Loading…
Loading…
Tender Value
₹45 L
EMD Value
₹90,000
Closing Date
25 Jun 2026, 6:00 pm
Garrison Engineer Utility-I Visakhapatnam
Garrison Engineer Utility-I Near Samudrika Naval Base Post Visakhapatnam -530 014
REPAIR / MAINTENANCE / SERVICING TO THE AC PLANTS AT INS EKSILA UNDER AGE E/M NO-III OF GE(U-I) VISAKHAPATNAM
2026_MES_769864_1
8863/E8
Open Tender
Electrical and Maintenance Works
270 days
Garrison Engineer Utility-I Visakhapatnam
As per NIT
7 documents required · 7 mandatory
₹500
Garrison Engineer Utility-I
₹90,000
Yes
4 Jun 2026
4 Jun 2026
27 Jun 2026
4 Jun 2026
25 Jun 2026
19 Jun 2026
M&L for rolled mild steel angles, bars, flats etc., as in supports for stiffening of fencing, wall ties, hold fasts, clamps and similar small articles confirming to Fe 410-O or Fe 310-O (Gde.E-250), quality-A including suitable size anchor fasteners grouted in wall at any height for supporting the Air ducts including applying two coats of synthetic enamel paint over a coat of red oxide primer including dismantling complete all as specified and directed. Note: The rate quoted shall be deemed to be inclusive of necessary civil work and its accessories as required at site.
M & L for servicing of UPS of minimum 10 mins back up Three phase AC input 360 to 440 V and output 415 +/- 1% of capacity 10 KVA complete including necessary control wiring for stabilised control supply of variable speed screw type liquid chiller of capacity 300 TR complete all as directed. Note : The batteries if required will be measured and paid seperately as supply only under relevent items of schedule.
S & F 3 pole power contactor of ML-3 with coil operating voltage 230 V/415V AC 50 HZ including taking down existing un-serviceable power contactor complete all as specified and directed.
S & F 3 pole power contactor of ML-2 with coil operating voltage 230 V/415V AC 50 HZ including taking down existing un-serviceable power contactor complete all as specified and directed.
S & F three phase over load relay 0-70 Amps range including taking down existing un-serviceable over load relay complete all as specified and directed.
S & F three phase over load relay 0-20 Amps range including taking down existing un-serviceable over load relay complete all as specified and directed.
M&L for taking down the defective fan motor of flange mounted extended type shaft of capacity 7.5 to 15 HP, 3 phase, 415 volts,6 Pole,900 RPM,50 Hz, along with fan assembly, and dismantling the motor complete cleaning with CTC, including rewinding the motor with appropriate gauge copper wire, necessary paper, tape, terminal etc., insulation shall be of class ‘F’ and degree of protection shall be IP-55, the work includes renewal of all corroded bolts & nuts, terminal block, and assembling, fixing in position, fixing of fan blade, and alignment of the fan blade for the suitable air throw of the cooling tower, testing & commissioning the cooling tower motor complete all as specified and as directed.
S&F 4" dia pressure gauge meter in refrigerant line including necessary pressure line with 1/4" copper tube and long neck type Brass file nut and fixing to the compressor and checking of leaks and including taking down existing un-serviceable pressure gauge meter complete all as specified and directed by Engr-in-Charge.
All as per Sl Item No. 11.00 here in before but 2" Dia Pressure Gauge Meter
S & F Temperature Gauge of 100 mm Dial size, having Temperature range of 0°C to 100°C, with Glycerin filled Bimetallic Thermometer conforming to EN 13190, having Standard Range of 0°C to 60°C and up to 400°C, IP 67 protection, Bimetal Coil Sensing Element, Accuracy Class 1 as per EN 13190, Stainless Steel Casing, Direct bottom mounted, SS-304 Case and Bayonet type Bezel, SS-316 Stem and Connection, Aluminum Dial [White background with Black marking] and Pointer [Black colour Micrometer with Zero Adjustable], with Toughened Glass Window, Neoprene filling Plug and Gasket including all accessories and including taking down existing un-serviceable temperature gauge complete all as specified and as directed.
S&F 40 mm bore dia galvanised steel tubing, light grade galvanised, laid under road crossing, for cable protection or fixed to poles, walls or laid under floors including taking down existing un-serviceable pipe of any description complete all as specified and directed.
All as per Sl Item No. 14.00 here in before but 50 mm bore
S & F Gun-metal, globe or gate valves, 40 mm dia with iron wheel head, screwed both ends for iron pipe and fixed end connection etc. with accessories including taking down existing un-serviceable valves complete all as specified and directed.
All as per Sl Item No. 16.00 here in before but 50 mm bore
M&L Complete overhauling / servicing of FRP cooling tower of 300 TR capacity, removal of complete scales, dirt etc. by using chemicals, cleaning the sump louvers, PVC fills, fan assembly, renewal of spray nozzles with connected pipe, renewal of nuts and bolts,leak arresting of the FRP tank, replacing of PVC fills complete all as specified and directed. Note :- PVC Fills shall be meaasured and paid separately under relavent schedule item.
All as per Sl Item No. 18.00 here in before but for 180 TR capacity
Supply only PVC Fills of size 600x300x150 mm Blocks complete all as specified and directed.
S & F Cooling Tower Sprinkler Head with all connected accessories of 300 TR and including taking down existing un-serviceable Cooling Tower Sprinkler Head complete all as specified and as directed by Engineer-in-charge.
All as per Sl Item No. 21.00 here in before but for 180 TR capacity
M &L for complete painting of the cooling tower of 300 TR capacity as per the standard practice complete all as specified and directed.
All as per Sl Item No. 23.00 here in before but for 180 TR capacity
M&L for taking down the damaged fan assembly of FRP cooling tower and connected fitting from the position and supply & fix by new fan assembly of capacity 7.5/15 HP, 1300mm minimum with 04 blades fan hub assembly made out of Die Cast aluminium,with necessary clamp supports,nut & bolts by SS metal,including testing comissioning the cooling tower complete all as specified and directed.
M&L for carry out the repair to cooling tower fan motor 7.5HP/15HP flange mounted extended shaft type ,including taking down from the position, transporting to local work shop,dismantling the motor,replacing damaged unserviceable shaft,bearings,rusted nuts & bolts including servicing motor by motor varnishing to winding, External painting for the motor,Provide a PVC cap for top portion of motor for rain protection etc.assembly back and installation to position & testing comissioning complete all as specified and directed.
M&L for complete overhauling / Servicing / Checking / inspection AHU of capacity upto 17500 to 18000 CFM and including dismantling units, sheet metal parts, blowing out the dust, chemical cleaning by spraying the organic based scale removing agent Vaniklin at the appropriate ratio till removal of complete dust & scale deposits in the fin area of evaporator coil, flushing through for proper air flow across the coil, cleaning of expansion valve, greasing of blower motor, checking of electrical connection, cleaning of air filters, replacement of un serviceable bearings, Painting of blower motor, water drain lines, renewal of rusted sheet metal screws, applying synthetic enamel paint over a coat of primer on the rusted portion and testing & commissioning the unit complete all as specified and directed by Engineer-in-Charge.
All as per Sl Item No. 27.00 here in before but of capacity 20,000 CFM
All as per Sl Item No. 27.00 here in before but of capacity 21,000 CFM to 25500 CFM
All as per Sl Item No. 27.00 here in before but of capacity 40,000 CFM
S & F V Belts of Size B 1846 LP/B 71 including taking down existing un-serviceable V Belts complete all as specified and directed.
S & F V Belts of size B 1872 LP/B 72 including taking down existing un-serviceable V Belts complete all as specified and directed.
S & F V Belts of size B 2659 LP/B 103 including taking down existing un-serviceable V Belts complete all as specified and directed.
S & F V Belts of size POLY-F PLUS SPA 2180 including taking down existing un-serviceable V Belts complete all as specified and directed.
S&F GI metal frame with powder coated Pre Filters 15 micron capacity made out of fibre visco washable type of Size 48"x48" , 50 mm thick including taking down existing un-serviceable Pre Filters complete all as specified and directed.
S&F GI metal frame with powder coated Pre Filters made 15 micron capacity out of fibre visco washable type of Size 24"x12" , 50 mm thick including taking down existing un-serviceable Pre Filters complete all as specified and directed.
S&F GI metal frame with powder coated fine filter 5 micron capacity made out of fibre visco washable type of Size 12"x12" , 50 mm thick including taking down existing un-serviceable fine Filters complete all as specified and directed.
S&F GI metal frame with powder coated fine filter 5 micron capacity made out of fibre visco washable type of Size 18"x18" , 50 mm thick including taking down existing un-serviceable fine Filters complete all as specified and directed.
Supply & installation of cross linked closed cell thermal insulation of 30mm over chilled water pipes of any size thermal conductivity of insulation should not exceecd 0.038 w/mk at 400C. Material should be fire retardant and class 1 certified as per BS 476. Should be CFC free. On combustion it should not emit HCN NO+ NO2 and SO2 + H2S gases. Smoke generated should be lighter than air and white in colour so as to allow easy exit passages in case of fire. Thermal insulation should be protected by thermal insulation protective coating of aluminium sheet not less than 0.30 mm thick in short length complete all as specified & directed by the Engr-in-charge.
Taking down carefully the existing motor for 10 to 20 HP capacity of pump sets from foundation bed /AHU for servicing by removing the coupling, cleaning the motor & stator body with cleaning agent, varnishing, to improve the insulation values reassembling and re-installing the motor with necessary bolts, nuts and washers and connecting the pump set complete all as directed complete all as specified and directed.
All as per Sl Item No.40.00 here in before but of capacity 30 to 40 HP
M&L for carry out the descaling for 300 TR capacity of shells & tubes water cooled type condenser by disconnecting the inlet and outlet water connections and providing of dummy to the inlet & outlet and descaling the condenser by circulating the circulated descaling agent by R-111 or equivalent chemical or organic compound at the proper ratio circulated chemical till remove complete scale deposite inside the copper tubes, and opening the both end cover by the condenser brushing the copper tubes with appropriate size nylon brush remove complete scale and flushing out the tubes and degreasing with castic soda solution and flushuing and boxing up the both end covers connecting up the water inlet & outlet connections including renewal by damaged rubber gas kets,and leak testing the joints for water leakage for the following capacity of shell and condensers complete all as specified and directed by Engineer-in-Charge.
M&L for carrying out leak test for 300 TR Chiller type / direct Expansion system by extracting the existing available Gas from the system to separate cylinder storing,and pressureising the complete system with Dry nitrogen and check the leaks, identify the leak, rectification of leaks by brazing/welding at the leak points/replacing by damaged valve gland package/Gas kit Etc, and after rectification of all leaks, pressure testing the complete system up to 300 Psig at high side, 200 Psig at low side of the system,holding the pressure for 24 Hours and vacuumising the complete system after releasing the Dry Nitrogen and charging the refrigerent Gas to system and testing & comissioning the plant checking all controls complete all as directed by Engineer-in-Charge
Carrying out repairs and maintenance, attending to breakdown of 1x300 TR variable speed screw type liquid chiller Central AC plant of capacity 300 TR of Make: Carrier Model : 23XRV3132NRVAA9 as per the following scope of the work given below including carrying out general repairs including periodical servicing to ensure smooth and trouble free operation of plants to the entire satisfaction of users / department complete all as specified and directed by Engineer-in-charge. Scope of Work: (a) Periodical monitoring / inspecting the complete AC plant and carrying out preventive / periodical maintenance to ensure smooth fuctioning by technician/service engineer of OEM once in a qurater other than breakdown calls for monitoring the operational condition of the plant including preventive maintenace / breakdown calls whenever required. Each preventive maintenace with a maximum of 02 nos of breakdown calls if any shall be measured as "Each Job". (b) Visual inspection for oil traces, technical inspection of all the microprocessors, microcontrollers, sensors, control wiring, insulation etc, to check the performance parameters such as the temperature difference between the inlet and outlet of the heat exchanger, check the motors and starters for performace and healthy condition of the plant. (c) Rectification of minor leaks in the system, filling the refrigirant upto 05 Kg at no extra cost if any. (d) Any minor spares/ repairs items which are required to keep the plant in operational are deemed to be included in scope. Note :- Supply and replacement of major spares required shall be measured and paid seperately under relevant items.
S&F and testing Current Transducer Sensor suitable for 300 TR variable speed screw type liquid chiller of Make : Carrier Model : 23XRV3132NRVAA9 including taking down existing un-serviceable Current Transducer Sensor complete all as specified and as directed.
S&F and testing Assembly PCB Power Inverter Board suitable for 300 TR variable speed screw type liquid chiller of Make : Carrier Model : 23XRV3132NRVAA9 including taking down existing un-serviceable Assembly PCB Power Inverter Board complete all as specified and as directed.
S&F and testing 80 Watt Inverter Board suitable for 300 TR variable speed screw type liquid chiller of Make : Carrier Model : 23XRV3132NRVAA9 including taking down existing un-serviceable 80 Watt Inverter Board complete all as specified and as directed.
S&F and testing Oil Pump suitable for 300 TR variable speed screw type liquid chiller of Make : Carrier Model : 23XRV3132NRVAA9 including taking down existing un-serviceable spare parts including taking down existing un-serviceable Oil Pump complete all as specified and as directed
S&F and testing Oil filter suitable for 300 TR variable speed screw type liquid chiller of Make : Carrier Model : 23XRV3132NRVAA9 including taking down existing un-serviceable Oil filter complete all as specified and as directed.
S&F and testing Oil pump strainer suitable for 300 TR variable speed screw type liquid chiller of Make : Carrier Model : 23XRV3132NRVAA9 including taking down existing un-serviceable Oil pump strainer complete all as specified and as directed.
S&F and testing Screw Compressor Oil SW-220 (40 Ltr) suitable for 300 TR variable speed screw type liquid chiller of Make : Carrier Model : 23XRV3132NRVAA9 including complete all as specified and as directed.
S&F and testing Control flow switch suitable for 300 TR variable speed screw type liquid chiller of Make : Carrier Model : 23XRV3132NRVAA9 including taking down existing un-serviceable Control flow switch complete all as specified and as directed.
S&F and testing Drive cooling fan suitable for 300 TR variable speed screw type liquid chiller of Make : Carrier Model : 23XRV3132NRVAA9 including taking down existing un-serviceable Drive cooling fan complete all as specified and as directed.
S&F and testing Refrigerant Filter (2 Nos) suitable for 300 TR variable speed screw type liquid chiller of Make : Carrier Model : 23XRV3132NRVAA9 including taking down existing un-serviceable Refrigerant Filter complete all as specified and as directed.
S&F and testing Rectifier Board suitable for 300 TR variable speed screw type liquid chiller of Make : Carrier Model : 23XRV3132NRVAA9 including taking down existing un-serviceable Rectifier Board complete all as specified and as directed.
S & F Totaline capacitors Burst Proof having Class of Safety protection - S2, VDE ( as per site required) and taking down existing un-serviceable Totaline capacitors complete all as specified and as directed by Engineer-in-charge.
M&L for carry out the descaling for 1x 180 TR capacity of shells & tubes water cooled type condenser by disconnecting the inlet and outlet water connections and providing of dummy to the inlet & outlet and descaling the condenser by circulating the circulated descaling agent by R-111 or equivalent chemical or organic compound at the proper ratio circulated chemical till remove complete scale deposite inside the copper tubes, and opening the both end cover by the condenser brushing the copper tubes with appropriate size nylon brush remove complete scale and flushing out the tubes and degreasing with castic soda solution and flushuing and boxing up the both end covers connecting up the water inlet & outlet connections including renewal by damaged rubber gas kets and leak testing the joints for water leakage of shell and condensers complete all as specified and directed by Engineer-in-Charge.
M&L for carrying out leak test for 1x180 TR Chiller type/direct Expansion system by extracting the existing available Gas from the system to separate cylinder storing and pressureising the complete system with Dry Nitrogen and check the leaks, identify the leak, rectification of leaks by brazing/welding at the leak points/replacing by damaged valve gland package/Gas kit Etc, and after rectification of all leaks, pressure testing the complete system up to 300 Psig at high side, 200 Psig at low side of the system, holding the pressure for 24 Hours and vacuumising the complete system after releasing the Dry Nitrogen and charging the refrigerent Gas to system and testing & comissioning the plant checking all controls complete all as specified and directed by Engineer-in-Charge.
Carrying out repairs and maintenance, attending to breakdown of 1 X 180 TR Flooded type screw chiller Central AC plant of Make: Voltas as per the following scope of the work given below including carrying out general repairs/servicing to ensure smooth and trouble free operation of plants to the entire satisfaction of users/ department complete all as specified and directed by Engineer-in-charge. Scope of Work: (a) Periodical monitoring / inspecting the complete AC plant and carrying out preventive / periodical maintenance to ensure smooth fuctioning by technician/service engineer of OEM once in a qurater other than breakdown calls for monitoring the operational condition of the plant including preventive maintenace / breakdown calls whenever required. Each preventive maintenace with a maximum of 02 nos of breakdown calls if any shall be measured as "Each Job". (b) Visual inspection for oil traces, technical inspection of all the microprocessors, microcontrollers, sensors, control wiring, insulation etc, to check the performance parameters such as the temperature difference between the inlet and outlet of the heat exchanger, check the motors and starters for performace and healthy condition of the plant. (c) Rectification of minor leaks in the system, filling the refrigirant upto 05 Kg at no extra cost if any. (d) Any minor spares/ repairs items which are required to keep the plant in operational are deemed to be included in scope. Note :- Supply and replacement of spares required shall be measured and paid seperately under relevant items.
S&F and testing Choked drier core assembly suitable for 180 TR screw type liquid chiller of Make : Voltas including taking down existing un-serviceable Choked drier core assembly complete all as specified and as directed by Engr-in-Charge.
S&F and testing Temperature Sensor suitable for 180 TR screw type liquid chiller of Make : Voltas including taking down existing un-serviceable Temperature Sensor complete all as specified and as directed by Engr-in-Charge.
S&F and testing HP Switch suitable for 180 TR screw type liquid chiller of Make : Voltas including taking down existing un-serviceable HP Switch complete all as specified and as directed by Engr-in-Charge.
S&F and testing LP Transducer suitable for 180 TR screw type liquid chiller of Make : Voltas including taking down existing un-serviceable LP Transducer complete all as specified and as directed by Engr-in-Charge.
S&F and testing HP Transducer suitable for 180 TR screw type liquid chiller of Make : Voltas including taking down existing un-serviceable HP Transducer complete all as specified and as directed by Engr-in-Charge.
S&F and testing Screw Compressor Protection Module(SCPM) suitable for 180 TR screw type liquid chiller of Make : Voltas including taking down existing un-serviceable Screw Compressor Protection Module(SCPM) complete all as specified and as directed by Engr-in-Charge.
S&F and testing Mother Board suitable for 180 TR screw type liquid chiller of Make : Voltas including taking down existing un-serviceable Mother Board complete all as specified and as directed by Engr-in-Charge.
S&F and testing Internal Oil Filters suitable for 180 TR screw type liquid chiller of Make : Voltas including taking down existing un-serviceable Internal Oil Filters complete all as specified and as directed by Engr-in-Charge.
S&F and testing Flow Switch suitable for 180 TR screw type liquid chiller of Make : Voltas including taking down existing un-serviceable Flow Switch complete all as specified and as directed by Engr-in-Charge.
S&F and testing Timer - star/delta suitable for 180 TR screw type liquid chiller of Make : Voltas including taking down existing un-serviceable Timer - star/delta complete all as specified and as directed by Engr-in-Charge.
S&F and testing Front operated Switch Disconnector suitable for 180 TR screw type liquid chiller of Make : Voltas including taking down existing un-serviceable Front operated Switch Disconnector complete all as specified and as directed by Engr-in-Charge.
S&F and testing contactor suitable for 180 TR screw type liquid chiller of Make : Voltas including taking down existing un-serviceable contactor complete all as specified and as directed by Engr-in-Charge.
Supply and filling compressor oil suitable for 180 TR screw type liquid chiller of Make : Voltas complete all as specified and as directed by Engr-in-Charge.
M&L for complete leak testing the indoor and outdoor units, refrigerant pipe with Nitrogen gas, locating the leaks, rectify the leak by brazing/ welding and pressure testing the complete system of 16.5/11 TR Capacity of air cooled package AC system complete all as specified and as directed by Engineer-in-Charge.
S & F of capacity control solenoid valve of 3 way connection and suitable to operate in 230V 50Hz AC for SMC series ACCEL make compressor including taking down existing un-serviceable solenoid valve complete all as specified and directed.
S&F oil pressure differential cut out unit including necessary wiring and testing & comissioning and taking down the existing un-serviceable oil pressure deferential cut out unit complete all as specified and directed.
All as per Sl Item No. 77.00 here in before but High pressure cut out.
All as per Sl Item No. 77.00 here in before but Low pressure cut out .
S & F following spares for carrying out repairs to Package Air conditioning unit of M/s Blue Star Model No. DPAI322R1-I / DPAI983R1A-I including taking down existing un-serviceable spare parts complete all as specified and directed:-
Sealed Compressor of capacity 5/5.5 TR
Fan Blade suitable for M/s Blue Star Model No. DPAI322R1-I / DPAI983R1A-I package unit
Fan Motor suitable for M/s Blue Star Model No. DPAI322R1-I / DPAI983R1A-I package unit package unit
Drier assembly complete suitable M/s Blue Star Model No. DPAI322R1-I / DPAI983R1A-I package unit package unit
Supply and charge refrigerant gas R 134A (Environment friendly) including leak testing the system, arresting the leaks with necessary materials like gasket/ ‘O’ rings/ washers complete all as specified and directed by Engineer-in-Charge.
Supply and Charge refrigerant gas R22 (Environment friendly) for Package type AC unit including leak testing the system, arresting the leaks with necessary materials like gasket/ ‘O’ rings/ washers complete all as specified and directed by Engineer-in-Charge.
S & F MS pipe of 150 mm size with flange, bend whichever required for fixing in all respect including required welding work & applying two coats of Synthetic Enamel paint of colour as per IS colour code 2379 and taking down existing un-serviceable pipe complete all as specified and directed by Engr-in-charge.
All as per Sl Item No. 83.00 here in before but size of 200 mm
All as per Sl Item No. 83.00 here in before but size of 250 mm
All as per Sl Item No. 83.00 here in before but size of 300 mm
S & F Copper Strip 20x3 mm on wall / in floor by brazing of all joints and final connection to end point equipments using GI nut bolts including taking down existing un-serviceable copper strip Complete all as specified and directed by Engr-in-Charge
S&F Butterfly valve 80/100 mm bore, PN 1.6 with necessary rubber gasket, bolts, nuts and washer and including taking down existing un-serviceable Butterfly Valve complete all as specified and as directed by Engineer-in-Charge.
All as per Sl Item No. 88.00 here in before but size of 150 mm bore
All as per Sl Item No. 88.00 here in before but size of 200 mm bore
Supplying, Fabricating, Installing, Testing & Commissioning Galvanised sheet steel ducts of 24 Guage having Zinc coating of 120 Grams / Sq.m and conforming to IS – 655 shall be factory fabricated for the required size and shape and shall be provided as per site requirement complete with gaskets, splitters, vanes including providing GI slotted angles/ MS angle frame, flanges, hangers, nuts & Bolts, etc. including painting to MS surfaces with 2 coats synthetic enamel paint over a coat of red oxide/ Zinc chrome primer with necessary scaffolding and including taking down existing un-serviceable steel ducts complete all as specified and as directed. Note: The rate quoted shall be deemed to be inclusive of necessary civil work and its accessories as required at site.
M&L thermal insulation of duct with 50 mm thick thermocole of TF quality with 24 kg/m3 density wrapped with chicken wire mesh vapour barrier and sand cement plastering complete all as specified and directed.
Overhauling centrifugal / monoblock pump set of capacity 30 to 40 HP after removing from base plate disconnecting from pipe line and dismantling pump set, replacing US gland packing, gun metal bush, bearing and water seal and applying grease etc, reassembling the pump set and refixing back on the base plate and connecting with existing pipe line with nuts, bolts and new gasket including dismantling the motor, cleaning the rotor, starter, varnishing, backing etc and reassembling the motor and painting motor and pump sets including suction and discharge pipe line with one coat of paint with spray painting also connecting the existing cable etc. including testing the pump set for full satisfaction of Engr-in-charge complete all as specified and directed.
Dismantling the centrifugal / mono block pump set upto 30/40 HP complete and replace the following defective parts of and re-assembling the pump set and testing complete etc all as specified and directed :-
Ball bearings of any make and type
CI Impeller
Stainless steel Shaft along with key and check nut of any type and make.
Rubber coupling of any type and make
Shaft bush of any type and make
Please Enable Macros to View BoQ information
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
BOQ_862127.xls
BOQ • 0.85 MB
8863Tender.pdf
Tender Documents • 0.77 MB
Download all tender documents and submit your bid