All Bids
RequiredL1 bidder is decided by taking the cumulative price of item Nos.1 to 5 (subject to the fulfillment of eligibility criteria and as per TGGENCO Terms and Conditions).
RequiredIn case of L1 firm other than M/s.L&T (OEM of HP Pumps), the firm must visit the site, check the measurements of the pump and it?s mating flanges to the pipeline.
RequiredThe material supplied shall be with fitment guarantee that the item is one to one replacement of the existing item with functional performance & no modification is to be done. In case of any issue, the material will be rejected and replacement needs to be provided on free of cost.
RequiredAll the necessary Tests/checks shall be conducted on the supplied material, as per the latest revisions of the Indian/International standards for ensuring the suitability of the material at site.
RequiredGuarantee/Warranty, Fitness guarantee (Interchangeability certificate), Material Test certificates with relevant standards from NABL approved laboratory should be furnished along with material during the supply.
RequiredIn case of any defects during the guarantee period, the bidder shall promptly carryout remedial measures to correct any defect at site or replace at free of cost. Guarantee for the replaced material shall be period of 12 months from the date of replacement.
RequiredBidders who are technically suitable as per tender specification enclosed can only be considered.
RequiredResponsibility for correctness of the information submitted in the online bid lies with bidder. If any information furnished in the bid is proved to be false at a later date, the bid will be rejected.
RequiredAcceptance of commercial terms and upload duly filled certificate.
RequiredGST registration certificate
RequiredHSN codes of the materials (6 to 8 digits) and GST rates of the offered material.
RequiredThe bidder must up load the EMD payment details i.e., scanned copy of DD or online transaction receipt.
RequiredBidders with poor performance in executing the previous purchase orders/bidders who have executed partial supplies during the delivery period/bidders who have not supplied the material even after several notices/bidders who supplied the material lately and suffered the works/bidders whose supplies failed during guarantee performance period/black listed firms are not eligible for quoting
OptionalThe bidder must have supplied the same material mentioned in the schedule of material to Ball Tube Mills BBD 4472 to M/s.NTPC/TGGENCO/APGENCO/State Thermal Power Plants/Central Thermal Power Plants/Reputed Private Power Plants like ADANI, TATA. Bidder must submit relevant purchase order copies as documentary proof. Note:PO copies for reconditioning of the same indented material are not accepted.
OptionalThe L1 firm needs to submit the indented material drawings along with the material of Construction and QAP for approval before the manufacture of the material.