Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹66.6 CrAccepted-AOC | ₹66.6 Cr | L1 | Accepted-AOC Accepted being contractor quoted reasonable and workable rates |
| 2 | L2₹66.8 CrRejected-Finance 48 19 6 2ND FLR MVR COMPLEX DWARAKANAGAR OPP RTC COMPLEX VISAKHAPATNAM 530003 | VISAKHAPATANAM | ANDHRA PRADESH | 530003 | ₹66.8 Cr | L2 | Rejected-Finance Rejected being L2 |
| 3 | L3₹69.2 CrRejected-Finance DADRA AND NAGAR HAVELI DN | ₹69.2 Cr | L3 | Rejected-Finance Rejected being L3 |
| 4 | L4₹82.9 CrRejected-Finance GODREJ WATERSIDE BUILDING TOWER I 4TH FLOOR BLOCK DP SECTOR V SALT LAKE KOLKATA 700 091 | 24 PARAGANAS NORTH | WEST BENGAL | 700091 | ₹82.9 Cr | L4 | Rejected-Finance Rejected being L4 |
| 5 | L5₹92.7 CrRejected-Finance | ₹92.7 Cr | L5 | Rejected-Finance Rejected being L5 |
Tender Value
₹95.8 Cr
EMD Value
₹15 L
Closing Date
23 Apr 2022, 6:00 pmClosed
DDG CE
DDG CE DGNP Navl Base Post Visakhapatnam 530014
ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) OF BRIDGE AND ELEVATED ROAD
2022_MES_500986_1
DDG CE TOKEN NO 16 of 2021 2022
Open Tender
Civil Works
730 days
Rambilli
As per NIT
8 documents required · 8 mandatory
₹3,000
DGNP
₹15 L
Yes
DDG CE conference hall
6 Jul 2022
11 Jan 2022
25 Apr 2022
11 Jan 2022
23 Apr 2022
8 Apr 2022
11 Jan 2022 - 13 Mar 2022
28 Jan 2022
Amount
Design including proof checking and construction of 115.00 mtrs length, 7.50mtrs over all width major permanent bridge with PSC Girder Superstructure on pile foundation including carrying out Sub Soil Investigation (SSI) over sharada river with span arrangement as per line drawings and based on sub soil data, hydraulic data, Design base report, Schedule A Notes, Special conditions, Particular specifications of the tender documents
Item No. 1 (Contd..,) comprising vetting and certification from any IIT/ NIT/ Andhra University for all the structural drawings. Construction works includes all preparatory works, Erection of staging/ shuttering, piles, pile caps, abutments, piers, return wall, Dirt wall, placing of POT & POT cum PTFE bearings, casting of PSC Girder superstructure, Prestressing, wearing coat having nonskid surface in uniform thickness, strip seal expansion joints, RCC crash barriers, foot paths, kerbs, MS railing on crash barrier, Security view cutter, flood gauge, drainage spout with necessary outlet fittings for adequate disposal of rain water, necessary road furniture items, Solar street light fittings, load testing of superstructure of bridge, protective coating to all exposed surfaces, disposal of excavated material, temporary river training works and diversion and all other items of works required for the completion of the bridge along with approach on another side of bridge including curing complete all as specified and as directed by Engineer-in-charge. Note: Approach road of approximate 115m length and same width of bridge (7.50m) including 1.0mtr width footpath on one side of the road, embankment type connecting to existing road to be considered on another side of bridge with bituminous wearing coat, metallic crash barriers, footpaths, kerbs, hand rails, drainage arrangement to adequate disposal of rain water, road furniture items, testing and complete as per IRC and MoRTH specifications.
Design including proof checking and construction of 1120.00 mtrs length, 7.50mtrs over all width major permanent elevated road with PSC Girder Superstructure on pile foundation including carrying out Sub Soil Investigation (SSI) with span arrangement as per line drawings and based on sub soil data, hydraulic data, Design base report, Schedule A Notes, Special conditions, Particular specifications of the tender documents comprising vetting and certification from any IIT/ NIT/ Andhra University for all the structural drawings. Construction works includes all preparatory works, Erection of staging/ shuttering, piles, pile caps, abutments, piers, return wall, dirt wall, placing of POT & POT cum PTFE bearings, casting of PSC Girder superstructure, Prestressing, wearing coat of bituminous surface as specified, strip seal expansion joints, RCC crash barriers, foot paths, kerbs, MS railing on crash barrier, drainage spout with necessary outlet fittings for adequate disposal of rain water, necessary road furniture items, Solar street light fittings, load testing of superstructure of elevated road, protective coating to all exposed surfaces, disposal of excavated material, temporary river training works and diversion and all other items of works required for the completion of the elevated road including curing complete all as specified and as directed by Engineer-in-charge. Notes for Item Nos. 1 & 2:- (i) PSC girder & Cross diaphram shall be minimum M-40 design mix and all other RCC works including piles shall be M-40 design mix. (ii) Reinforcement steel shall be Corrosion resistant steel (CRS) TMT bars of grade Fe-500D.
M. Venkata Rao Infra Projects Pvt. Ltd.
VIJAY M MISTRY CONSTRUCTION PVT LTD
Royal Infraconstru Limited
Rds Project ltd.
RKEC Projects Limited
HES INFRA PRIVATE LIMITED
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid