Tender Value
₹94.8 L
EMD Value
₹94,761
Closing Date
17 Jul 2026, 4:00 pmClosed
SE PRED PR KAKINADA
Kakinada
Construction of Bridge across Peta Canal near Rajiv Gandhi College in Ramanayyapeta of Kakinada Rural in Kakinada District.Est.Cost.Rs.130.00 lakhs in 1st call.
957120
NIT14/DB/DMF works Kakinada District/2026-27 Dt.23.06.2026 of Superintending Engineer PR Circle Kakinada
OPEN - NCB
Bridges, Cross drainage Works including U.T
KAKINADA, ANDHRA PRADESH
18 documents required · 16 mandatory · 2 optional
₹3,355
₹94,761
1 Oct 2026
2 Jul 2026
2 Jul 2026
Name of the Work:Construction of Bridge across peta canal near Rajiv Gandhi college in Ramanayyapeta(V) of Kakinada(R)(M), Est.Cost.Rs.130.00 Lakhs, Construction of 3 Vent 6.00mts Span bridge: Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH, including dewatering, contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Foundations in Oridinary soils up to 3 m depth including dewatering.
Filling in foundation trenches with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete.
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete
Providing concrete for plain concrete M 15 grade using 40 mm Graded hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete.- For cutoff walls and Aprons.
Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in foundations complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1203 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete For Raft
Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1206 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete ( upto 5m height) For Bed Blocks/ Backing walls
Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1206 MORD and 1500, 1700 & 2200 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete For Abutments Below Bed Level
Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1206 MORD and 1500, 1700 & 2200 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete For Abutments above Bed Level upto 5m height
Providing and laying reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in superstructure as per drawing and technical specifications Clauses 800, 1401.4.1 and 1401.4.2 MORD / Sections 1500, 1600 & 1700 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete 5 to 10m height for Deck slab
Reinforced Cement Concrete M 30 grade approach slab using 20 & 10mm metal (HBG) mechanically mixed excluding reinforcement complete as per drawing and technical specifications Clauses 800 and 1404.4 MORD / 1500, 1600, 1700 & 2704 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete
Providing and laying cement concrete wearing course M 30 (Design Mix) grade using 20 & 10mm metal (HBG) mechanically mixed excluding reinforcement complete as per drawing and technical specifications Clauses 800 and 1404.2.2 MORD and 2702 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete-
Cost, supply and fixing of Bituminous Mastic pad 25.4 mm including cost and conveyance and all labour charges and including contractors profit & Over head charges, but excluding GST etc., complete
Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1001 and 1202 MORD & 1100, 1600 MORTH for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, but excluding GST etc., complete - For Foundation
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1001 & 1206 MORD / Sections 1600 & 2200 MORTH for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, but excluding GST etc., complete- For Sub Structures
Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1001 and 1401 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, but excluding GST etc., complete - For Super Structures
Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia PVC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1206.6 MORD / 2706 & 2200 MORTH including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1206.3 MORD / 710.14 of IRC, 78 & 2200 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1206.3 MORD / 710.14 of IRC, 78 & 2200 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete
Construction of embankment with approved material obtained from borrow pits with all lifts, transporting to site, spreading, grading to required slope and compacting with vibratory roller 80-100 KN to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 MORD/305 MORTH including overhead charges & Contractor profit, but excluding GSTand Seignorage charges etc., complete for finished item of work.
Bailing out of water with in cross bunds, foundations with using Oil Engine of 5.00 HP capacity including crew charges, oil charges, operational charges and all labour charges etc., complete. - 1 HpHR.including overhead charges & Contractor profit, but excluding GST
Road work: Construction of improved subgrade by providing selected earth having minimum CBR of 10%, MDD not less than 1.85 g/cc with LL & PI not more than 40% and 20 respectively and and spreading in uniform layers with tractor grader on prepared surface and compacted to OMC with Vibratory roller of 80 to 100kN capacity to achieve the desired density, complete as per IRC technical specification clause 303 MoRD/ 305, MoRTH by using machinery including contractors profit & Over head charges, but excluding GST and seigniorage etc.,
Construction of granular sub-base by providing well graded HBG material (Grading III material) (Table 400.1A), spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller 80-100 kN / vibratory roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD including cost of all materials, labour, conveyance, hire charges of machinary, but excluding GST and Seignorage charges etc., complete
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN / Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD/ MORTH, including overhead charges & Contractor profit, but excluding GST and Seignorage charges etc.
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 MORD (for use on Wet mix macadam & WBM) ,including contractors profit & Over head charges, but excluding GST etc.
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 MORD, including contractors profit & Over head charges, but excluding GST etc.
Providing and laying bituminous macadam with 40-60 TPH hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieved the desired compaction as per Technical Specification Clause 504 MORD (using vibratory Roller 80-100 KN for intermediate rolling and 3 wheel roller 80-100 KN for initial and final rolling) including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete
Providing and laying semi dense bituminous concrete with 40-60 TPH batch type HMP producing an average output of 37.5 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 508 complete in all respects, including contractors profit & Over head charges, but excluding GST and seigniorage etc.
Construction of Shoulders by providing selected earth having MDD not less than 1.85 g/cc with LL & PI not more than 40% and 20% respectively and spreading in uniform layers with tractor grader on prepared surface and compacted to OMC with Vibratory roller of 80 to 100kN capacity to achieve the desired density, complete as per IRC technical specification clause 303 MoRD/ 305, MoRTH by using machinery including contractors profit & Over head charges, but excluding GST and seigniorage etc.,Complete for finished item of work.
stage.html
html • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.01 MB
SBDpetacanal.doc
TENDER_DOCUMENT • 0.63 MB
BOQpetacanal.xls
TENDER_DOCUMENT • 0.59 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .