Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹6.5 L
Closing Date
3 Nov 2026, 6:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
CHIEF ENGINEER (G)
Work for hiring of 03-nos. School Buses, having 56 seating capacity and 02-no. School Bus (Mini bus), having 29 seating capacity , MODEL (BS-6 ) completed with chess& body, With AC, FAPS Onwards, for 12 hours (6.15 AM to 6.15 PM) with driver & conductor for 03 years.
354035
EW-366
Open
Miscellaneous Works
Works
Gandhinagar
2 documents required · 2 mandatory
₹17,700
Gujarat State Electricity Corporation Limited Payable at Gandhinagar
₹6.5 L
13 Oct 2026
13 Oct 2026
13 Oct 2026
3 Nov 2026
13 Oct 2026
180 days from the date of opening of Technical bid)
3 Security Deposit (SD) 5% of Contract Value (excluding GST).
(Refer ITB clause no.9)
Important Dates:
Event Date & Time
1 Last Date & time for submission of Pre-bid queries (if
As per Tender Notice
Pre bid meeting applicable)
2 Date & Time of Pre-Bid meeting (If applicable) As per Tender Notice
3 Last date of On-line (e-tendering) submission of tender
documents [Technical as well as Price bid] along with
soft copy of all other documents as stated here under
As per Tender Notice
(This is mandatory). No physical documents shall
require from bidders except cover for Tender Fee and
EMD (In case paid through Demand Draft/ Bank
EW- 366 PUR-F-006 RFQ-
Guarantee only).
4 Last Date for Physical submission of cover for Tender
Fee and EMD (In case paid through Demand Draft/ / As per Tender Notice
Bank Guarantee/ only).
5 Date of Opening of online Technical Bid, all relevant
documents submitted through online process and As per Tender Notice
Cover for Tender Fee and EMD (If submitted)
6 Date and Time for opening of online submitted price Party has to be in touch with
bid for all technically acceptable bidders. website https://tender.nprocure.com
and also with e-mail sent by above
7 Tender Validity 180 Days from date of opening of
Important Notes to Bidders:
“Technical bid containing all the relevant documents of tender to be submitted
through ONLINE process only on (n)Procure. No documents (except Demand Draft/ /
Bank Guarantee/ for Tender Fee and EMD) will be accepted in offline mode or hard
copy”. If submitted same will be ignored.
Only cover for Demand Draft/ / Bank Guarantee for Tender Fee and EMD shall be
accepted through Registered Post AD or Speed Post addressed to Chief Engineer
(Generation) Gujarat State Electricity Corporation Ltd, Gandhinagar TPS-382041
super scribing the envelope with Tender No & item description. This is mandatory.
“NO COURIER SERVICE OR HAND DELIVERY” will be accepted.
Envelopes for Tender Fee and EMD shall be super scribed as:
Tender fee/EMD shall be accepted through NEFT/RTGS also. In case, payment for
Tender Fee and EMD is done through NEFT / RTGS; the payment details/Receipt
must be submitted/ attached in n-procure (online) in PDF format. In this case no
physical documents are required to be submit. For NEFT/RTGS payment the bank
details are as under.
BENIFICARY NAME GSECL
BANK NAME & BRANCH NAME BOB, SECTOR-21, GANDHINAGAR
IFSC CODE BARB0GANDHI
In case, payment for Tender Fee and EMD is done through NEFT / RTGS; Bidder
has to submit the following details to GSECL E-mail [email protected],
Bidder has to provide the details on the same date of payment so that receipt can be
Description/Tender
Purpose of Payment & Tender Fee Rs:
EW- 366 PUR-F-006 RFQ-
Mode and Date of
Unique Transaction
Reference (UTR) No
Tender received after due date & time of submission shall not be accepted /opened
irrespective of delay due to postal services or any other reasons. GSECL shall not be
responsible for late receipt of the tender.
The bid documents consist of the following and shall be the part of contract.
Section Name of Document Page No.
1 Notice Inviting Tender (NIT)
2 Instructions to Bidders (ITB)
3 Tender Pre-Qualification Criteria (PQC)
4 General conditions of contract (GCC)
5 Detail Scope of work & Special conditions of
6 Schedule –B (Price Bid)
7 Terms and Conditions regarding Labour Laws
8 General Safety Rules /Norms to be observed by The
9 Annexures/Forms
Following is the certifying agency for obtaining the Digital Signature Certificates
(DSC as per category III).
Sr. No. Name of certifying agencies Web Site Address.
1 (n)code Solutions (GNFC) www.tender.nprocure.com
In case bidders need any clarifications/help to participate in online tenders, they can
contact (n)Procure Support team.
Contact Details :
(n)Code Solutions-A division of GNFC Ltd.,
(n)Procure Cell
501, GNFC Info Tower, S.G. Road, Bodekdev, Ahmedabad – 380054 (Gujarat)
E-mail: [email protected]
Chief Engineer (Gen)
GSECL: TPS: Gandhinagar
EW- 366 PUR-F-006 RFQ-
Section-2: Instruction to Bidder (ITB) No:GSECL/Works
Name of Work: Work for hiring of 03-nos. School Buses, having 56 seating capacity
and 02-no. School Bus (Mini bus), having 29 seating capacity
MODEL (BS-6 ) completed with chess& body, With AC, FAPS
Onwards, for 12 hours (6.15 AM to 6.15 PM) with driver & conductor
Note to Bidder:
1 Contract means the documents forming tender and the subsequent agreement that
may be entered.
2 Work or works means the work related to the subject mentioned in tender.
3 Contractor means a firm or an individual undertaking these works or offers the
rates for this work.
4 The general rules and regulations of the GSECL for tender and contract for works
will apply to the extent of the same and not modified herein. The contractor is
deemed to have gone through and considered to be fully aware of the conditions
mentioned therein. Any other rules and regulations, conditions etc. that are in
force in present and that may be framed by the Corporation from time to time in
condition with contracts will be binding and acceptable to the contractor.
5 SUBMISSION OF TENDER
Tender to be submitted through ONLINE process only on (n)Procure. No
documents (except Demand Draft/ Bank Guarantee for Tender Fee and EMD) will
be accepted in offline mode or hard copy. Bidder has to submit Tender fee and
EMD in physical form in case paid through Demand Draft/ Bank Guarantee in
sealed cover superscripted with the “Name of Work” on OR before due date and
time. All such documents should be strictly submitted by RPAD/ speed post only
to The office of Chief Engineer (Generation) Gujarat State Electricity Corporation
Ltd, Gandhinagar TPS-382041) up to due date and time as mentioned in tender
notice. Otherwise the offer will not be considered and no any further
communication in the matter will be entertained. GSECL does not take any
responsibility for postal delay for cover received after due date and time will not
be accepted by this office.
Tenderer should also certify as “unconditional tender” on cover itself. Conditional
tenders are liable for rejection.
“Please note that the Notarized / self-attested copies of original required
documents should be invariably uploaded in n-procure portal on or before
due date and time in pdf form (Scanned copy). This is mandatory. No
physical documents are required to be submitted except tender fee and
The Technical Bid shall be opened on the due date as mentioned in the tender
notice (if possible), in the presence of those tenderers who wish to be present. If
EW- 366 PUR-F-006 RFQ-
the authorized representative is likely to be present, then authorized representative
must submit the authorization letter of the representing company at the time of the
opening of bids compulsorily.
Please note that the required documents should be invariably submitted along with
tender copy in n-procure portal and tender without documents is liable for
6 Price Bid: Bidders are requested to submit Price Bid (Schedule-B) online (N-
procure portal) only. Scanned copy of Price Bid is not required to be uploaded and
if uploaded with documents, it will not be considered, and only the online
submitted Price Bid (filled on N-procure portal) will be considered for evaluation.
The time and date for the opening of the Price Bid shall be decided by GSECL
and shall be communicated to the tendering firms after technical bids are
analysed. The intimation will be sent only to the technically qualified tenderers.
Any technical questions, information, and clarifications that may be required
pertaining to this Tender should be referred to The Chief Engineer, GSECL, TPS
Gandhinagar and their team as under
Name & No. is to be mentioned of Head of Technical department/P&C cell/user
a) Tender fee (Non- refundable) should invariably be paid through Demand
Draft or through online transfer by RTGS/NEFT in GSECL- Gandhinagar
TPS account; otherwise offer shall be ignored out rightly. Demand Draft
should be in the name of the “Gujarat State Electricity Corporation Limited
payable at Gandhinagar”. Tender fee (Demand Draft) must be kept in the
cover of EMD; otherwise offer is liable to be rejected.
b) All the bidders are required to pay Tender fees plus applicable GST as
mentioned in the tender documents in cash (up to Rs.10,000/- only) at the
office address specified in the tender documents OR by
RTGS/NEFT/online OR by DD/ .
c) The Tender Fees is Non-refundable.
d) No exemption from payment of tender fees and no price preference shall be
given to small, cottage & tiny industrial units registered under small scale
industries of Gujarat state and holding subsequent registration with
CSPO/NSIC/DGS&D registration certificates for the item under this tender
8 Earnest Money Deposit:
(a) EMD should invariably be paid by Demand Draft/ /by RTGS/NEFT/Online
transfer in favor of the “Gujarat State Electricity Corporation Limited payable
at Gandhinagar”. It can also be furnished by way of an irrecoverable Bank
Guarantee from any Banks as per GOG GR No. FD/MSM/e-
file/4/2025/2712/DMO Dtd. 01/04/2026 in a standard format prescribed by
GSECL (Format given in this tender document). The validity of the Bank
Guarantee for EMD should be for a period of at least Six Months from the date
of submission of the Bid of the Tender. Tenders without EMD are liable for
EW- 366 PUR-F-006 RFQ-
(b) If the EMD amount is more than Rs.03 Lakhs, it should be paid either by
RTGS/NEFT/Online OR Demand draft OR Bank Guarantee. Otherwise it
should be paid either in Cash (up to Rs.10,000/- only) at the office address
specified in the tender documents OR by RTGS/NEFT.
(c) Bank Guarantee (wherever it is applicable) will be accepted if issued from
following banks only as per GOG GR No. FD/MSM/e-
file/4/2025/2712/DMO Dtd. 01/04/2026 and revised time to time.
Sr. Sr. Name of Banks
1 AXIS Bank 23 A U Small Finance Bank
2 Bandhan Bank 24 City Union Bank
3 CSB Bank 25 DBS Bank India Limited
4 DCB Bank 26 Dhanlaxmi Bank
5 Equitas Small Finance 27 Federal Bank
6 HDFC Bank 28 HSBC Bank
7 ICICI Bank 29 IDBI Bank
8 IDFC First Bank 30 Induslnd Bank
9 Jammu and Kashmir Bank 31 Jana Small Finance Bank
10 Karnataka Bank 32 Karur Vysya Bank
11 Kotak Mahindra Bank 33 RBL Bank
12 South Indian Bank 34 Standard Charter Bank
13 Tamilnadu Mercantile Bank 35 Ujjivan Small Finance Bank
14 YES Bank 36 Ahmedabad Mercantile Co-
15 Nutan Nagrik Sahakari 37 Rajkot Nagrik Sahakari
Bank Ltd. Bank Limited.
16 Sarswat Co-Operative Bank 38 SBPP Co-operative Bank
17 SVC Co-Operative Bank 39 The Cosmos Co-op Bank
18 The Gujarat State Co- 40 The Surat District Co-
Operative Bank operative Bank
19 The Surat Peoples Co- 41 The Baroda Central Co-
operative Bank Ltd. operative Bank
20 The Panchmahal District 42 The Kalupur Commercial
Co-operative Bank Co-operative Bank
21 The Rajkot Commercial Co- 43 The Banaskantha
operative Bank Limited Mercantile Co-Operative
22 Gujarat Gramin Bank 44 All Nationalize Bank
(d) No Interest shall be payable against payment of E.M.D.
(e) Tenders submitted without Earnest Money Deposit is liable for rejection
without entering in to further correspondence.
(f) EMD will be forfeited
(i) if the tender is withdrawn during the validity of the offer.
(ii) If the successful bidder fails to furnish the security deposit in time.
(g) EMD of the unsuccessful Tenderers will be returned within 15 days from the
date of placing of the order to the successful Tenderer through RTGS/NEFT
for credit to his Bank Account. However, the EMD Amount of technically
EW- 366 PUR-F-006 RFQ-
disqualified bidder will be returned within 15 days from opening of price bids.
9 Security Deposit:
a) The successful bidder (lowest-1 bidder) shall have to submit Security
Deposit with acceptance of Letter of Intent (LOI) before placement of
order. The successful bidder will be required to pay an amount as per NIT
(excluding GST) as a guarantee [Security deposit] for satisfactory
execution of the contract. Such guarantee[Security deposit] for
satisfactory/successful execution will be payable either in D.D./ Bank
Guarantee/NEFT/RTGS only.
b) For submission of SD, GSECL will accept the bank guarantees, if the
guarantees are issued by bank as mentioned in Sr. No. 8 above.
c) If the full Security Deposit amount is not paid within 15 days after the
receipt of the Letter of Intent, then Gujarat State Electricity Corporation
Limited shall exercise its discretionary powers to cancel the order without
entering into any correspondences and this will be binding on the bidder.
d) If the bidder fails to pay the Security Deposit or defaults in execution of the
orders placed or if GSECL suffers any financial loss due to this, then
GSECL will be at liberty to adjust the amount from other orders of the
same firm or by encashing the Bank Guarantee. Failure to deposit the SD
will entail for forfeit of EMD and the contract shall be treated as
e) The GSECL reserves the right to forfeit the SD in case of any breach of
contract and in case of disputes. The decision of Chief Engineer, TPS
Gandhinagar shall be final, binding and acceptable to the contractor.
f) The Security Deposit/ Bank guarantee covering execution of the contract
will be released only on successful execution of contract and on receipt of
the bank guarantee towards warrantee/guarantee wherever applicable and
on receipt of the “NO Objection Certificate” from the Engineer In
charge/Officer In Charge of the work.
10 The bidder shall quote their item wise rates for all the items as per schedule-B
compulsorily otherwise offer will be ignored. The rate quoted should be exclusive
11 Not Applicable to this Tender: It is not compulsory for bidders to quote their
rates for all the vehicles. Individual Bidder/Agency are allowed to quote their
rates vehicle wise for all vehicles or any nos. of vehicles out of total vehicles for
which they are interested to take part and tender will be evaluated accordingly.
(This is applicable to car/Jeep tender only)
12 Tender Evaluation: Overall lowest-1 bidder will be considered.
Revision of prices:
13 Revision of prices or any commercial terms affecting the price after opening of
technical bids shall not be considered and will be ignored.
14 Price Escalation:
The bidders must quote firm price only. The contract price remain same
throughout the contractual period including extension (except Fuel cost & Labour
escalation). The Fuel cost & Labour escalation shall be reimbursed as per tender
terms & conditions mentioned in scope of work . In case, if the bidder does not
offer firm prices, his offer shall be rejected.
15 The rates quoted by BIDDER shall be based on his own knowledge, judgment of
EW- 366 PUR-F-006 RFQ-
the conditions & hazards involved and shall not be based on any representations.
No claim on this account shall be admitted by the GSECL.
16 The tender documents shall be legible and free from addition/alteration, over
writings or conversions of figures. Corrections unavoidable shall be made by
crossing out, initialling, dating and rewriting.
17 The rates quoted shall be firm and valid as per NIT or extension thereof for
acceptance from the date of opening of technical bid. During this period no bidder
shall be allowed to withdraw their tender. Any such withdrawal during the said
period will entail forfeiture of the Earnest Money Deposit submitted along with
the tender and the GSECL may take further action such as stop dealing with such
bidder for future tenders of GSECL as per GSECL policy.
18 Authentication of Documents :
“All bidders shall submit the details/documents in support of Technical
Qualification Requirements duly certified and verified for authenticity from
Specified Third-Party Inspection Agency (TPIA) or Statutory Auditor of their
Company or Practicing CA/CA Firm along with a certificate regarding
verification of authenticity of documents as per the format placed at Annexure XI.
All the documents submitted by the bidder in support of meeting Technical QR
shall be digitally signed by the Specified Third-Party Inspection Agency (TPIA)
or Statutory Auditor of their Company or Practicing CA/CA Firm. In case
documents are certified & verified for authenticity through TPIA, the verification
and certification of authenticity of documents is acceptable from any of the
following TPIAs:
1. M/s Competent Inspectorate and Consultants Pvt. Ltd, Hyderabad, India.
2. M/s Gulf Lloyds Industrial Service India Pvt. Ltd.-Ahmedabad.
3. M/s International Certifications Services.
4. M/s Intertek India Pvt. Ltd.
5. M/s SGS India Pvt. Ltd.
6. M/s Moody International (India) Pvt. Ltd.
7. M/s TUV SUD South Asia (P) Ltd.
8. M/s TUV Rheinland (India) Pvt. Ltd.
9. M/s Bureau Veritas (India) Pvt. Ltd.
10. Hertz inspection & Services Pvt. Ltd.
11. IRCLASS Systems and Solutions Pvt. Ltd.
The following website may be referred for contact details of above TPIAs:
http://nabcb.qci.org.in/accreditation/reg_bod_inspection_bodies.php.
Any document/documents in support of Technical QR, which is not certified by
the Specified Third-Party Inspection Agency (TPIA) or Statutory Auditor of their
Company or Practicing CA/CA Firm, as per the format enclosed with the bidding
documents, shall not be considered verified/ certified for the purpose of
evaluation, and the bid shall be liable for rejection. The Bidder shall be
responsible to get their documents/ credentials verified & certified by the
Specified Third Party Inspection Agency (TPIA) or Statutory Auditor of their
Company or Practicing CA/CA Firm in support of Technical QR. All the costs
pertaining to third party verification and certification (including those by statutory
auditors) shall be borne by the Bidder. GSECL shall have no liability (financial or
otherwise) towards the same and shall not be liable for any claim/ dispute between
the bidder and the Specified Third-Party Inspection Agency (TPIA) or Statutory
EW- 366 PUR-F-006 RFQ-
Auditor of their Company or Practicing CA/CA Firm”
19 Conditional tender is liable to be rejected. Withdrawal or insertion of conditions
unilaterally after opening of tenders will not be permitted unless it is so desired by
20 Chief Engineer, TPS Gandhinagar reserves the right to reject any or all tenders
without assigning any reasons thereof.
21 Technical Bids received will be opened if possible on the day and time indicated
in the tender notice by representing Officer nominated by GSECL as in presence
of such of the bidders who wish to be present. Time and date for opening of price
bids will be determined by GSECL and intimated to qualified bidders only.
22 The bidders shall submit their offer without any deviations to the technical
specifications, Commercial conditions and General Terms and Conditions of the
23 Tenders received after the time and date specified in the tender notice will not be
accepted. Once the offer is submitted by the bidder before the due date of
submission, the bidder shall not be allowed to submit revised / additional /
modified offer after due date and time of submission of tender. However, if the
date of submission of tender is extended by GSECL, the bidder may submit
revised / additional / modified offer before extended due date and time of
submission. Bidders shall clearly mention “Revised Offer” on envelope and
revised offer shall only be considered.
24 The bidder may visit the site before submitting the tender. The bidder shall be
presumed to have carefully examined the conditions & specifications of work and
to have fully acquainted themselves with all details of the site conditions,
locations, materials, geological and weather characteristics, labour conditions and
in general all the necessary information and data etc. pertaining to and need for
25 The bid submitted by bidders who are listed under declaration of ineligibility for
corrupt or fraudulent practices issued by the GOI/GOG as well as the list of
Blacklisted contractors announced by GSECL/GUVNL subsidiaries, shall be
26 Any tender not bearing signature of the bidder & with seal of company on all the
documents accompanying the tender is liable to be rejected.
27 The Notice inviting tender/clarification/amendments/corrigendum, general
instruction to bidders and all other documents of this tender shall be the part of the
28 The information given in this specification is in good faith and meant to serve as a
guide to the BIDDER. It is, therefore, imperative that BIDDER shall obtain and
examine for himself all the data, information and particulars required for the
satisfactory execution of the work under this enquiry/tender. The submission of a
bid by Bidder implies that he has fully read the specifications, bid drawing,
Contractor Document and General Conditions of Contract and has made himself
aware of the scope and the specifications for the work to be performed and local
conditions and other features which have a bearing on the cost and execution of
the work. GSECL shall not, therefore, after acceptance of the bid, pay any extra
charges for any reason whatsoever.
29 Every page of the bid document/amendments/corrigendum, shall be signed and
dated in ink by the BIDDER as a token of having examined the same.
EW- 366 PUR-F-006 RFQ-
30 ACCEPTANCE / REJECTION OF BID
A. GSECL reserves the right to accept or reject any bid in whole or part and/or
accept other than the lowest bid without assigning any reasons.
B. The bid is liable for rejection prima facie, if it is:
a. Not in the prescribed form.
b. Not properly signed by the BIDDER.
c. Not conforming to TENDER specification.
d. Tender fee & EMD cover Received after expiry of the due date and time.
e. Bid submitted without payment of Tender fee & EMD (in case of paid through
Demand Draft / Bank Guarantee),
g. Online tender not filled and Hard copy of Tender fee & EMD cover Sent.
31 Any clarification/queries asked by GSECL / GSECL's representative about
tender/offer shall have to be furnished by the contractor within stipulated time;
otherwise the offer of the firm will be liable to be rejected.
32 Tenders which do not fulfil all or any of the above conditions or incomplete in any
respect, are liable to rejection.
33 a) GSECL. reserves the right to accept/reject/Cancel any or all the
offers/tenders, extend dates and / or re-advertise tender, and /or modify the
process at any stage of the process without assigning any reason thereof.
b) GSECL reserves the right to accept any tender irrespective of whether it is
lowest or not or to reject all the tenders without assigning any reasons
c) Tenders departing from the stipulated technical specifications, commercial
conditions or the method of bidding in a radical manner are liable to be
34 Relationship with employee
Every bidder should, at the time of submission of bid, give a declaration as under.
“If in any Bidder Company/ firm, the interest (i.e. Shareholding in company and
share in partnership firm) of any employee of the tendering Company or his/ her
relative as defined in Section 2(77) of the Company’s Act. 2013 is 10% or more,
the tendering Company will not deal with such Company/ Firm at all.
Tenderer, therefore, must specifically disclose this fact in his technical Bid. Non-
disclosure of such facts would immediately disqualify the tenderer for further
dealing with the tendering Company.”
35 If participating bidder/agency have stake in one or more other agencies/ bidders
who are participating in same tender and on account of submission of wrong
information / declaration in the tender / enquiry, than the bidder will be declared
as disqualified automatically and EMD & SD will be forfeited. Further, GSECL
shall take stern action including Stop dealing with their firms.
36 If the bidder has opted for the composition scheme of GST, the same must be
clearly specified with valid declaration and certificate from department. In the
event of withdrawal / cessation of the bidder from composition scheme during the
tenure of the contract, the rate (i.e. Price) mentioned in the prices bid shall be final
and any additional GST will have to be borne by the bidder. In no case additional
amount toward GST or otherwise will be paid /reimbursed to bidder.
37 Every bidder should mention separate HSN/SAC Code and rate of GST and cess
as applicable, if not specifically mentioned then company will have the option to
take the prices as exclusive of taxes and duties at maximum higher slab rates for
the evaluation of tenders.
EW- 366 PUR-F-006 RFQ-
38 Every bidder shall have to inform their GSTIN NO of the registered place from
where the bidder intends to supply the goods/services, meaning thereby the bidder
has supply the goods/services from the relevant declared / registered place(s) of
39 It should be clearly understood that the GSECL will not reimburse any cost
incurred by bidder for the Preparation of offer, site visit, collection of information,
or, if bidder is selected, for contract or negotiation.
40 Bidders are requested to remain in touch with the web-site for any amendment /
corrigendum or extension of due date etc. At any time prior to the deadline for
submission of bids, the GSECL may, for any reason, whether at its own initiative,
or in response to a clarification requested by a prospective Bidder, amend the
bidding documents. The amendments will be posted at e-Tender Portal for
viewing by the Bidder. The amendments will be binding on Bidders and it will be
assumed that the information contained therein will have been taken into account
by the Bidder in its bid. Bidders are also advised to regularly check e-Tender
Portal regarding posting of Amendment, if any.
41 If party has two registrations, out of which one is cancelled than party has to
provide the No due certificate from GST Department for the cancelled GST
42 Conflict of Interest among Bidders/ Agents: -
A bidder shall not have conflict of interest with other bidders for particular quoted
item. Such conflict of interest can lead to anti-competitive practices to the
detriment of Procuring Entity’s interests. The bidder found to have a conflict of
interest shall be disqualified. A bidder may be considered to have a conflict of
interest with one or more parties in this bidding process for quoted item, if:
(a) They have proprietor/ partner(s)/ Director(s) in common; or
(b) They receive or have received any direct or indirect subsidy/ financial stake
from any of them; or
(c) They have the same legal representative/agent for purposes of this bid; or
(d) They have relationship with each other, directly or through common third
parties, that puts them in a position to have access to information about or
influence on the bid of another bidder; or
(e) Bidder participates in more than one bid in this bidding process. Participation
by a bidder in more than one Bid will result in the disqualification of all bids in
which the parties are involved. However, this does not limit the inclusion of the
components/ sub-assembly/assemblies from one bidding manufacturer in more
(f) In cases of agents quoting in offshore procurements, on behalf of their
principal manufacturers, one agent cannot represent two manufacturers or quote
on their behalf in a particular tender enquiry. One manufacturer can also authorize
only one agent/ dealer. There can be only one bid from the following:
1. The principal manufacturer directly or through one Indian agent on his behalf;
2. Indian/ foreign agent on behalf of only one principal.
(g) A Bidder or any of its affiliates participated as a consultant in the preparation
of the design or technical specifications of the contract that is the subject of the
(h) In case of a holding company having more than one independently
manufacturing units or more than one unit having common business ownership/
EW- 366 PUR-F-006 RFQ-
management, only one unit should quote. Similar restrictions would apply to
closely related sister companies. Bidders must proactively declare such sister/
common business/ management units in same/ similar line of business.
(i) Bidder shall not act in contravention/ violation to the provisions of competition
act, as amended from time to time.
Every bidder should, at the time of submission of bid, give a declaration as per
ANNEXURE, that bidder shall not have conflict of interest/related with other
bidders for particular quoted item, as above.
43 Stop Dealing/Blacklisting/Banning for business Dealing
As per GSECL policy, A Firm/bidder will be placed in a Stop deal/ banned for
business dealing / blacklist, if the Firm/bidder has carried out any of the following
mischief/mal practices with GSECL.
(a) Has submitted fake, false or forged documents / certificates.
(b) Has revised / withdrawn price bid after opening of Techno-commercial bid,
until and unless it is sought for.
(c) Has tampered with the stipulated tendering procedure.
(d) Has refused to accept Letter of Acceptance / Purchase Order / Work Order
after the same is issued by the Company within the validity period and as per
agreed terms and conditions.
(e) Has committed breach of contract or has failed to perform a contract or has
abandoned the contract.
(f) Has failed to provide suitable expertise for the work as per pre-scheduled
(g) Has failed to submit all the necessary tests reports / documents within time
schedule / as per Company’s time limit, as mentioned in the LOA, if the Letter of
Acceptance (LOA) is placed subject to submission of type reports / documents to
(h) Has indulged in construction and erection of defective works.
(i) Has supplied inferior quality / defective materials and refused to replace with
stipulated time frame, as specified by the Company.
(j) Has substituted materials in lieu of materials supplied by the Company or has
not returned or has short returned or has unauthorisedly disposed of materials /
documents / drawings / tools or plants or equipment supplied by the Company.
(k) Has involved in malpractices such as bribery, corruption, fraud, canvassing
(l) Has unauthorisedly obtained official company information or copies of
documents, in relation to the Tender / Contract.
(m) Has failed to follow the stipulated mode of communication, if specified by the
tendering authority / purchaser.
(n) Has parted with, leaked or provided confidential / proprietary information of
the Company given to the firm only for its use (in discharge of its obligations
against an order) to any third party without prior consent of the Company.
(o) Any other ground for which in the opinion of the Company makes, it
undesirable to deal with the Firm, and.
(p) In case the State Government directs the Company to place a firm in stop
dealing / banned for business dealing / blacklisting.
EW- 366 PUR-F-006 RFQ-
44 1. Dispute Resolution Mechanism: For works contracts and composite
Contracts, the arbitration mechanism shall be governed by the Gujarat
Public Works Contracts Disputes Arbitration Tribunal Act, 1992 as per
(1) Amicable Settlement : "Any dispute, difference, controversy or claim
between the parties arising out of or relating to this contract with
reference to the construction, interpretation, breach, termination or
validity thereof (herein after referred as "the Dispute") shall, upon the
written request of either party by referred to the authorized
representatives of the Disputing Parties for resolution. The authorized
representatives shall promptly meet and attempt to negotiate in good
faith a resolution of the Dispute within thirty days of the service of the
(2) Arbitration: If the Parties fail to amicably resolve the disputes or
differences or contrary claims as indicated herewith in sub clause (1) of
Clause 44 arising under or in connection with the present works
contracts, whether pertaining to works contracts alone or works and
procurement both, the same shall be referred to arbitration under the
Gujarat Public Works Contracts Disputes Arbitration Tribunal Act,
Chief Engineer (G)
GSECL: Gandhinagar TPS
Dated seal & signature of
Bidder/Contractor
EW- 366 PUR-F-006 RFQ-
Section-3: (Tender Pre-Qualification Criteria) No: GSECL/Works
Name of Work: Work for hiring of 03-nos. School Buses, having 56 seating capacity
and 02-no. School Bus (Mini bus), having 29 seating capacity
MODEL (BS-6 ) completed with chess& body, With AC, FAPS
Onwards, for 12 hours (6.15 AM to 6.15 PM) with driver &
conductor for 03 years.
The bidders who wish to participate in the bidding shall satisfactorily establish that
they fulfil the following Qualifying Requirements in addition to the satisfactory
fulfilment of the requirements stipulated under tender condition:
A. Technical qualification criteria:
The bidder should have executed / completed similar works and will produce
certificate / documents as evidence for experience of having successfully completed
similar work/jobs for minimum one year during the last seven (7) years in
Government / semi government / state electricity board / private limited company /
public limited company / IPP, as on last date of the month preceding the month of
publication of tender, having minimum contract /order values as indicated below
a. One order of value not less than the amount equal to Rs.
b. Two orders, each of value not less than the amount equal to Rs.
c. Three orders, each of value not less than the amount equal to Rs.
Similar work means – “Similar Works” experience means work such as ““Work
of providing vehicle i.e Bus/ School Bus on hire basis”.
1.1 The work “Executed mentioned above means that bidder should have achieved
the criteria specified above as on the date of techno commercial bid opening,
even if the total contract is started earlier and / or is not completed / closed.
1.2 In case of Contract under execution, the value of total work executed as on the
date of Techno commercial Bid opening shall be considered subject to
submission of certificate from Client / End user only duly certifying the
executed value and Scope of work in such contract / PO/ work.
1.3 Multiple orders placed against single rate contract / Agreement / MoU shall be
treated as one work for the above purpose.
1.4 The above value of executed work is exclusive of applicable tax / GST.
B. Financial qualification criteria:
The Average Annual Turnover of the bidder, shall not be less than the amount
equal to Rs. 23,44,236.00 during the preceding three (3) financial years as one
date of Techno-Commercial bid opening
1) Net worth of bidder shall not be less than 100% of the bidder’s paid up share
capital as on the last day of the preceding financial year. In case the Bidder
meets the requirement of Net worth based on the strength of its Subsidiary
EW- 366 PUR-F-006 RFQ-
(ies) and/or Holding company and/or Subsidiaries of its Holding Companies
wherever applicable, the Net worth of the Bidder and its Subsidiary (ies)
and/or Holding company and/or Subsidiary (ies) of the Holding Company, in
combined manner should not be less than 100% of their total paid up share
capital. However individually, their Net worth should not be less than 75% of
their respective paid share capitals.
Net worth in combined manner shall be calculated as follows:
Net worth (combined )= (x1+x2+X3)/(y1+y2+y3) X 100, where x1,x2, x3
are individual net worth which shall not be less than 75 % of the
respective paid up share capitals and y1, y2, y3 are individual paid up
share capitals.
2) In case the bidder is not able to furnish its audited financial statements on
stand-alone entity basis, the unaudited unconsolidated financial statements of
the bidder can be considered acceptable provided the bidder further furnishes
the following documents for substantiation of its qualification.
Copies of the unaudited unconsolidated financial statements of the bidder
along with copies of the Audited consolidated financial statements of its
Holding Company.
A Certificate from the CEO/CFO of the Holding Company, stating that the
unaudited unconsolidated financial statements form part of the
Consolidated Annual Report of the company.
3) In cases where audited results for the last preceding financial year as on the
date of techno-commercial bid opening are not available, the financial results
certified by a practicing Chartered Accountant shall be considered acceptable.
In case, Bidder is not able to submit the Certificate from practicing Chartered
Accountant certifying its financial parameters, the audited results of three
consecutive financial years preceding the last financial year shall be
considered for evaluating the financial parameters. Further, a Certificate
would be required from the CEO/CFO, stating that the Financial results of the
Company are under audit as on the date of Techno-commercial bid opening
and the Certificate from the practicing Chartered Accountant certifying the
financial parameters is not available.
4) The bidder must submit Average Annual Turnover and Net worth Certificate in
support of Financial QR, duly certified and verified for authenticity from
Independent Statutory Auditor of their company / Practicing Charterer
Accountant/ C.A. Firms / TPIA (Third-Party Inspection Agency ) empaneled /
approved by GSECL along with copy of Annual Audited Accounts of last three
5) The bidder must submit Average Annual Turnover and Net worth Certificate in
support of Financial QR, duly certified and verified for authenticity from
Independent Statutory Auditor of their company / Practicing Charterer
Accountant/ C.A. Firms / TPIA (Third-Party Inspection Agency ) empaneled /
approved by GSECL along with copy of Annual Audited Accounts of last three
Note for point No.1, 2, 3 &4:
i. Other income shall not be considered for arriving at annual turnover.
ii. “Holding Company" and “Subsidiary Company” shall have the meaning
ascribed to them as per Companies Act of India, in vogue.
iii. Net worth means the sum total of the paid up share capital and free reserves.
Free reserve means all reserves credited out of the profits and share
premium account but does not include reserves credited out of the
revaluation of the assets, write back of depreciation provision and
EW- 366 PUR-F-006 RFQ-
amalgamation. Further, any debit balance of Profit and Loss account and
miscellaneous expenses to the extent not adjusted or written off, if any, shall
be reduced from reserves and surplus.
Other requirements:
1) Bidder should have a separate valid GST registration number and PAN
2) Copy of P.F. code from the appropriate provident fund authorities.
3) Labour License for Labour Contract: The contractor on getting the work order
but before starting the work shall have to furnish the copy of Labour License
under the Contract Labour (Regulation & Abolition) from the appropriate
authorities. Also required workman group insurance policy covering labour
4) The bidder must submit performance certificates or satisfactory work completion
certificates (issued directly by the utility) or Copy of Processed Final Bill of the
executed / submitted PO from the utility. Bidders shall be required to submit all
the documents, in support of Technical QR (Such as copies of Purchase
orders/work orders / Contract Agreements, Client Certificates, etc), duly
certified and verified for authenticity by the Independent Statutory Auditor of
their company / Practicing Charterer Accountant/ C.A. Firms / TPIA (Third-
Party Inspection Agency) empaneled/approved by GSECL.
5) Copy of partnership deed in case of partnership firm or proprietorship
declaration in case of proprietary firm or memorandum of article in case of
6) Bidder has to submit copy of vehicle documents for the offered vehicles against
subject tender such as RC book, insurance and other vehicle related documents
or bidder has to provide self-declaration stating that they shall provide newly
purchase vehicles as per tender terms & condition and submit the documents
accordingly if they found successful (lowest-1) bidder.
1. The Chief Engineer (Gen.), GSECL, GTPS reserve right to reject any tender or
all tenders without assigning any reason thereof and to split up the work
between more than one party as the case may be.
2. Non-compliance of above criteria the technical bid is liable to be rejected.
After acceptance of the Technical Bid, the Price Bid will be considered for
Chief Engineer (G)
GSECL: Gandhinagar TPS
Dated seal & signature of
Bidder/Contractor
EW- 366 PUR-F-006 RFQ-
Section-4: General Conditions of Contract No:GSECL/Works
Name of Work: Work for hiring of 03-nos. School Buses, having 56 seating capacity
and 02-no. School Bus (Mini bus), having 29 seating capacity , MODEL (BS-6 )
completed with chess& body, With AC, FAPS Onwards, for 12 hours (6.15 AM to
6.15 PM) with driver & conductor for 03 years.
1 The General rules and regulations of the Corporation for tender and contract
for works will apply to the extent the same are not modified herein. Any other
rules and regulations, conditions etc. that are in force in present and that may
be framed by the Corporation from time to time in condition with contracts will
be binding and acceptable to the contractor.
To sublet or to transfer the contract without prior approval of the
GSECL shall be treated, as breach of contract and it shall be punishable
by forfeiting the S.D. as well as termination of contract.
The contractor shall not engage any sub-contractor without written prior
permission of the Chief Engineer or the authorized officer of the
GSECL. In no case the GSECL will be liable in any manner regarding
any liability in respect of any contract laboure engaged by the sub-
contractor and the liability of such contract laboure will solely rest with
the principal contractor.
3 Execution of Agreement:
The successful bidder (contractor) will have to enter into an agreement
(notarized stamp paper of Rs.300/-) with the GSECL before starting the work
and the cost of the stamp paper will be borne by the contractor. The contractor
will also have to execute indemnity bond on required value of stamp paper as
per GSECL‟s rules. The cost of stamp paper for indemnity bond will be borne
by the contractor.
The GSECL will be entitled to deduct directly from the bills to be paid to the
contractor any sum or sums payable by the contractor and which sum/sums the
GSECL is required to recover as its own dues/recoveries as well as to pay as a
principal employer on account of contractor’s default in respect of all liabilities
referred to in above clauses.
In case of default, the work will be got done through other
agency/agencies at the risk and cost of the original contractor, and the
GSECL shall be entitled to recover such expenses from defaulting
contractor by such methods as deemed fit. The contractor shall not,
however, be entitled to terminate the contract or stop works undertaken
by him before expiry of the contract period/extended period due to any
reason whatsoever.
The contractor is bound to execute the work for any item as per the
instruction of the Engineer-in-Charge. On refusal to do so, the work will
be carried out at the risk and cost of contractor by using the contractors
tools and tackles, for which no compensation whatsoever shall be
payable to the contractor.
EW- 366 PUR-F-006 RFQ-
6 Limitation of Liability : Except in cases of criminal negligence or wilful
(a) Neither Party shall be liable to the other Party, whether in contract, tort, or
otherwise, for any indirect or consequential loss or damage, loss of use, loss
of production, or loss of profits or interest costs, which may be suffered by
the other Party in connection with the Contract, provided that this exclusion
shall not apply to any obligation of the Contractor to pay liquidated
damages to the Employer and
(b) The aggregate liability of the either party to the other party, whether under
the Contract, in tort or otherwise, shall not exceed the total Contract Price,
provided that this limitation shall not apply to any obligation of the
Contractor to indemnify the Employer with respect to patent infringement.
Notwithstanding anything contained hereinabove, the aggregate liability of the
Employer to the Contractor shall not exceed the Total Contract Price, less
payments already released to the Contractor, if any.
a) The GSECL shall not pay any advance(s) against this work including
mobilization advance if not otherwise included hereunder.
b) The Payment shall be made within 30 days from recording of bill. Any delay
in payment of bill shall not entail the contractor for any extra claim. All
required documents are required to be submitted with bill.
d) Amount of GST and applicable cess will be kept under retention till
submission of documentary proof of payment of GST or till reflection of
payment of GST pertain to respective bill amount in GST return for concern
order after due verification.
8 Taxes and Duties:
All royalties, sales tax, toll tax, local tax, development charges, GST, welfare
cess and any other taxes including works contract tax etc., except GST in
respect of this contract and also any statutory variation in future towards above
mentioned taxes & any other taxes if levied in future by statutory authority
which are applicable to the this contract shall be payable by the contractor and
GSECL will not entertain any claim whatsoever in this respect.
GST is applicable as per government rules. The Bidder shall have to furnish
attested copy of Registration Certificate issued by government authority
mentioning GST Registration Number and the same is to be shown in each
Amount of GST and applicable cess will be kept under retention till
submission of documentary proof of payment of GST or till reflection of
payment of GST pertain to respective bill amount in GST return for concern
order after due verification.
10 Statutory variation :
Statutory variation on applicable taxes mentioned in order shall be admitted
provided they take place during the contractual completion period subject to
claim being supported by documentary evidence.
Any statutory increase or decrease on the taxes and duties subsequent to your
offer if it takes place within the original contractual delivery date will be to the
EW- 366 PUR-F-006 RFQ-
company’s account subject to the claim being supported by documentary
evidence. However if any decrease takes place after the contractual delivery
date the advantage will have to be passed on the company.
Income tax & other taxes at the applicable rate will be deducted at source from
your bill as per rules. Contractor has to submit all the invoices clearly
mentioning PAN No.
The contractor being exempted for Income tax shall submit the valid
exemption certificate with bill.
12 Arbitration:
All matters, questions, disputes, differences and / or claims arising out of and /
or concerning, and /or in connection with, and /or in consequence of, and /or
relating to this contract which may arise between the parties in connection with
the Contract or any matter arising out of or in relation thereto shall be reported
to Gujarat Public Work Contract Dispute Arbitration Tribunal and provision of
Gujarat Public Work Contract Disputes Arbitration and Tribunal Act
shall be applied as updates time to time.
Recoveries due from the contractor, up to the end of the month previous to the
one in which the bill is prepared shall be made from bills approved by payment
every month or at other periods when the bills are prepared, for the various
items in the following order of priorities and extents.
a) Deduction on account of security deposit in full together with shortage,
if any, to be made good.
b) Penalty/Liquidated Damages in full, if levied.
c) Expenditure, if any, incurred by the GSECL on behalf of Contractor for
labour or materials in full.
d) Other recoveries. (If any).
14 Labour wages:
The contractor shall pay minimum wages to his labourers as per the Minimum
Wages Act, 1948 and rules therein, as applicable from time to time, in
pursuance to the state government notification. The concerned contractor, after
making such payment to his labourers, shall submit the details of the payment
with the certification of Labour Welfare Officer/Industrial Relations Officer.
The contractor/Agency shall strictly observe all the labour laws, Factory Acts
and other applicable statutory Rules in existence and amendments made from
15 Commencement of Work:
The contractor shall not enter upon or commence any portion of the work
without clear commencement letter issued by the GSECL (except with the
written authority of GSECL), failing which the contractor shall have no claim
to ask for measurement or payment for work and shall be responsible for any
claims or damages that may arise due to such unauthorized commencement or
entry. The contractor shall make all necessary arrangements at site to mobilize
labour, supervisor as per schedule.
Before starting the work, the contractor should contact Industrial Relation
Officer/ Labour Welfare Officer to complete all formalities and obtaining the
gate passes of his labourers.
EW- 366 PUR-F-006 RFQ-
The contractor shall have to submit required documents for obtaining of GATE
PASS i.e labour licence, workman compensation policy, police verification
certificate, photo ID etc as per applicability for gate entry of his workers,
materials , tools and parts etc.
16 Liability for accidents to persons
a) The contractor or sub-contractor shall indemnify the GSECL against any
claims which may be made under the workman's compensation Act, 1923, or
any statutory modification or otherwise in respect of any damages or
compensation payable in consequence of any accident or injury caused, by
fault of contractor or sub-contractor and sustained by any workman or other
person in the employment of the contractor or sub-contractor. In every case
in which by virtue of the provisions of sub-section (1) of section 12 of the
workman's Compensation Act, 1923, the GSECL is obliged to pay
compensation to a workman employed by the contractor or sub-contractor in
execution of the work, the GSECL will recover from the contractor the
amount of compensation so paid, and without prejudice to the rights if the
GSECL under sub-section (2) of section 12 of the said Act any such amount
shall be paid by contractor within 30 days, failing which the GSECL shall be
at liberty to recover such amount or any part thereof by deducting it from
any due by the GSECL to the contractor under this contract or otherwise.
The GSECL shall not be bound to pay any claim made against either of them
under section 12, sub-section (1) of its said Act, except on written request
from the contractor and upon his giving to the GSECL full security for all
costs for which the GSECL might become liable in consequence for
entertaining such claim.
b) The contractor and/or sub-contractor named in the contract shall indemnify
the GSECL against all claims based upon injury or death to any person in the
employee of the contractor or sub-contractor, or to third parties to the extent
of any sums recovered under the insurance policy.
c) On the occurrence of an accident which results in the death of workman
employed by the contractor or sub-contractor, which is so serious as to be
likely to result in the death of any such workman, the contractor shall within
24 hours of happening of such accidents intimate in writing to the Engineer
the fact or such accidents. The contractor or sub-contractor shall indemnify
GSECL against all loss or damage sustained, by the GSECL resulting
directly or indirectly from his failure to give intimation in the manner
aforesaid including penalties or fine if any, payable by GSECL as a
consequence of GSECL's failures, to give notice under workman's
compensation Act or otherwise to confirm to the provisions of the said Act
in regard to such accident.
d) The contractor will be responsible for complying with all rules and
regulations and labour land applicable to him and the GSECL will not be
responsible for any lapses committed by them. If there is any claim from any
Govt. Authority pertaining to the contractor the same amount will be
deducted from the contractor's bill.
e) The contractor shall hold the Corporation indemnified against and in respect
of any claim arising out of injury to any persons, loss of life, workman’s
compensation or any other claims whatsoever. The contractor shall be
responsible for any damages to any property of the Corporation due to
negligence of the contractor or his employees. The Corporation will be
EW- 366 PUR-F-006 RFQ-
entitled to recover the damages from the contractor and it shall be final and
binding to the contractor.
17 Office correspondence will be carried out in English language, and if at any
time to facilitate the contractor, Gujarati translation may be furnished, if
deemed fit. The English version will be the correct one and the same only will
hold good for legal matters.
18 The contractor shall deploy the adequate number of experienced staff at site for
daily supervision and for maintenance of various registers and records required
under the law and contract. No payment by the GSECL for supervision shall be
19 The contractor should intimate to the office the name, cell no. and address of
authorized and responsible representatives, so that our field officers can contact
them when required in connection with the execution of the said works.
An authorized and technically qualified representative of the contractor must
be available at site while the work is going on. The address of the
representative should be submitted to this office so that EIC can be contacted
whenever required in connection with execution of the work.
20 Any clarification/queries asked by GSECL / GSECL's representative shall have
to be furnished by the contractor.
21 All safety measures as required to be adopted as per the Statutory Regulations
and the Safety Rules of the Plant shall be strictly followed by the Contractor
during the execution of the Contract. The Contractor shall set up a suitable
safety organization of his own in this regard. The contractor shall ensure the
safety of workers, material and structure including existing structures during
execution of the contract. Safety measures shall be followed during operations
of equipments/machinery being used. No separate payment shall be made for
the safety measures and the quoted rates shall include the cost for all safety
22 The GSECL will not pay any extra charges or rate for any reasons in case the
contractor claims, after acceptance of contract to have misjudged the site
23 In case of conflict/discrepancies among clauses of different specifications
given in this document, the stringent specification shall be followed and under
such circumstances, the decision of the EIC shall be final and binding to the
24 The contract or any part thereof shall not be subject to change without the
written permission of the Chief Engineer (Gandhinagar TPS) or his authorized
representatives from issuing authority of certificates / details.
25 For any conflict and ambiguity, the decision of the Chief Engineer
(Gandhianagar TPS) shall be final and binding on the contractor.
26 The GSECL reserves the right to terminate this contract at any time during its
currency without giving notice of termination or any reason thereof and no any
compensation shall be given.
27 Measurements to be provisional and subject to correction
Every measurement for running payment on account of work done shall be
subject to adjustment or final measurements. In case of disagreement between
such intermediate and final measurements, the latter shall prevail.
28 Performa returns
The contractor shall maintain Performa, charts and details regarding machinery
equipments materials, labour personnel and other matters as may be specified
EW- 366 PUR-F-006 RFQ-
by the Engineer. He shall further, submit returns of Performa and details as
may be specified by the Engineer in charge from time to time.
29 Jurisdiction and Governing laws:
The Contract shall be governed by laws of GOI/GOG and the Courts of
Gandhianagr shall have exclusive jurisdiction in all matters under the contract.
Chief Engineer (G)
GSECL: Gandhinagar TPS
Dated seal & signature of
Bidder/Contractor
EW- 366 PUR-F-006 RFQ-
Section-5: Detail Scope of work & Special No:GSECL/Works
conditions of contract (SCC) Tender/
Name of Work: Work for hiring of 03-nos. School Buses, having 56 seating capacity
and 02-no. School Bus (Mini bus), having 29 seating capacity
MODEL (BS-6 ) completed with chess& body, With AC, FAPS
Onwards, for 12 hours (6.15 AM to 6.15 PM) with driver &
conductor for 03 years.
The Successful bidder /Contractor have to provide vehicles i.e. 03-nos. School
Buses, having 56 seating capacity and 02-no. School Bus (Mini bus), having
seating capacity , MODEL (BS-6 ) completed with chess& body, With AC, FAPS
Onwards, for 12 hours (6.15 AM to 6.15 PM) with driver & conductor as per Tender
terms & conditions mentioned herewith.
Bidders shall quote/offer their rates in Schedule-B (price Bid) covering cost of: -
1. Providing vehicle with Drivers and cleaners including service charge.
2. Tools & Tackles for repair, maintenance/replacement of spares.
3. Salary & wages of drivers and cleaners as well as other staff essential for
above contract including statutory liability thereof.
4. Full Comprehensive Insurance for vehicle/staff/passengers travelling
5. RTO Tax/permits which are essential for the subject work.
6. Any Legal & Accident liabilities etc.
7. All other related expenses for successful execution of above contract.
Note: GSECL will pay the charges as per quoted/offered rates in Schedule-B only.
However all other charges/fees shall be paid by contractor.
Vehicle Specification: Bidder/Contractor has to provide vehicles as per
following specifications.
Vehicle Type 03-nos. 56 seating capacity and 02-no. School
Bus (Mini bus), having 29 seating capacity
MODEL (BS-6 ) completed with chess& body,
Make / Model Eicher/TATA/Ashok Leyland make only
Year of The first registration of vehicles shall not be
Manufacture/Registration older than 01 (One ) year from the date of
opening of Technical Bid. Re-registered or re-
sell vehicles shall not be accepted in any case.
Vehicles shall be registered in the name of
contractor/Bidder/agency’s name only.
Seating Capacity School Buses
03-nos. 56 seating capacity
02-no. (Mini bus), having 29 seating
Nos. of required vehicles Hiring of 03-nos. School Buses, having
seating capacity and 02-no. School Bus (Mini
bus), having 29 seating capacity
Service hours The contractor has to provide the SCHOOL BUS
for 12 hours (6:15 a.m. to 6:15 p.m) with
Driver & Conductor.
(A) TERMS AND CONDITIONS:
EW- 366 PUR-F-006 RFQ-
(1) Period of Contract:
The duration of this contract is 36 months [03 years] and agency have to
deployed vehicle (s) for the period of 36 months [03 years].This includes
Sundays, National holidays and GSECL declared holidays. Further GSECL
reserves the right to extend the contract for further period of 12 (Twelve)
months or part thereof with same rates, terms and conditions of original
contract on requirement based on satisfactory performance of the contractor.
However, in case of poor services provided by the contractor, GSECL reserve
right to terminate the contract at any time after given 01 month notice period.
(2) Area of Work:
a) The vehicle (s) hired will be deployed for local as well as outstation
movement as per requirement of GSECL (GTPS).
b) The vehicle will be required to run anywhere within the territory (i.e.
anywhere in India) as and when the GSECL, so desires. If in special case
the same is required to be used outside Gujarat state, the contractor shall
obtain requisite permission of concern RTO authority for the same. All such
permit charges payable for this purpose shall be reimbursed on actual
basedon production of receipts.
c) If required the vehicle shall be utilised for other than allotted section as per
instruction of EIC/OIC and contractor/bidder is bound for same.
a) The contractor /bidder should maintain logbook of the vehicle and the
logbook should bear the name contractor / bidder on all pages.
b) A daily record indicating time and mileage of the vehicle, KM travelled,
Cumulative KM travelled and obtaining the signature of user of vehicle
along with driver’s signature shall be maintained in a log book as per
format decided by EIC and shall be submitted to the concerned officer
on regular basis for verification.
(4) Safety Regulations, Accident, Damage & Accident liability:
(a) The Contractor/bidder must have to observe all Labour laws, safety rules
and RTO rules. The Contractor / bidder has to provide 'SAFETY ARTICLES
to all his Workmen as per the nature of work they have to perform in the
contract. The Certificate in this regard should be obtained from safety
(b) GSECL shall not be responsible for any damages whatsoever to public/
private property and/or to any third person due to any accident arising out
of and in the course of deployment of the vehicle. It will be the whole and
sole responsibility of the contractor/bidder for any accident or damage to
vehicles and persons traveling including driver for which comprehensive
Insurance policy must be insured time to time throughout the contractual
period. The loss or damage or legal expenses on this account shall be
borne by the contractor/bidder. If any damages will occur in the GSECL
premises by your vehicle, the contractor will have to pay the amount of
damage or the same will be deducted. The contractor will be responsible to
provide another same type vehicle for GSECL in case of accident or police
(c) The GSECL will not be liable in case of any accident or for any other
claims arising out during the transport services rendered to the GSECL.
The contractor shall be fully responsible for all liabilities & actions, which
may be, arise in case of accident / fault or due to any contractor
obligations. The contractor shall indemnify corporation and its personals
against any claim arising out of accident, misbehavior of driver and
violation of RTO, traffic laws or any other laws.
EW- 366 PUR-F-006 RFQ-
(a) The Contractor shall take the complete and comprehensive insurance for
the safety of the vehicle and for the necessary compensation of the persons
travelling by the hired vehicle. Certified copies of the insurance policies
and its receipts must be submitted as a proof and responsibility for the
renewal of the required policies will always be part of the Contractors.
(b) The contractor/bidder shall immunize company’s personnel against any
claim arising out of accidents or misbehaviour of the drivers. The vehicle
shall be kept properly insured all the time to cover the 3rd party risk and
simultaneously immunized company on account of likely claims from
public, police dept. etc.
(c) Comprehensive vehicle insurance (covering third party insurance) must
have to be obtained from any national insurance company. The contractor
shall keep GSECL free from all type of encumbrances, arising due to any
accident throughout the contract period through such insurance policy.
(6) Payment Terms:
The payment will be made as per actual work done only after taking joint
measurement and the contractor will be paid 100 % amount of actual work
done on satisfactory completion of job work. Payment will be released within
30 days from receipt of bill in all aspect. However, amount of GST and
applicable cess will be kept under retention till submission of documentary
proof of payment of GST or till reflection of payment of GST pertain to
respective bill amount in GST return after due verification.
(7) Parking Charge, Toll Tax:
a) As per Guidelines of Central govt. Authority (NHAI), All vehicles
travelling through toll plaza mandatorily pay toll tax using “FASTag” on
vehicle & without fixing of FASTag, vehicle pay up penalty of twice toll
tax at toll plaza. As per above guidelines Contractor / bidder mandatory
has to provide ‘’FASTag’’ on all hired vehicle. In case fastag is not
provided or not in working conditions, GSECL will reimburse only Toll
tax amount without penalty.
b) The toll tax & parking charge will be reimbursed at actual on
production of documentary proof of payment.
(8) Reimbursement of Fuel cost:
Cost of fuel [i.e. Diesel/Petrol] will be Reimbursed as per consumption based on
mileage of vehicle (s) as per prevailing market rates [Monthly average] of fuel for
actual travelled kms only as per below formula on producing documentary
evidence. The prevailing fuel market rate (monthly average) will be the average
price of 1st, 16th & last day of the month obtain from local area authorised fuel
pumps of IOCL/HPCL/BPCL
Formula for Reimbursement of Fuel cost (in Rs.) = X1*X2
Where X1-Actual Travelled kms
X2-Fuel cost as per prevailing market rates [Monthly average]
X3-Mileage of Vehicle
As per available data Considering Mileage of Diesel vehicle
For 56 Seat bus 4.2 Km/liter
For 29 Seat bus 5.6 Km/liter
EW- 366 PUR-F-006 RFQ-
Bidder has to submit invoice for fixed cost & fuel cost separately on monthly basis
(9) Service (Working) Hours:
a) For 12 Hours Vehicles: The agency shall deploy the vehicles with drivers
& Cleaners (if applicable) on 12 hrs basis. The normal working hours will
be from 6.15 AM to 6.15 PM for all days of the year. However as per
requirement the vehicle may have to report earlier or may be relieved after
(10) Extra working hours charge:
For 12 Hours Vehicles: GSECL GTPS will pay extra hours charges for driver
& Conductor Rs.128.00 & Rs 125.00 per hour if the vehicle is deployed
beyond the normal 12 hours period. In case the vehicle services required in
extra hour more than 30 minutes, it will considered as 01 hour as an extra
hours and accordingly Extra hours charges will paid, However in case the
vehicle services required in extra hour less than 30 minutes, the same shall
be ignored and no extra hour payment shall be made.
(11) Night halt Charge
a) For 12 Hours Vehicles: For 12 hours vehicles, in case vehicle stayed out
from head quarter in night hours [between 00:00 hours to 6:00 AM],the
night halt charges Rs 500.00 per night per person ( i.e Driver & cleaner as
per available ) will be applicable and same will be paid extra by GSECL
If the vehicle reaches to head quarter in night hours [between 00:00 hours to
6:00 AM] and does not requires to stay outside the headquarter, in such
case, night halt charges will not be applicable, however extra hours charges
shall be payable as per tender terms & conditions.
Contractor will be able to claim Night halt charge in the following
i) If driver & conductor driven vehicle with GSECL employees have to stayed
out in night hours.
ii) Contractor cannot overlap & claim combine of Extra hours & Night halt
charges for night hours [between 00:00 hours to 6:00 AM].
iii) For payment of Extra Hours & Night halt charges, proof of record indicating
time with KM travelled and obtaining the signature of GSECL employee
/officer of vehicle along with driver’s signature shall be maintained in a log
book and shall be submitted to the concerned officer, regularly for
verification & passing of Monthly R.A. Bill.
iv) During Night halt, the lodging and boarding of driver shall be borne by
Contractor/Bidder only.
(12) Extra Kms:
As the vehicle hired for monthly basis, No extra kms charges shall be
applicable as the fuel cost shall be reimbursed as per fuel cost formula.
(13) Driver Liability:
a) Driver Age: Driver Age shall be Preferably between 21 to 40 years & not
above 55 years.
b) Driver Education: Minimum 7th standard pass.
c) Driver Experience: Minimum 3 years of taxi driving & able to attain normal
EW- 366 PUR-F-006 RFQ-
d) Contractor/Driver shall be followed the Central Motor Vehicle Act 1988 &
rules 1989, The Motor Vehicles (Amendment) Act 2019 & Gujarat motor
Vehicles rules 1989 and amendment thereon during the this contract.
e) The driver must have valid Taxi driving License issued by RTO and it
should be valid up to the validity of the contract.
f) Driver should carry necessary permits/clearance from the Transport
Authority any other concerned authority including pollution certificate.
g) Engaged/deployed Driver should be medically fit in all respect.
h) Driver so engaged will be well disciplined, well behaved and well
experienced of driving. If driver misbehaves with any GSECL Officers / staff
and found in any illegal condition during his duty hours, same will be
dismissed immediately. They must behave in a polite and courteous
manner with the Company’s employees. In case of any complaint against
any drivers etc., the contractor must change him/them and in case
contractor fails to do so, such Driver shall not be accepted on duty and
vehicle on which deputed shall not be accepted on duty and marked
i) The driver should always remain with the vehicle during entire period of
duty hours. In case of any urgency the driver may seek permission of the
concerned officers. The driver cannot be changed /on leave without the
permission of the officer using the vehicle.
j) The Drivers should be provided with enough money to cover the cost of fuel,
repairs and incidental expenditure etc.
k) The lodging and boarding of driver/cleaner & contractor staff shall be borne
by Contractor/Bidder only. In no case, contractor’s any staff including
driver/cleaner shall ask money or facility for lodging/boarding/fuel
charge/repairing cost or any other cost from any GSECL officers.
Contractor/bidder have to clearly instructed to their staff accordingly. In
case any complaint received from any GSECL officer regarding this, the
paid amount by GSECL officer for lodging/boarding/fuel charge/repairing
cost or any other cost plus 25% as penalty will be deducted from
contractor’s bill.
l) The required speed limits mentioned in the plant, township areas,
Road/Highways etc as notified there are to be strictly followed. In no cases
driver should be engaged in Rash driving or cause any type of men and
material damages in duty hours.
(14) Contractor Liability:
(a) The vehicle shall be deployed within 30 (Thirty) days from the date of
issue of Letter of Intent or as per written instruction of EIC/GSECL.
(b) The Contractor will have to depute responsible supervisor for to obey
instruction & better co- ordination with GSECL (GTPS) throughout the
(c) The vehicle to be deployed for hiring shall be in up-to-date condition
including its battery, Oil, Tyre-tubes, engine as well as conditions of its
outside body & maintain schedule service as per OEM guideline
throughout the contractual period & for that no any extra payment shall
be paid by GSECL.
(d) Contractor has to provide all the vehicles with GPS enabled real time
position tracker along with the software to track the same and submit
vehicle wise monthly GPS tracker report with RA bills.
(e) The contractor shall ensure that the vehicle (s) deployed under this
contract shall be strictly utilised for GSECL officer/GSECL site
requirement/as instructed by EIC only and not for the other purpose. If
any time it is found that the contractor or its staff utilising the vehicle (s)
deployed under this contract for any personal use (except GSECL
requirement) then penalty will be imposed as per penalty clause. Further
if similar incident found more than 03 times, the contact is liable for
EW- 366 PUR-F-006 RFQ-
(f) The contractor shall ensure that speedometer of vehicle(s) supplied is
properly sealed so that no tampering is done with a view to inflate
distance travelled. LPG Cylinders/Gas Kit should not be used for running
the vehicles in any case.
(g) In case of any breakdown of vehicle on duty, the contractor shall make
arrangement for providing another same type vehicle. In such a case,
mileage from garage to the point of breakdown would not be paid.
(h) In case vehicle does not report within the reasonable time or does not
report at all, the GSECL would have a right to make an alternate
arrangement of a vehicle from the market and the additional cost incurred
by the GSECL will be borne by the Contractor and same will be deducted
from contractor’s monthly bill.
(i) In case of outside journey, the vehicle should be provided immediately
after receipt of Telephonic intimation from EIC with sufficient fuel and
pocket money to driver.
(j) The contractor shall also be liable for depositing all taxes, levies, cess etc.
on account of services rendered by it to GSECL to concerned tax
collection authorities from time to time as per extant rules and
regulations on the matter.
(k) Contractor shall ensure that the vehicle deployed by them does not
damaged GSECL goods, materials and equipments etc. in the process of
carrying out the services undertaken by it and shall be responsible for
acts of commission and omission on the part of its staff and its employee
etc. If the GSECL suffers any loss or damage on account of negligence,
default or theft on the part of the employees/drivers of the contractor
then the contractor shall be liable to reimburse to the GSECL for the
same. The contractor shall keep this GSECL fully indemnified against any
such loss or damage.
(l) The vehicle shall be used for movement of persons of the
department/others and material as per the instructions of EIC. The
contractor/agency/driver can’t have any rights for objection. In case of
any such objections, the deployment of vehicle for the day shall be treated
as “not reported” and no payment for the same shall be paid. In addition
additional 50% of charges for the day shall be deducted as penalty
for non-compliance.
(m) The contractor shall not assign, transfer, pledge or contract the
performance or service without the prior written consent of the GSECL.
(n) Driver or any other staff shall not be entitled for the accommodation in
GSECL colony area. Contractor/bidder have to make arrangement for
accommodation for their staff near to GSECL colony area on his own cost.
(o) Necessary entry and gate pass will be issued to Maximum
persons/vehicle (in case of cleaner required maximum 04 person/vehicle)
by GSECL authority for which contractors have to submit and comply all
necessary formality for the same.
(p) The contractor shall ensure that one permanent numbered mobile phone
with head phone with the engaged vehicle is in working condition round
the clock and it must with engaged driver & for which no separate
payment shall be made by GSECL. For non-responding recurrence will be
viewed seriously and appropriate penalty may be imposed.
(q) Driver/Cleaner wages: Drivers & cleaner Salary to be paid by the
agency/bidder as semi-skilled labour wages for driver & Un-skilled
labour wages for cleaner as per the minimum wage circular of GOG
revised time to time along with applicable liability as per GSECL rules.
The present minimum wages for semiskilled labour & Un-skilled labour
wages are Rs. 522.5 & Rs. 512.5 respectively and same is considered in
tender estimated cost. In case labor wages increase by GOG during the
contractual period then the differential amount along with applicable
liability shall be reimbursed to agency/bidder against documentary
EW- 366 PUR-F-006 RFQ-
evidence for the payment made to driver/Cleaner (s).In case decrease in
wages it will be adjusted in next bill. However in case of individual bidder
who has submitted self-declaration stating that the vehicle will be driven
by him/her self or their family members only are eligible for
reimbursement of labour wages difference as mentioned above without
any documentary evidence and they are not allowed for any labour
liability difference as they are already exempted.
(r) The contractor has to make payment of driver salary through bank
account only.(Not applicable to self-driving individual bidder/his family
(s) It will be the responsibility and liability of contractor/bidder for
observance of PF/gratuity/all other statutory rules, for the
persons/drivers engaged for this work if applicable.
(t) Contractor will be wholly and exclusive responsible for payment of wages
to the person engaged by it in compliance of all the statutory obligations
under all related legislations as applicable to it from time to time
including Minimum Wages Act, Employee Provident Fund, etc. and the
Department shall not incur any liability for any expenditure whatsoever
on the person employed by the contractor on account of any obligation.
(u) The contractor shall maintain all statutory registers under the applicable
law. The contractor shall produce the same, on demand, to the concerned
authority of GSECL or any other authority under law if applicable.
(v) In case, the contractor fails to comply with any statutory/taxation liability
under appropriate law, and as a result thereof the GSECL is put to any
loss/obligation, monetary or otherwise, the GSECL will be entitled to get
itself reimbursed out of the outstanding bills or from security deposit of
the contractor, to the extent of the loss or obligation in monetary terms.
(w) It will be the responsibility of contractor to arrange for biometric punching
(i.e. providing biometric specimen of all drivers engaged to LWO) Engaged
driver’s payment will be made by contractors as per biometric presence
and documents & payment to be paid to persons by RTGS in their bank
account, nowhere GSECL will be responsible for the same. Any
banking/transition charges etc. to be borne by contractor.
(x) It is liability of the contractor to maintain regular biometric presence
record and should be paying all acquired, benefits to the drivers which in
(y) It is the agency's responsibility to arrange required numbers of
drivers/cleaner (if applicable) to run without any hindrance and extra
(z) The Contractor shall arrange to pay all taxes and dues to the Government
from time to time and shall abide by statutory requirements for
operating and providing such hire services. The Contractor shall
indemnify GSECL against all claims arising out such demands and
GSECL takes no liability on this accounts.
(aa) During the contract period, if the vehicle is seized or detained or
requisitioned by Police/Motor Vehicle Authority or any other authorities
for whatsoever reasons that will be at the Contractor’s risk. Also alternate
vehicle (s) of similar or higher category will be provided by contractor
without any extra charges.
(15) Penalties: In case contractor or their staff does not adherence the tender
terms & conditions, GSECL shall imposed penalties to contractor/agency as
under (but not limited to).
Sr. Reason of Penalty Penalty amount in
1 In case of absence of vehicle on any day of the 1.5 times of Per day
month. cost per vehicle
2 In case delay reporting Rs.250 per day per
EW- 366 PUR-F-006 RFQ-
3 Non arrangement of alternate similar or higher 1.5 times of Per day
category vehicle during breakdown or due to seized/ cost per vehicle
detained by any authority.
4 If vehicle utilised by contractor or its staff for any2 times of Per day
personal use (Except GSECL requirement). cost per vehicle
5 Frequent changing of driver without information to Rs.500 per incident
EIC & misbehaving of Driver per driver
6 Improper cleaning of vehicle inside/outside Rs.200 per incident
7 Driver gate pass permission expired or not renewed Rs.50/- per day per
in time (wherever applicable). driver
8 Non adherence of any order Terms & Conditions Rs.250 per incident
9 Vehicle not in proper condition interior or exterior Rs.500 per day per
[i.e. Broken glass/improper seat condition/improper vehicle till repairing/
window/broken door/gear/body/tyre tube etc.] replacement of such
(16) Successful bidder shall have to submit following documents zerox copy
before commencement of the work.
(a) Invoice, RC book of vehicle
(b) Insurance of the vehicle covering period of hire.
(c) Taxi / Maxi permit certificate.
(d) RTO Tax paid receipt.
(e) Fitness certificate
(f) PUC certificate
(g) W.C. Policy (if applicable).
(h) Proof of fixing FASTag on hired vehicle.
(i) Photograph & Driving license of the driver.
(j) Permanent mobile number per vehicle
(k) Any other relevant documents relating to hiring of vehicle required under
Road Transport rules in force from time to time.
(17) If contractor fail to execute the order successfully, the order will be got
completed through other agency and if required to pay higher rates, in that
case, difference of rates will be recovered from contractor who fails to execute
(18) The chief engineer, GSECL, (GTPS) reserves right to withdraw/relax any of
the terms and conditions mentioned above so as to overcome the problem
encountered by the contracting parties.
(19) For any dispute in terms & conditions for this work order interpretation,
meaning and decision of Chief Engineer GSECL, (GTPS)shall be final and
binding upon contract.
SPECIAL CONDITION OF CONTRACT.
1. Contractor has to maintain the vehicles in good healthy condition
including the tyres, batteries, Seats, Lubricants etc. should be in good
condition. This is must for all the days in the contract. The SCHOOL BUS
put on hire should be duly insured for all risk and having RTO clearance.
2. Contractor has to maintain the diesel in tank to enable to run the vehicle
daily and driver should have necessary money for daily fuel requirements.
3. Outside of school bus :
i. The school bus should be painted yellow
ii. The front and the back of the school bus carrying school
children should be written “SCHOOL BUS” in clear and capital
iii. Driver information ( Name / License NO / Badge No. ) and
school bus information or bus owner’s telephone help line
number should be written inside and outside the vehicle with
EW- 366 PUR-F-006 RFQ-
contras color, it is clearly readable to bus travelers and public
for in emergency informed to school management , police or
4. Inside of school bus :
i. The window of the bus should have horizontal bars and grilles.
ii. There should be reliable lock on the bus door.
iii. Emergency Exit door in every school bus is compulsory.
iv. ABC type fire extinguisher ( 5 kg. ISI certified ) should be in the
v. First aid box and drinking water facility should be in bus and
curtain on school bus window & film on window glass is not
5. The contractor has to provide the SCHOOL BUS for 12 hours (6:15 a.m.
to 6:15 p.m) with Driver & Conductor. The contractor has to ensure that
the driver has valid driving License as Heavy Vehicle driver for the
SCHOOL BUS on contract. The contractor shall ensure that the vehicle
provided is not owned by any employee of GSECL any person who is in
service of GSECL or an employee of this company should not be made
partners to the contract by the contractor directly or indirectly in any
manner whatsoever.
6. In case of any accident to the vehicle, it will be the responsibility of the
contractor or his representative to lodge FIR etc. with police. All RTO
issues and Traffic rules violations are the responsibility of contractor
during the period of contract.
7. Log-book shall be provided by the contractor as per GSECL’s format and
the daily trips shall be maintained by him which shall be verified on daily
basis by the concerned user section`s controlling officer. The
Contractor/Driver of the vehicle has to provide the daily km from the
logbook at Auto section daily without failure. In case the vehicle is on trip
out of the station, the km details are to be submitted on telephone to the
officers of Auto section. The vehicle is to be used for official purpose/
work of GSECL, Gandhinagar TPS hence controlling officer should
monitor the usage of the vehicle accordingly.
8. The contractor shall at his own expenses comply, with all labour laws and
keep the GSECL Gandhinagar TPS indemnified in respect thereof. The
major liabilities under various labour laws and industrial laws which the
contractor shall comply, is included in the General Terms and Condition
of Contract, compliance of various provisions of Law and Rules framed
there under in respect of this contract and in respect of Staff Employed by
the contractor and will be the sole responsibility of the contractor.
9. Contractor and their driver & conductor will have to give complete
address with Telephone/Mobile numbers for contact during emergency at
any time the dedicated mobile phone with sim card in the school bus is
10. Driver and shall be preferably below the age of 40 years and never above
55 years. The lodging and boarding of driver shall be borne by the
contractor. Also the Conductor engage should be well disciplined, caring
in nature as he has to handle students of Jr. KG and Sr. KG.
11. The contractor should provide driver & Conductor who are well mannered
and if they engage in rash and unsafe driving, in any case of such
apprehension or misbehaviour GSECL,TPS, Gandhinagar has the right to
expel refuse entry to your personnel with immediate effect. The Driver
should be literate, courteous, should have pleasing manners and having a
valid driving license of the vehicle on contract and should be competent to
run and maintain the vehicle and write logbook daily.
12. The contractor should provide driver & conductor along with the vehicle
who should be fully conversant experienced with the road, driving
conditions and familiar with the applicable highway codes.
EW- 366 PUR-F-006 RFQ-
13. The contractor should provide driver with sufficient cash for discharging
obligations an account of parking charges, toll tax etc. The contractor can
claim such expenditure as reimbursement on submission of supporting
documents with monthly bill
14. The contractor should instruct the driver to carry round the clock all
necessary documents like Registration papers, Insurance papers, PUC
clearance RTO tax payments, valid driving license and all other
documents that should accompany the vehicle as per rules and
regulations of applicable laws. In case of any liability arising due to non
possession of required document, the contractor shall indemnify GSECL
and its personnel.
15. If required the vehicle provided shall be used anywhere in Gujarat
or oust side Gujarat , then you have to provide Bus other than
School bus with all required documents as per the RTO norms,
which no extra charges will be payable.
16. Vehicle may be used on Sunday or Public Holidays or during school
vacation etc. by the Engineer- In-Charge or controlling officer and
no any extra the payments made for the same due to contract
agreement is monthly base same to be acceptable by contractor
during the contractual period,
If contractor not provide vehicle as required than penalty may be
imposed at the rate of 1.5-time (Monthly charges)/30. (This is also
applicable to absent period of vehicle for whole day or any part of
17. The contractor shall obtain necessary Photos Gate pass in time for entry
/exit purpose in GSECL, Gandhinagar TPS Power House area from
Security Section as per the prevailing practice during the contract period.
18. The contractor will comply with all labour and statutory laws applicable
as revised from time to time.
19. On Violation of any Terms as stated in scope of work & Schedule “B” the
decision of competent authority the Security Deposit held by GSECL
Gandhinagar TPS will not be refunded.
20. Details mentioned in scope of work & Schedule “B” are totally the part of
this Tender. In case of any dispute the decision of Chief Engineer (G),
GSECL Gandhinagar TPS will be final.
21. The Vehicle allotted will carry a sticker “ON DUTY GSECL
GANDHINAGAR TPS” in front and back side of the vehicle during the
period of the contract.
22. The contractor should depute his employee for the contract activity and
document thereof such as Appointment Letter, Identity Card of the Firm,
should be produced. The sole responsibility of the staff deployed by the
contractor is his own. The contractor must insure the staff engaged
against all liability by obtaining workmen compensation policy for the
specific Work Order.
The contractor should pay wages as revised from time to time to all his
workmen engaged for this activity in presence of authorized representative
of the company as per the provision of the Contract Labour act. The wages
should be disbursed on or before 10th of next month, the date; time place
of salary disbursement should be informed in advance to the authorized
representative so that he can remain present for witnessing the wages
The contractor should maintain the records of all the contract driver
engaged for this activity in total in the name of the firm such as
attendance register, wages register, Provident fund record etc. and
produce the PF challan and wages register of the relevant month along
with monthly bill with one copy to be sent to HR section.
23. The contractor and their staff shall follow the GSECL Gandhinagar TPS
Safety Rules and Safe Practices while doing any work in the company
EW- 366 PUR-F-006 RFQ-
premises. General Safety rules enclosed. The contractor and his staff will
have to comply with all the guidelines given by the GSECL Gandhinagar
TPS in relation to the Safety and Security of the plant.
24. The school bus timing may be revised by school the contractor has to
provide school bus accordingly
25. The contractor or his staff will not carry any material of the company
outside the premises without valid authorization from Engineer in charge.
The competent Staff will Check your vehicle as per Security guidelines
anytime. If any unauthorized persons are found traveling in the SCHOOL
BUS then the contractor will be penalized at the Rate of Rs. 100/- per
person. The school are issued BUS PASS only after verifying the same
they should be allowed inside the bus at all points.
26. At the discretion of the competent authority this vehicle may be
utilized for any others outstation works as & when required during
this contract period.
27. For Item Sr. No. 10 & 11 of Sch-B, Party shall have to provide extra AC luxury
56 or 29 seater buses other than school bus (having Good condition with
audio/video system, comfortable push-back seats) as & when required for
EPD/Sachivalaya/ Vibrant Gujarat Summit/ Recreation-club / MahilaMandal
activities / Working women’s / technical study tour / Youth hostel / Inter
GSECL TPS tournament / KHEL Mahakumbh & Science fair etc. on as and when
require basis. All RTO rules will be applicable for additionally provided AC luxury
buses. Journey Kilometers will be considered form Gandhinagar TPS to
Gandhinagar TPS.
a. The Party shall have quote rate based on a minimum travel distance of
300 km per trip per bus. For any trip exceeding 300 km, fuel costs
attributable to the distance travelled beyond 300 km shall be reimbursed
as per Scope of work Terms & Condition clause no.8.
b. Parking charges, Border Tax, Tall Tax & Fastag will be reimburse as per
actual on production of proof of same.
c. No any extra charge will be paid for extra hours, night halt, road side
assistance/penalty etc.
28 In case of failure to carryout allotted work under this contract / non
performance of the contract the damages in terms of any excess amount
incurred by GSECL, Gandhinagar TPS in carrying out the work through
alternate agency will be recovered from the contractor from Security
Deposit, pending bills etc.
29 All road toll/ bridge toll tax / border tax (during the out state journey
if required) shall be reimbursed on production of the proof of
payment along with monthly RA bill .As per Central Government
authority (NHAI) guide line. FASTAG is mandatory for all the vehicle
,if any vehicle required to pay penalty at toll plaza due to non-
availability of FASTAG or non working of FASTAG than GSECL shall
pay normal toll only ( i.e. without penalty ) and penalty amount will
be borne by bidder.
30 The toll tax/ parking charge / border tax (during the out state journey
if required) will be reimbursed at actual on production of documentary
proof of payment.
1. If the contractor fails to perform the obligation under the contract due to
causes beyond his reasonable control including war, fire, blockade, strike
(excluding strike by his own personnel) or natural catastrophe or any
other force majeure event then the contractor shall not be held
responsible for any loss or damage which may be incurred by the
company as a result of such failure.
TERMINATION OF CONTRACT.
1. All documents mentioned in “Scope of work clause no A/02” shall have to
be submitted to Ex. Engineer (Work shop) within one month of issue of
work order / letter of intent failing which order shall stand terminated.
EW- 366 PUR-F-006 RFQ-
2. The work order of the Contractor can be terminated by GSECL,
Gandhinagar TPS in its sole discretion by giving 10 days notice in writing
before the completion of Time limit if the vehicle is not provided as per
order or if at any stage it is found that any of the information /declaration
given by the contractor is false. This shall be applicable individually to
any vehicle if more than one vehicle is covered in single contract.
3. In the event of the contractor or their employees are found involving in
any unlawful activities during the period of contract, GSECL Gandhinagar
TPS is authorized/free to terminate the contract forthwith and the
contractor shall be held responsible to make good to the corporation for
the loss incurred on account of this.
4. If agency fail to execute the order successfully, the order will be got
completed through other agency and if required to pay higher rates, in
that case, difference of rates will be recovered from agency on which order
5. The services rendered by the contractor can be terminated on any other
ground that is considered sufficient by GSECL, Gandhinagar TPS for
termination of contract. In case, the vehicle meets with accident due to
negligence of driver contract of vehicle will be automatically cancelled.
Chief Engineer (G)
GSECL: Gandhinagar TPS
Dated seal & signature of
Bidder/Contractor
EW- 366 PUR-F-006 RFQ-
Section-6 Schedule-B (Price Bid) No:GSECL/Works
Subject: Work for hiring of 03-nos. School Buses, having 56 seating capacity and 02-no.
School Bus (Mini bus), having 29 seating capacity , MODEL (BS-6 )
completed with chess& body, With AC, FAPS Onwards, for 12 hours (6.15
AM to 6.15 PM) with driver & conductor for 03 years.
Offered Appl y Rate Ex
Monthly icabl With Cost
Sr. Rate e GST Amou
Description UOM Qty Amount
No. (excludi GST in Rs. nt in
(A) ng GST) in (G) Rs.
Work for Hiring of School
Buses, having 56 seating
capacity (BS-6 )
Completed with chess &
1 Months 36 To be quoted in attached Price break up
body With AC, With FAPS
for 12 hrs (6.15 AM to
6.15 PM) with drivers &
conductors (Bus No 1)
Work for Hiring of School
Buses, having 56 seating
capacity (BS-6 )
Completed with chess &
2 Months 36 To be quoted in attached Price break up
body With AC, With FAPS
for 12 hrs (6.15 AM to
6.15 PM) with drivers &
conductors (Bus No 2)
Work for Hiring of School
Buses, having 56 seating
capacity (BS-6 )
Completed with chess &
3 Months 36 To be quoted in attached Price break up
body With AC, With FAPS
for 12 hrs (6.15 AM to
6.15 PM) with drivers &
conductors (Bus No 3)
Work for Hiring of School
Buses, having 29 seating
capacity (BS-6 )
Completed with chess &
4 Months 36 To be quoted in attached Price break up
body With AC, With FAPS
for 12 hrs (6.15 AM to
6.15 PM) with drivers &
conductors (Bus No 4)
Work for Hiring of School
Buses, having 29 seating
capacity (BS-6 )
Completed with chess &
5 Months 36 To be quoted in attached Price break up
body With AC, With FAPS
for 12 hrs (6.15 AM to
6.15 PM) with drivers &
conductors (Bus No 5)
Extra Hrs Charges for
EW- 366 PUR-F-006 RFQ-
Extra Hrs Charges for
7 Conductor/ clenner Hrs
Night Halt charges Actu
Above monthly rates are without Cost of fuel [i.e.
Diesel/Petrol]. Party has to quote their rate without
fuel cost. It will be Reimbursed extra by GSECL CO,
Fuel cost: For Item Sr. no.
Vadodara as per consumption based on mileage of
9 1,2,3,4&5 of Sch-B Actual
vehicle (s) as per prevailing market rates [Average of 1st,
16th and last day of Month] of fuel for actual travelled
kms only as per formula prescribed in tender terms &
Work for Hiring of AC
luxury bus other than
school bus, having
seating capacity on as &
10 when required basis at Nos. 54 To be quoted in attached Price break up
GTPS as per Special
Condition of Contract
Work for Hiring of AC
luxury bus other than
school bus, having
seating capacity on as &
11 when required basis at Nos. 27 To be quoted in attached Price break up
GTPS as per Special
Condition of Contract
Total Amount Rs. (For Item Sr. no. 1 to 5, 10 & 11)
Total Amount Rs. (For Item Sr. no. 1 to 5, 10 & 11)
1. For Item Sr. No. 1 to 3 of Schedule-B, provide 56 seating capacity AC School buses
make of EICHER/TATA/ASHOK LEYLAND only.
2. For Item Sr. No. 4 to 5 of Schedule-B, provide 29 seating capacity AC School buses
make of EICHER/TATA/ASHOK LEYLAND only.
3. The rates are exclusive of GST and while making the monthly payment, the rate of GST
quoted/offered by bidder at the time of submission of the bid or the applicable
prevailing rate whichever is lower will be applicable.
4. Parking Charge, Toll Tax: (A) As per Guidelines of Central govt. Authority (NHAI), All
vehicles travelling through toll plaza mandatorily pay toll tax using “FASTag” on
vehicle & without fixing of FASTag, vehicle pay up penalty of twice toll tax at toll plaza.
As per above guidelines Contractor / bidder mandatory has to provide ‘’FASTag’’ on
all hired vehicle. In case fastag is not provided or not in working conditions, GSECL
will reimburse only Toll tax amount without penalty. (B) The toll tax & parking charge
will be reimbursed at actual on production of documentary proof of payment.
5. Provision related to TDS on GST@ 2% shall be made applicable if value exceeds
contract threshold limit (i.e. at present threshold limit Rs. 250000/-)
6. Bidders have to quote their item wise rates in column E only and GST in column F only.
7. For Item Sr. No. 6 & 7 of Sch-B i.e. Extra working Hour Charge: GSECL GTPS will pay
extra hours charges for driver & Conductor Rs.128.00 &Rs 125.00 per hour respectively
if the vehicle is deployed beyond the normal 12 hours period.
8. For item Sr. No. 8 of Sch-B i.e. Night halt charge: GSECL will pay night halt charge
Rs.500.00 per night for 12 hours vehicles only, in case vehicle required for night
journey or night stay outside GSECL (GTPS).
9. For Item Sr. No. 10 & 11 of Sch-B, Party shall have to provide extra AC luxury 56 or
seater buses other than school bus (having Good condition with audio/video system,
EW- 366 PUR-F-006 RFQ-
comfortable push-back seats) as & when required for EPD/Sachivalaya/ Vibrant
Gujarat Summit/ Recreation-club / MahilaMandal activities / Working women’s /
technical study tour / Youth hostel / Inter GSECL TPS tournament / KHEL
Mahakumbh & Science fair etc. on as and when require basis. All RTO rules will be
applicable for additionally provided AC luxury buses. Journey Kilometers will be
considered form Gandhinagar TPS to Gandhinagar TPS.
a. The Party shall have quote rate based on a minimum travel distance of 300 km per
trip per bus. For any trip exceeding 300 km, fuel costs attributable to the distance
travelled beyond 300 km shall be reimbursed as per below Clause no.
b. Parking charges, Border Tax, Tall Tax & Fastag will be reimburse as per actual on
production of proof of same.
c. No any extra charge will be paid for extra hours, night halt, road side
assistance/penalty etc.
10. The % higher or lower offer by the contractor will not be applicable for the charge of sr
no 6 to 8 and payment shall be reimbursed at actual.
11. Reimbursement of Fuel cost:Cost of fuel [i.e. Diesel/Petrol] will be Reimbursed as
per consumption based on mileage of vehicle (s) as per prevailing market rates [Monthly
average] of fuel for actual travelled kms only as per below formula on producing
documentary evidence. The prevailing fuel market rate (monthly average) will be the
average price of 1st, 16th & last day of the month obtain from local area authorised fuel
pumps of IOCL/HPCL/BPCL.
Formula for Reimbursement of Fuel cost (in Rs.) = X1*X2
Where X1-Actual Travelled kms
X2-Fuel cost as per prevailing market rates [Monthly average]
X3-Mileage of Vehicle
Considering Mileage of vehicle
For 56 Seat bus 4.2 Km/liter
For 29 Seat bus 5.6 Km/liter
12. L1 will be considered based on overall L1 offer.
13. For item Sr. No. 1, 2, 3, 4 & 5 AC School bus hiring is with service of Driver &
conductor for 12 Hours. For Item sr. no. 10 & 11 AC Luxury bus (Other than School
bus) on as & when required base.
14. For item Sr. No. 1, 2, 3, 4 & 5 party has to quote their rate without fuel cost.
Chief Engineer (G)
GSECL: Gandhinagar TPS
Dated seal & signature of
Bidder/Contractor
EW- 366 PUR-F-006 RFQ-
Section-7 Terms and Conditions regarding No:GSECL/Works
Labour Laws Tender/
The following are the major obligations to be fulfilled by the Contractor [Applicable
to Successful bidder only, however all the bidders have to submit duly signed &
sealed on each page of Section-VIII Terms and Conditions regarding Labour Laws as
a token of acceptance]:
1) The Factories Act,
The contractor should not deploy worker below the age of 18 years and above
60 years for the awarded work.
No female worker shall be employed in the night shift between 7.00 P.M. to
As per the provision of the Act, facility of crèches to be fulfilled if the female
laborers employed.
Identity cards as prescribed under the Factories Act shall be issued to each
workman engaged for the nature of work by contractor.
Earn Leave shall be paid at the rate of one day for every 20 days worked by the
contractor to their bonafide contract workers as per the provisions of the
Factories Act, 1948. On competition of calendar year of the awarded contract,
the contractor shall have to pay Earn Leave to its eligible workers within
days; the calculation of payment of Earned Leave to be carried out as per the
provision of the Factory Act. Contractor shall maintain Earn Leave Register in
Form No. 19 as per the provisions of the said Act and submit the same on
Attendance register shall be maintained on daily basis. All the written registers,
Performa etc. shall be filled up and maintained up to date and kept ready for
inspection at any time or submitted on-time to the concerned authorities as per
Contract Labour Act, Factory Act, etc. by contractor.
Contractor shall have to pay Over Time at the double the rate of a wages to
their entitled workers as per the provisions of the Factory Act.
2) The Contract Labour (Regulation and Abolition) Act,
The Contractor / Agency shall have to obtain the Labour License under
Contract Labour (Regulation & Abolition) Act from the appropriate authorities
before commencement of work. The contractor shall maintain a valid labour
license under the Contract Labour (Regulation and Abolition) Act for
employing necessary man power to be required by contractor. In the absence
of such license the contract shall be liable to be terminated without assigning
any reasons thereof.
EW- 366 PUR-F-006 RFQ-
The contractor should not be allowed to engage fifty (50) or more contract
labourers without initiating to obtain the labour license under the Contract
Labour Act. (the said number i.e., fifty (50) or more includes Supervisor and
If contractor has engaged the female workmen more than 30 numbers then
provision of crèches, shall be complied as per the provisions of the said Act.
3) Minimum Wages Act,
Contractor shall have to make the payment of wages to the Contract Labours
engaged by them, on or before 7th of every month through nearest Nationalized
Bank compulsory, preferably situated in the premises of TPS area in case of All
works Contract. The Contractor shall supply copy of Bank Statement duly
stamped by the Concerned Bank as well as debited entry of amount displayed
in the contractors’ own bank account as token of proof towards payment of
Wages to HR Department. Apart from Payment of wages through Bank,
Contractors shall have to make all other payments like Advances, Bonus,
Leave Encashment etc. to their labours through bank only and cash
payment/entry will not be allowed while issuing HR Clearance Certificate from
Wages rates for contract laborers are applicable as per the terms and conditions
of the license. The contractor shall have to pay wages to workers as notified by
Government of Gujarat., from time to time.
Any default to pay the minimum wages to the engaged workers and
deprived of their right to minimum wages payment on or before 7th of each
month shall result in levy of penalty of Rs. 10,000/- per month by way of
fine and if recurrence of the same may be lead to cancellation of awarded
4) The Provident Fund and Miscellaneous Provisions Act,
The contractor must possess separate P.F. code on the name of the Firm /
Agency / Company itself for the above subject work.
It should be ensured that all the contract labours engaged by contractor are
covered under the provident fund scheme and employee’s pension scheme and
their contribution must be remitted regularly to the concerned RPFC. The
photo copies of challan along with ECR in this regards should be submitted
regularly to the User Department to enable their onward billing clearance.
The contractor shall submit along with his bill (month wise) statement
regarding deductions against employees’ provident fund and family pension
scheme in respect of each concerned employee. Provident fund and family
pension scheme at the rate of 12 % of wages (or at the rates made applicable by
the Government time to time). The contractor’s contribution and his workers
contribution towards provident fund and family pension scheme shall deposited
EW- 366 PUR-F-006 RFQ-
by the contractor with Regional Provident Fund Commissioner. In case if the
contractor deposits the contribution to the Assistant Provident Fund
Commission, the photo copy of challans and schedule must be submitted in the
5) WORKMEN'S COMPENSATION & EMPLOYER'S LIABILITY
The contractors shall have to obtain Employee Compensation Policy under the
Employees Compensation Act before starting the work. Employee
Compensation Insurance shall be obtained for all the workers engaged for the
execution of awarded contract. If any of the work is sub-letted, the contractor
shall ensure that the sub-contractor take and provide workmen's compensation
and Employer's liability insurance for the labours engaged. Contractor is liable
to pay compensation in case of accidental injury arising out of and in the
course of employment as per the said Act and shall bear medical expenses due
to on duty accident.
6) The Payment of Gratuity Act,
The contractor shall deposit 15 days salary to GSECL, at the rate of last drawn
salary for every completed year of services or in proportionate thereof in case
less than 240 days of services of the worker in the year for each worker for the
liabilities of the gratuity. If contractor pays the same and submit the
documentary proof of payment through bank then in that case no need to
deposit the same to GSECL. (* applicable to ARC / BRC works contract
7) The Payment of Bonus Act,
Every worker shall be entitled to be paid by the contractor in an accounting
year, bonus, in accordance with the provisions of this Act, provided he has
worked in the establishment for not less than thirty working days in that year.
Contractor has to submit the paid bonus details of its worker in Form No. C as
per the provisions of the said Act as and when required by the Govt. Authority
as well as by GSECL.
8) The Maternity Benefit Act,
Contractor shall ensure that entitled female worker should provide Maternity
Leave and other benefits as per the provision of the said Act.
9) The Building and other Construction Workers’ Act,
For any construction work, fall under the definition of Section 2(1)(d),
happening outside / inside the Factory premises the said act will be applicable
and the contractor or its sub-contractor shall be liable to comply the provisions
framed there under.
10) The contract workers presently working in the existing contract awarded
are continued due to the stay order under The Industrial Disputes Act,
1947 under Court Case No.________ cannot be terminated by the new
EW- 366 PUR-F-006 RFQ-
contractor till further order of Hon’ble Court and also their terms of
employment cannot be changed. (This condition may be deleted If not
11) Follow the following procedure at each milestone for the execution of
works contract.
(a) On Commencement of Contractual Work:
(1) Before starting the work, the contractor may contact Labour Welfare Officer
/ Industrial Relations Officer for all formalities related to labour law
compliance before commencement of the contract and onward Labour Law
compliance thereof, so that later no dispute will arise in respect of
compliance of labour laws.
(2) It is the responsibility of the contractor to ensure that contractor’s employees
maintain strict discipline as regards security, methods of safe working etc,
and not to cause any hindrance to smooth running of power station or in
execution of duties by GSECL staff. Any lapse in this regard will be viewed
seriously and if lapse found contract is liable to be terminated. If any of
contractor’s staff is found unsuitable or not behaving properly, the contractor
shall have to remove such worker from the work-site on demand by OIC.
The contractor shall have to strictly observe the rules and conditions
specified in the enclosed works contract booklet of the GSECL, which are
not modified hereunder. To keep harmonious industrial relations amongst
contract labours is solely the responsibility of contractor. Any breach of the
same will be viewed seriously.
(3) The Contractors shall have to obtain Photo-Gate-Pass before the
commencement of contractual work awarded. Photo Gate Pass procedure
(Attached in Annexure & Form section) must initiate by the contractor
before 10 days from actual execution of work in a prescribed application
form which is available at Security Section for the entry of workmen in the
premises at GSECL. Contractor shall obey the digital gate pass
procedure on implementation of Contract Labour Information and
Management System(CLIMS)
(4) Such application shall have to be processed for the approval of Factory
Manager. After obtaining approval of Competent Authority, contractor shall
have to prepare the Gate Passes and obtain the signature of Factory Manager.
(5) If Contract Labours are required to be engaged in Emergency during Public
Holidays / General Holidays, contractor can apply for Temporary Gate-Pass
for the period of only three days with recommendation of respective SE and
the same shall have to be regularized after following the procedure of Gate
Pass applications on the office working day from HR Department. It is to
note that No Temporary Gate-Pass shall be issued for the work other than
acute emergency to carry out the work in power station premises.
(6) The Contractor who intends to engage labours more than the specified limit
under law then necessary - Form No. V under the Contract Labour (R& A)
Act, 1970 or Form No. VI under the Interstate Migrant worker (employment
regulation) Act 1979 as applicable is to be obtained from HR Department for
the purpose of obtaining Labour License from the Licensing Authority.
(7) The attendance of the workers is to be monitored through Bio-Metric
Punching System only. The contractor should submit the details of its
worker in prescribed Performa for Bio-Metric Punching and all formalities
regarding registration thereof shall be completed before commencement of
EW- 366 PUR-F-006 RFQ-
the work. The concern user section ensures from HR department that
engaged labours have registered themselves for biometric punching and then
only allows to commence the work.
Prescribed Performa to be sent by email in excel format only by the
concerned Contractor on its Latter Pad and copy of it be sent to the
concerned User Dept.
Name of contractor : Work order No.:
Period of contract : Starting from......................... to ........................
E-mail address / Contact No. of the contractor:
Sr. No of Full Categor Date of Date of Ag Mobil Aadha
worker Name y of Joining Birth of e e No r No
as of worker worker in worker (in
mentione Worke Contract yrs
(8) It shall be the duty of the Contractor or his Supervisor to ensure Bio-Metric
punching and reporting at the location of work. Non-reporting or non-
punching availability at the location of work shall be construed as absence
and suitable actions can be taken by User department as per terms and
conditions of the contract.
(9) Attendance of contract laborers will be through punching machines for
which punching machines are installed to facilitate the contractors by
GSECL for which monthly charges of Rs. 10/- will be levied on contractor
as administrative charges.
(10) The contractor shall employ adequate number of experienced staff at site for
daily supervision and for maintaining of various registers and records
required under the Labour laws and contracts. No payment for such
supervision shall be admissible.
(11) The gate passes obtained for any specific work order will be valid for that
specific work order only and contractor should not divert the man power for
any other work order. If any work or part thereof is desired/required to
sublet, the contractor shall obtain the necessary permission of the competent
EW- 366 PUR-F-006 RFQ-
authority in black and white well in advance which is mandatory for
considering the statutory documents of agency other than the agency who
awarded work order.
b) During Contractual Work under the progress:
(1) All Contractors shall have to make the payment of wages to the Contract
Labours engaged by them, on or before 7th of every month through Nearest
Nationalized Bank compulsory, preferably situated in the premises of PS
area. The Contractor shall supply copy of Bank Statement duly stamped by
the Concerned Bank as a token of proof towards payment of Wages to HR
(2) All Contractors has to comply & maintain statutory documents / registers at
GSECL site under the provision of labour laws & EPF Act.
(3) In case the contractor having more than one contract in the same TPS, the
contractor shall have to obtain work order wise separate Gate Passes and
submit the same with the documents of statutory compliance that too work
order wise every month to the User Department to enable their onward billing
12) CONTRACTOR TO INDEMNIFY THE GSECL REGARDING LABOUR
The contractor shall indemnify and keep indemnified the GSECL, and every
member, officer and employees of the GSECL, also Engineer-in-charge and his
staff against all actions, proceedings, claims, demands, costs and expenses
whatsoever arising out of or in connection with the matter referred in above
clauses and elsewhere and against all actions, claims demands, cost and
expenses which may be made against the GSECL by any workman/ employees
of contractor or any sub contractor and or from any liability any wise to any
workman/employees of the contractor or sub-contractor under any laws, rules
or regulation having in force of law including but not limited to claims against
the owner under employee compensation Act, 1923. The Employee’s Provident
Fund Act.1952, and/or the contract labour (Abolition and Regulation) Act,
The GSECL shall not be liable for or in respect of or in consequence of any
accident or injury to any workmen or other person in the employment of the
contractor or his sub-contractor, and the contractor shall indemnify and keep
indemnified the GSECL against all such damage and compensation and against
all claims, demands proceedings costs, charges and expenses whatsoever in
respect of or in relation thereto.
EW- 366 PUR-F-006 RFQ-
The contractor shall at his own expense / risk and cost to comply with all the
labour laws as above mentioned and keep the G.S.E.C.L. indemnified in
respect thereof.
GSECL : shall be entitled / empowered to deduct directly from the bills, the
amount to be paid to engaged bonafide contract workers or the contract
workers engaged by Sub-contractor; any sum or sums payable by main
contractor / sub-contractor and which sum/sums the Corporation is required to
pay in capacity of Principal Employer on account of the default of contractor in
respect of all liabilities incurred out of non-compliance regarding any
provisions of Labour Laws and same amount shall be recovered from the
pending dues of the contractor with 15% administrative charges.
Any other rules and regulation, conditions, circulars etc., that are in force at
present and that may be framed by the GSECL from time to time in connection
with contracts will be binding and acceptable to contractor.
The above are some of the major liabilities of the contractor in addition to other
liabilities prescribed under the various labour laws in force from time to time
from Statutory Authorities like State Government / Government of India,
which the contractor shall have to comply with.
13) Submission of Statutory documents to ensure the compliances:
The Contractor shall have to submit following statutory documents, work order
wise, under the labour laws and EPF to the recording officer of user
Copy of Attendance register – with name & address of establishment,
Name of work and site (duly signed & stamp by Contractor ) - Form XVI
Copy of Wage Payment Sheet – with signature of workmen, duly signed &
stamped by Contractor - Form XVII
Copy of Bank Statement (Wage Payment statement deposited in respective
bank - duly signed & Stamp by Concern Bank) (along with statement of
labours net payment amount which is reflected in Contractor’s bank account
Copy of PF Challan, ECR Wage Members details along with Copy of
Payment confirmation receipt for the respective month/s
Copy of Gate Pass Permission ( duly signed by Authorities )
Copy of Work Order ( First Time / only once )
Copy of Valid W.C. Policy (to be submitted as and when required and
renew before expiration if required)
Copy of Valid Labour License (Applicable in case of More than
manpower Engaged by Contractor for the said work) (to be submitted as and
when required and renew before expiration if required)
Form No. XIII – Register of workers employed by Contractor (to be
maintained at Security Section by every contractor)
EW- 366 PUR-F-006 RFQ-
Form No. 19 Earn Leave Card issued to the workers engaged for the
calendar year and to pay the same to their eligible workers (* applicable to
ARC / BRC works contract only)
Form C Register of Bonus paid to the eligible engaged workers.
Prescribed under the Contract Labour (R&A) Act, 1970 Contractor shall submit
& specify the Name of Work, Place of Work and Work order number in Muster
Roll- Form No. XVI & Wage Register – Form No XVII and self certification
Above documents shall be submitted by the contractor in two copies invariably on or
before the 15th day of each month to respective user department for onward process
and smooth clearance by HR Department.
The contractor shall have to submit “Declaration cum Indemnity Bond” on Rs. 300/-
Non-Judicial stamp paper in prescribed Performa (Attached in annexure &
forms section) with Agreement and Indemnity Bond before the commencement of the
EW- 366 PUR-F-006 RFQ-
Section-8 : General Safety Rules /Norms to be No:GSECL/Works
observed by The Contractor Tender/
GENERAL SAFETY RULES / NORMS” TO BE OBSERVED BY THE CONTRACTOR
All the contractors working in Gujarat State Electricity Corporation Limited
Factory like Coal/Lignite/Gas/Hydro/Pumping Station shall have to strictly
observe the following Safety Rules. Concern principle contractors are responsible
for informing & observance of these rules by their supervisors/contract workers as
well as the owner/supervisors/ workers of sub-Contractors engaged, if any, by
them for the work contract awarded to them. Prior to commencement of the work,
Contractor shall have to submit a written assurance on their letterhead to the
concerned Sectional Head / Engineer-in-charge that they have thoroughly gone
through these Rules, have educated their employees / workers of their sub
contractor and will strictly observe the said Rules while execution of work under
work contract awarded to them. They will have to indemnify the company for any
loss or damage / accident / injury to the company’s property / employee or
employee of their own in default of non - observing these rules.
(01) Contractor should issue photo gate pass for their workers from GSECL
Factory Manager as per Gujarat Factories rules, 1963 & details shall be filled
up in GSECL gate pass format as per Aadhar card /Election card id proof & to
follow the gate pass issue procedure through concern department EE & SE,
Security Officer, LWO/IRO/DGM, Factory Medical Officer, Safety Officer/Dy.
Safety Officer & Factory Manager.
(02) In case of emergency, temporary photo gate pass shall be issued by Security
Officer only for three days with prior permission of Factory Manager only.
More than three days, Permanent photo gate pass procedure shall be
completed by contract agency for their contract workers.
(03) Certificate of Fitness of employment in hazardous process & operations in
form no.33 of Gujarat Factories rules, 1963 shall be issued by GSECL Factory
Medical Officer for all contractor workers before commencement of work &
examination responsibility shall be taken by contractor as well as concerned
Head of Department .Pre-employment & Periodical medical examination of
contractor workers shall be carried out in form no.32 from GSECL Factory
Medical Officer after every six (06) months of contractor with their contractor
workers. Contractor shall be fulfilled all health requirements before
commencement of work. After completion of medical examination in form
no.32/33, GSECL Factory Medical Officer shall be signed in contract worker
gate pass procedure format.
(04) If work executed outside factory premises, Principle Contractor shall be
registered compulsory under The Building & Other Construction Workers
(Regulation of Employment and condition of service) Act, 1996 and The
Gujarat Building & Other Construction Workers (Regulation of Employment
and condition of service) Rules, 2003 before execution the ”building or other
construction work” means the construction, alteration, repairs, maintenance
or demolition, of or, in relation to, buildings, streets, roads, railways,
tramways, airfields, irrigation, drainage, embankment and navigation works,
flood control works (including storm water drainage works), generation,
transmission and distribution of power, water works (including channels for
distribution of water), oil and gas installations, electric lines, wireless, radio,
television, telephone, telegraph and overseas communications, dams, canals,
reservoirs, watercourses, tunnels, bridges, viaducts, aqueducts, pipelines,
towers, cooling towers, transmission towers and such other work as may be
specified in this behalf by the appropriate Government, by notification but
does not include any building or other construction work to which the
EW- 366 PUR-F-006 RFQ-
provisions of the Factories Act, 1948 (63 of 1948), or the Mines Act, 1952 (35
of 1952), apply.
(05) Contract worker gate pass will issue after completion of safety induction 3D
animation movie & Training record is to be maintained in IMS/OHSAS
training format by TK Office/LWO.
(06) As per Gate pass format of GSECL, Safety Officer/Dy. Safety Officer shall be
checked the issue PPE to contract workers as per nature of job, Form no.10 of
lifting tools and tackles, Driving license, Electrical contractor license,
Electrical trade qualifications, Safety induction training, SOP, supervisor
qualifications etc. After fulfillment of all Safety compliances, Safety
Officer/Dy. Safety Officer shall be signed in Contract worker Gate pass
procedure format.
(07) Work Contract shall be completed by principle contractor/agency/person who
is awarded the work order. Subletting of contract shall be allowed only if prior
approval of Power station chief before execution of work. Contractor/agency
shall be submitted the entire subletting contract documents with gate pass
application through concern department EE & SE, LWO/DGM, Safety
Officer/Dy.Safety Officer & Factory Manager.
(08) Under The Conditions Framed Under Rule-45 Of The Indian Electricity Rules,
1956, Valid Electrical contractor License shall be submitted to concern
electrical department EE/SE/Electrical Safety Officer/ Safety Officer/Factory
Manager at the time of apply gate pass by agency/party with latest renewal
from Chief Electrical Inspector, Gandhinagar- Gujarat. Electrical License
photocopy shall be checked by Concerned HOD of Electrical
Department/Electrical Safety Officer/Dy.Safety Officer/ Safety Officer/Factory
(09) As per nature of job/work, Qualified supervisor (Diploma (Electrical/
Mechanical/Civil/C&I) + 3 years experiences or ITI + 10 years) shall be
engaged by contract agency & qualification certificate with experience
certificate shall be submitted to concern EE/SE/LWO/IRO/DGM/ Dy. Safety
Officer /Safety Officer/Factory Manager at the time of apply gate pass.
(10) As per rule 3 of CEA regulation ,2010: Designating person(s) to operate and
carry out the work on electrical lines and Apparatus, Contract
person/worker possesses a certificate of competency or electrical work permit,
issued by the Appropriate Government. That means, Electrical trade
Qualification of contract worker/person like ITI-wireman/ Electrician,
Diploma (Elect), BE/B. TECH (Elect), ME/ M. TECH (Elect) shall be submitted
to concern EE/SE/LWO/IRO/DGM, Dy.Safety Officer/ Safety Officer/Factory
Manager at the time of apply for photo gate pass procedure.
(11) As per nature of job/work & during capital overhauling work /Annual
overhauling work /24X7 round the clock work/major shut down work,
Qualified Safety Officer/Manager/Supervisor (BE/Diploma (Elect/Mech/Civil)
+ PDIS-Post Diploma in Industrial Safety) shall be engaged by contractor
during dangerous operations/dangerous works as well as day to day
dangerous activities, safety supervision, tool box talk, Safety awareness
programme, SOP preparation with hazards & its control measures with each
step , checking of lifting tools & tackles, hydra mobile crane, Safety
precautions, coordination with Safety Department etc.
(12) License of driver shall be submitted with gate pass issue application as per
nature of vehicles & to follow the Motor vehicle Act,1988,the Central Motor
Vehicles (Amendment) Rules,2016 as well as Gujarat Motor Vehicles
rules,1989 & driver license shall be checked every day by security shift in
charge before entry in the Factory premises.
(13) SOP with JSA (Job Safety Analysis) shall be prepared by contractor through
competent person as per GFR, 1963 or Qualified Safety Officer as per GFR,
1963 with 05 years experiences. SOP will review & approve by concern
JE/DE/EE/SE/Elect. Safety Officer/Dy. Safety Officer /Safety
Officer/Factory Manager before execution of work.
EW- 366 PUR-F-006 RFQ-
(14) It is compulsory to use standard make Personal Protective Equipments
(P.P.Es.) as per the job requirement. Do not work without use of required
P.P.Es. Contractor is responsible to provide standard make
(ISI/DGMS/CE/EN/ANSI approved) & to checked standard/make in PPE
issue format by concern JE/DE/EE/SE/Safety Officer/Factory Manager.
Personal Protective Equipments / Safety Gadgets suitable to give sufficient
protection against hazards involved in their work / job to their staff, as per
the job requirement and insist / enforce their workers to put on the same
while at works.
The ongoing work is liable to be stopped at any time if your contract
workers/staffs found working without P.P.Es. Following is the list of various
P.P.Es (as per ISI/DGMS/CE/ EN/ ANSI approved only) to be used for various
works / worksites.
In any work, Contractor shall be issued the minimum 06 nos. of PPEs like
Safety Shoes, Safety Helmet, Safety goggles, Mask & Reusable Ear plug, hand
gloves to their workers/supervisor compulsory & it will check by concern
section HOD & Dy. Safety Officer /Safety Officer at the time of gate pass
Quality of PPE shall be approved from Safety Officer as per Indian Standard
and International Standard before executions of work or at the time of gate
pass apply procedure.
List of safety equipments
Industrial Safety Helmet For protection of head against falling objects or
during fall of person from height. Yellow Colour
helmet is used for contract worker with agency
Safety Goggles/welding For protection of eyes against flying particles / dust,
goggles/ chemical splash chemical splash, welding spark, arc, flashover etc.
Full Face shield For protection of face against flying particles / dust,
chemical splash, spark, arc, flashover etc.
Reusable Earplug / Ear For ear / hearing system protection while working in
muffs. high noise level area.
Chemical suit/Gas tight suit For body protection against chemicals, oils, sharp
/Fire proximity suit/FR edged objects, heat, hot objects etc.
Safety Hand Gloves For protection of hands against chemicals, oils,
sharp edged objects, heat, hot metals/objects,
electricity etc.
Safety shoes/ Gum Boots For protection of leg/feet against falling objects,
with sharp edged objects, heat, hot metals/objects,
Oil/Chemical/water/heat/ electricity etc..
Electrical resistance etc.
Safety Belt(full body For fall prevention while working at heights or in
hardness with double depth, working in vessel or in confined space.
lanyard & shock absorber) /
Rope / Life line / Fall
Dust Mask/Respirator with Protection of respiratory system against dust.
Chemical Cartridge Protection against toxic chemical fumes /
Respirator with full face gases/vapors/dust etc.
mask type A2B2E2K2
Trolley mounted Air line Working in oxygen deficient zone or confine space
respirators with full face area
EW- 366 PUR-F-006 RFQ-
Portable Single gas detector Working in hazardous storage/process area
like Chlorine, Ammonia,
Portable Multi gas Detector Working in oxygen deficient zone & use in entry of
( LEL,O2,CO,H2S,SO2, etc) confine space & Major fire
Automatic voltage detector To check the present voltage or induction voltage of
electrical equipments/ bus/switch gears from
(one) feet distance before starting the any electrical
Auto darkening welding The new auto darkening welding helmet combines
helmet (EN 379 & EN 175 legendary Speed glass quality and auto darkening
Level-B) with PAPR as per technology with an innovative wide-view grinding
EN 12941:1998, class TH2 visor to give welders an all-in-one solution for more
and AS/NZS 1716 flexibility, precision, and efficiency.
Respiratory System is a combined face and breathing
protection device, for increased comfort and safety in
welding. The unit is equipped with a particle filter
which removes particles from the air. The unit
provides a constant airflow independent of filter
combinations and clogging. The unit can also be
equipped with a gas filter (for example A1B1E1). The
unit supplies air to the head top via the connecting
breathing tube. The airflow creates a slight positive
pressure which together with the sealing to the face
prevents particles and other contaminants from
entering the head top.
(15) All PPEs (as per ISI/DGMS/CE/EN/ANSI approved only) Should issued by
party/agency/contractor to their contractor workers as per nature of job and
allotment of PPE list shall be submitted to Safety Officer, Dhuvaran on his
letter head as per below mentioned format by Contractor before
commencement of work through concerned JE,DE,EE/SE .
Sub: Issue of PEE to Contractor workers
Sub of work Order:
Name of Agency:
Date of Commencement:
Time limit for work order:
Sr. Name Desi Name of Name of PPE IS Make Qt Unit Date Rec
no. of gnati Section :Code of PPE y of eivi
worke on under no. of issue ng
rs work PPE sign
Reusable Ear Pair
Safety Shoes Pair
(16) Shift Security Inspector/Security Officer shall be checked Safety Shoes &
Safety Helmet of all contractor workers at entry gate of Factory Premises &
shall entered contractor workers with Safety Shoes & Safety Helmet with
photo ID Gate Pass.
(17) Shift Security Inspector/Security Officer shall be checked validity of Gate pass
of all contractor workers on daily basis.
EW- 366 PUR-F-006 RFQ-
(18) During the work execution, one trained & competent supervisor of agency
should always remain present at work site. Concern JE/DE of GSECL shall be
supervised the contract work as per SOP .
(19) Approved NABL laboratory calibration certificates of
electrical/mechanical/Civil/ C&I/Environment survey/Chemical etc
measuring /testing equipments/instruments which are used during contract
work shall be submitted before starting the work & shall be checked by
concern JE/DE/EE before starting work & it’s record shall be maintained in
concern section.
(20) The contractor shall take all the required safety measures prior to
commencement of work on dangerous substances, machineries or area at
which cautionary notice is displayed and obtain “Line Clear” or “Work Permit”
through the concern Department / Section JE/DE and shall be informed to
concern section JE/DE for closed/ returned after completion of work.
(21) Safety talk/Safety work instructions shall be given to contractor workers by
concern JE/DE regarding hazards of specific work, risk & it’s control measure
(mentioned in HIRA) before starting the job work and records shall be
maintained for each & every job works.
(22) Display Safety instructions shall be strictly followed by all workers who are
working in factory premises.
(23) Material Safety Data Sheet (MSDS) of each chemical shall be available with
Chief Chemist/Control room & work related Chemical information shall be
taken by contractor & contractor workers from Concern EE/Chief Chemist
before starting of chemical handling work.
(24) The contractor shall be checked & securely covered or securely fenced any
opened fixed vessel, sump, tank, pit or opening in ground or in floor which, by
reason of its depth, situation, construction or contents ,is or may be a source
of danger before starting the work each & every days or after interval/recess.
Contractor supervisor shall be informed to concerned HOD regarding any
unsafe conditions.
(25) Prohibition of smoking, fires, lights, spontaneous ignition substance,
matches; fuses, mobile phone etc are to be strictly followed by all workers who
are working in factory premises.
(26) Prior to carrying out welding, gas cutting, furnace heating or any other hot
work job, remove all the inflammable material lying at or nearby worksite or
cover it properly by suitable protective covering. Also, special care shall be
taken before carrying out such job & see that all possible contributing factors
to set fire shall be removed / vanished prior to commencement of the work.
Advance intimation shall be given to concerned section / fire section to
commence the work in fire prone areas. They should also keep ready all the
First Aid Fire Extinguishers / equipments & fire extinguishing media /
material like sand / water buckets or other appropriate equipment at such
(27) While carrying out work in confined space or inside vessel, obtain necessary
“Confined Space / Vessel Entry Permit” from concerned department prior
to commencement of the work.
For lighting in such areas, only 24-volt (ISI certified & with proper guard)
hand lamp shall be used. For taking care of the persons working inside the
confined space / vessel, a supervisor / person capable to keep continuous
watch on person(s) working inside, assist them in case of emergency or
arrange to get immediate outside help, shall remain present at entry point.
Use full body safety belt without failed.
While working inside sewage, trench or in-depth, a person to warn outsiders /
entrants / passers etc shall remain available near entry point or the entry
point shall be cordoned by a barricaded tape with a cautionary notice. After
completion of the works, all the lids / covers / grills / grits opened, shall be
re-fixed / re-placed in the original position as it were prior to commencement
EW- 366 PUR-F-006 RFQ-
of the work and leave the work place in safe condition in all respect, so as to
prevent accident to fellow workers.
(28) The contractor shall see that he / his persons do not work on or block (by
stacking material, spare parts, tools-tackles, equipments etc), any passages /
walkways / gangways / aisles / staircases / ladders / lifts or any other
approaches / roads leading to plans or its auxiliaries, on which there is traffic
movements or possible traffic movements in case of emergency. Such
passages are meant for safe escape in the event of emergency. If it is utmost
necessary to carry out work in such area with blocking of passage, prior
permission of Competent Authority or the Engineer-In-Charge shall be
obtained. To demarcate / declare the area as “UNSAFE”, cordon it using
barricading tape & display suitable caution notice or keep a person to restrict
/ divert the traffic on this route through other safe passage.
(29) The contractor shall see that he / his persons do not work on or block (by
stacking material, spare parts, tools-tackles, equipments etc), any passages /
walkways / gangways / aisles / staircases / ladders / lifts or any other
approaches / roads leading to plans or its auxiliaries, on which there is traffic
movements or possible traffic movements in case of emergency. Such
passages are meant for safe escape in the event of emergency. If it is utmost
necessary to carry out work in such area with blocking of passage, prior
permission of Competent Authority or the Engineer-In-Charge shall be
obtained. To demarcate / declare the area as “UNSAFE”, cordon it using
barricading tape & display suitable caution notice or keep a person to restrict
/ divert the traffic on this route through other safe passage.
(30) Prior to use power / electrically operated hand tools / equipments / machines
/ gadgets like welding machine, hand grinder, hand drill etc, ensure for its
safe operation & use it only if it is found safe to use. Do not use defective,
unsafe or improperly maintained equipments.
The electrical power supply required to run such equipments shall not be
taken directly at their own but shall be obtained through concerned Electrical
Maintenance Departments or their authorized persons or under their
observations / guidance only. The Electrical Section shall provide temporary
electrical connection up to contractor’s Mains Board on which it is
compulsory to install mains switch, ELCB & fuses of adequate capacity. All
such equipments shall invariably be earthed adequately to prevent electrical
shock, sparking, short circuit etc. Power cord to be used shall be of adequate
capacity, without any joint & shall consist of earth wire also. Hence, it is
necessary to use adequate capacity 3-wire power cord for single & 5-wire
power cord for three phase power connections. The plugs, receptacles, pins,
holders etc shall be of adequate capacity & safe to use.
All electrical & mechanical equipments / tools-tackles viz. welding machine,
cutting machine, Grinder, Drill, Chain Pulley Blocks, Hook chooks etc
required to be used during work execution shall be of standard make & bear
ISI certification mark on it.
The consumables like welding electrodes, grinding wheels / discs etc which
has specific prescribed life span shall not be used in any case if its expiry date
(31) Non-Sparking Non-Magnetic electrical hand tools and tool kits shall be used
by Electrical contractor for safe use in areas where hazardous, flammable, or
combustible vapors, liquids, dusts, or residues may be present in Gas Based
power plant and list of tools and tackles shall be submitted with technical bid.
Non-Sparking Non-Magnetic electrical hand tools and tool kits shall be
checked by JE/DE before commencement of Electrical work.
(32) Before using lifting machines / tackles (like C.P.Bs., Hook chooks, winch,
forklift, mobile crane, EOT crane etc) & its attachments (like D-shackles,
slings, U-clamps, Eye bolts or any fixtures), it shall be checked and used only
if found safe to use. Also, ensure that these are tested, examined & certified in
form no.10 by Competent Person as per the Factory act-1948 & Gujarat
EW- 366 PUR-F-006 RFQ-
Factories Rules and its validity do not expire. Further, it shall be fixed
properly and firmly prior to lifting the weight. Valid Test certificate of all
Lifting machines used by Contractor to be submitted to Dy.Safety Officer/
Safety Officer before commencement of work through concerned EE/SE.
(33) Metal Scaffoldings to be used for working at height shall be of adequate size &
capacity. Obtain the work permit when working at height. While climbing on
such scaffolding or working on any structure at height, use of full body safety
belt /full body hardness with double lanyard & Fall arrestor & Helmet is
compulsory. It is also necessary to fasten chinstraps of the helmet.
(34) Contractor or their employee shall not interfere in day-to-day routine plant
activities / works except the work assigned to them, shall not loiter in the
areas other than their work jurisdiction, as well as shall not temper / operate
/ touch the machineries/equipments/auxiliaries with which they are not
concerned. Also, the contractor shall strictly instruct their staff for not to sit
or take rest at/near/below running plants, auxiliaries, systems or any place
which is risky, hazardous & prone to accident.
(35) The cylinders containing poisonous / toxic or inflammable / explosive gas like
Oxygen, Acetylene, LPG, Hydrogen, Ammonia, Chlorine, CO2 etc shall be
handled safely taking due care. To handle / shift such cylinders a special
trolley /cage meant for it must be used but in no case it should be rolled.
(36) In Gas Based Power station/Hydrogen storage area /Hydro carbon fumes-
vapour generated area, Spark arrestor (as per approved manufacturer of
CCOE, Nagpur) shall be provided on each vehicle by party/agency and it will
check by shift security in charge before entry of vehicles in the factory
(37) No women or young person shall be employed or permitted to work in Lead-
compound area like battery room etc. as per schedule VI of GFR
(38) No women or young person shall be allowed to clean, lubricate or adjust any
part of a prime mover or of any transmission machinery while the prime
mover or transmission machinery is in motion. Examination or operation of
motion machinery shall be made or carried out only by a specially trained
adult male worker wearing tight fitting clothing as per section 22 of factories
(39) In all risky job, before start the work, contractor should obtain General Safety
Work Permit through concerned section from Shift –in-charge well in advance.
(40) In case of noticing smoke or fire during their work execution, they shall make
immediate efforts to extinguish / control it and simultaneously inform the
Fire Station Mobile No as well as Station Fire Officer or Emergency Control
room no which is displayed at prominent place of factory like Main Security
Gate, All unit control room, Canteen area, Safe Assembly points, Fire Station,
All security gates, Occupational Health Centre.
(41) In case of any injury / accident while working, it shall immediately be
reported to Safety Department through concerned Sectional Head / Engineer.
The prescribed Form No. 21 & ANNEXURE may be obtained from concerned
section or Dy.Safety Officer/Safety Officer.
In case of any electrical accident, it shall immediately be reported to Electrical
Safety Officer through concern Sectional Head / Engineer. The prescribed
Electrical accident form no. A as per electricity act-2003 & Form No.
& ANNEXURE as per Gujarat Factories rules shall be filled up by concern
department JE/DE with written consent of contractor. The Form may be
obtained from concerned Electrical section or Electrical Safety Officer.
Electrical accident investigation shall be carried out by Electrical Safety
Officer with Factory Manager.
After any reportable accident, Contract agency shall be submitted the fitness
certificate of injured person with endorsement of GSECL factory Medical
Officer to LWO/Dy.Safety Officer/Safety Officer/Electrical Safety Officer then
after injured person may allow for work.
EW- 366 PUR-F-006 RFQ-
(42) For any incident occurred but have no injury to any persons should also
reported as per GSECL format and informed to Dy.Safety Officer/Safety
Officer as Near Miss Incident.
(43) Safety penalty shall be imposed against Offences by contract workers: If
any contract worker worked in a factory contravenes any provision of
Factories act or any rules or orders made there under ,imposing any duty or
liability on workers, contractor/agency shall be punishable with fine which
mentioned as under.
Sr. Description of penalty Amount
(i) Work without PPEs Rs.300/- per person
(ii) Work without work Safety permit like working at Rs.1000/- per day
height, confine space entry, hot work etc.
(iii) License of driver as per type of vehicles not Rs.750/- per person
(iv) Welding work without flashback arrestor/double Rs.1000/- per set
gauge regulator set
(v) Operate Portable power tool without ELCB Rs.1000/-per
(vi) Work without qualified Supervisor as per nature Rs.1000/-per day
of job like mechanical, electrical, civil, C&I,
(vii) Work without SOP & JSA Rs.2000/-per day
(viii) Work without test report of lifting machines / Rs.2000/- per
tackles (like C.P.Bs., Hook chooks, winch, forklift, equipment
mobile crane, EOT crane etc) & its attachments
(like D-shackles, slings, U-clamps, Eye bolts or
any fixtures) in Form No.10 of Gujarat Factories
(ix) Work without Double lynyer Safety belt during Rs.3000/-per person
working at Height work, work without anchoring
in hook/line line
(x) Work without 24 Volt supply in Confine space Rs.3000/-per person
(xi) (a) Grinding machine used without safety Rs.500/-per
guard/machine guard equipment / per set
(b) unsafe welding machine like open body, Knob
without insulation, connection without lug
(c) damaged welding cables/gas pipelines
(d) welding work doing without welding blanket,
(e) electrical supply without 3 pin plug/Industrial
(f) use of damaged electrical wire for lighting/
(g) use of lighting lamp without cage,
(h) use of open halogen tube,
(i) use of damaged PPEs/use of non Standard
(j) Unsafe lifting and handling of gas cylinders
(k) Cylinder handling without safety cap
(l) Temporary connection without ELCB, etc.
During plant visit/supervision of concern JE/DE/EE, SE, Safety
Officer/Dy.Safety Officer, Electrical Safety Officer, Factory Manager, If they will
observed any safety violations as per CO circular/statutory requirements then
they must impose Safety Penalty through office note directly against contract
workers/ contract agency and Office Note process through proper channel to
EW- 366 PUR-F-006 RFQ-
concern Sectional head and Account head for recovery purpose.
Photograph/CCTV footage is to be put up with penalty note by imposing
(44) Party will damage any fire equipments or property or machinery in factory
during execution of work, total damage cost will be recovered from party RA
bill and recovery Office note put up by concern HOD.
(45) All the relevant labour and industrial laws shall also be followed compulsorily.
(46) After completion of work, cotton waste, grease, oil, unused material, welding
rod pieces, scrap etc. are to be removed by contractor and scrap shall be
deposited to scrap yard of Main Store.
(47) For performance evaluation of contractor, safety factors of work accident, fire
incident & near miss accident will be considered. Steps can be taken to review
the job assignment up to cancellation for negligence.
(48) Over & above these, contractor shall have to follow all the safety requirements
/rules & regulations / norms and legal provisions laid down in various
statutes. Particularly the provisions of The Factories Act-1948 & the Gujarat
State Factories Rules-1963 (Amended up to date), The Electricity Act-2003 &
rules, BOCW Act/Rules shall be followed strictly. The contractor shall also
obey the rules / regulations / instructions of the local Competent Authority
for safety & health requirements.
(49) The above rules shall be scrupulously followed and where required,
Contractor /contractor workers may contact to the Dy.Safety Officer/Safety
Officer/Electrical Safety Officer in case of any ambiguity or needs further
guidance in this regard.
Chief Engineer (G)
GSECL: Gandhinagar TPS
Dated seal & signature of
Bidder/Contractor
EW- 366 PUR-F-006 RFQ-
Section-9 : Annexures & Forms No: GSECL/Works
(On firm letter head)
Subject: Work for hiring of 03-nos. School Buses, having 56 seating capacity and
02-no. School Bus (Mini bus), having 29 seating capacity , MODEL (BS-6
) completed with chess& body, With AC, FAPS Onwards, for 12 hours
(6.15 AM to 6.15 PM) with driver & conductor for 03 years.
Ref: Tender Notice No. :
In connection with the above subject and reference I / We confirm the following:
1. I / We, the under signed have read and examined the Tender Specifications in
tender mentioned under reference along with the Commercial terms and
2. I / We, declare that our Technical Bid is strictly in line with the Tender
specifications and there is no deviation from the technical specifications of this
3. Further, I / We also agree that if any deviation is found in the technical
specifications, terms & condition, our offer shall be out rightly rejected without
assigning any reason thereof.
Signature of the Tenderer
Seal of the Firm
EW- 366 PUR-F-006 RFQ-
(On firm letter head)
ANNEXURE – B: DETAILS OF THE FIRM
Subject: Work for hiring of 03-nos. School Buses, having 56 seating capacity and
02-no. School Bus (Mini bus), having 29 seating capacity , MODEL (BS-6
) completed with chess& body, With AC, FAPS Onwards, for 12 hours
(6.15 AM to 6.15 PM) with driver & conductor for 03 years.
Within Gujarat / Outside Gujarat
Pvt. Firm / Public Ltd. / State Govt. Under taking / (Indicate the relevant status)
Central Govt. Undertaking
GST No. and GST Date
License Type (ISO9001/9002) ISO9001/ ISO9002 (Tick applicable)
License Validity Period From Date___________ to Date___________
Address of Registered Office Factory Works Liaison
Contact person name
City & Pin code
Phone Nos.(Office)
Phone Nos.(Residence)
Web site address
Signature of the Tenderer
Seal of the Firm
EW- 366 PUR-F-006 RFQ-
(On firm letter head)
DETAILS OF THE EXPERIENCE FOR SIMILAR TYPE OF WORKS IN LAST
SEVEN YEARS FROM THE DUE DATE OF TENDER:
Sr. Name of the organization and work ORDER Order Status of Remar
No carried out. REFERENCE fully order ks
No. & DATE Executed under
Yes / No execution
A) GUJARAT STATE ELECTRICITY CORPORATION LTD / SISTER COMPANIES:
B) OTHER STATE ELECTRICITY BOARDS / GEN COs:
C) PRIVATE FIRMS:
Signature of the Tenderer
Seal of the Firm
EW- 366 PUR-F-006 RFQ-
ANNEXURE – D (On firm letter head)
Tenderer must fill up below details & should place at the top of the Technical
Subject: Work for hiring of 03-nos. School Buses, having 56 seating capacity and
02-no. School Bus (Mini bus), having 29 seating capacity , MODEL (BS-6 )
completed with chess& body, With AC, FAPS Onwards, for 12 hours (6.15
AM to 6.15 PM) with driver & conductor for 03 years.
1. PRICES: [FIRM ONLY] Yes / No
(Please Specify YES / NO)
2. GST: [IN PERCENTAGE]
(Please Specify INCLUSIVE / EXCLUSIVE / EXEMPTED)
Please quote your GST Registration No. & Date.
Please specify CGST & SGST or other TAX
3. PENALTY TERMS AGREED:
(Please Specify YES / NO)
4. SD / Bank Guarantee TERMS AGREED:
(Wherever applicable):
(Please Specify YES / NO)
5. DETAILS OF EMD PAYMENT
6. TIME PERIOD TERMS AGREED:
(Please Specify YES / NO)
7. VALIDITY OF THE OFFER AGREED:
(Please Specify YES / NO)
8. PAYMENT TERMS AGREED:
(Please Specify YES / NO)
9. ITEMS OF THE WORK OFFERED:
(as per the Schedule – B)
(Please do not mention the quoted price
10. TELEPHONE NOS. & FAX NO.:
11. Authorized person of the firm:
12. Name of the proprietor, partners,
directors [as the case may be], along with
address, telephone, fax no. etc.
13. If Vendor Registration is Done: Not applicable for the said contract
(Please submit copy of Vendor Registration
approval letter in the EMD envelope).
Signature of the Tenderer
Seal of the Firm
EW- 366 PUR-F-006 RFQ-
Technical deviations if any to be furnished in this annexure only and to be
submitted with technical bid.:
Subject: Work for hiring of 03-nos. School Buses, having 56 seating capacity and 02-
no. School Bus (Mini bus), having 29 seating capacity , MODEL (BS-6 )
completed with chess& body, With AC, FAPS Onwards, for 12 hours (6.15
AM to 6.15 PM) with driver & conductor for 03 years.
Signature of the Tenderer
Seal of the Firm
EW- 366 PUR-F-006 RFQ-
(On firm letter head)
(On firm letter head)
Subject: Work for hiring of 03-nos. School Buses, having 56 seating capacity and 02-
no. School Bus (Mini bus), having 29 seating capacity , MODEL (BS-6 )
completed with chess& body, With AC, FAPS Onwards, for 12 hours (6.15
AM to 6.15 PM) with driver & conductor for 03 years.
UNDERTAKING IN REGARD TO STOP DEAL / BLACK LIST THEREOF
Authorized signatory of M/s............................................................ here by certify that
is not stop deal/black listed by GUVNL and or their any subsidiary company viz.
GSECL / GETCO/DGVCL/ MGVCL/UGVCL/PGVCL.
Signature of the Tenderer
Seal of the Firm
EW- 366 PUR-F-006 RFQ-
(On firm letter head)
Subject: Work for hiring of 03-nos. School Buses, having 56 seating capacity and 02-
no. School Bus (Mini bus), having 29 seating capacity , MODEL (BS-6 )
completed with chess& body, With AC, FAPS Onwards, for 12 hours (6.15
AM to 6.15 PM) with driver & conductor for 03 years.
CERTIFICATE – “A”
I/We__________________________________ authorized signatory of
M/s.________________________________________hereby Certify that
M/s.______________________________________ is not related with other firms
who have submitted tenders for the same items under this inquiry / Tender.
Signature of the Tenderer
Seal of the Firm
EW- 366 PUR-F-006 RFQ-
(On firm letter head)
Subject: Work for hiring of 03-nos. School Buses, having 56 seating capacity and 02-
no. School Bus (Mini bus), having 29 seating capacity , MODEL (BS-6 )
completed with chess& body, With AC, FAPS Onwards, for 12 hours (6.15
AM to 6.15 PM) with driver & conductor for 03 years.
Relationship with employee
I/We__________________________________ authorized signatory of
M/s.________________________________________hereby Certify that
M/s.______________________________________ have not relation with any
GSECL employee or his/her relative as defined in section 2 (77) of the Company’s
Signature of the Tenderer
Seal of the Firm
EW- 366 PUR-F-006 RFQ-
(On firm letter head)
Subject: Work for hiring of 03-nos. School Buses, having 56 seating capacity and 02-
no. School Bus (Mini bus), having 29 seating capacity , MODEL (BS-6 )
completed with chess& body, With AC, FAPS Onwards, for 12 hours (6.15
AM to 6.15 PM) with driver & conductor for 03 years.
Conflict of interest among Bidders/Agents
I/We__________________________________ authorized signatory of
M/s.______________________________________ have not conflict of interest with
other bidders/agents as per Tender Term & Condition.
Signature of the Tenderer
Seal of the Firm
EW- 366 PUR-F-006 RFQ-
(On firm letter head)
Subject: Work for hiring of 03-nos. School Buses, having 56 seating capacity and 02-
no. School Bus (Mini bus), having 29 seating capacity , MODEL (BS-6 )
completed with chess& body, With AC, FAPS Onwards, for 12 hours (6.15
AM to 6.15 PM) with driver & conductor for 03 years.
The Bidders should clearly give certificate as under along with the Technical Bid:
1. I/We hereby certify that I/We have read entire terms and conditions of the
tender mentioned above and I/We shall abide hereby the
terms/conditions/clause contained therein.
2. I/We hereby certify that m y / o u r s u b m i t t e d o f f e r is strictly in
accordance with the GSECL’s Tender specifications.
3. There is no commercial or Technical deviation in the offer from the GSECL’s
Tender Specification.
4. I undertake to abide by the GSECL’s Tender Terms & Conditions. Also, I
undertake to execute the contract strictly as per the GSECL’s Tender Terms &
5. I also undertake to abide by all commercial conditions of the GSECL, including
contract schedule.
6. The corrigendum(s) issued from time to time by your
department/organization too have also been taken into consideration, while
submitting this acceptance letter.
7. I/We hereby unconditionally accept the tender conditions of above
mentioned tender document(s)/corrigendum(s) in this totality/entirely.
(Signature of the Tenderer)
Any offer without above certificate will not be considered and the tender will be out
rightly ignored in the absence of above certificate.
After opening of the Tender, if it is found that the offer given by the Bidders is not
according to the GSECL’s Tender specifications and commercial terms and conditions
and false certificate is given by the Bidders, then GSECL will not deal with the firm
for the present Tender. It is, therefore requested that the Bidder should take care in
giving their offer and submission of documents.
The conditional tenders will not be accepted.
EW- 366 PUR-F-006 RFQ-
Undertaking from Third Party Inspection Agency/Statutory Auditor or Practicing CA/CA
(On letter head digitally signed by a person duly authorized to Sign on behalf of the
TPS, Gandhinagar
Subject: Authentication of veracity of documents submitted by M/s …….. in support
of Meeting the Qualifying Requirements.
Ref : Tender no. …………………..
Name of the Package/ Tender: ………………………………………
Dear Sir, M/s. ………………. (hereinafter called Bidder) having Registered office at
…………………… intend to participate in above referred tender of GSECL.
The tender condition stipulates that the bidder shall submit supporting Documents
pertaining to Qualifying Requirement duly verified and certified by Third-Party
Inspection Agency (TPIA) or Statutory Auditor of their Company or Practicing
CA/CA Firm as per the list mentioned in the bidding documents.
In this regard, it is hereby confirmed that we have examined the following documents,
which are also attached with this letter. The same has been verified from the Original
Documents and / or Client for authenticity.
We hereby confirm that the following documents are found to be genuine and
1. Doc ref. no. ……….. dated …….. (name of Documents)
2. Doc ref. no. ……….. dated …….. (name of Documents)
All the aforesaid documents have been digitally signed by us as a certificate of
We further confirm that we neither have any vested interest in aforesaid tender nor
have any conflict of interest in respect of above tender.
This certificate is issued at the request of M/s ………………. (Bidder) for the purpose
of participating in the subject tender/s.
EW- 366 PUR-F-006 RFQ-
ANNEXURE-L: EMD BANK GUARANTEE FORMAT
[ON STAMP PAPER OF Rs.300/-]
[Applicable to those bidders who have submitted EMD in form of Bank Guarantee
FOR TENDER NO.__________
WHEREAS M/s. __________________________________________(Name and Address of the
Firm/company) having their registered Office at ________________________________(Address
of the Firm’s registered Office) (hereinafter called the “Tenderer”) wish to participate in the
Tender No._______________ for _________work (Supply / Erection / Supply & Erection Work, etc.)
of ______________________ (Name of the Material/equipment / work) for Gujarat State Electricity
Corporation Limited (hereinafter called the “Beneficiary”) and WHEREAS a Bank Guarantee
for Rs._____________ (Amount of Bank Guarantee towards EMD) valid till ____________ (mention
here date of validity of this Guarantee which will be Six months from the date of submission of bid
of the tender) which is required to be submitted by the Tenderer along with the Tender.
We,_____________________________________________(Name of the Bank & address of the
Branch giving the Bank Guarantee) having our registered Office at _____________________
(Address of Bank’s registered Office) hereby give this Bank Guarantee No.
_________________ dated ____________ and hereby agree unequivocally and unconditionally to
pay immediately on demand in writing from Beneficiary Gujarat State Electricity Corporation
Limited or any Officer authorized by it in this behalf any amount up to and not exceeding
Rs.____________(Amount of E.M.D.), (Rupees in words______________
________________________________________) to the said Gujarat State Electricity Corporation
Limited on behalf of the Tenderer.
We, ____________________________________________ (Name of the Bank) also agree that
withdrawal of the Tender/Bid/EOI or part thereof by the Tenderer within its validity or Non
submission of Performance Guarantee towards execution/supply period by the Tenderer within
days from the date of issue of Letter of Acceptance by the Gujarat State Electricity Corporation
Limited would constitute a default on the part of the Tenderer and that this Bank Guarantee is
liable to be invoked & encashed within its validity by the Beneficiary in case of any occurrence of a
default on the part of the Tenderer and that the encashed amount is liable to be forfeited by the
This agreement shall be valid and binding on this Bank up to and inclusive of
_______________ (mention here the date of validity of Bank Guarantee) and shall not be terminable
by notice or by Guarantor for change in the constitution of the Bank or the Firm of Tenderer or by
any reason whatsoever and our liability hereunder shall not be impaired or discharged by any
extension of time or variations or alterations made, given, conceded with or without our
knowledge or consent by or between the Tenderer and the Gujarat State Electricity Corporation
Notwithstanding anything contrary contained in any law for the time being in force or banking
practice, this Guarantee shall not be assignable, transferable by the Beneficiary (i.e. GSECL) Notice or
invocation by any person such as assignee, transferee or agent of beneficiary shall not be entertained
by the Bank. Any invocation of the Guarantee can be made only by the beneficiary directly.”
NOTWITHSTANDING anything contained hereinbefore our liability under this Guarantee is
restricted to Rs.__________(Amount of EMD) (Rupees __________________________________)
(in words). Our Guarantee shall remain in force till _____________ (Date of validity of the
Guarantee). Unless demands or claims under this Bank Guarantee are made to us in writing on or
before ___________ (Date of validity of the Bank Guarantee), all rights of Beneficiary under this
Bank Guarantee shall be forfeited and we shall be released and discharged from all liabilities
EW- 366 PUR-F-006 RFQ-
Please Mention here Complete Postal Address of the Signature of the Bank’s Authorised
Bank with Branch Code, Telephone and Fax Nos Signatory with Official Round seal
Note: The Banks shall be the Banks recognized/notified by the Finance
Department, Government of Gujarat (GOG) from time to time.
EW- 366 PUR-F-006 RFQ-
ANNEXURE-M: AGREEMENT FORMAT
[ON STAMP PAPER OF Rs.300/-]
[Applicable to Successful bidder only, however all the bidders have to submit duly signed &
sealed on each page as a token of acceptance]:
This agreement is made at VADODARA the _______ day of _______in the Christian
year Two Thousand _______ between _________________
(hereinafter referred to as “THE CONTRACTOR” which expression shall unless
excluded by or repugnant to the context include its successors or permitted assigns)
of the one part and the Gujarat State Electricity Corporation Limited having their
Head Office at Race Course, VADODARA 390 007 (hereinafter called ”The GSECL”
which expression shall unless excluded by or repugnant to the context include its
successors or assigns) of the other part.
“WHEREAS’ the aforesaid GSECL has accepted the tender of the aforesaid
contractor for______________________________________ as per GSECL Order
No. _____________ dated ______________ hereinafter called “The Works” and
more particularly described enumerated or referred to in the specification, terms and
conditions prescribed in the order letter, covering letter and other letters and schedule
of price which for the purpose of identification have been signed by Shri
___________________________ on behalf of the Contractor and by
____________________________ on behalf of the GSECL a list whereof is made out
in the Schedule hereunder written and all of which said documents are deemed to form
part of this contract and included in the expression “The Works” wherever herein
used, upon the terms and subject to the conditions hereinafter mentioned.
AND WHEREAS THE BOARD has accepted the tender of the contractor for the said
works for the sum of Rs. ________________ (Rupees _______________________
_________________________________ only) upon the terms and subject to the
conditions herein mentioned.
NOW THIS AGREEMENT WITNESSES AND IT IS HEREBY AGREED AND
1. The contractor shall do and perform all works and things in this contract
mentioned and described or which are implied therein or there from respectively or
are reasonably necessary for the completion of the works as mentioned and at the
times in the manner and subject to the terms conditions and stipulations contained in
this contract and in consideration of the due provision executions and completion of
the works agreed by the contractor as aforesaid, the GSECL both whereby covenant
with the contractor to pay all the sums of money as and when they become due and
payable to the contractor under the provisions of the contract. Such payments to be
made at such times and in such manner as is provided by the contract.
2. The conditions and covenants stipulated herein before in this contract are
subject to and without prejudice to the rights of the GSECL to enforced penalty for
delays and/or any other rights whomsoever including the right to reject and cancel on
default or breach by the contractor of the conditions and the covenants as stipulated in
the general conditions, specification, forms, or tender schedule, etc. attached with
GSECL Order No. ___________________ dated ________. The contract value,
EW- 366 PUR-F-006 RFQ-
extent of supply delivery dates, specifications, and other relevant matters may be
altered by mutual agreement and if so altered shall not be deemed or construed to
mean or apply to affect or alter other terms and conditions of the contract and the
general conditions and the contract so altered or revised shall be and shall always be
deemed to have been subject to and without prejudice to said stipulated.
List of documents forming part of the contract.
In witness whereof the parties hereto have set their hands and seals this_____ day of
___________month in the Christian year ____________.
1. Signed, Seals and delivered by:
For and on behalf of M/s. ____________
In the presence of
2. Signed, sealed and delivered by
For and on behalf of Gujarat State Electricity Corporation Limited, Vidyut Bhavan,
Race Course, Vadodara-390
In the presence of
Name and Address:
EW- 366 PUR-F-006 RFQ-
ANNEXURE-N: [For Performance Guarantee (PBG) towards execution/supply
period as per Commercial Terms & Conditions of Tender]
[ON STAMP PAPER OF Rs.300/-]
[Applicable to Successful bidder only, however all the bidders have to submit duly
signed & sealed on each page as a token of acceptance]:
We,_______________________(Name of the Bank and address of the Branch giving
the Bank Guarantee) having our registered office at _________________(Address of Bank’s
registered office) hereby give this Bank Guarantee No._____________ dated_________ and
hereby agree unequivocally and unconditionally to pay immediately on demand in writing
from the beneficiary company Gujarat State Electricity Corporation Limited or any
Officer authorized by it in this behalf any amount up to and not exceeding
Rs.______________ (in words) Rupees
Electricity Corporation Limited on behalf of M/s. __________
_______________________________ who have entered into a contract for the supply /
works specified below.
This agreement shall be valid and binding on this Bank up to and inclusive of
_______________ (Date of validity of the Bank Guarantee) and shall not be terminable by
notice or by change in the constitution of the Bank or the firm of Contractors / Suppliers or
by any other reasons whatsoever and our liability hereunder shall not be impaired or
discharged by any extension of time or variations or alterations made, given conceded or
agreed, with or without our knowledge or consent by or between parties to the said within
written contract.
Notwithstanding anything contrary contained in any law for the time being in force or
banking practice, this Guarantee shall not be assignable, transferable by the beneficiary (i.e.
GSECL). Notice or invocation by any person such as assignee, transferee or agent of
beneficiary shall not be entertained by the Bank. Any invocation of the Guarantee can be
made only by the beneficiary directly.
NOTWITHSTANDING anything contained herein before, our liability under this guarantee
is restricted to Rs.________________ (Rupees ______________
_______________________________________only). Our guarantee shall remain in force
until ________________ (Date of validity of the Guarantee). Unless demands or claims
under this Bank Guarantee are made to us in writing on or before ________________ (Date
of validity of the Bank Guarantee), all rights of Beneficiary under this Bank Guarantee shall
be forfeited and we shall be released and discharged from all liabilities there under:
Please mention here Complete Postal Signature of the Bank’s Authorized Signatory
Address of the Bank with Branch Code, with Official Round Seal.
Telephone and Fax Nos.
Note: The Banks shall be the Banks recognized / notified by the Finance
Department, Government of Gujarat (GOG) from time to time.
EW- 366 PUR-F-006 RFQ-
GUJARAT STATE ELECTRICITY CORPORATION LIMITED
APPLICATION FORM FOR PHOTO GATEPASSES OF CONTRACTOR & CONTRACT WORKERS
[Applicable to Successful bidder only, however all the bidders have to submit duly signed & sealed on each
page as a token of acceptance]:
01 Name And Address of The Firm
02 Name And Mobile No. Of The Contractor
& Site In-charge
03 Work Order No. & Date
04 Subject of Work
05 Name of Section
06 Duration/period of Work
07 Date of commencement
08 Contract agreements/ subletting work contract documents with
09 Total No. of Workmen required for this work order (In Figure and words) is to Local: Out State :
be given on letterhead of contractor Male: Male:
Female: Female:
10 Labour License /IMSW License Obtained for No. of Labours and validity
11 BOCW Registration No. and date
12 Insurance Obtained for No. of Labours and validity thereof
13 Detail of P.F. Code No.
I, ……………………………………Prop./Manager/In-Charge of M/s. ……………………………….give assurance that all the details
related to labours as per the attached list herewith are true and also give assurance that none of the labours are
involved in any anti-social activities or having criminal records. I am solely responsible if any dispute will arise in
Signature of Sub Contractor with Rubber Stamp Signature of Contractor with Rubber Stamp
For Office Use Only
M/s. ……………………………………………………………………………………………………..will be issued Gate Pass for the Work Order
mentioned in the List attached herewith for the …………Nos. of Labours
for the period of ………………. to ……………………(03 months only).Documents are checked & verified as per GSECL
photo gate pass procedure.
Executive Engineer ( ) Superintending Engineer ( )
Signature with Stamp Signature with Stamp
Electrical Safety Officer Safety Officer/Dy. Safety Officer
Factory Medical Officer: to maintain record in form no.32 &
Security Officer LWO / IRO
Factory Manager/Occupier
Senior Security Officer: To issue gate pass & maintain record of gate passes. If any remark put up by any officer,
it will convey to Factory Manager & Occupier.P.T.O
EW- 366 PUR-F-006 RFQ-
Following details shall be provided by Contractor on Company’s letter pad
Work Order No.& Date:
Subject of Work:
No. of Labours:
Details of Contractor & Contract Labour
Sr. Full Name of Permanent Present Date of Employees PF Identification
No. Worker as per Address of Address of Birth / Code No. Mark on Body
id proof Worker Worker Age
LIST OF DOCUMENTS ARE ATTACHED WITH APPLICATION FOR PHOTO GATEPASSES OF
CONTRACTOR & CONTRACT WORKERS
Sr. Description of documents Attached
1 Copy of Work Order
2 Copy of P. F. Code No.
3 Insurance Policy as per subject of work order under the Workmen Compensation
4 Contract agreements/ subletting work contract documents with approval copy
5 Filled Gate Pass Application Form and List of Labours in 1 Copy.
6 Self-attested Copy of Id proof of Aadhar card or Election voting card or driving
license or Passport only
7 List of Indian Standard or International Standard mark PPEs provided to contract
worker in prescribe Format as per nature of hazardous process and operations.
PPE undertaking of Contract Agency which submitted in work tender.
8 GSECL 3D animation Safety Induction movie showing attendance sheet copy
9 Final Safe Operating Procedure -SOP with JSA (Job Safety Analysis) signed
documents which submitted in work tender.
10 Qualification of work Supervisor, Safety supervisor, Safety Officer
11 Electrical Contractor License, Form-I& Electrical trade person qualifications copy
in Electrical work only which submitted in work tender.
12 Gujarat BOCW registration in Form-II copy if applicable
13 Form no.10: Prescribed for report of examination of the lifting machines like
CPB, winch machine, wire rope slings D-shackles, belt slings, chain slings,
eyebolts, polyester web/round sling etc of all capacities if used.
14 Driver license of LMW, Mobile crane, tractor, fork lift photo copy, RTO Fitness
certificate in from no.33, PUC certificate, Vehicle insurance policy, spark arrestor
15 Approved NABL laboratory calibration certificates of
electrical/mechanical/Civil/C&I/Environment survey/Chemical etc. measuring
/testing equipment’s /instruments if used.
16 Copy of Police Verification in respect of each contract workers
Signature of Sub Contractor with Rubber Stamp Signature of Contractor with Rubber Stamp
EW- 366 PUR-F-006 RFQ-
[ON STAMP PAPER OF Rs.300/- duly notarised]
DECLARATION CUN INDEMNITY BOND
[Applicable to Successful bidder only, however all the bidders have to submit duly
signed & sealed on each page as a token of acceptance]:
THIS DECLARATION CUM INDEMNITY BOND made at -------------------------
(mention location) by M/S. ------------------------- having its Reg. office at------------
------------------------------------------(hereinafter referred to as “Contractor” which
expression Shall unless it be repugnant to the context or meaning thereof, be
deemed to mean and include their respective assigns, successor, executors,
subcontractors and/or administrators) of the ONE PART in favour of
M/S Gujarat State Electricity Corporation Limited having its power Station at
……………..Thermal Power Station (hereinafter referred to as the “Company”
), which expression shall unless it be repugnant to the context or meaning
thereof be deemed to mean and include its assigns, successors) of the OTHER
WHEREAS the COMPANY has entered into a contract with the Contractor for the
------------------ dated-------------------------“hereinafter called the “Contract”);
AND WHEREAS it is one of the essential conditions of the Contract that the
Contractor shall comply with all the provisions of the Labour& Industrial Laws, as
may be applicable from time to time for the discharge and completion of the works
and completion of the Works and Services covered under said Contract Labour (R &
A) Act 1970,Child Labour (Prohibition and Regulation) Act 1986,The Employees
Provident Funds & Miscellaneous Provisions Act,1952,Employees State Insurance
Act 1948, Minimum Wages Act,1948,Payment of Bonus Act,1965,Payment of Wages
Act,1936, Employees Compensation Act.1923, Factories Act,1948 and other Labour
Laws, Rules, Notifications and Codes which are at present applicable to the contractor
and which may be applicable during the tenure of the contract (hereinafter referred as
AND WHEREAS the Contractor has agreed to execute this Declaration cum
Indemnity Bond to this effect and has agreed to indemnify and Company, it’s
Directors, Officers and employees and representatives indemnified and hold harmless
against all third party claims, charges ,penalties, fines, expenses ,losses, damages
costs, suits or any other levy against the Company and/or the management due to the
failure of the Contractor to observe or follow all applicable laws.
NOW THIS DEED WITNESSETH AS UNDER:
1. The Contractor hereby declares that all acts, deeds, actions, activities, conduct
and lapse, delays, misdeeds, faults, breaches, inactions etc done by his
assigns, successors, executors, subcontractor and/ or administrators shall
be construed to be have been done by the contractor and he alone
shall be liable for such acts, inactions etc.
2. In consideration of the Company awarding the Contract to the Contractor
subject to the condition of execution of this Declaration cum Indemnity
bond, the Contractor declares and represents to the Company that the
Contractor has obtained all Statutory registrations, Certificates, licenses and
EW- 366 PUR-F-006 RFQ-
approvals required under the Laws enabling the Contractor to execute
the Contract in a legal and lawful manner.
3. That in the event of any liability arising out of failure to observe or
non-compliance of any such ‘Laws’ by the Contractor in connection with
the Performance of the contract, the Contractor shall bear all the
resultant whatsoever liability (ies), if any arising out thereof and that the
company , its Directors, Officers and employees, representatives, shall not be
liable for any such liability(ies). The Contractor agrees to indemnify and keep
the Company and its Directors, Officers and employees, representatives
indemnifies, defend and hold harmless, against all losses, costs, damages,
claims, penalties, interest, expenses, demands, fines, legal liability, causes of
action, injury to persons, suits etc., which may be suffered, incurred,
undergone and / sustained by the Company including the Costs and
expenses that may be incurred in defending any such liability(ies)
claim(S), Proceeding (S) etc. that maybe made or taken or taken or arise
on the same by any Person, body, authority, government, judicial /
quasi - judicial authority due to the failure or non-compliance of any
such laws and rules there under (including any amendments in acts, laws,
statutes & rules there under) of whatsoever kind and nature arising out of
or in any way connected with, whether or not such acts or omissions
are actual or alleged, active or passive with regard to the discharge of
the said Contract.
4. The Contractor further declares that in case of
any suit / claim / right / damages / compensation / fine / levy / charges /
expenses / losses / penalties / costs raised by the third party, including
contract labours engaged by the contractor, he shall join such proceedings in
such Suit/Court/Tribunal/Authority and effectively defend the same.
5. The Contractor hereby agree and undertakes to make good any loss,
damage, claims, suits, demands, decrees, expenses that the Company
may suffer to the fullest satisfaction of the Company and if the
Contractor fails to make good the same then the Company shall have
the right to recover the same and or any other loss sustained, without
any restriction or limitation, together with any other incidental expenses,
costs, and all incidental logistic expenses etc that may be suffered by
the Company from the Contractor and the Contractor hereby further
confirms and declares that this Declaration cum Indemnity Bond is
irrevocable and shall be final and binding on it / him heirs, executors,
administrators, legal representatives, successors, subcontractors and assigns,
wherever the context applies. any claims, demands, shall be adjusted
against any amount due and payable to the Contractor and the
Company shall have the right to withhold any amounts due and payable
to the Contractor, till the settlement of such claims, disputes to the
Contractor towards discharge of such claims, obligations etc.
6. This Declaration cum indemnity bond shall be in accordance with the laws of
India and any dispute between the parties with regard to this Declaration cum
Indemnity Bond shall be resolved through the dispute resolution process
mentioned in the General Conditions of the Contract (GCC).
EW- 366 PUR-F-006 RFQ-
IN WITNESS WHEREOF, the said Contractor has hereunto set their hand the day and
year first hereinabove written.
SIGNED SEALED AND DELIVERED
By the within named “CONTRACTOR”
(Authorised Signatory)
Rubber Stamp of Firm/Company
Name: Designation: Date:
In presence of Witness
Name & Address of Witness Signature
EW- 366 PUR-F-006 RFQ-
(On firm letter head)
ANNEXURE – Q (Details of offered vehicles under this contract)
1) Name of the Agency/bidder…………………………………………………………….……….
2) Address for communication: - …..………………………………………………………
3) a) Phone No: 1) Land Line: …..………………… 2) Mobile: …………………………
6) GST Registration No: ……………………………………………………………..
7) Agency/bidder interested to deploy nos. of vehicles in this tender as per tender terms & conditions.
Particulars Number of vehicle in figure Number of vehicle in word
8) Following are the details & particulars against the vehicles for which offer submitted:-
Make & Model of Type of Vehicle Name of Registration Date of
Vehicle (With AC ) (BUS) Owner Number & Date Manufacturing
09) Copy of the documents to be Submitted (Mandatory for Works/Services)
a) PF registration certificate
b) GST registration certificate.
c) PAN Card/Latest income tax clearance certificate
d) Proof of ownership of the vehicle.
Certified that to the best of our knowledge, the information provided above are correct. Also confirm our
acceptance of all the Terms & Conditions.
Signature of the bidder with Seal
EW- 366 PUR-F-006 RFQ-
(On firm letter head)
FORMAT FOR ELECTRONIC FUND TRANSFORMER – ANNEXURE - R
Vendor Name and Address:
We hereby authorize the Employer to make all our payments through Electronic Fund Transfer System. The
details for facilitating the payments are given below:-(TO BE FILLED IN CAPITAL LETTERS)
4. BANK PARTICULARS
A) BANK TELEPHONE NO. (WITH STD CODE)
C) BANK FAX NO. (WITH STD CODE) …………………………………………
E) 9 DIGIT MICR CODE OF THE BANK BRANCH (Enclose copy of a cancelled Cheque): …………………………………………
H) BANK ACCOUNT TYPE (TICK ONE):
SAVING CURRENT LOAN CASH CREDIT OTHERS
6. PERMANENT ACCOUNT NUMBER (PAN): …………………………………………………………………………….
7. E–MAIL ADDRESS for Intimation regarding release of Payments: …………………………………………………………………….
I/We hereby declare that the particulars given above are correct and complete. If the transaction is delayed or
credit is not affected at all for reasons of incomplete or incorrect information, I/We would not hold the
Employer responsible.
EW- 366 PUR-F-006 RFQ-
Signature of the Tenderer
Seal of the Firm
BANK CERTIFICATION:
It is certified that above mentioned beneficiary bolds a Bank Account No. . with our Branch and the Bank
particulars mentioned above are correct.
DATE : (AUTHORIZED SIGNATORY)
EW- 366 PUR-F-006 RFQ-
To create an environment where Business Confidence is built through Best Business
Practices and is fostered in an atmosphere of trust and respect between providers of
goods and services and their users for the ultimate benefit of society and the nation.
GSECL’S COMMITMENT PARTY’S COMMITMENT
To maintain the highest ethical Not to bring pressure recommendations from
standards in business and outside GSECL to influence its decision.
Ensure maximum transparency to the Not to use intimidation, threat, inducement or
satisfaction of stakeholders. pressure of any kind on GSECL or any of it’s
employees under any circumstances.
To ensure to fulfill the terms of To be prompt and reasonable in fulfilling the
agreement / contract and to Consider contract, agreement, legal obligations.
objectively the viewpoint of parties.
To ensure regular and timely release To provide goods and/or services timely as per
of payments on due dates for work agreed quality and specifications at minimum
done. cost to GSECL.
To ensure that no improper demand To abide by the general discipline to be
is made by employees or by anyone maintained in our dealings.
To give maximum possible To be true and honest in furnishing information.
assistance to all the Vendors /
Agency / Service Provider and other
to enable them to complete the
contract in time.
To provide all information to Not to divulge any information, business details
suppliers / contractors relating to available during the course of business
contract / job which facilitate him to relationship to others without the written
complete the contract / job consent of GSECL.
successfully in time.
To ensure minimum hurdles to Not to enter into carter / syndicate /
vendors / agency / contractors in understanding whether formal / non-formal so
completion of agreement / contract / as to influence the price.
Signature of the Tenderer
Seal of the Firm
EW- 366 PUR-F-006 RFQ-
Financial Department, GR.No. FD/MSM/e-file/04/2024/2859/DMO Dtd. 01/05/2025
[ To be revised as per GoG notification issued from time to time.]
List of Banks Notified by GSECL
(A) Guarantees issued by following banks will be accepted as SD/EMD on permanent basis.
All Nationalized Banks.
(B) Guarantees issued by following Banks will be accepted as SD/EMD for period up to March
31, 2027. The validity cut-off date in the GR is with respect to date of issue of Bank
Guarantee irrespective of date of termination of Bank Guarantee.
Sr. Sr. Name of Banks
1 AXIS Bank 23 A U Small Finance Bank
2 Bandhan Bank 24 City Union Bank
3 CSB Bank 25 DBS Bank India Limited
4 DCB Bank 26 Dhanlaxmi Bank
5 Equitas Small Finance Bank 27 Federal Bank
6 HDFC Bank 28 HSBC Bank
7 ICICI Bank 29 IDBI Bank
8 IDFC First Bank 30 Induslnd Bank
9 Jammu and Kashmir Bank 31 Jana Small Finance Bank
10 Karnataka Bank 32 Karur Vysya Bank
11 Kotak Mahindra Bank 33 RBL Bank
12 South Indian Bank 34 Standard Charter Bank
13 Tamilnadu Mercantile Bank 35 Ujjivan Small Finance Bank
14 YES Bank 36 Ahmedabad Mercantile Co-Operative
15 Nutan Nagrik Sahakari Bank Ltd. 37 Rajkot Nagrik Sahakari Bank Limited.
16 Sarswat Co-Operative Bank Ltd. 38 SBPP Co-operative Bank Ltd.
17 SVC Co-Operative Bank Ltd. 39 The Cosmos Co-op Bank Ltd.
18 The Gujarat State Co-Operative Bank 40 The Surat District Co-operative Bank
19 The Surat Peoples Co-operative 41 The Baroda Central Co-operative
20 The Panchmahal District Co- 42 The Kalupur Commercial Co-
operative Bank operative Bank
21 The Rajkot Commercial Co-operative 43 The Banaskantha Mercantile Co-
Bank Limited Operative Bank Ltd.
22 Gujarat Gramin Bank
EW- 366 PUR-F-006 RFQ-
GUJARAT STATE ELECTIRICITY CORPORATION LTD., GANDHINAGAR
TENDER & CONTRACT FOR WORKS
GENERAL RULES AND DIRECTIONS FORTHE GUIDANCE OF CONTRACTOR
Notwithstanding anything contained to the contrary in the specification or tenders
in subsequent exchange of correspondence, the conditions of contract shall be
binding on the contractor and any change of variation expressed or implied
however made in the said conditions shall not be however valid or operative unless
expressly sanctioned by the corporation The contractor shall be deemed to have
fully informed himself and to have special knowledge of the provisions of the
conditions of contract herein contained.
1. All works proposed to be executed by contract shall be notified in one of the
English and one of the vernacular local daily newspapers stating the work to be
carried out as well as the date for submitting and opening tenders and time
allotted for carrying out the work also the amount of earnest money to be
deposited with the tenderer and the security deposit to be deposited by the
successful tenderer.
2. Copies of the specifications, designs drawings, estimated rates. Schedule rates
and any other documents required in connection with work which will be signed
by the Executive Engineer for the purpose; of identification shall be open for
inspection by the contractors at the office of the Executive Engineer during
3. Where the works are proposed to be executed according to the specification
recommended by a contractor and approved by a competent authority on
behalf of the Gujarat State Electricity Corporation Ltd. Such specification with
designs and drawings shall form part of the accepted tender.
3 The tender and receipts for payments made on the account of any work, when
executed by a firm, should be signed by all the partners except where the
contractor are described in their tender as firm in which case the receipt shall
be signed in the name of firm including the Partners or some other persons;
having authority to do so.
5. Any person who submits tender at percentage rate shall fill up the usual form
stating what percentage above or below rates specified he is willing to undertake
the work. Only one rate or such percentage on all the estimated rates or
scheduled rates shall be mentioned.
6. Tenders which propose any alteration in the work specified in the form
invitation to tender or in the time allowed for carrying out the works or which
contain any other conditions of any sort, will be liable to rejection.
7. No single tender shall include more than one work. but contractors who wish to
tender, for two or more works, shall submit a separate tender for each work.
Tender shall have the name and the number of the works of which they pertain
be subscribed on the envelop.
8. The Executive Engineer or his duly authorized assistant will open tenders in the
presence of any intending contractors who may be present at the time and will
enter the amount of the several tenders in a comparative statement in a suitable
form. In the event of tender being accepted the contractor shall thereupon, for
the purpose of identification, sign copies of the specifications and other
documents. In the event of tender being rejected the officer (Executive Engineer
) shall authorize the paying officer to refund the amount of the earnest money
deposited to the contractor making the tender on his giving for the return of the
9. The officer competent to dispose off the tenders, shall have the right of rejecting
all or any of the tenders without assigning any reasons thereof.
10. No receipt for any payment alleged to have been made by a contractor in regard
to any matter relating to tender of the contract shall be valid and binding on the
EW- 366 PUR-F-006 RFQ-
corporation unless it is signed by the Executive Engineer.
11. The memorandum of work to be tendered for and the schedule of materials to
be supplied by the Gujarat state Electricity corporation Ltd. and their rates
shall be filled in and completed by the office of Executive Engineer before the
tender form is issued if a form issued to an intending tenderer has not been so
filled in and uncompleted he shall request the said office to have this done
before he completes and delivers his tender.
12. All work shall be measured, meet by standard measure and according to rules
and custom and usual in the use in the Gujarat state electricity corporation
Ltd. and no proposals to adopt alternative method will be accepted. The
Executive Engineer's decision as to what is the usual method in use in the
Gujarat state Electricity Corporation Ltd. shall be final.
13. Every contractor shall except the registered contractor on the approved list of
the corporation produce along with his tender a solvency certificate from the
collector of the District within which he resides or a bankers Certificate of his
financial stability if he fails to produce such a certificate his tender will not be
14. All correction and addition or pasted slips should be initiated.
15. Tenderer shall be deemed to have full knowledge of all relevant documents site
conditions etc. whether inspected or not by him.
16. Submissions of a tender by a contractor implies he has read the instruction
and conditions of contract and has made himself aware of the scopes and
specification of the work to be done & of the conditions and rates at which
stores etc. will be issued to him and local conditions and other factors bearing
on the execution of the work.
17. Under no circumstances shall any contractor be entitled to claim enhanced
rates for any items of contract without prior sanction of the competent
18. These rules and directions shall form part of the contract.
I/We hereby tender for the GUJARAT STATE ELECTRICITY CORP.LTD. (herein
referred as "Corporation") of the work specified in the under written memorandum
within the time specified in Scheduled B (memorandum showing items of work to
be carried out) and in accordance in all respect with the specifications design
drawing and instructions in writing and as per annexed conditions of contract and
agree that when the materials for works are provided by the corporation such
materials and rates to be paid for them shall be as Provided in schedule A hereto.
(a) General description of work.
(b) Estimated cost.
(c) Earnest money.
(d) Security deposit:
(1) Party shall have to pay security deposit(if applicable) in the form of Bank
Guarantee/ Demand Draft in favour of GSECL payable at Gandhinagar within
10 days of date of issue of Letter of Intent.
(2) Time allowed for the completion of work from date written order to commence.
Should this tender be accepted I/we hereby agree to abide by and fulfill all the
terms and provision of conditions of contractor annexed hereto as applicable and
in default thereof forfeit and pay to the corporation the sums of money mentioned
in the said conditions.
Receipt No. date from the GUJARAT STATE ELECTIRICITY CORP. LTD.
in respect of sum of Rs. (The amount to be specified in figure & words,) Is herewith
forwarded representing the earnest money (the full value of which is to be
absolutely forfeited to the CORPORATION l/We not deposit the full amount Deposit
of the said conditions/otherwise the said sum of Rs. Shall be refunded
on surrendering the original receipt.
EW- 366 PUR-F-006 RFQ-
Signature of the Contractor Address of the
Signature of witness Address of Witness
The above tender is hereby accepted by me on behalf of the Gujarat State
Electricity Corporation Ltd.
The Chief Engineer (Gen).
Superintending Engineer
Executive engineer
Or his duly authorized assistant.
EW- 366 PUR-F-006 RFQ-
GUJARAT STATE ELECTIRICITY CORPORATION LTD, GANDHINAGAR
TENDER & CONTRACT FOR WORKS
CONDITIONS OF CONTRACT
(a) The “contract” means the documents forming the tender and acceptance
thereof together with the document referred to therein or individual work order
in the case of term contracts including these conditions schedules and or
additional conditions attached to the form of tender or individual works, order,
rate schedule the specifications and the drawings and all these documents as
applicable taken together shall be deemed to form the contract.
(b) The “Tender Document” means the form of tender the applicable schedules
and/or additional conditions and the specifications and/or drawing as issued
on the contractors for the purpose of preparing tender.
(c) The expression "Works" or 'work when used in the condition of contract shall,
unless there be something in the subject or context repugnant to such
construction means the work or the work contracted to be executed under or
in virtue of the contract whether original or altered.
(d) The "Contractor” means the individual or firm or company. Whether
incorporated or not, undertaking the works and shall include his or its legal
personal representatives successors and permitted assignees.
(e) ”Corporation” means Gujarat state Electricity Corporation Ltd. and the
"Accepting Officer" means the officer who is authorized to sign and signs the
contract on behalf of the corporation.
(f) The letter “EE" means Executive Engineer who in the case of measurement and
lump sum contracts directs the contract and the letters S.E. mean
Superintending Engineer and "CE(G)" means Chief Engineer (Generation), who
administers and in the case of the term contracts directs the contract.
(g) 'The Engineer-in-charge" means all officers of the CORPORATION appointed by
the Chief Engineer (Gen), to supervise the works or part of the works.
(h) "Approved" and "Directed" means the approval or direction of the Chief
Engineer (Gen), or the Superintending Engineer or the person deputed by him
for the particular purpose.
(i) B.S. means the "British Standards" as issued by the British Standard
Institution. "A.S.” means the “American Standards" as issued by the "American
Standards Institution" and "I.S." means the “Indian Standards" as issued by
the Indian Standards Institution. Wherever the above mentioned abbreviations
are referred to in the specifications and/or work orders, they mean
the addition with all amendments current at the date of issued of tender
document of work orders.
In case of measurement and terms of contracts "Specifications" mean those
contained in Gujarat State Electricity Corporation Ltd. Schedule together with
any amendments etc. embodied in the tender documents “Drawing” refer to
those accompanying the tender documents and/or any work orders referred
(j) The “Contract Sum" means the sum accepted or the sum calculated in
accordance with the prices accepted in the tender and/or the contract rate as
payable to the contractor for the full and entire execution and completion of
(k) "The date for completion" is the date or dates of completion of the work or any
part of the works set out or ascertained in accordance with the individual work
orders and the tender documents or any subsequent agreed amendments
EW- 366 PUR-F-006 RFQ-
GUJARAT STATE ELECTIRICITY CORPORATION LTD., GANDHINAGAR
TENDER & CONTRACT FOR WORKS
1. Security Deposit:
The contractor shall within 10 days from the date of issue of letter of intent pay the
security deposit for the performance of the contract.All damages, costs, charges,
expenses and other sums which may be or may become due to payable by the
contractor to the CORPORATION under the terms of the contract may be deducted
from the cash the proceeds of sale of the securities so deposited (which the officer
or person to whom the same may be endorsed as aforesaid is hereby authorized to
sell that purpose) of from the interest of any such securities or from any sums or
which may become due to the contractor by the CORPORATION whole or the
balance unapplied as aforesaid of cash securities so deposited being repaid or
transferred and returned as may be to contractor after the date on which the final
bill is paid or after the expiry of the date up to which the contractor has to
maintain the work in good order whichever is later.
2.Compensation for the delay :
The time limit allowed for carrying out the work as entered in the tender shall
strictly observed by the contractorand shall be reckoned from the date on which
the order to commence the work is given to the contractor. The work shall
throughout the stipulated period of contract be proceeded with all due diligence
(time being deemed to be the essence of contract) and for delay the contractor shall
pay compensation an amount equal to half percent per one week for the Contract
value or as per the decision of the Competent Authority of the GSECL..
3. Action when whole of Security Deposit is forfeited;
In any case in which under any clause of this contract the contractor shall have
tendered himself to pay compensation amounting to the whole of his security
deposit (whether paid sum or deducted by installments) or in the case of
abandonment to the work owing to serious illness/ death of the contractor or any
other cause, the Executive Engineer on behalf of the corporation shall have
powers to adopt (a) below and any of the following causes under (b) and (c) as he
may deem best suited to the interest of the corporation.
To rescind to the contract (or with rescission notice of 10 days in writing to
the contractor under the hand of the Executive Engineer shall be conclusive
evidence and in that case the security deposit of contractor shall stand forfeited
and be absolutely at the disposal of the corporation.
(b) To employ labor paid by the corporation to supply materials to carry out the
works, or any part of the works debiting the contractor with the cost of the labor
and the price of the materials (as to the correctness of which cost & price, the
certificate of Executive Engineer shall be final & conclusive against the contractor)
and crediting him with value of the work done. In all respect in the same manner
and at the same rates as if it had been carried out by the contractor under the
terms of this contract and in that case the certificate of the Executive Engineer as
to the value the work done shall be final and conclusive against the contractor.
(c) To order that the work of the contractor be measured up and to take such part
thereof as shall be unexecuted out of his heads and to give it to another contractor
to complete in which case any expenses which may be incurred in excess of the
sum which would have been paid to the original contractor if the whole work had
been executed by him (as to amount of which excess expense the certificate in
writing of the Engineer shall be final, conclusive and shall be paid by the original
contractors) and shall be deducted from any money due to by the corporation
under the contract or otherwise from his security deposit of the proceeds sale
thereof or a sufficient part thereof.
In the event of the above causes being adopted by the Executive Engineer the
contractor shall have no claim to compensation for any loss sustained by him by
reason of his having purchased or procured any materials or entered into any
engagements or made any advances on account of or with a view to the execution
of the work or the performance of the contract. And in case the contract shall be
EW- 366 PUR-F-006 RFQ-
rescind under the provision aforesaid the contractor shall not be entitled to recover
or be paid any sum for any works thereof actually performed by him under this
contract unless and until the Executive Engineer shall have certified in writing the
performance of such work and the amount payable to him in respect thereof and
he only be entitled to be paid the amount so certified.
4. Notice for Unsatisfactory Progress :
If the progress or a particular portion of the work is unsatisfactory the Executive
Engineer whose decision shall be final shall not withstanding that the general
progress of work is satisfactory be entitled to take action under Clause 3(b) after
giving the contractor 10 days notice in writing and the contractor will have no claim
for compensation for any loss sustained by him owing to such action.
5. Action in the case of Default by Contractor:
If any case in which any of power conferred upon the Executive Engineer by
Clauses 3 and 4 hereof shall have exercisable and the same shall not have been
exercised, the non-exercise thereof shall not constitute a waiver of any of the
conditions hereof and such powers shall notwithstanding be exercisable in any
further case of default by the contractor for which by any hereof he is declared
liable to pay future compensation shall remain unaffected in the event of the
Executive Engineer taking action under sub-clause (a) or (c) of Clause 3 he may, if
he so desires take possession of all or any tools plant materials and stores in so
upon the work or the site thereof belonging to the contractor or procured by him
and intended to be used for the execution of the work or any part thereof paying
for allowing the same in account at the contract rates or in the case of a contract
rates not being applicable of current market rates to be certified by the Executive
Engineer whose certificate thereof shall be final. In the alternative the Executive
Engineer may by notice in writing to the contractor or his clerk of works, foreman
or other authorized agent require him to remove such tools Plant materials or
stores from the premises within a time to be specified in such requisition the
decision to the contractor failing to comply with any such requisition the decision
of the Executive Engineer as to the expense of any such removal and the amount of
the proceed and expense of any such shall be final and conclusive against the
6. Extension of Time Limit :
If the contractor shall desire an extension of the time limit for completion of the
work on the ground of his having been unavoidably hindered in execution or any
other ground he shall apply in writing to the Executive engineer and the executive
Engineer may, if in his opinion there are reasonable grounds for granting extension
recommend such extension as he thinks necessary or proper. The decision of the
competent authority in this shall be final.
7. Completion Certificate
On completion of the work the Contractor shall be furnished with Completion
Certificate by the Executive Engineer of such completion but no such certificate
shall be given nor shall be the work of considered to be complete unit works are
taken over and/or duly tested and put to operation as the case may be nor until
the work have been measured by the Engineer in Charge or where the
measurements have been taken by his subordinates until they have received the
approval of the Executive Engineer the said measurements being binding and
conclusive against the contractor.
8. Effect of the Certificate :
No payment shall be made for any work estimated to cost less than Rs. 1,000 till
after the whole of said work shall have been completed and certificate of completion
given. But in the case of works estimated to cost more than Rs. 1,000 contractor
shall on submitting a monthly bill thereof to be entitled to receive payments
propionate to the part of the work them approved and passed by the Engineer-in-
charge whose certificate of such approval and a passing of the sum so payable
shall be final and conclusive against the contract of all such intermediate payment
shall be regard as payment by way of advance against the final payment only and
not as payments for work actually done, completed and shall not preclude the
EW- 366 PUR-F-006 RFQ-
Engineer-in-charge from requiring bad, unsound, imperfect or unskillful work to be
removed and taken away and reconstructed or re erected not shall any such
payment be considered as admission of the due performance of the contractor any
part thereof in any respect of the accruing of the claim nor shall conclude,
determine or effect in anyway the otherwise or in any other way vary or affect the
contract. The final settlement and adjustment of the accounts otherwise or in any
other way vary or affect the contract. The final bill shall be submitted by the
contractor within one month of the date fixed for completion of work, otherwise, the
certificate of the Engineer-in-charge of the measurement and of total amount
certificate of the Engineer-in-charge of the measurement and of total amount
payable for the work shall be final and binding on all parties.
9. Payment to Contractors:
The rates for several items of works estimated to cost more than Rs. 1000 agreed to
within shall be valid only when the item concerned is accepted having been
completed full in accordance with the sanctioned specification. In case, where the
items of the work are not accepted as so completed the Engineer-in-charge may
make payment on account of such items at such reduced rates as he may
considers reasonable in the preparations of final or running accounts bills.
Bills shall be submitted by the contractor each month on or before the date fixed by
the Engineer-in-Charge for all works executed in the previous month and the
Engineer-in-Charge shall take or cause to be taken the requisite measurement for
the purpose or having the same verified and the claim so far as it is admissible
shall be adjusted. If, possible, within ten days from the presentation of the bills,
If the, contractor does not submit the bill within the time fixed as aforesaid the
Engineer-in-Charge may depute a subordinate to measure up the said work in the
presence of the contractor or his duly authorized agent whose counter signature in
the measurement list shall be sufficient warrant and the Engineer-in-Charge may
prepare a bill from such list which shall be binding on the contractor in all
11. Supply of Materials to Contractor:
If the specification of the estimate work provides for the use of any special
description of material to be supplied from the corporations Stores or if it is
required that the contractor shall use certain stores to be provided by the
Engineer-in-Charge (such material and stores and the prices to be charged thereof
as hereinafter mentioned being so far as practicable for the convenience of
contractor but not so as in any way to contro1, the meaning or effect of this
contract specified in the schedule or memorandum hereto annexed) the contractor
shall be supplied, with such materials and stores as may be required from time to
time be used by him for the purpose of the contract only and the value of the full of
materials and stores so supplied shall be cut of or deducted from any such item
due or thereafter to become due to the contractor under the contract or otherwise
or from the security deposit or the proceeds of sale thereof if the deposit is held in
Government securities the same or a sufficient portion thereof shall be sold for the
purpose. All materials supplied to the contract or shall remain the absolute
property of corporation and shall on account be removed from the site of the work
and shall at time be open to inspection by the Engineer-in-charge. Any such
materials unused and in perfectly good condition at time of completion or
determination of the contract shall be returned to the corporation stores if the
Engineer-in-Charge so requires by notice in writing given under his hand but the
contractor shall not be entitled to return any such materials supplied to him as
aforesaid but remaining unused by him or for any wastage in damage thereto.
The contractor shall be responsible for the loss, destruction or deterioration of the
material stores or articles supplied to him by the corporation even if such loss,
destruction or deterioration has occurred under any circumstances whatsoever
beyond his control as if the materials, stores or articles so supplied were his
12. Works to be executed in accordance with Specifications, Drawings, Orders
EW- 366 PUR-F-006 RFQ-
The contractor shall execute the whole and every part of work in the most
substantial and workmanlike manner and both as regarding materials and in every
other respect in strict accordance with the specifications, the contractor shall also
confirm exactly , fully and faithfully to the designs, drawings and instructions in
writing relating to the work signed by the Engineer-in-Charge and lodge in his
office and to which the contractor shall be entitled to have access for the purpose
of inspection at such office or on the site of the work during office hours and the
contractor shall; if he so requires, be entitled at his own expense to make or cause
to be made copies of the specification, and of all such designs, drawings and
instruction as aforesaid .
13. Alterations in Specifications and Designs not to invalidate Contracts:
The Executive Engineer shall have powers to make any alterations, in or addition to
the original specifications designs and instructions that may appear to him to be
necessary or advisable during the progress of the work and the contractor shall be
bound to carry out-the work in accordance with any instruction in this connection
which may be given to him in writing signed by the Engineer-in-Charge and such
alterations shall not invalidate the contract. Any additional work which the
contractor may be directed to do in the manner above specified as part of the work
shall be carried out by the contractor on the same conditions in all respect on
which he agreed to do the main works, and at the same rates as are specified in the
tender for the main work.
Where, however, the work is to the executed according to the designs, drawings
and specifications recommended by the contractor and accepted by the competent
authority. The alteration above referred to shall be within the scope of such
designs, drawings and specifications appended to the tender.
14. Rates for Works not entered in Estimate or Schedule of Rate of the
And if the additional and altered work includes any class of work for which no rate
is specified in this contract then such class of work shall be carried out at the rates
entered in the Schedule of Rates of the Division or at the mutually agreed upon
between the Executive Engineer and the contractor whichever are lower. If the
additional or altered work for which no rate is entered in the Schedule of Rates of
the Division is ordered to be carried out before the rates agreed upon then the
contractor -thin seven days of date of receipt by him of the order to carry out the
work inform the Executive Engineer does not agree to this rate he shall be notice
in writing be at liberty to cancel his order to carry out such class of work and
arrange to carry it out in such manner as he may consider advisable provided
always that if the rates shall have been determined as lastly herein before
mentioned then in such case he shall only be entitled to be paid in respect of the
work carried out or expenditure incurred by him prior to the date of the
determination of the rate as aforesaid according to such rate or rates as shall be
fixed by the Executive Engineer. In the event of dispute, the decision of the
Superintending Engineer of the Circle will be final.
15. Extension of Time Limit in consequence of Addition or Alteration:
The time limit for the work shall be extended in the proportion that the increase in
its cost occasioned by alteration or addition bears to the cost of the original
contract work and the certificate of the Engineer-in Charge as to such proportion
shall be conclusive.
16. No Compensation for Alteration in or Restriction of Work to be carried
If any time after the execution of the contract documents the Engineer-in-charge
shall be for any reason whatsoever require the whole or any part of the work as
specified in the tender to be stopped for any period or shall not require the whole or
part of the work to be carried out at all or to be carried out by the contractor he
shall give notice in writing or the fact to the contractor who shall thereupon
suspend or stop the work totally or partially as the case may be in any such case
except as provide hereunder the advantage which he might have derive from the
execution of the work in full but which he did not so derive consequence of the full
EW- 366 PUR-F-006 RFQ-
amount of work not having been carried out or on account of any loss that he may
be put to on account of material purchased or agree to be purchased or for
unemployment of labor recruited by him. He shall not also have any claim for
compensation by reason of any alterations having been in the original specification
drawings, designs, and instructions which may involve any curtailment of the work
as originally completed. Where, however, materials have already been purchased or
agreed to be purchased by the contractor before receipt by him of said notice, the
contractor shall be paid for such materials at the rate of requirement and are of
approved quality and/or shall be compensated for the loss, if any, that the he may
put to in respect of materials agreed to be purchased by him, the amount of such
compensation to be determined by the Executive Engineer whose decision shall be
final. If the contractor suffers any loss on account of his having to pay, his labor
charges during the period during which the stoppage of work has been ordered
under this clause the contractor shall on application be entitle to such
compensation on account of labor charges as the Executive Engineer whose
decision shall be final may consider reasonable provided that the contractor shall
be entitle to any compensation on account of labor charges if in the opinion of the
Executive Engineer , the labor could have been employed by the contractor
elsewhere for the whole part of the period during which the stoppage of the work
has been ordered as aforesaid.
17. No claim to compensation on account of loss due to delay of materials by
The contractor shall not be entitled to any claim any compensation from
corporation for the loss suffered by him on account of delay by corporation in the
supply of materials entered in Scheduled A where’ such delay is caused by:
(i) Difficulties relating to supply of railway wagons.
(ii) Force Major
(iii) Act of God
(iv) Any other reasonable cause beyond the control of corporation
In the case of such delay in the supply of materials.corporation shall grant such
extension of time for the completion of the works as shall appear to the Executive
Engineer to be reasonable in accordance with the circumstance of the case. The
decision of the Executive Engineer as to the extension of time shall be accepted as
final by the contractor.
18. Time Limit for Compensation claims:
Under no circumstances whatsoever shall the contractor be entitled to any
compensation from corporation on any account unless the contractor has claimed
in writing to the Executive Engineer within one month of the cause thereof.
19. Action and Compensation payable in case of Bad Work:
At any time before the security deposit is refunded to the contractor shall appear
the Executive engineer or his subordinate in charge of the work that any work has
been executed with unsound imperfect or unskillful workmanship or with materials
of inferior .quality or that any materials or articles provided by him for the
execution of the work are unsound or of a quality inferior to that contract for or are
otherwise not in accordance with the contract it shall be lawful for Engineer-in-
Charge to intimate this fact in writing to the contractor and then notwithstanding
the fact that the work materials or articles complained of may have been
inadvertently passed, certified and paid for, the contractor shall be bound forthwith
to rectify or remove and reconstruct the work so specific in whole or in part as the
case may require or if so required shall remove the materials or articles so specified
and provide other suitable materials or articles at his own charge and cost, and in
the event of his failing to do so within a period to be specified by the Engineer-in-
Charge in the written intimation aforesaid, the contractor shall be liable to pay
compensation at the rate of one percent on the amount of the estimate for every
day not exceeding ten days during which the failure so continues and in the event
of any such failure as aforesaid the Executive Engineer may rectify to get remove
and re-execute the work and replace the materials or articles complained of as the
case may be at the risk and expense in all respects of contractor should the
EW- 366 PUR-F-006 RFQ-
Engineer -in-Charge consider that any such inferior work of materials as described
above may be accepted or made use of, it shill be within discretion to accept the
same as such reduce as he may fix thereof Provided that in the case of any work of
which is visible check is not possible if the Engineer-in-Charge or his subordinate
in charge of the work feels that such work has been executed with unsound,
imperfect , unskillful workmanship or with materials of interior quality, he shall
take sample test at random, cost of which shall; have to borne by the contractor
and if after taking such test part of such work is found to be defective in any
respect of to have been executed with materials of inferior quality, then the
contractor shall be paid for the whole work such amount as may be fixed by the
office on the basis of the lowest quality of work found by him in such sample tests.
Sample Test shall mean:
(i) In relation to poles fixed as line supports the token of one pole out of every
100 poles after taking it out from its foundation for inspection.
(ii) In relation to any other work such test as may be considered necessary by the
Engineer-in-charge or his subordinate in charge of the work.
Cost of sample test shall mean cost incurred for the purpose of taking sample test
and for restoring the tested work to its original condition.
20. Work to be opened to inspection Contractor or Responsible Agent to be
All works under or in course of execution or executed in pursuance of the contract
shall at times be open to the inspection and supervision of the Executive Engineer
and his subordinate and contractor shall at all times during the usual working
hours and at all other times at which reasonable notice of the intention of the
Executive Engineer or his subordinate to visit the works shall have been given to
the contractor, during which period either he should be present to receive order
and instruction or have a responsible agent duly accredited in writing, present for
that purpose. Orders given to the contractors duly authorized agent shall be
considered to have the same force and effect as if they had been given to the
contractor himself.
21. Notice to be given before work is covered up:
The contractor shall be given not less than five days notice in writing by the
Executive Engineer or subordinate In-charges of the work before covering up of
otherwise placing beyond the reach of measurement any work in order that the
same may be measured and correct dimension thereof taken before the same is so
covered up or placed beyond the reach of measurement and shall not and work
without the consent in writing of Executive Engineer or his subordinate in charge
of the work. If any work shall be covered up or placed beyond the reach without
such notice having been given or consent obtained the same shall be uncovered at
the contractors expense, and in default thereof no payment or allowance shall be
made for such work or for the materials with the same was executed.
22. Contractors Liabilities:
The contractors shall supply at his own cost all materials (expect such special
materials, if any, as may be supplied from the corporation Stores in accordance
with the contract plant tools appliances, implements ladders, cordage, take
scaffolding and any temporary works which may be required for the proper
execution of the work, in the original altered or substituted from and whether
included in the specification or other document forming part of the contract or
referred to in these conditions or note and which may be necessary for the
purpose of satisfying or complying with the requirement of the Engineer-in-charge
as to any matter on which under these conditions he is entitled to be satisfied or
which he is entitled to require together with carriage thereof to and from the work.
The contractor shall also supply without charge the requisite number of person
with means and materials necessary for purpose of setting out works, and
accounting, weighing and assisting in the measurement of examinations at any
time and from time to time of the work or material. Failing this the same may be
EW- 366 PUR-F-006 RFQ-
provided by the Engineer-in-charge at the expenses of the contractor and the
expenses may be deducted form any money due to the contractor under the
contractor from his security deposit or the proceeds of sale thereof or of a
sufficient portion thereof. The contractor shall provide all necessary fencing and
lights required to protect the public from accident and shall also be bound to bear
expenses of defense of every suit, action or other legal proceedings at law that may
be brought by any person for injury sustained. Owing to neglect of the above
precautions and to pay any such person or which may be awarded in such suit,
action or proceedings to any such Persons or which may with the consent of the
contractor be paid in compromising any claim by any such person.
23. Contractors Liable for all Damage:
Compensation for all damages done intentionally or unintentionally by contractor's
laborer whether in or beyond the limit of corporation’s property shall be estimated
by the Executive Engineer, or such other officer as he may appoint and the
estimates of the Executive Engineer, subject to the decision of the Superintending
Engineer, on appeal shall be final and the contractor shall be bound to pay the
amount of the assessed compensation demand failing which, the same will be
recovered from the contractor as damages or deducted by the Engineer-in-charge
from any sums that may be due to or become due from corporation to the
contractor under this contract or otherwise. The contractor shall bear the expense
of defending any action or other legal proceeding that may be brought by any
person for injury sustained by him owing to neglect of precautions to prevent the
spread of fire and he shall also pay any damages and cost that may be awarded by
the court if in consequence.
24. Rescission of Contract and Forfeiture Deposit
The contractor shall not be assigned or subject without the written approval of the
Engineer-in-charge and if the contractor assign or subject his contract, or attempt
to do so or become insolvent or commence any Proceedings to be adjudicated as
insolvent or make any composition with creditors, attempt to do so the Engineer-
in-charge may by notice in writing, rescind the contract. Also, if any bribe gratuity,
gift, loan, Perquisite, regard or advantage pecuniary or otherwise shall either
directly or indirectly be given promised or offered by the contractor any of his
servants, or agents, to any person in the employee of corporation in any way
directly or indirectly interested in the contract the Executive Engineer may give
10 days notice in writing and rescind the contract. In the event of a contract
being rescinded the security deposit of the contractor shall there upon stand
forfeited and be absolutely at the discretion of corporation and the same
consequences shall ensure as if the contract has been -rescinded under Clause
thereof and in addition the contractor shall not be entitled to recover or be paid for
any work thereof actually performed under the contract.
25. Compensation .
All sums payable by a contractor by way of compensation under any of these
conditions shall be considered as a reasonable compensation to be applied to the
use of corporation without reference to the actual loss or damage sustained and
Whether any damage has not been sustained.
26. Changes In the Constitution of Firm to be notified.
In the case of tender by partners of a firm any change in the constitution of firm
shall be forthwith notified by the contractor to the Executive Engineer for his
27. Works under direction of Superintending Engineer.
All works be executed under the contract shall be executed under the direction and
subject to the approval of the Superintending Engineer of the Circle for the time
being who shall be entitled to direct at what point or points and in what manner
they are to be commenced and from time to time carried on.
28. Decision of superintending Engineer to be final.
Except where otherwise specified in contract and subject to the power delegated to
him by corporation under the corporation , then in force the decision of the
Superintending Engineer of the Circle for the time being shall be final conclusive
EW- 366 PUR-F-006 RFQ-
and binding on all parties of the contract upon all questions relating to the
meaning for the specification, designs drawings and instruction herein before
mentioned and as to the quality of workmanship or material used on the work or as
to any other question, claim right matter or thing whatsoever in any way arising or
relating to the contract. designs, drawing specification estimates instructions
orders or these conditions or otherwise concerning, the works or the execution or
failure to execute the same whether arising during progress of the work or after the
completion on abandonment thereof.
29. Stores to be obtained from corporation
The contractor shall obtained from the corporation stores, such stores and
articles as are mentioned schedule A which may be required for the work or any
part of the work or in making up any articles required therefore or in connection
therewith unless he has obtained permission in writing from the Executive
Engineer or obtained such stores and articles from elsewhere. The value of such
stores & articles as may be supplied to the contractor by the Engineer-in-charge
will be debited to the contractor his account at the rate shown in the schedule A
attached to the contract and if they are not entered said schedule, they shall be
debited to him at cost price which for the purposes of this contract shall include
cost of carriage and all other expenses whatsoever which may have to be incurred
in obtaining delivery of the same at the stores aforesaid and further overhead
charges 15%. The contractor shall be responsible for the loss destruction or
deterioration of the materials, stores or articles supplied to him by the corporation
even if such loss destruction or deterioration has occurred under any articles so
supplied were his property. The contractor shall be responsible for returning the
residual materials after completion of the contract and if fails to return the balance
materials supplied to him by the corporation the cost of the of the residual
materials will be recovered form the contractor at the market rate or stock issue
rate whichever is higher at the time of materials account plus 15%.
30. Lump Sum in Estimate.
(1) When the estimate on which tender is made includes lump sums in respect of
parts of the works contractor shall be entitled to payment in respect of the items or
works involved or the part of work in question at the same rates as are payable
under this contract or such items of the part the work in question is not in the
opinion of the Engineer-in-charge capable of measurement Engineer-in-charge and
the certificate in writing of the Engineer-in-charge shall be final & conclusive
against the contractor with regard to any sum or sums payable to him under
provision of this clause.
Lump sum Tenders
(2) Whenever lump sum tenders have been invited for buildings or other structures
of the same type, design, the contractor shall submit his bill stated in Clause II and
the Engineer-in-charge not below the rank of Executive Engineer shall certify by
general measurement or by other method considered suitable to him, the value of
work done and the contractor shall be paid monthly a sum equal to. 90% of the
total value the work so certified since the last payment after deducting a part or
whole of the secured advance if not already paid for the materials utilized on the
works. An additional secured advance for any fresh materials brought on site will
also be paid if certified by the office not below the rank of Executive Engineer.
After the work is completed final bill would be paid on the certification of an officer
not below the rank of Executive Engineer, that the works are done according to
drawing and specifications attached to the tender if any additions and alteration
have been carried out, details measurement in respect thereof shall be recorded
and extra payment of deductions are regulated as per item rates quoted by the
contractor while submitting the tender and if there are any items in the additions
and alteration for which the contractor has not quoted a rate, the payment shall be
regulated as per clause 14 above.
31. Action Where no Specification.
In the case of any class of work for which there is no such specification as is
mentioned in rule I such work shall be carried out in accordance with the divisional
EW- 366 PUR-F-006 RFQ-
specifications and in the event of absence of divisional specification the work shall
be carried out in all respect in accordance with the instructions and requirement of
the Engineer-in-charge.
32. Compensation under Workmen’s Compensation Act.
The contractor shall be responsible for and shall pay any compensation to his
workmen payable under the workmen’s Compensation Act 1923 (VIII of 1923)
(herein after called the said Act) for injuries caused, to the workmen. If such
compensation is paid by corporation as principal under sub-section (1) of Section
12 of the said Act on behalf of the contractor, it shall be recoverable by Corporation
from the contract or under sub-section (2) of the said section. The contractor shall
pay such amount of compensation on demand failing which it will be recovered
from him by deducting it from any sums that may be due or become due to the
contractor by the corporation under this contract or otherwise.
33. No claim for Variation in quantities of work
Quantities shown in the tender are approximate and no claim shall be entertained
Quantities of work executed being either more or less than those entered in the
tender or estimate.
34. No claim for Compensation for Delay in execution of work
No compensation shall be allowed for any delay caused into starting of work on
account of acquisition of land and in the case of clearance works for any delay in
according to sanction estimate.
35. No claim for Compensation for delay in execution of work
No compensation shall be allowed for any delay in execution of the work on
account of water standing in borrow pits or compartment, the rates are inclusive
for hard or cracked soil, excavation in mud, subsoil water or water standing in
borrow pits and no claim for an extra rate shall be entertained unless otherwise
expressly specified.
36. Entering upon or commencing any portion of work
The contractors shall not enter upon or commence any portion of work except with
the written authority any instructions of the Executive Engineer or his subordinate
in charge of the work fail in such authority the contractor shall have no claim to
ask for measurement of payment for work.
37. Method of Payment
Payment to contractors shall be made by cheques provided the amount exceeds
Rs. 10/- Amount not exceedingRs. 10/- will be paid in cash.
38. ACCEPTANCE OF CONDITIONS OF TENDERING FOR WORK
Submission to tender or acceptance of work order shall imply acceptance of those
conditions of tender by contractor.
39. Employment of Scarcity Labor
If Government declares a state of scarcity of famine to exist in any village situated
within 10 miles of the work the piece worker/contractor shall employ upon such
parts of the work as are suitable for unskilled labor any person certified to him by
the Executive Engineer or by any person to whom Executive Engineer may have
delegated this duty in writing to be in need of relief and shall be bound to pay
such person wage not below the minimum which Government may have fixed in
this behalf. Any disputes which arise in connection with the implementation of this
clause shall be decided by the Superintending Engineer whose decision shall be
final and binding on the piece worker/contractor
40 Employment of Technical Persons.
The contractors who are registered class ‘A’, ‘B’ and ‘C’ or such contractors who
execute the works of Rs. 5 lakhs and above shall employ the technically qualified
personnel possessing minimum a Diploma from a recognized Technical Institution
executing the work of the corporation.
Chief Engineer (G)
GSECL: Gandhinagar TPS
Dated seal & signature of
Bidder/Contractor
EW- 366 PUR-F-006 RFQ-
COMPULSORY UNDERTAKING OF BIDDER REGARDING QUALITY OF
PPEs (PERSONNEL PROTECTIVE EQUIPMENTS)
Ref.: Tender no.: ____________
Authorized signatory of M/s____________________________________
Hereby certify that following mentioned PPEs (as per
ISI/DGMS/CE/EN/ANSI approved only) must be issued to our all contract
workers as per nature of hazards before execution of work.
Sr. Name of PPE IS :Code no. of Make of Qty Unit
1 Safety Helmet IS:2925 Nos.
2 Safety goggles with IS:5983:1980 Nos.
Anti fog lens or EN:166
3 Reusable Ear Plug ANSI S3.19- Pair
4 Dust Mask EN149:2001 Nos.
5 Safety Shoes IS:15298 Pair
6 Cur resistance Hand EN 388:2003 Pair
gloves Cut level-1
If our company is not provided above mentioned good quality of PPE’s,
Safety Officer and Factory manager shall be empowered to stop the work
without any notice.
Seal of the Firm Signature of Authorized
EW- 366 PUR-F-006 RFQ-
ANNEXURE-II: SOP/JOB SAFETY ANALYSIS
Name of Job analyzed:
Tender No. /Work order No.
Name of Agency: Mobile No.
Name of Supervisor: Mobile No.
Name of Section/Department:
Job Location/Area:
A Job Safety Analysis (JSA) for hiring a bus ensures passenger safety by
verifying vehicle roadworthiness, driver qualifications, and emergency
preparedness. Key steps include verifying valid licenses/inspections,
ensuring functional seatbelts/lights/brakes, checking for required safety
equipment (first aid, fire extinguisher), and confirming driver compliance
with safety rules.
Job Step Hazard Control Measures
Verify valid fitness certificate, pollution
Vehicle Unsafe/non-compliant bus,
certificate, insurance, and roadworthiness
Selection mechanical failure.
inspection (brakes, lights, tyres).
Verify valid heavy vehicle driving license, verify
Unqualified/fatigued driver, experience, ensure no history of accidents,
drug/alcohol abuse. perform background check, enforce no
drug/alcohol policy.
Safety Confirm presence of functioning first-aid box,
Missing safety items, injury
Equipment fire extinguisher, spare wheel, tool kit, and
during emergency.
Check reverse horn.
Perform a daily check of fuel, oil, coolant,
Pre-Trip Unexpected breakdown,
wipers, mirrors, and tire pressure. Clean the
Inspection accident.
interior and exterior.
Ensure all passengers use seatbelts. Enforce
Passenger Overcrowding, improper
capacity limits. Ensure safe
Operations seating, falling, accidents.
boarding/disembarking.
Utilize GPS tracking, monitor speed, ensure
Trip Reckless driving, excessive
driver follows rest/work hours. Plan routes to
Monitoring speed, accident.
DATE PREPARED BY CHECKED BY REVIEWED BY APPROVED BY
EXPERT ENGINEER E.E(_________) S.E(_________) FACTORY
OF AGENCY WITH MANAGER
EW- 366 PUR-F-006 RFQ-
SOP for Hiring of Bus
A Job Safety Analysis (JSA) for hiring a bus ensures that the vehicle, driver, and
operational procedures meet safety standards before any journey begins. The
process involves breaking down the hiring and mobilization into key steps to
identify potential risks.
Vector Solutions +1
1. Pre-Hiring & Documentation
Before the bus arrives at your site, verify that all legal and safety requirements are
met by the service provider.
Vehicle Compliance: Confirm the bus has a valid commercial registration,
fitness certificate, and updated insurance.
Driver Competency: Verify the driver possesses a valid heavy vehicle license and
has undergone a medical or eye test recently.
Safety History: Check for any history of misconduct or rash driving.
2. Vehicle Inspection (On-Site Arrival)
Perform a physical inspection of the bus before allowing any passengers to board.
Inspection Hazard Identified Control Measure
Mechanical Brake or steering Test brakes and check fluid levels before use.
Tyres Blowouts due to worn Ensure tyres are in good condition and at
treads. proper pressure.
Safety Gear Fire or injury without Verify presence of fire extinguisher and first
tools. aid box.
Visibility Low visibility Check all lights (head, brake, fog) and
accidents. windshield wipers.
3. Driver Induction & Rules
Set clear behavioral and operational expectations for the driver to prevent
Zero Tolerance Policy: Strictly prohibit driving under the influence
of alcohol or drugs.
Speed Limits: Enforce speed limits (e.g., 15 km/h inside plant premises and
standard limits on open roads).
EW- 366 PUR-F-006 RFQ-
Distraction Control: No mobile phone use or smoking while driving.
Emergency Contact: Provide the driver with emergency contact numbers for
the nearest hospital and safety office.
4. Passenger Boarding & Movement
Manage how people interact with the vehicle to prevent slips, trips, or collisions.
Safe Boarding: Passengers should only board and exit at designated, level
areas away from other moving traffic.
Aisle Safety: Keep the aisle clear of bags and parcels to prevent tripping
hazards during transit.
Reverse Movement: If the bus must reverse, use a banks man (signal
person) wearing a reflective vest to guide it.
5. Operational Controls
Parking: Always use wheel stoppers or chocks when parked on slopes.
Rest Periods: Ensure the driver has adequate rest to avoid fatigue-related
Weather Conditions: During heavy rain or fog, reduce speed or halt
operations if visibility is too low.
EW- 366 PUR-F-006 RFQ-
GSECL Contractor EH&S Performance Evaluation Form
Name of Contract Agency:
Contract work order No.
Date Evaluation Completed:
Work Description:
Name of Power Station:
Status of Work/ Project: _________% completed.
No. of person engaged during work contract:
Total Exposure hours worked on work order:
This evaluation must be completed by Concern EE & SE after completion of
the Work Contract /project and at pre-determined intervals (three months)
as agreed upon at the Pre-Job Mobilization Meeting.
Statistics Number Frequency
Environmental Excursions
Traffic Violations
The following categories should be rated for the Contractor’s overall
performance on the work order/ Project.
RATING (5 = Excellent; 4=Very Good 5 4 3 2
3=Good 2=Satisfactory 1 = Poor)
A. Adherence to Requirements:
Adherence to contract provisions for new
hire orientation.
Compliance to plant safety rules.
Compliance with industrial hygiene
Compliance with site contractor’s health and
safety guidelines.
Compliance with site permits.
Material Safety Data Sheets (MSDS)
Response to safety requests.
B. Housekeeping
Monthly housekeeping inspection results.
Overall site housekeeping practices.
Response to safety requests.
Chemical hazard control
Fire control measures
Flammable and explosive materials control
General waste – trash collection
EW- 366 PUR-F-006 RFQ-
C. Injury Performance:
Contractor’s timely reporting of accidents
Contractor’s use of modified work program.
Contractor’s participation in accident
investigations.
Number of incidents observed and reported.
D. Contractor Safety Program:
On site safety officer.
All subcontractors employed by the
Contractor have been managed effectively
with reference to EHS and Quality (meets
company standards, practices and/or
Safety training for supervisors.
Substance abuse policy compliance.
Weekly toolbox meeting and/or participation.
Updates to written safety programs.
E. Tools and Equipment:
Availability of tools and equipment
Condition of contractor’s tools and
equipment by site and provincial Labour and
OH&S standards.
Maintenance of Equipment / Tools / etc.
Contractor’s knowledge and proper use of
Contractor’s equipment certification readily
Contractor’s materials
inspection/acceptance program followed.
F. Costs Within Expectations:
Contractor’s cost program.
Contractor’s reasonableness and/or
G. Execution of Work:
Contractor’s cooperation in handling change
Contractor’s efforts to eliminate
nonproductive time.
Contractor’s planning of work.
Relationship with other site contractors.
Contractor’s cooperation with our company
and other contractor personnel.
H. Key Field Personnel:
Competence of main office staff and
Quality of first and second line supervision.
J. Labour Relations:
Contractor’s ability to anticipate problems.
Contractor’s efforts in exercising
management rights.
EW- 366 PUR-F-006 RFQ-
Contractor’s relationship with the building
K. Project Management/Supervision:
Contractor’s efforts to use efficient crew size.
Control of subcontractors.
L. Quality of Craft Labour :
Contractor’s ability to obtain qualified
Quality of work.
Contractor’s adherence to schedule
N. Quality Control/Assurance:
Contractor’s equipment certification readily
Contractor’s material inspection /
acceptance program followed.
Contractor meets expectations on quality
O. Issues and Concerns:
Advises of potential problems.
Efficiency in handling paperwork.
Readiness to accept responsibility.
Reliability in dealings.
Response to site requests for action by the
supervisor/management.
OVERALL PERFORMANCE:
Any specific issues or concerns with the contractor:
Would you hire this contractor again to do similar work:
How can this contractor improve on its past performance:
Evaluation carried out By:
Designation Executive Engineer Superintending Safety Officer
Date Completed:
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
GTPS_Tender _ EW-366_08_10_2026.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .