Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 CrAccepted-AOC PLOT NO H 109 MIDC AMBAD NASHIK MAHARASHTRA 422010 | NASHIK | NASHIK | MAHARASHTRA | 422010 | ₹2.2 Cr Quoted ₹2.3 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹3.0 CrRejected-AOC | ₹3.0 Cr | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | Arkind Consultants Private Limited L2 | Mahindra EPC Irrigation Limited L1 |
|---|---|---|---|---|---|
| 1.00APPENDIX A - CONSTRUCTION OF PUMP HOUSE AND PUMPING LINE EXTENTION | |||||
| 1.00 | 2.6.1 Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil | 142.91 | Cum | 450 ₹64,309.50 | 251.08 ₹35,881.27 |
| 1.00 | 4.1.8 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) | 15.35 | Cum | 9,593.49 ₹1.5 L | 7,994.58 ₹1.2 L |
| 1.00 | 4.1.3 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) | 2.05 | Cum | 11,248.93 ₹23,060.30 | 9,374.11 ₹19,216.92 |
| 1.00 | 5.9.1 Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 23.4 | Sqm | 471.96 ₹11,043.93 | 393.3 ₹9,203.29 |
| 1.00 | 5.1.2 Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size | 16.62 | Cum | 12,664.23 ₹2.1 L | 10,553.53 ₹1.8 L |
| 1.01 | 2.25 Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 91.98 | Cum | 363.99 ₹33,480.17 | 303.33 ₹27,900.11 |
| 1.01 | 5.9.6
Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 65.6 | Sqm | 1,215.77 ₹79,754.25 | 1,013.14 ₹66,461.85 |
| 1.01 | 5.9.5 Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 124.17 | Sqm | 914.76 ₹1.1 L | 762.3 ₹94,653.53 |
| 1.01 | 5.2.2 Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 15.07 | Cum | 15,420.28 ₹2.3 L | 12,850.23 ₹1.9 L |
Tender Value
₹2.1 Cr
EMD Value
₹1 L
Closing Date
3 Apr 2025, 5:00 pmClosed
Superintending Engineer
Office of the Superintending Engineer Third floor Cauvery House West Hill Kozhikode 5
Construction of pump house and pumping line extension Construction of sump tank Fencing works and Survey Design and installation of Community Micro Irrigation System with valve automation
2025_Irrig_747214_1
SE MI/ET/04/2024-25
Open Tender
Civil Works - Lift Irrigation Schemes
540 days
Dasanakkara
Tenders is invited from Empanelled Firms as per G.O(Rt) 210/2024/WRD dated 07.03.2024
10 documents required · 10 mandatory
₹9,759
₹1 L
Yes
Superintending Engineer Chamber
19 Mar 2026
6 Mar 2025
5 Apr 2025
6 Mar 2025
3 Apr 2025
6 Mar 2025
24 Mar 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid