ftbu ftuEvK mrJom jtEllu LþfNtl l &tg <u he<u ftb fhÔþk vzNu, òu ftuE mrJom jtEl lu LþfNtl &Nu <tu <ule mkÃËKo
sJtcœthe (òlbtjle) ftuLx[tfxhle vtu<tle hnuNu. mtEx vh ftb œhBgtl bswh fu sl<t lt ftuE btKmlt òlbtjlu lwfNtl
&tg <ule sJtcœthe ftuLx[tfxhle hnuNu. vtujem Vhegt>&tg <tu <ule sJtc>the vK ftuLx[tfxhle hnuNu. CuFz ^me l vzu <ule
sJtc>the vK vtujem Vhegt>btk ftuLx[tfxhle hnuNu. CuFz ^me l vzu <u btxu mjtb<elt vdjtk (suJt fu >tuhzwk ctk^e bsqh
Ftztbtk W<thJt, mtuh´d ylu Mx[x´d fhJt rJduhu) je^t Jdh bsqhlu Ftztbtk W<thNu <tu ftuLx[tfxh s vtujem Vhegt>btk
sJtct>h hnuNu ylu BGþrl.ftuvtuohuNlltu ftuEvK MxtV ytlt btxu sJtc>th hnuNu lrn. ytxÕþk mbSlu s xuLzh ChÔþk. Btswhtultu
rJbtu vK W<thtJJtu.
17. juch yufx «btKu<ubs Bgw. frb§h©eltkk vrhvºt lkch 81 <t.26.02.2015bwsc <btb juch / bsqhtulwk dwsht< rcÕzekd
yuLz y^h fLMx[[fNl Jfombtkk VhSgt<hSMx[uNl fhtJJt ykdu ybj fhJtltu hnuNu <&t fuxjt juch jtJNtu <u vK sKtJJtLþk
hnuNu. juch yufx «btKu ftgoJtne lrn &E ntug <tu <u btxu ftuLx[tfxh mkÃËKovKu sJtc>th hnuNu. ylu<ulu vubuLx ytvJtbtk
ytJNu lrn <ubs ct¤ bswhtulu ftb Wvh htFe NftNu lrn.<ubs JF<tu JF< Bgw. frBNlh©e îtht fhJtbtkk ytJuj
mh¾gwjhtule Nh<tu ftuLx[[tfxhlu ckk^l f<to hnuNu.
18. ftuEvK ftgœtfeg jexeduNl ybœtJtœ Nnuhle ftuxobtk hnuNu.
19. ftuE fthKmh òu ftuLx[tfxhlu ftb l ytve Nftg <tu <u ykdu ftuLx[tfxh ftuEvK «fthltu LþfNtle- J¤<hltu n¬ >tJtu fhe NfNu
lrn fu ftg>tfeg ftgoJtne yt ykdu &E NfNu lrn. xuLzh bkswh >ltu y&o ftb ytve s >uJtLþk Au <uJtu &E NfNu lrn.
20. ytuVh y&Jt xuLzhbtk œNtoJuj ytRxbltu sÚ&tu mkCrJ< sÚ&tu Au subt atjw ftb œhBgtl VuhVth &Jtle N¾g<t hnuje Au.
21. M&¤ vrhÂM&r< / sYhegt< Bþsc ftb fhtJ<t xuLzhbtk sKtJuj fJtuLxexebtk J^ Dx &Nu <tu <u ykdu ftuLx[tfxh îtht ftuEvK
«fthle J^thtle ltKtkfeg btkdKe fhe NfNu lrn. ylu ftb ytuAw &tg <tu ftuLx[tfxhle J¤<hle btkdKe MJefthJtbtk ytJNu
22. mtEx vh jtJJtbtk ytJuj btjmtbtl hesufx fhJtbtk ytJu <tu ðþhk< r>l-1btk vh< jE sJtltu hnuNu. yLg&t ftuvtuohuNl îtht
<u hesufx btjltu rlftj fhe >uJtbtk ytJNu ylu <ule LþfNtlele sJtc>the ftuLx[tfxhle hnuNu.
23. su ftuLx[tfxh vtmu bswhtultu rJbtu, ydtW&e W<htÔgtu ntug <ublu «t^tLg ytve ftb ytve NfNu.
24. bsqhtu fu htn>theytulu ftuEvK «fthltu yfMbt<&tg <tu <ule vtujem ftgoJtnele fu juch yufx bwscle ftgoJtnele sJtc>the
yb.BGþrl.ftuvtuo.lt fboatheytule ftuEvK he<u hnuNu lrn.btºt ftuLx[tfxh s yt btxu sJtc>th hnuNu. bswhtulu dbçËx, nuÕbux
nt<k btuò rJduhu ftuLx[tfxhu VhSgt< ytvJtltk hnuNu. bswhtu <&t MþvhJtEÍ fu Bþft>bltu rJbtu vK W<thJtltu VhSgt<
hnuNu. juch yufx Bþsc ltuk^Ke fhtJe <ult rlgbtuLþk vtjl fhJt ftuLx[tfxh ck^tguj hnNu. ct¤ bswhtu htFe NftNu lrn.
25. bsqhtu fu htn>theytulu ftuEvK «fthltu yfMbt<&tg <tu <ule vtujem ftgoJtnele fu juch yufx bwscle ftgoJtnele sJtc>the
yb.BGþrl.ftuvtuo.lt fboatheytule ftuEvK he<u hnuNu lrn.btºt ftuLx[tfxh s yt btxu sJtc>th hnuNu. bswhtulu dbçËx, nuÕbux
nt<k btuò rJduhu ftuLx[tfxhu VhSgt< ytvJtltk hnuNu. bswhtu <&t MþvhJtEÍ fu Bþft>bltu rJbtu vK W<thJtltu VhSgt<
hnuNu. juch yufx Bþsc ltuk^Ke fhtJe <ult rlgbtuLþk vtjl fhJt ftuLx[tfxh ck^tguj hnNu. ct¤ bswhtu htFe NftNu lrn.
26. rcÕz´d ftble ytExbtu btxu - slhj xuflefj MvuNeVefuNl ytuV rcÕz´d Jfomle çþf Bþsc yLþmhJtltk hnuNu. Mt>h ÃþM<eft
øþsht< çþf Mxtumo 20-ce, zeMx[ef Ntuv´d, mufxh-21, dtk^eldh&e b¤e hnuNu. su Juc mtEx
www.ahmedabadcity.gov.inWvh Bþfuj Au.
27. bxehegj fu ceò xuMx´d hevtuxo ftuLxtfxhu vtu<tlt Fauo ftuvotuhuNl sKtJu <u søgtyu fhtJJtlt hnuNu. yt ykdultu mkÃËKo Fao <&t
Bgwrl.MxtVlu juctuhuxhe Mþ^e <&t buLGþVufah´d søgt Mþ^e jtJJt -jE sJtltu Fao vK ftuLx[tfxhu CtudJJtltu hnuNu.
28. btj su <u Mxtumo Wvh y&Jt mtEx Wvh jtuftulu lz<h l &tg <u he<u MËalt Bþsc W<thJtltu <ubs dtuXJJtltu hnuNu.
29. òu BGþ.yuLSlegh´d MxtV sKtJu <tu ftuLx[tfxhu atÕþ ftbu mtEx Wvh zeÍexj fubuht&e ftb atÕþ > vnujt, atÕþ ftbu <&t ftb
ÃËKo >ltk Vtuxtud{tVm BGþrl.yturVmbtk ytvJtltk hnuNu <u rmJtg ftbLþk vubuLx fhJtbtk ytJNu lrn òu MxtV MËalt ytvu <tu
fubuhtbtk&e ftuBÃGþxhbtk Vtuxt x[tLmVh fhe ytvJtlt hnuNu. yt ykdu ftuE vK J^thtltu Fao ytvJtbtk ytJNu lrn.
30. ftuEvK fthKmh xuLzh h> fhJtbtk ytJu <tu ftuLx[tfxh <u ykdu ftuEvK «fthltu n¬ >tJtu fu J¤<hle btkdKe fhe NfNu lrn.
yt Nh< MJeftgo ntug <ubKu s xuLzh ChÔþk.
31. bxehegÕm suJt fu hu<e, #xtu, mebuLx, vtEv, rJduhu MxtLzzo bxehegÕm MvuNeVefuNl «btKult jtJJtlt hnuNu. sgtk ftuE
atuFJx l &E ntug ðgtk ytE.yum.ftuz «btKu bxehegÕm jtJJtLþk <&t xuMx´d fhtJJtLþk hnuNu. <ubs ftuLx[tfxhu muBvj yu«wÔz
fhtÔgt ct> ftb NY fhtJJtLþk hnuNu.
32. yt xuLzhbtk òu ftuE ytExb hne dE ntug <tu <u atÕþ yum.ytu.yth.btk&e juJtbtk ytJNu ylu òu yum.ytu.yth.btk ytExb l
ntug <tu btfuox huEx&e huEx yultjemem fhe su CtJ Ft<t <hV&e ytvu <u ftuLx[tfxhu juJtltu hnuNu. yt mbSlu s xuLzh ChJtLþk
hnuNu. J^tht le ytRxb btk ftuLx[tfxhle btkdKe Bþsc CtJ b¤Nu lrn.
33. atÕþ ftb >hBgtl «tuxufNlle mkÃËKo sJtc>the ftuLx[tfxhle hnuNu subtk vevzt, >tuhzt, CgMËaf ctuzo, jtj xul , cuhefuxekd
xuv, ÃjtMxef vèe, rJ. ftuLx[tfxhu jtJJtLþk ylu mtaJJtLþk hnuNu. ylu ftuEvK yfMbt<&Nu <tu <ule mkÃËKo sJtc>the
ftuLx[tfxhle hnuNu.
34. MxtV MËalt ytvu <tu mtEx Wvh zuEje «tud{um hSMxh ftuLx[tfxhu htFJtLþk hnuNu. >hhtus ytme.mexe yuLSlegh©ele <ubtk mne
juJtle hnuNu, <ubtk >hhtus ftb fh<t bswhtule mkÏgt, fhuj ftbdehe <&t yr^ftheytuyu ftb Mþ^thJt fu «tud{um J^thJt ltuk^
fhuj ntug <tu <uLþk ftuBÃjtgLm ytvJtLþk hnuNu ytJe ltuk^ltk sJtc l &gu fu <u «btKu M&¤ Wvh ybj l &gu ftuLx[tfxhlu vulÕxe
fhJtle m•tt yuze.mexe yuLSlegh©elu hnuNu <u ykdu ftuLx[tfxh ftuE Jtk^tu jE NfNu lrn.
35. rlg< mbgbgto>tbtk ftb ÃþY l &gu&e xuLzh ¾jtuÍ bwsc ctfe ftbltkk 10.00% juFu vulÕxe BGþrl.ftuvtuohuNllu åþfJJtle
36. xuLzh le yt Nh<tu ce - 1 Vtubobtk sKtJuj Nh<tulu ytuJhYj fhNu.
Wvhtuf<<btb Nh<tu <&t rlgbtu buk ft¤SÃËJof Jtkauj Au ylu blu fçËj bksqh Au.
ftuLx[tfxhle mne - rm¬tu yuze.mexe yuLSlegh
btuctEj lkch mt&u (œrûtK Ítul)
DRAINAGE CATEGORY
Sr.No. Category Problem SLA Penalty per one
Problem Per day
1 Drainage Engineering No Drainage Machine hole Cover-Eng 24 Hours
2 Drainage Engineering Drainage-Other 48 hours
3 Drainage Engineering Drainage-Choking Of Line 48 hours
4 Drainage Engineering Drainage overflowing of mainline and 48 hours
distribution line on road
5 Drainage Engineering Drainage-Public Toilets and Urinals 72 hours
Drainage Line Blockage or Choking
6 Drainage Engineering Frequent Breakdown & Blockage Of Drain- 96 Hours
Signature of contractor with seal Deputy City Engineer-5(S.Z)
Date Ahmedabad Municipal Corporation
AHMEDABAD MUNICIPAL CORPORATION
ENGGNIERING DEPARTMENT
GENERAL SPECIFICATION
Time limit for the work shall be as per tender notice after the order to start the works.
Progress of work should be in proportion to time limit. The details of reinforcement of R.C.C.
work shall be as per design and instructions of Add. City Engineer and his order will be considered
The contractor shall have to maintain account of steel, cement and other materials that may
be brought by him on site. This account shall be regularly maintained and kept open for inspection
by Municipal Staff. Watering of all the items shall be as per instructions otherwise no payment
shall be made to contractors. Mixing of concrete shall be done by concrete mixer machine.
Arrangements of binding vibrator for R.C.C. works if required shall have to be made by the
The contractor shall be remain responsible for Workmen’s compensation if any accident.
The contractor shall arrange for barricading at night and arrangement of Pagi at night to direct the
traffic. He shall be responsible for any damage to public. If any incident happen, during the
execution of work. In case of dispute for unseen or overlooked items the decision of the Dy. City
Engineer shall be final. The contractor shall have to give site clean of all rubbish during the work
and at the time of completion of work and hand over the site with final finishing of the work as
directed. All the rejected materials shall be removed from site within 24 hours by contractor at this
risk and cost. Debris shall have to cart daily from site.
For mixing mortar either for masonry or for plaster or for any other purpose contractor shall
have to prepare through of bigger size and mix the mortar in the required proportion. In on case he
shall be allowed to mix the mortar either on floor or any finished surfaces. The contractor shall
have to make his own arrangement for water required for the work.
If any extra item crops up during the progress of work the same shall be carried out by the
contractor and he shall be paid at the rate fixed by Add.C.E. as per the rate analysis based on latest
SOR or if item is not available in SOR than based on current market rates. In case of extra item
decision of Add. City Engg. shall remain final regarding rate.
If in the interest of the Corporation it is necessary to change either any site or the design of
the propose work the contractor shall carry out the same at his quoted rates without charges any
extra and the contractor will have to carry out the works and he will be paid at the rate quoted by
him. No claim for extra rate for subsequent changes in site and design is entertained.
The cubical contents of the cement bag shall be taken as 1-20 cft. Per bag and the
contractors shall have to prepare the measures boxes according to this measure.
Octroi exemption passes shall not be given for any materials required for the work.
Contractor will be fully responsible for compliance of the various provisions under contract Act.
1970 and the Rules framed the to under.
The tender for the work shall remain open for a period (120) days from the date of opening
of the tenders for this work and that the tenderer shall not be allowed to withdraw on modify the
offer on his own during the period. If any tenderer withdraw or makes any modifications or
addition in the terms and conditions of his tender not acceptable to the Municipal Corporation the
Municipal Corporation shall without prejudice to any right or remedy be at liberty to forfeit in full
the said earnest money and black list the contractor.
If work is not started within specified time limit i.e. within ten days from the date of order
to start the work the penalty of the 0.01% tender Amount per day of delay of start shall be
recovered separately from the immediate bills payable to the contractor. Contractor has to make his
own arrangement for procurement of steel and cement.
Contractors should note the following conditions carefully:-
i) Conditional tender shall not be accepted.
ii) All tenders are to be submitted in duplicate without which the tenders are liable to be
iii) In case of tender downloaded from website, tender fee & EMD should be submitted in form
of demand draft.
iv) Condition of Form - B1 only Standard Specification of material & code of practice will be
applicable. Form B1 is available in website. Specification shall be as per ' R& B Dept. -
Govt. of Gujarat booklets of Building Works & and Road Works Specifications published
by Gujarat Book Depot, Sector-21. Gandhinagar. Other techinical condition will be
applicable as per tender condition only.
CONTRACTOR'SSIGNATURE & STAMP ADD. CITY ENGINEER
Mobile No.:- (South Zone)
For materials relevant specification of Building Specification shall apply.
TECHNICAL SPECIFICATIONS
(A) labour work of laying and jointing of /cast iron pipes.
(B) labour charges for recovered cleaning di water pipe line & relaying
(C) labour charges for recovering exst.CI/DI water pipe line incldg. excavation and
refilling and jointing pipe in line and level etc.comp.
(D) labour work of laying and jointing of cast iron sluicevalves.& bend ,coller.& any
This Specification covers the requirements for collecting from Municipal Stores or contractor’s stack yard transportation of cast to work sites lying jointing and
field testing of cast iron pipes and fittings for the water distribution Network.
APPLICABLE CODES:
Various operations such as transport to work sites lowering in trenches laying jointing and field testing of
cast iron pipes and fittings shall comply with all currently applicable standards. In all cases the latest
revision of the standards shall be referred to. If requirements of this specification conflict with the
requirements of the standards this specification shall grove.
(a) IS: 638 Specification for sheet rubber jointing and rubber inserting jointing.
(b) IS: 782 Specification for caulking lead.
(c) IS: 1538 Specification for cast ion fittings for Pressure pipes for water gas and sewage.
(d) IS: 3114 Code of practice for laying of cast-iron.
(e) IS: 3400 Methods of test for vulcanized rubber (Parts to 20)
(f) IS: 5382 Specification for rubber sealing ring for Gas mains water and sewers.
(g) IS: 6587 Specification for spun hemp yarn.
CARTING AND HANDLING:
Cast iron pipes fittings (specials) and valves with tail pieces shall be transported from the Municipal Stores or contractor’s stack yard to the work sites at places
along the alignment of pipeline as directed by Owner /Engineer. The Contractor shall be responsible for the safety of pipes fitting and vales with tail
pieces in transit loading/unloading. Every care shall be exercised in handling pipes and fittings to avoid damage. While unloading the pipes and
fittings shall with steadying ropes of by any other means. Padding shall be provided between coated pipes fittings and skids to avoid damage to the
coating Suitable gape between pipes should be lift at intervals in order to permit access from one side to the other. In case of spigot socket pipes care
should be taken regarding orientations pipes while unloading. As far as possible pipes shall be ulna added on one side of the stretch only. The pipes
shall be checked for any visible damage (such as broken edges cracking or spelling of pipe) while undo adding and shall be sorted out for
reclamation any pipe which shows sufficient damage to preclude it from being used shall be discarded shall be prohibited. Necessary warning boards
and lamps should be provided in front and side of pipes to avoid any accident. Pipes should be stacked with sufficient packing to prevent rolling of
the same. Contractor will be fully responsible for any accident due to pipes or other materials stacked on site of yard. Contractor will be fully
responsible for any legal formalities arising due to such accident and all legal charges there of shall be paid by contractor of will be recovered from
his running bill of the same or other AMC works.
Each stack of pipes shall contain only pipes of same class and size, with consignment or batch number
marked on it with particulars of supplies wherever possible storage shall be done on film level and clan
ground and wedges shall be provided at the bottom layer to keep the stack stable. The stack shall be in
pyramid shape or the laid lengthwise and crosswise in altimeter layers. The pyramid stack shall be made
for smaller diameter pipes for conserving space in storing them. The height of the stock shall not exceed
1.5m. Fitting and sluice valves with tail pieces shall be stacked under cover and separated from pipes.
Rubber rings shall be stored in clean cool store away from windows boiler electrical equipment and petrol
oils or other chemicals particularly in the field where the rubber nods are being used it is desirable that
they are left out on the ground in the sun or overmuch under heavy frost of snow conditions.
LAYING - GENERAL
The Contractor shall visit the before tendering and get himself acquainted site condition and the
regulations regarding the laying of pipes in congested areas heavy traffics areas etc. The successful bidder
shall take the necessary permission and clearance of all the authorities like dip ardent of ads traffic water
supply and the drainage electricity broad telephone comp any etc. Wherever necessary.
Road reinstatement shall not be included in back filling unless specified.
To protect person from injury and to avoid damage to property adequate barricades construction signs red
lanterns and guards as required shall be placed and mainlined during the progress of the construction
work and unit it is safe for the traffics to use the roadways. The relevant Indian standards and the rules
and regulations of the local authorities in regarded to safety provisions shall be observed.
General lighting for works site, warning lights, sign boards, fencing etc. shall be provided by contractor at
Suitable fencing shall be provided along the sides of trenches and pits. The post of the fencing shall be of
timber securely fixed in the ground not more then 3m.apart and they shall be less than 75 mm in diameter
of less than 1.2 m above the surface of the ground. There shall be two rails. One near the top of the post
and the other about 450 mm. above the ground and each shall be from 50mmto 70mm in diameter and
sufficiently long to run from post to post which they shall be bound with strong rope. The method of
projecting rails beyond the posts and tying them together where they meet will not be allowed on any
account. All along the edges of the excavated trenches a bank of earth about 1.2. m high shall be formed
as required by the Owner/Engineer for further protection. The above work shall not be paid for separately
and the contractor shall take into account the costs of such works and quote accordingly.
Whole work shall do within 24 hrs. By parts or whole work so that water supply from AMC shall not be
The excavation in the foundation shall be carried out in true and level and shall have the width and
depth as required and as directed. The Contractor shall provide necessary slopes to a safe angle or steps as
required or directed at his own cost No extra payment shall be made for such precautionary measures
taken. The bottom of the excavated area shall be leveled both longitudinally and transversely as directed
by removing excess soil and watering as required. No earth filling will be allowed for bringing it to level if
by mistake or any other reason excavation is made deeper or wider than as directed. The extra depth or
width shall be made up with concrete of the same proportion as specified for the foundation concrete at
the cost of the contractor. The excavation up to any required depth shall be carried out under this item as
required and directed by engineer in charge.
Surface Excavation for Road Work:
Excavation exceeding 1.5 mm in width and 10 sq mm on plan but not exceeding 30 cm in depth in all kinds
of soil which are specified shall be as treated as surface excavation.
Excavation in trenches for service lines- Water supply and Drainage:
Excavation in trenches shall be carried out in any material encountered on the site to enable the service
lines to be laid to the lines and levels shown and as directed. Excavation shall be made with adequate and
stable side slopes or shoring strutting if necessary. The contractor shall provide all measures to protect
adjoining properties service limes etc. The contractor shall take necessary action to keep excavation free
Trenches shall be wide enough to provide sufficient space for joining and inspection. The trench bed shall
be trimmed and rammed with sprinkling of sand or murmur so that the pipes when laid to the required
levels and gradients shall be no the bottom fully supported along the entire length of the pipe. The trench
shall be deepened and widened locally to receive the sockets and to permit the joint to be made and
Before excavation is started rails shall be erected at convenient places and at all changes of direction and
gradients at a definite and as far as practicable uniform height above the proposed invert level of the pipes
the center lime being clearly marked on each horizontal rail. The depth of excavation and level of the pipe
invert shall be checked by means of benching road of appropriate lengths.
Disposal of the Excavated Stuff:
The excavated stuff of the selected type shall be used for filling the trenches and plinth or leveling the
ground in layers including ramming and watering etc. complete. The Contractor shall remove the balance
of the excavated from the site of work to a place as directed within a lead unto 50mm and for all lift.
Filing of Trenches:
As soon as the work in foundation has been completed and measured the sides of foundation shall be
cleared of all dedans brick bats mortar dropping etc. and filled with earth in layers not exceeding 15 cm
each layer shall be adequately watered rammed well and consolidated before the succeeding layer is laid.
The earth shall be rammed with iron rammers where feasible and with the butt ends in layer of crowbars
where rammer cannot be used. The plinth shall be similarly filled with earth in layers not exceeding 15 cm
adequately watered and consolidated by ramming with iron or wooden rammers. When filling reaches
finished level the surface shall be flooded with water for at least 24 hours and allowed to dry and then
rammed and consolidated. The finished level of filing shall be kept to shape and gradient intended to
receive any floor finish. The excavated stuff of the selected type only shall be allowed to be used for filling
the trenches and plinths. Under no circumstances black cotton soil shall be used for filling the plinths.
FILLING MATERIALS:
Filling materials may be either excavated stuff of selected materials brought from outside. Excavated stuff
or selected earth to be used shall be cleared of all rubbish large size stones brick bats etc. complete and
big clods shall be broken down to a size of 50 mm or less. The selected soil and or murmur or any other
materials shall be got approved before filling.
Refilling shall be done in a systematic manner by the contractor before refilling starts, the contractor shall
get checked the trenches ready for refilling.
The space between foundation masonry concrete pipe line and the sides of excavation and/or bottom of
found at ion shall be refilled to the original surface or up to plinth level with earth or selected materials in
layers of 15 cm to 20 cm each well watered and rammed.
Each layer shall be watered and compacted with heavy rammer before the upper layer is laid till the final
level is reached to form a thoroughly compacted base.
Refilling on top of pipe shall be carried out carefully with selected soft stuff out of the excavated stuff. The
refilling shall be raised about 5 cams. For subsequent settlements.
The contractor shall be responsible for any settlement during passage of time of
during monsoon and the same shall be refilled with stuff brought from the out
side if necessary.
The process of refilling brunches in plinth watering ramming shall be carried out in such a way as not to
danger to pipe line for foundation footing plinth well etc. already laid or built up.
If watering is not done by contractor with its own arrange meant watering charges at 20% of this item rate
shall be deducted from the bill against this item.
The rubber ring shall be stored in a cool dark dry and dust free environment The storage shall not be
exposed to direct sunlight or any heat radiating appliance. The rings shall not be allowed to come in
contact with any fuels and shall be stored free of tension.
Rubber rings shall be clearly labeled in bundles to indicate the type of ring. The size of pipes for which they
are to be used the manufacturer’s name or trademark and the month and the year of manufacture.
The rings shall comply with IS 5382 regarding their material finish tolerance in dimension and physical
The rubber rings shall be such that they shall not show any signs of deterioration for any reason during the
contract period plus the defects liability period, Entire expenses associated with correcting defects in this
regard including replacement of rubber rings shall be fully borne by the contractor.
In jointing cast iron spigot and socket pipes and fitting with tycoon flexible joints the contractor shall take
into account the manufacturer’s recommendations as to the methods and equipment to be used in
assembling the joints. In particular the contractor shall ensure that the spigot end of the pipe to be jointed
is smooth and has been properly chamfered that the rubber ring as per IS 5382 is correctly positioned in
the socket and that the two pipes are accurately in line, before the joint is maid. The rubber rings and any
recommended lubricant shall be obtained only through the pipe supplier or as directed by the Engineer.
LEAD CAULKING JOINTS
The jointing shall be done with molten lead and spun yam. Pin lead shall be of uniform quality clean and
free from foreign materials. It shall be of uniform softness capable of being easily caulked or driven. It shall
conform to IS: 782 Spun yarn shall be of clean hemp and of good quality. It shall conform to IS: 6587 Its
quantity shall be as follows.
Quantities of spun Yarn for Different Sizes of Pipes
(Materials for single collar joints)
Nominal Internal Spun Yarn Mass
Note: Under special circumstances the Engineer-in-charge may decide the quantities of spun yarn
depending upon the site conditions. The quantity of different diameters of C.L. pipes and fittings
shall be as follows:
QUANTITIES OF LEAD YARN FOR DIFFERENT SIZES OF PIPES
Normal Size of Lead/ Joint Depth of lead
Pipe mm Kg Joint mm
Note: The quantities of lead given are provisional and a variation of 20 percent is permissible either way.
Lead shall be heated in a melting pot kept in easy reach of the joint to be poured so that the molten metal
will not be chilled in being carried from the melting pot to the joint and shall be brought to a proper
temperature so that when stirred it will show a rapid change of color. Before pouring all scum shall
be removed. Each joint shall be made with one continuous pour filling of the entire joint space with
solid lead. Spongy or imperfectly filled joints shall be bunt out and repaired.
The joint runner shall fit snugly against the face of the socket and the outside of the pipe shall be dammed with
clay to from a pouring lip to provide for filling the joint flush with the face and to the top of the socket.
The jointed is done by first caulking in spun yam, then filling the remainder of the joint space by running in
molten lead, taking care that no dross enters the joint and then thoroughly caulking the lead. The spun
yam shall be used to center the spigot in the socket and to prevent the flow of molten lead into the bore of
After the lead has been run into the joint the lead shall be thoroughly caulked. Caulking of joints shall be done
after a convenient length of the pipes has been laid and leaded. The leading ring shall first be removed and
any lead outside the socket shall be removed with a flat chisel and then joint caulked removed with a flat
chisel and then the joint caulked around three times with caulking tools of increasing thickness and
hammer of 2 kg. Weight Lead run joints shall be preferably finished 3 mm behind the socket face. The
joints shall not be covered till the pipe line has been tested under specified hydrostatic test pressure,
though the rest of the pipe line should be covered up to prevent expansion and contraction due to
variation in temperature.
Filling available excavated earth (excluding rock) in trenches plinth sides of foundation etc. in layers not
exceeding 20 cams. In depth consolidating each deposited layer by ramming and watering.
The refilling will generally refer to refilling of pipe line trenches, foundation trenches up to plinth level or
ground level with excavated stuff selected soil brought from outside.
Clearing or Trenches or Ground:
The excavated trenches for foundation or ground over which filling is to be done shall be cleared off all
grass loose stones rubbish of all kinds brick bats as well as tress roots etc.
They shall be well watered before stuff is laid.
Mode of measurement for Item No.
Measurement shall be paid by Rmt. basis.
Mode of measurement
Measurement shall be paid by Nos. basis.
Seal and Signature of the Bidder Addl. City Engineer
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
50 LAC tender.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].