| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC | ₹1.1 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.1 Cr+₹1.1 L (1.01%)Rejected-Finance HIMALAYA COMPLEX MAIN BAZAR LEH LADAKH 194101 J K | LEH | LEH | JAMMU AND KASHMIR | 194101 | ₹1.1 Cr+₹1.1 L (1.01%) | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | JK Technical Services L2 | M/S ANWAR ALI L1 |
|---|---|---|---|---|---|
| 1.00 | Schedule 'A' Part-I
Building work
Lump sum price worked out by the Contractor for "Construction of Single officer Living Accn for 04 Maj and above, double storey building with framed (Permanent structure) in RCC M-30 design mix with PCC block masonry" complete all as specified and as directed by Engineer-in-Charge and as shown on Drawings.
NOTE:- The lumpsum price to be quoted by the Contractor. | 1 | EACH BLOCK | 84,00,000 ₹84,00,000 | 75,00,000 ₹75,00,000 Lowest |
| 2.00 | Schedule 'A' Part-II
Lump sum price worked out by the Contractor for "Internal water supply" complete all as specified and as directed by Engineer-in-Charge. | 1 | LUMP SUM | 60,000 ₹60,000 Lowest | 1,00,000 ₹1,00,000 |
| 3.00 | Schedule 'A' Part-III
Lump sum price worked out by the Contractor for "Internal Electrification" complete all as specified and as directed by Engineer-in-Charge. | 1 | LUMP SUM | 3,00,000 ₹3,00,000 | 70,000 ₹70,000 Lowest |
| 4.00 | Schedule 'A' Part-IV
Lump sum price worked out by the Contractor for "External Electrification" complete all as specified and as directed by Engineer-in-Charge. | 1 | LUMP SUM | 7,50,000 ₹7,50,000 Lowest | 9,00,000 ₹9,00,000 |
| 5.00 | Schedule 'A' Part-V
"External Water Supply" complete all as specified and as directed by Engineer-in-Charge. | 1 | LUMP SUM | 2,30,000 ₹2,30,000 Lowest | 2,50,000 ₹2,50,000 |
| 6.00 | Schedule 'A' Part-VI
Lump sum price worked out by the Contractor for "Hot Water Supply" complete all as specified and as directed by Engineer-in-Charge. | 1 | LUMP SUM | 60,000 ₹60,000 Lowest | 1,00,000 ₹1,00,000 |
| 7.00 | Schedule 'A' Part-VII
Lump sum price worked out by the Contractor for "Sewage Disposal" complete all as specified and as directed by Engineer-in-Charge. | 1 | LUMP SUM | 1,30,000 ₹1,30,000 Lowest | 1,50,000 ₹1,50,000 |
| 8.00 | Schedule 'A' Part-VIII
Lump sum price worked out by the Contractor for "Demolition of Building" complete all as specified and as directed by Engineer-in-Charge. | 1 | LUMP SUM | 70,000 ₹70,000 Lowest | 1,50,000 ₹1,50,000 |
| 9.00Schedule 'A' Part-IX Miscellaneous E/M & Water Supply and sewage disposal items. | |||||
| 9.01 | Supply and fix aerial bunched cable (ABC) 1100 volts grade stranded& compact aluminium phase conductor aerial bunched cable of size 3x25 sqmm +1x16 sqmm (half core) with stranded messenger conductor of 25 sqmm (bare messenger ACSR ) with alum alloy.The phase conductor should be insulated with XLPE compound with all fittings such as ( anchor clamp,suspension clamp,inline conductor ,service clamp,insulation piercing connector ) any other fittings besides this is also deemed to be included in the quoted rate. | 80 | RUNNING METER | 1,000 ₹80,000 | 400 ₹32,000 Lowest |
Tender Value
₹1.1 Cr
EMD Value
₹1.8 L
Closing Date
27 Jun 2026, 6:00 pmClosed
CWE KHUMBATHANG
HQ CWE KHUMBATHANG PIN 900270 C/O 56 APO
PROVISION OF SINGLE OFFICERS ACCOMMODATION AT BIAMAH UNDER GE KHUMBATHANG
2026_MES_758713_2
80051/77/2025-26
Open Tender
Civil Works
Item Rate
540 days
BIAMAH
Class B and above and category a (i)
9 documents required · 9 mandatory
₹1,000
GE KHUMBATHANG
₹1.8 L
Yes
11 Sept 2026
5 Jun 2026
29 Jun 2026
5 Jun 2026
27 Jun 2026
20 Jun 2026
5 Jun 2026 - 12 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Schedule 'A' Part-I
Building work
Lump sum price worked out by the Contractor for "Construction of Single officer Living Accn for 04 Maj and above, double storey building with framed (Permanent structure) in RCC M-30 design mix with PCC block masonry" complete all as specified and as directed by Engineer-in-Charge and as shown on Drawings.
NOTE:- The lumpsum price to be quoted by the Contractor. | 1 | EACH BLOCK | 58,81,606.41 | ₹58,81,606.41 |
| 2 | Schedule 'A' Part-II
Lump sum price worked out by the Contractor for "Internal water supply" complete all as specified and as directed by Engineer-in-Charge. | 1 | LUMP SUM | 51,872.36 | ₹51,872.36 |
| 3 | Schedule 'A' Part-III
Lump sum price worked out by the Contractor for "Internal Electrification" complete all as specified and as directed by Engineer-in-Charge. | 1 | LUMP SUM | 2,80,227.28 | ₹2,80,227.28 |
| 4 | Schedule 'A' Part-IV
Lump sum price worked out by the Contractor for "External Electrification" complete all as specified and as directed by Engineer-in-Charge. | 1 | LUMP SUM | 6,90,922.85 | ₹6,90,922.85 |
| 5 | Schedule 'A' Part-V
"External Water Supply" complete all as specified and as directed by Engineer-in-Charge. | 1 | LUMP SUM | 1,76,391.45 | ₹1,76,391.45 |
| 6 | Schedule 'A' Part-VI
Lump sum price worked out by the Contractor for "Hot Water Supply" complete all as specified and as directed by Engineer-in-Charge. | 1 | LUMP SUM | 48,902.52 | ₹48,902.52 |
| 7 | Schedule 'A' Part-VII
Lump sum price worked out by the Contractor for "Sewage Disposal" complete all as specified and as directed by Engineer-in-Charge. | 1 | LUMP SUM | 90,715.46 | ₹90,715.46 |
| 8 | Schedule 'A' Part-VIII
Lump sum price worked out by the Contractor for "Demolition of Building" complete all as specified and as directed by Engineer-in-Charge. | 1 | LUMP SUM | 51,581.77 | ₹51,581.77 |
| 9 | Schedule 'A' Part-IX
Miscellaneous E/M & Water Supply and sewage disposal items. | - | - | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.52 MB
BOQ_862284.xls
BOQ • 1.49 MB
PS77040626.pdf
Tender Documents • 1.31 MB
SC77040626.pdf
Tender Documents • 0.32 MB
ARCHDRGDRWGS.pdf
Tender Documents • 5.08 MB
STRDRG.pdf
Tender Documents • 4.04 MB
Tenderdoc77.pdf
Tender Documents • 0.67 MB
Annex.pdf
Tender Documents • 0.45 MB
page37and46.pdf
PDF • 1.47 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .