RATE CONTRACT FOR SUPPLY, INSTALLATION, TESTING, COMMISSIONING AND COMPREHENSIVE OPERATION AND MAINTENANCE OF MOTOR DRIVEN, GAS ENGINE DRIVEN & VIP (VARIABLE INLET PRESSURE) DRIVEN CNG COMPRESSORS/PACKAGES (101 Nos)
296383
Open e tender 296383
Open
Mechanical Equipment
Works
Ahmedabad
19 documents required · 19 mandatory
₹5,000
Gujarat Gas Limited,Gandhinagar
₹1.6 Cr
20 Apr 2026
20 Apr 2026
20 Apr 2026
11 May 2026
20 Apr 2026
SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF ENGINE DRIVEN CNG COMPRESSOR/ COMPRESSOR PACKAGES
Cost Calculation for Fuel Consumption and Vent Gas Loss per Compressor Package / Compressor
1200 SCMH Bidder-1 Bidder-2 Remarks
@ 19 barg @ 19 barg
C For Guaranteed Fuel Consumption
Guaranteed Fuel Consumption in Kgs/Hr 36 38 To be entered by Bidder
Annual Fuel consumption (365 x 12 x Guaranteed Fuel Consumption in kg.) (Considering 12 Hrs running per day) 157,680 166,440 Formula
Gas price in Rs. per Kg. 64.19 64.19 Fixed Value
Total Fuel Cost PER YEAR 10,122,081 10,684,419 Formula
Output in SCMH 1200 1200 Fixed Value-variable as per Capacity of the Compressor Package / Compressor
Annual sales (kg.) (365 x 12 x output in kg.) (Considering 12 Hrs running per day) 3,951,880 3,951,880 Formula
Fuel Cost per Kg.-Rs. 2.56 2.70 Formula
Fuel Cost / Compressor [for Ten years ] Rs. 101,220,812 106,844,190 Formula
D For Guaranteed Gas Loss from Vent Meter
Gas Vent mass flow meter reading (In Kg) for month measured through vent meter installed in Compressor considering accuracy of meter. (Considering 12 Hrs running per day) (Vent mass flow meter reading in kg. per hour * 12 * 30) 28.42 30 To be entered by Bidder
Suction mass flow meter reading (In Kg) for month (Considering 12 Hrs running per day) 337,800 338,522 Formula
Guaranteed Monthly Gas Loss in % that will be vented through the vent meter installed in Compressor considering accuracy of meter. 0.00841% 0.00886% Formula
Retail Selling Price (RSP) (per Kg) 80.26 80.26 Fixed Value
Dealer Commission (A) 3.42 3.42 Fixed Value
Gas Price Without dealer Commission (b)=RSP-A 76.84 76.84 Formula
Applicable VAT (c ) =B - (B / (1+VAT/100)) (5%) 3.66 3.66 Formula
Gas price in Rs. without VAT (D) = B - C 73.18 73.18 Formula
Applicable Excise Duty in Rs. (E) = D - (D / (1+ED/100)) (14%) 8.99 8.99 Formula
Gas price in Rs. without ED (F) = D – E (per kg) 64.19 64.19 Formula
Gas loss in Rs per year per compressor 21,343 22,482 Formula
Gas loss in Rs for 10 years per compressor 213,433 224,818 Formula
Total cost including Guaranteed Fuel Consumption and Vent Gas Loss 101,434,245 107,069,009 Formula
SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF ENGINE DRIVEN CNG COMPRESSOR/ COMPRESSOR PACKAGES
Cost Calculation for Fuel Consumption and Vent Gas Loss per Compressor Package / Compressor
1700 SCMH Bidder-1 Bidder-2 Remarks
@ 24 barg @ 24 barg
C For Guaranteed Fuel Consumption
Guaranteed Fuel Consumption in Kgs/Hr 44 46 To be entered by Bidder
Annual Fuel consumption (365 x 12 x Guaranteed Fuel Consumption in kg.) (Considering 12 Hrs running per day) 192,720 201,480 Formula
Gas price in Rs. per Kg. 64.19 64.19 Fixed Value
Total Fuel Cost PER YEAR 12,371,433 12,933,770 Formula
Output in SCMH 1700 1700 Fixed Value-variable as per Capacity of the Compressor Package / Compressor
Annual sales (kg.) (365 x 12 x output in kg.) (Considering 12 Hrs running per day) 5,598,496 5,598,496 Formula
Fuel Cost per Kg.-Rs. 2.21 2.31 Formula
Fuel Cost / Compressor [for Ten years ] Rs. 123,714,326 129,337,704 Formula
D For Guaranteed Gas Loss from Vent Meter
Gas Vent mass flow meter reading (In Kg) for month measured through vent meter installed in Compressor considering accuracy of meter. (Considering 12 Hrs running per day) (Vent mass flow meter reading in kg. per hour * 12 * 30) 30 32 To be entered by Bidder
Suction mass flow meter reading (In Kg) for month (Considering 12 Hrs running per day) 476,020 476,742 Formula
Guaranteed Monthly Gas Loss in % that will be vented through the vent meter installed in Compressor considering accuracy of meter. 0.00630% 0.00671% Formula
Retail Selling Price (RSP) (per Kg) 80.26 80.26 Fixed Value
Dealer Commission (A) 3.42 3.42 Fixed Value
Gas Price Without dealer Commission (b)=RSP-A 76.84 76.84 Formula
Applicable VAT (c ) =B - (B / (1+VAT/100)) (5%) 3.66 3.66 Formula
Gas price in Rs. without VAT (D) = B - C 73.18 73.18 Formula
Applicable Excise Duty in Rs. (E) = D - (D / (1+ED/100)) (14%) 8.99 8.99 Formula
Gas price in Rs. without ED (F) = D – E (per kg) 64.19 64.19 Formula
Gas loss in Rs per year per compressor 22,650 24,123 Formula
Gas loss in Rs for 10 years per compressor 226,496 241,230 Formula
Total cost including Guaranteed Fuel Consumption and Vent Gas Loss 123,940,822 129,578,934 Formula
SUPPLY, INSTALLATION, TESTING, COMMISSIONING OF ELECTRIC MOTOR DRIVEN CNG COMPRESSOR PACKAGES/ COMPRESSORS INCLUDING COMPREHENSIVE OPERATION & MAINTENANCE SERVICES
Cost Calculation for Power and Gas Loss per Compressor Package / Compressor
400 SCMH Bidder-1 Bidder-2 Remarks
@ 3 barg @ 3 barg
C For Guaranteed Power
Guaranteed Power Consumption in KWH 75 74 To be entered by Bidder
Annual Power consumption 328,500 324,120 Formula
(365 x 12 x Guaranteed KWH)
(Considering 12 Hrs running per day)
Electricity Distribution Company charges = RS. 8.10 /unit 8.1 8.1 Fixed Value
Total Power Cost 2,660,850 2,625,372 Formula
Output in SCMH 400 400 Fixed Value-variable as per Capacity of the Compressor Package / Compressor
Annual sales (Kg.) 1,317,293 1,317,293 Formula
(365 x 12 x output in Kg.)
( Considering 12 Hrs running per day)
Power Cost per Kg.-Rs. 2.02 1.99 Formula
Power Cost / Compressor [for Ten years ] (In Rs.) 26,608,500 26,253,720 Formula
D For Guaranteed Gas Loss
Gas Vent mass flow meter reading (In Kg) for month measured through vent meter installed in Compressor considering accuracy of meter. (Considering 12 Hrs running per day) (Vent mass flow meter reading in kg. per hour * 12 * 30) 28.42 32.00 To be entered by Bidder
Suction mass flow meter reading (In Kg) for month (Considering 12 Hrs running per day) 108,299 108,303 Formula
Guaranteed Monthly Gas Loss in % that will be vented through the vent meter installed in Compressor considering accuracy of meter. 0.02624% 0.02955% Formula
Retail Selling Price (RSP) (per Kg) 80.26 80.26 Fixed Value
Dealer Commission (A) 3.42 3.42 Fixed Value
Gas Price Without dealer Commission (b)=RSP-A 76.84 76.84 Formula
Applicable VAT (c ) =B - (B / (1+VAT/100)) (5%) 3.66 3.66 Formula
Gas price in Rs. without VAT (D) = B - C 73.18 73.18 Formula
Applicable Excise Duty in Rs. (E) = D - (D / (1+ED/100)) (14%) 8.9871 8.9871 Formula
Gas price in Rs. without ED (F) = D – E (per kg) 64.19 64.19 Formula
Gas loss in Rs per year per compressor 22,191 24,985 Formula
Gas loss in Rs for 10 years per compressor 221,909 249,854 Formula
Total cost including Guaranteed KWH and Gas Loss 26,830,409 26,503,574 Formula
Per package * No. of Compressors
SUPPLY, INSTALLATION, TESTING, COMMISSIONING OF ELECTRIC MOTOR DRIVEN CNG COMPRESSOR PACKAGES/ COMPRESSORS INCLUDING COMPREHENSIVE OPERATION & MAINTENANCE SERVICES
Cost Calculation for Power and Gas Loss per Compressor Package / Compressor
650 SCMH Bidder-1 Bidder-2 Remarks
@ 19 barg @ 19 barg
C For Guaranteed Power
Guaranteed Power Consumption in KWH 75 74 To be entered by Bidder
Annual Power consumption 328,500 324,120 Formula
(365 x 12 x Guaranteed KWH)
(Considering 12 Hrs running per day)
Electricity Distribution Company charges = RS. 8.10 /unit 8.1 8.1 Fixed Value
Total Power Cost 2,660,850 2,625,372 Formula
Output in SCMH 650 650 Fixed Value-variable as per Capacity of the Compressor Package / Compressor
Annual sales (Kg.) 2,140,602 2,140,602 Formula
(365 x 12 x output in Kg.)
( Considering 12 Hrs running per day)
Power Cost per Kg.-Rs. 1.24 1.23 Formula
Power Cost / Compressor [for Ten years ] (In Rs.) 26,608,500 26,253,720 Formula
D For Guaranteed Gas Loss
Gas Vent mass flow meter reading (In Kg) for month measured through vent meter installed in Compressor considering accuracy of meter. (Considering 12 Hrs running per day) (Vent mass flow meter reading in kg. per hour * 12 * 30) 28.42 32.00 To be entered by Bidder
Suction mass flow meter reading (In Kg) for month (Considering 12 Hrs running per day) 175,968 175,972 Formula
Guaranteed Monthly Gas Loss in % that will be vented through the vent meter installed in Compressor considering accuracy of meter. 0.01615% 0.01818% Formula
Retail Selling Price (RSP) (per Kg) 80.26 80.26 Fixed Value
Dealer Commission (A) 3.42 3.42 Fixed Value
Gas Price Without dealer Commission (b)=RSP-A 76.84 76.84 Formula
Applicable VAT (c ) =B - (B / (1+VAT/100)) (5%) 3.66 3.66 Formula
Gas price in Rs. without VAT (D) = B - C 73.18 73.18 Formula
Applicable Excise Duty in Rs. (E) = D - (D / (1+ED/100)) (14%) 8.9871 8.9871 Formula
Gas price in Rs. without ED (F) = D – E (per kg) 64.19 64.19 Formula
Gas loss in Rs per year per compressor 22,193 24,988 Formula
Gas loss in Rs for 10 years per compressor 221,931 249,882 Formula
Total cost including Guaranteed KWH and Gas Loss 26,830,431 26,503,602 Formula
Per package * No. of Compressors
SUPPLY, INSTALLATION, TESTING, COMMISSIONING OF ELECTRIC MOTOR DRIVEN CNG COMPRESSOR PACKAGES/ COMPRESSORS INCLUDING COMPREHENSIVE OPERATION & MAINTENANCE SERVICES
Cost Calculation for Power and Gas Loss per Compressor Package / Compressor
1000 SCMH Bidder-1 Bidder-2 Remarks
@ 19 barg @ 19 barg
C For Guaranteed Power
Guaranteed Power Consumption in KWH 109 110 To be entered by Bidder
Annual Power consumption 477,420 481,800 Formula
(365 x 12 x Guaranteed KWH)
(Considering 12 Hrs running per day)
Electricity Distribution Company charges = RS. 8.10 /unit 8.1 8.1 Fixed Value
Total Power Cost 3,867,102 3,902,580 Formula
Output in SCMH 1000 1000 Fixed Value-variable as per Capacity of the Compressor Package / Compressor
Annual sales (Kg.) 3,293,233 3,293,233 Formula
(365 x 12 x output in Kg.)
( Considering 12 Hrs running per day)
Power Cost per Kg.-Rs. 1.17 1.19 Formula
Power Cost / Compressor [for Ten years ] (In Rs.) 38,671,020 39,025,800 Formula
D For Guaranteed Gas Loss
Gas Vent mass flow meter reading (In Kg) for month measured through vent meter installed in Compressor considering accuracy of meter. (Considering 12 Hrs running per day) (Vent mass flow meter reading in kg. per hour * 12 * 30) 28.42 32.00 To be entered by Bidder
Suction mass flow meter reading (In Kg) for month (Considering 12 Hrs running per day) 270,705 270,709 Formula
Guaranteed Monthly Gas Loss in % that will be vented through the vent meter installed in Compressor considering accuracy of meter. 0.01050% 0.01182% Formula
Retail Selling Price (RSP) (per Kg) 80.26 80.26 Fixed Value
Dealer Commission (A) 3.42 3.42 Fixed Value
Gas Price Without dealer Commission (b)=RSP-A 76.84 76.84 Formula
Applicable VAT (c ) =B - (B / (1+VAT/100)) (5%) 3.66 3.66 Formula
Gas price in Rs. without VAT (D) = B - C 73.18 73.18 Formula
Applicable Excise Duty in Rs. (E) = D - (D / (1+ED/100)) (14%) 8.9871 8.9871 Formula
Gas price in Rs. without ED (F) = D – E (per kg) 64.19 64.19 Formula
Gas loss in Rs per year per compressor 22,194 24,990 Formula
Gas loss in Rs for 10 years per compressor 221,944 249,898 Formula
Total cost including Guaranteed KWH and Gas Loss 38,892,964 39,275,698 Formula
Per package * No. of Compressors
SUPPLY, INSTALLATION, TESTING, COMMISSIONING OF ELECTRIC MOTOR DRIVEN CNG COMPRESSOR PACKAGES/ COMPRESSORS INCLUDING COMPREHENSIVE OPERATION & MAINTENANCE SERVICES
Cost Calculation for Power and Gas Loss per Compressor Package / Compressor
1200 SCMH Bidder-1 Bidder-2 Remarks
@ 19 barg @ 19 barg
C For Guaranteed Power
Guaranteed Power Consumption in KWH 131 132 To be entered by Bidder
Annual Power consumption 573,780 578,160 Formula
(365 x 12 x Guaranteed KWH)
(Considering 12 Hrs running per day)
Electricity Distribution Company charges = RS. 8.10 /unit 8.1 8.1 Fixed Value
Total Power Cost 4,647,618 4,683,096 Formula
Output in SCMH 1200 1200 Fixed Value-variable as per Capacity of the Compressor Package / Compressor
Annual sales (Kg.) 3,951,880 3,951,880 Formula
(365 x 12 x output in Kg.)
( Considering 12 Hrs running per day)
Power Cost per Kg.-Rs. 1.18 1.19 Formula
Power Cost / Compressor [for Ten years ] (In Rs.) 46,476,180 46,830,960 Formula
D For Guaranteed Gas Loss
Gas Vent mass flow meter reading (In Kg) for month measured through vent meter installed in Compressor considering accuracy of meter. (Considering 12 Hrs running per day) (Vent mass flow meter reading in kg. per hour * 12 * 30) 28.42 32.00 To be entered by Bidder
Suction mass flow meter reading (In Kg) for month (Considering 12 Hrs running per day) 324,840 324,844 Formula
Guaranteed Monthly Gas Loss in % that will be vented through the vent meter installed in Compressor considering accuracy of meter. 0.00875% 0.00985% Formula
Retail Selling Price (RSP) (per Kg) 80.26 80.26 Fixed Value
Dealer Commission (A) 3.42 3.42 Fixed Value
Gas Price Without dealer Commission (b)=RSP-A 76.84 76.84 Formula
Applicable VAT (c ) =B - (B / (1+VAT/100)) (5%) 3.66 3.66 Formula
Gas price in Rs. without VAT (D) = B - C 73.18 73.18 Formula
Applicable Excise Duty in Rs. (E) = D - (D / (1+ED/100)) (14%) 8.9871 8.9871 Formula
Gas price in Rs. without ED (F) = D – E (per kg) 64.19 64.19 Formula
Gas loss in Rs per year per compressor 22,195 24,990 Formula
Gas loss in Rs for 10 years per compressor 221,948 249,903 Formula
Total cost including Guaranteed KWH and Gas Loss 46,698,128 47,080,863 Formula
Per package * No. of Compressors
SUPPLY, INSTALLATION, TESTING, COMMISSIONING OF ELECTRIC MOTOR DRIVEN CNG COMPRESSOR PACKAGES/ COMPRESSORS INCLUDING COMPREHENSIVE OPERATION & MAINTENANCE SERVICES
Cost Calculation for Power and Gas Loss per Compressor Package / Compressor
1700 SCMH Bidder-1 Bidder-2 Remarks
@ 19 barg @ 19 barg
C For Guaranteed Power
Guaranteed Power Consumption in KWH 210 215 To be entered by Bidder
Annual Power consumption 919,800 941,700 Formula
(365 x 12 x Guaranteed KWH)
(Considering 12 Hrs running per day)
Electricity Distribution Company charges = RS. 8.10 /unit 8.1 8.1 Fixed Value
Total Power Cost 7,450,380 7,627,770 Formula
Output in SCMH 1700 1700 Fixed Value-variable as per Capacity of the Compressor Package / Compressor
Annual sales (Kg.) 5,598,496 5,598,496 Formula
(365 x 12 x output in Kg.)
( Considering 12 Hrs running per day)
Power Cost per Kg.-Rs. 1.33 1.36 Formula
Power Cost / Compressor [for Ten years ] (In Rs.) 74,503,800 76,277,700 Formula
D For Guaranteed Gas Loss
Gas Vent mass flow meter reading (In Kg) for month measured through vent meter installed in Compressor considering accuracy of meter. (Considering 12 Hrs running per day) (Vent mass flow meter reading in kg. per hour * 12 * 30) 28.42 32.00 To be entered by Bidder
Suction mass flow meter reading (In Kg) for month (Considering 12 Hrs running per day) 460,179 460,182 Formula
Guaranteed Monthly Gas Loss in % that will be vented through the vent meter installed in Compressor considering accuracy of meter. 0.00618% 0.00695% Formula
Retail Selling Price (RSP) (per Kg) 80.26 80.26 Fixed Value
Dealer Commission (A) 3.42 3.42 Fixed Value
Gas Price Without dealer Commission (b)=RSP-A 76.84 76.84 Formula
Applicable VAT (c ) =B - (B / (1+VAT/100)) (5%) 3.66 3.66 Formula
Gas price in Rs. without VAT (D) = B - C 73.18 73.18 Formula
Applicable Excise Duty in Rs. (E) = D - (D / (1+ED/100)) (14%) 8.9871 8.9871 Formula
Gas price in Rs. without ED (F) = D – E (per kg) 64.19 64.19 Formula
Gas loss in Rs per year per compressor 22,195 24,991 Formula
Gas loss in Rs for 10 years per compressor 221,954 249,911 Formula
Total cost including Guaranteed KWH and Gas Loss 74,725,754 76,527,611 Formula
Per package * No. of Compressors
OPEN TENDER 296383
RATE CONTRACT FOR SUPPLY, INSTALLATION, TESTING, COMMISSIONING AND COMPREHENSIVE OPERATION AND MAINTENANCE OF MOTOR DRIVEN, GAS ENGINE & VIP (VARIABLE INLET PRESSURE) DRIVEN CNG COMPRESSORS/PACKAGES (101 NOS)
Tentative Tendered Qty
Sr. No. Compressor Capacity Compressor Package Compressor and UPS Total
1 1700 SCMH @19 kg/cm2 - Motor Driven 1 0 1 165,086,610 #REF!
2 1200 SCMH @19 kg/cm2 - Motor Driven 4 0 4 113,215,332 #REF!
3 1000 SCMH @19 kg/cm2 - Motor Driven 0 1 1 61,987,968 #REF!
4 650 SCMH @19 kg/cm2 - Motor Driven 41 10 51 930,951,466 #REF!
5 400 SCMH @ 3 kg/cm2 - Motor Driven 16 12 28 640,197,995 #REF!
6 1000 SCMH @ 19 kg/cm2, VIP (Variable Inlet Pressure) – Motor Driven 6 0 6 197,378,755 #REF!
7 1200 SCMH @19 kg/cm2 - Gas Engine Driven 7 3 10 195,455,160 #REF!
Total 75 26 101
PRESENT VALUE CALCULATION SHEET (Refer Pricing Notes which shall prevail)
RATE CONTRACT FOR SUPPLY, INSTALLATION, TESTING, COMMISSIONING AND COMPREHENSIVE OPERATION AND MAINTENANCE OF MOTOR DRIVEN, GAS ENGINE & VIP (VARIABLE INLET PRESSURE) DRIVEN CNG COMPRESSORS/PACKAGES
OPEN TENDER 296383
Interest rate assumed to be 10%
COMPRESSOR CAPACITY: 1700 SCMH @19 kg/cm2 – Motor Driven - COMPRESSOR PACKAGE
Bidder shall fill up their quoted basic unit rates (same as quoted by the Bidder on nProcure portal SoR) against each line item below, based on which Present Value (PV) for a Compressor Package OR Compressor + UPS shall be calculated below.
Item Description Qty Unit of Measure Name of the Bidder Remarks
Basic Unit Rate Total Basic Value O&M %
Compressor Capacity 1700 SCMH @ 19kg/cm2(g) 1 No 0
Car Dispenser Flow > 15 kg/min 1 No 0
Car Dispenser Flow > 15 kg/min 1 No 0
Cascade (3000 WL) 1 No 0
3 KVA- office Type UPS 1 No 0
INSTALLATION, TESTING & COMMISSIONING 1 No 0
CAPEX Total Cost for Supply, Installation, Testing & Commissioning of 1 No. of Compressor Package 0 0.00 This input shall include basic cost of Supply, Installation, Testing & Commissioning of 1 No. of Compressor Package (1 Compressor + 2 Dispensers + 1 Cascade + 1 UPS) - excluding GST.
OPEX - Total Operation & Comprehensive Maintenance Cost for 10 years This input shall include basic cost of Operation & Comp. Maintenance of 1 No. of Compressor Package (1 Compressor + 2 Dispensers + 1 Cascade + 1 UPS) for a period of 10 years from the date of commissioning - excluding GST.
Operations of Compressor package during the warranty period 12 Month 0 #DIV/0! This input shall include Operation cost during warranty period
Operations of Compressor package during 1st year after the warranty period 12 Month 0 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor Package during 1st year after the warranty period 12 Month 0 This input shall include both Operation & Maintenance cost
Operations of Compressor package during 2nd year after the warranty period 12 Month 0 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor Package during 2nd year after the warranty period 12 Month 0 This input shall include both Operation & Maintenance cost
Operations of Compressor package during 3rd year after the warranty period 12 Month 0 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor Package during 3rd year after the warranty period 12 Month 0 This input shall include both Operation & Maintenance cost
Operations of Compressor package during 4th year after the warranty period 12 Month 0 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor Package during 4th year after the warranty period 12 Month 0 This input shall include both Operation & Maintenance cost
Operations of Compressor package during 5th year after the warranty period 12 Month 0 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor Package during 5th year after the warranty period 12 Month 0 This input shall include both Operation & Maintenance cost
Operations of Compressor package during 6th year after the warranty period 12 Month 0 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor Package during 6th year after the warranty period 12 Month 0 This input shall include both Operation & Maintenance cost
Operations of Compressor package during 7th year after the warranty period 12 Month 0 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor Package during 7th year after the warranty period 12 Month 0 This input shall include both Operation & Maintenance cost
Operations of Compressor package during 8th year after the warranty period 12 Month 0 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor Package during 8th year after the warranty period 12 Month 0 This input shall include both Operation & Maintenance cost
Operations of Compressor package during 9th year after the warranty period 12 Month 0 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor Package during 9th year after the warranty period 12 Month 0 This input shall include both Operation & Maintenance cost
Total Gas Loss Cost in 10 years
Year - 1 Per Package Per Year This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 2 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 3 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 4 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 5 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 6 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 7 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 8 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 9 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 10 This input shall include Gas Loss cost for 1 Compressor for 1 year
Total Fuel Consumption cost in 10 years
Year - 1 Per Package Per Year This input shall include Power Cost for 1 Compressor for 1 year
Year - 2 This input shall include Power Cost for 1 Compressor for 1 year
Year - 3 This input shall include Power Cost for 1 Compressor for 1 year
Year - 4 This input shall include Power Cost for 1 Compressor for 1 year
Year - 5 This input shall include Power Cost for 1 Compressor for 1 year
Year - 6 This input shall include Power Cost for 1 Compressor for 1 year
Year - 7 This input shall include Power Cost for 1 Compressor for 1 year
Year - 8 This input shall include Power Cost for 1 Compressor for 1 year
Year - 9 This input shall include Power Cost for 1 Compressor for 1 year
Year - 10 This input shall include Power Cost for 1 Compressor for 1 year
Total cost of Ownership Per Package 0.00 This shall be a summation of Capex and total cost for 10 years from the date of commissioning towards Comp. O&M + Gas Loss + Power Cost for 1 Compressor Pkg
PRESENT VALUE (PV) CALCULATION
Present Value for 1 No. of Compressor Package #REF! This value (PV) shall be manually entered on the nProcure Portal
PV as per Nprocure Portal Bidder to cross check PV entered as per Excel calulation sheet as well as Tendering Portal entry
Difference between actual and portal entry- Bidder to check if any. Both Portal as well as excel entry should match
Bidder shall calculate Present Value (PV) for each type of Compressor Pkg/Compressor + UPS and the same shall be entered on the nProcure portal manually.
In case of any discrepancies, the unit rates & Min Design parameters (Fuel Consumption and Gas Loss) quoted by the Bidder online on the nProcure portal shall prevail and Annual Fuel Cost as well as Annual Gas Loss Cost along with Resulting Unit Present Value (PV) shall be re-calculated / corrected and Bidder ranking shall stand revised accordingly and the same shall be binding to the Bidder
Company's decision of Commercial Bid Evaluation shall be final and binding to all the bidders in all cases.
PRESENT VALUE CALCULATION SHEET (Refer Pricing Notes which shall prevail)
RATE CONTRACT FOR SUPPLY, INSTALLATION, TESTING, COMMISSIONING AND COMPREHENSIVE OPERATION AND MAINTENANCE OF MOTOR DRIVEN, GAS ENGINE & VIP (VARIABLE INLET PRESSURE) DRIVEN CNG COMPRESSORS/PACKAGES
OPEN TENDER 296383
Interest rate assumed to be 10%
COMPRESSOR CAPACITY: 1200 SCMH @19 kg/cm2 – Motor Driven COMPRESSOR PACKAGE
Bidder shall fill up their quoted basic unit rates (same as quoted by the Bidder on nProcure portal SoR) against each line item below, based on which Present Value (PV) for a Compressor Package OR Compressor + UPS shall be calculated below.
Item Description Qty Unit of Measure Name of the Bidder Remarks
Basic Unit Rate Total Basic Value O&M %
Compressor Capacity 1200 SCMH @ 19 kg/cm2(g) 1 No 0
Car Dispenser Flow > 15 kg/min 1 No 0
Car Dispenser Flow > 15 kg/min 1 No 0
Cascade (3000 WL) 1 No 0
3 KVA- office Type UPS 1 No 0
INSTALLATION, TESTING & COMMISSIONING 1 No 0
CAPEX Total Cost for Supply, Installation, Testing & Commissioning of 1 No. of Compressor Package 0 0.00 This input shall include basic cost of Supply, Installation, Testing & Commissioning of 1 No. of Compressor Package (1 Compressor + 2 Dispensers + 1 Cascade + 1 UPS) - excluding GST.
OPEX - Total Operation & Comprehensive Maintenance Cost for 10 years This input shall include basic cost of Operation & Comp. Maintenance of 1 No. of Compressor Package (1 Compressor + 2 Dispensers + 1 Cascade + 1 UPS) for a period of 10 years from the date of commissioning - excluding GST.
Operations of Compressor package during the warranty period 12 Month 0.00 #DIV/0! This input shall include Operation cost during warranty period
Operations of Compressor package during 1st year after the warranty period 12 Month 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor Package during 1st year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Operations of Compressor package during 2nd year after the warranty period 12 Month 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor Package during 2nd year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Operations of Compressor package during 3rd year after the warranty period 12 Month 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor Package during 3rd year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Operations of Compressor package during 4th year after the warranty period 12 Month 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor Package during 4th year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Operations of Compressor package during 5th year after the warranty period 12 Month 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor Package during 5th year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Operations of Compressor package during 6th year after the warranty period 12 Month 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor Package during 6th year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Operations of Compressor package during 7th year after the warranty period 12 Month 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor Package during 7th year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Operations of Compressor package during 8th year after the warranty period 12 Month 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor Package during 8th year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Operations of Compressor package during 9th year after the warranty period 12 Month 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor Package during 9th year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Total Gas Loss Cost in 10 years
Year - 1 Per Package Per Year This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 2 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 3 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 4 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 5 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 6 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 7 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 8 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 9 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 10 This input shall include Gas Loss cost for 1 Compressor for 1 year
Total Fuel Consumption cost in 10 years
Year - 1 Per Package Per Year This input shall include Power Cost for 1 Compressor for 1 year
Year - 2 This input shall include Power Cost for 1 Compressor for 1 year
Year - 3 This input shall include Power Cost for 1 Compressor for 1 year
Year - 4 This input shall include Power Cost for 1 Compressor for 1 year
Year - 5 This input shall include Power Cost for 1 Compressor for 1 year
Year - 6 This input shall include Power Cost for 1 Compressor for 1 year
Year - 7 This input shall include Power Cost for 1 Compressor for 1 year
Year - 8 This input shall include Power Cost for 1 Compressor for 1 year
Year - 9 This input shall include Power Cost for 1 Compressor for 1 year
Year - 10 This input shall include Power Cost for 1 Compressor for 1 year
Total cost of Ownership Per Package #REF! This shall be a summation of Capex and total cost for 10 years from the date of commissioning towards Comp. O&M + Gas Loss + Power Cost for 1 Compressor Pkg
PRESENT VALUE (PV) CALCULATION
Present Value for 1 No. of Compressor Package #REF! This value (PV) shall be manually entered on the nProcure Portal
PV as per Nprocure Portal Bidder to cross check PV entered as per Excel calulation sheet as well as Tendering Portal entry
Difference between actual and portal entry- Bidder to check if any. Both Portal as well as excel entry should match
Bidder shall calculate Present Value (PV) for each type of Compressor Pkg/Compressor + UPS and the same shall be entered on the nProcure portal manually.
In case of any discrepancies, the unit rates & Min Design parameters (Fuel Consumption and Gas Loss) quoted by the Bidder online on the nProcure portal shall prevail and Annual Fuel Cost as well as Annual Gas Loss Cost along with Resulting Unit Present Value (PV) shall be re-calculated / corrected and Bidder ranking shall stand revised accordingly and the same shall be binding to the Bidder
Company's decision of Commercial Bid Evaluation shall be final and binding to all the bidders in all cases.
PRESENT VALUE CALCULATION SHEET (Refer Pricing Notes which shall prevail)
RATE CONTRACT FOR SUPPLY, INSTALLATION, TESTING, COMMISSIONING AND COMPREHENSIVE OPERATION AND MAINTENANCE OF MOTOR DRIVEN, GAS ENGINE & VIP (VARIABLE INLET PRESSURE) DRIVEN CNG COMPRESSORS/PACKAGES
OPEN TENDER 296383
Interest rate assumed to be 10%
COMPRESSOR CAPACITY: 1000 SCMH @ 19 kg/cm2 – Motor Driven ONLY COMP + UPS
Bidder shall fill up their quoted basic unit rates (same as quoted by the Bidder on nProcure portal SoR) against each line item below, based on which Present Value (PV) for a Compressor Package OR Compressor + UPS shall be calculated below.
Item Description Qty Unit of Measure Name of the Bidder Remarks
Basic Unit Rate Total Basic Value O&M %
Compressor Capacity 1000 SCMH @ 19 kg/cm2(g) 1 No 0
3 KVA- office Type UPS 1 No 0
INSTALLATION, TESTING & COMMISSIONING 1 No 0
CAPEX Total Cost for Supply, Installation, Testing & Commissioning of 1 No. of Compressor 0 This input shall include basic cost of Supply, Installation, Testing & Commissioning of 1 No. of Compressor Package (1 Compressor + 2 Dispensers + 1 Cascade + 1 UPS) - excluding GST.
OPEX - Total Operation & Comprehensive Maintenance Cost for 10 years This input shall include basic cost of Operation & Comp. Maintenance of 1 No. of Compressor Package (1 Compressor + 2 Dispensers + 1 Cascade + 1 UPS) for a period of 10 years from the date of commissioning - excluding GST.
Operations of Compressor including UPS during the warranty period 12 Month 0.00 #DIV/0! This input shall include Operation cost during warranty period
Operations of Compressor including UPS during 1st year after the warranty period 12 Month 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor including UPS during 1st year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Operations of Compressor including UPS during 2nd year after the warranty period 12 Month 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor including UPS during 2nd year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Operations of Compressor including UPS during 3rd year after the warranty period 12 Month 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor including UPS during 3rd year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Operations of Compressor including UPS during 4th year after the warranty period 12 Month 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor including UPS during 4th year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Operations of Compressor including UPS during 5th year after the warranty period 12 Month 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor including UPS during 5th year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Operations of Compressor including UPS during 6th year after the warranty period 12 Month 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor including UPS during 6th year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Operations of Compressor including UPS during 7th year after the warranty period 12 Month 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor including UPS during 7th year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Operations of Compressor including UPS during 8th year after the warranty period 12 Month 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor including UPS during 8th year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Operations of Compressor including UPS during 9th year after the warranty period 12 Month 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor including UPS during 9th year after the warranty period 12 Month 0.00 0.00 This input shall include both Operation & Maintenance cost
Total Gas Loss Cost in 10 years
Year - 1 Per Compressor + UPS Per Year This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 2 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 3 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 4 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 5 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 6 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 7 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 8 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 9 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 10 This input shall include Gas Loss cost for 1 Compressor for 1 year
Total Fuel Consumption cost in 10 years
Year - 1 Per Compressor + UPS Per Year This input shall include Power Cost for 1 Compressor for 1 year
Year - 2 This input shall include Power Cost for 1 Compressor for 1 year
Year - 3 This input shall include Power Cost for 1 Compressor for 1 year
Year - 4 This input shall include Power Cost for 1 Compressor for 1 year
Year - 5 This input shall include Power Cost for 1 Compressor for 1 year
Year - 6 This input shall include Power Cost for 1 Compressor for 1 year
Year - 7 This input shall include Power Cost for 1 Compressor for 1 year
Year - 8 This input shall include Power Cost for 1 Compressor for 1 year
Year - 9 This input shall include Power Cost for 1 Compressor for 1 year
Year - 10 This input shall include Power Cost for 1 Compressor for 1 year
Total cost of Ownership Per Compressor + UPS Per Year 0.00 This shall be a summation of Capex and total cost for 10 years from the date of commissioning towards Comp. O&M + Gas Loss + Power Cost for 1 Compressor Pkg
PRESENT VALUE (PV) CALCULATION
Present Value for 1 No. of Compressor Package #REF! This value (PV) shall be manually entered on the nProcure Portal
PV as per Nprocure Portal Bidder to cross check PV entered as per Excel calulation sheet as well as Tendering Portal entry
Difference between actual and portal entry- Bidder to check if any. Both Portal as well as excel entry should match
Bidder shall calculate Present Value (PV) for each type of Compressor Pkg/Compressor + UPS and the same shall be entered on the nProcure portal manually.
In case of any discrepancies, the unit rates & Min Design parameters (Fuel Consumption and Gas Loss) quoted by the Bidder online on the nProcure portal shall prevail and Annual Fuel Cost as well as Annual Gas Loss Cost along with Resulting Unit Present Value (PV) shall be re-calculated / corrected and Bidder ranking shall stand revised accordingly and the same shall be binding to the Bidder
Company's decision of Commercial Bid Evaluation shall be final and binding to all the bidders in all cases.
PRESENT VALUE CALCULATION SHEET (Refer Pricing Notes which shall prevail)
RATE CONTRACT FOR SUPPLY, INSTALLATION, TESTING, COMMISSIONING AND COMPREHENSIVE OPERATION AND MAINTENANCE OF MOTOR DRIVEN, GAS ENGINE & VIP (VARIABLE INLET PRESSURE) DRIVEN CNG COMPRESSORS/PACKAGES
OPEN TENDER 296383
Interest rate assumed to be 10%
COMPRESSOR CAPACITY: 650 SCMH @19 kg/cm2 – Motor Driven COMPRESSOR PACKAGE
Bidder shall fill up their quoted basic unit rates (same as quoted by the Bidder on nProcure portal SoR) against each line item below, based on which Present Value (PV) for a Compressor Package OR Compressor + UPS shall be calculated below.
Item Description Qty Unit of Measure Min. % of ‘Total Capital Cost’ defined above Name of the Bidder Remarks
Basic Unit Rate Total Basic Value O&M %
Compressor Capacity 650 SCMH @ 19 kg/cm2(g) 1 No 0
Car Dispenser Flow > 15 kg/min 1 No 0
Car Dispenser Flow > 15 kg/min 1 No 0
Cascade (3000 WL) 1 No 0
3 KVA- office Type UPS 1 No 0
INSTALLATION, TESTING & COMMISSIONING 1 No 0
CAPEX Total Cost for Supply, Installation, Testing & Commissioning of 1 No. of Compressor Package #REF! 0 0.00 This input shall include basic cost of Supply, Installation, Testing & Commissioning of 1 No. of Compressor Package (1 Compressor + 2 Dispensers + 1 Cascade + 1 UPS) - excluding GST.
OPEX - Total Operation & Comprehensive Maintenance Cost for 10 years This input shall include basic cost of Operation & Comp. Maintenance of 1 No. of Compressor Package (1 Compressor + 2 Dispensers + 1 Cascade + 1 UPS) for a period of 10 years from the date of commissioning - excluding GST.
Operations of Compressor package during the warranty period 12 Month 3% 0.00 #DIV/0! This input shall include Operation cost during warranty period
Operations of Compressor package during 1st year after the warranty period 12 Month 11% 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor Package during 1st year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Operations of Compressor package during 2nd year after the warranty period 12 Month 12% 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor Package during 2nd year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Operations of Compressor package during 3rd year after the warranty period 12 Month 13% 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor Package during 3rd year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Operations of Compressor package during 4th year after the warranty period 12 Month 14% 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor Package during 4th year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Operations of Compressor package during 5th year after the warranty period 12 Month 15% 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor Package during 5th year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Operations of Compressor package during 6th year after the warranty period 12 Month 16% 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor Package during 6th year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Operations of Compressor package during 7th year after the warranty period 12 Month 17% 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor Package during 7th year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Operations of Compressor package during 8th year after the warranty period 12 Month 18% 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor Package during 8th year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Operations of Compressor package during 9th year after the warranty period 12 Month 19% 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor Package during 9th year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Total Gas Loss Cost in 10 years 0.00
Year - 1 Per Package Per Year This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 2 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 3 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 4 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 5 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 6 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 7 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 8 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 9 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 10 This input shall include Gas Loss cost for 1 Compressor for 1 year
Total Fuel Consumption cost in 10 years
Year - 1 Per Package Per Year This input shall include Power Cost for 1 Compressor for 1 year
Year - 2 This input shall include Power Cost for 1 Compressor for 1 year
Year - 3 This input shall include Power Cost for 1 Compressor for 1 year
Year - 4 This input shall include Power Cost for 1 Compressor for 1 year
Year - 5 This input shall include Power Cost for 1 Compressor for 1 year
Year - 6 This input shall include Power Cost for 1 Compressor for 1 year
Year - 7 This input shall include Power Cost for 1 Compressor for 1 year
Year - 8 This input shall include Power Cost for 1 Compressor for 1 year
Year - 9 This input shall include Power Cost for 1 Compressor for 1 year
Year - 10 This input shall include Power Cost for 1 Compressor for 1 year
Total cost of Ownership Per Package #REF! This shall be a summation of Capex and total cost for 10 years from the date of commissioning towards Comp. O&M + Gas Loss + Power Cost for 1 Compressor Pkg
PRESENT VALUE (PV) CALCULATION
Present Value for 1 No. of Compressor Package #REF! This value (PV) shall be manually entered on the nProcure Portal
PV as per Nprocure Portal Bidder to cross check PV entered as per Excel calulation sheet as well as Tendering Portal entry
Difference between actual and portal entry- Bidder to check if any. Both Portal as well as excel entry should match
Bidder shall calculate Present Value (PV) for each type of Compressor Pkg/Compressor + UPS and the same shall be entered on the nProcure portal manually.
In case of any discrepancies, the unit rates & Min Design parameters (Fuel Consumption and Gas Loss) quoted by the Bidder online on the nProcure portal shall prevail and Annual Fuel Cost as well as Annual Gas Loss Cost along with Resulting Unit Present Value (PV) shall be re-calculated / corrected and Bidder ranking shall stand revised accordingly and the same shall be binding to the Bidder
Company's decision of Commercial Bid Evaluation shall be final and binding to all the bidders in all cases.
PRESENT VALUE CALCULATION SHEET (Refer Pricing Notes which shall prevail)
RATE CONTRACT FOR SUPPLY, INSTALLATION, TESTING, COMMISSIONING AND COMPREHENSIVE OPERATION AND MAINTENANCE OF MOTOR DRIVEN, GAS ENGINE & VIP (VARIABLE INLET PRESSURE) DRIVEN CNG COMPRESSORS/PACKAGES
OPEN TENDER 296383
Interest rate assumed to be 10%
COMPRESSOR CAPACITY: 650 SCMH @19 kg/cm2 – Motor Driven ONLY COMP + UPS
Bidder shall fill up their quoted basic unit rates (same as quoted by the Bidder on nProcure portal SoR) against each line item below, based on which Present Value (PV) for a Compressor Package OR Compressor + UPS shall be calculated below.
Item Description Qty Unit of Measure Name of the Bidder Remarks
Basic Unit Rate Total Basic Value O&M %
Compressor Capacity 650 SCMH @ 19 kg/cm2(g) 1 No 0
3 KVA- office Type UPS 1 No 0
INSTALLATION, TESTING & COMMISSIONING 1 No 0
CAPEX Total Cost for Supply, Installation, Testing & Commissioning of 1 No. of Compressor #REF! 0 0.00 This input shall include basic cost of Supply, Installation, Testing & Commissioning of 1 No. of Compressor Package (1 Compressor + 2 Dispensers + 1 Cascade + 1 UPS) - excluding GST.
OPEX - Total Operation & Comprehensive Maintenance Cost for 10 years This input shall include basic cost of Operation & Comp. Maintenance of 1 No. of Compressor Package (1 Compressor + 2 Dispensers + 1 Cascade + 1 UPS) for a period of 10 years from the date of commissioning - excluding GST.
Operations of Compressor including UPS during the warranty period 12 Month 0.00 #DIV/0! This input shall include Operation cost during warranty period
Operations of Compressor including UPS during 1st year after the warranty period 12 Month 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor including UPS during 1st year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Operations of Compressor including UPS during 2nd year after the warranty period 12 Month 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor including UPS during 2nd year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Operations of Compressor including UPS during 3rd year after the warranty period 12 Month 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor including UPS during 3rd year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Operations of Compressor including UPS during 4th year after the warranty period 12 Month 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor including UPS during 4th year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Operations of Compressor including UPS during 5th year after the warranty period 12 Month 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor including UPS during 5th year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Operations of Compressor including UPS during 6th year after the warranty period 12 Month 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor including UPS during 6th year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Operations of Compressor including UPS during 7th year after the warranty period 12 Month 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor including UPS during 7th year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Operations of Compressor including UPS during 8th year after the warranty period 12 Month 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor including UPS during 8th year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Operations of Compressor including UPS during 9th year after the warranty period 12 Month 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor including UPS during 9th year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Total Gas Loss Cost in 10 years 0.00
Year - 1 Per Compressor + UPS Per Year 0.00 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 2 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 3 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 4 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 5 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 6 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 7 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 8 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 9 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 10 This input shall include Gas Loss cost for 1 Compressor for 1 year
Total Fuel Consumption cost in 10 years
Year - 1 Per Compressor + UPS Per Year This input shall include Power Cost for 1 Compressor for 1 year
Year - 2 This input shall include Power Cost for 1 Compressor for 1 year
Year - 3 This input shall include Power Cost for 1 Compressor for 1 year
Year - 4 This input shall include Power Cost for 1 Compressor for 1 year
Year - 5 This input shall include Power Cost for 1 Compressor for 1 year
Year - 6 This input shall include Power Cost for 1 Compressor for 1 year
Year - 7 This input shall include Power Cost for 1 Compressor for 1 year
Year - 8 This input shall include Power Cost for 1 Compressor for 1 year
Year - 9 This input shall include Power Cost for 1 Compressor for 1 year
Year - 10 This input shall include Power Cost for 1 Compressor for 1 year
Total cost of Ownership Per Compressor + UPS Per Year #REF! This shall be a summation of Capex and total cost for 10 years from the date of commissioning towards Comp. O&M + Gas Loss + Power Cost for 1 Compressor Pkg
PRESENT VALUE (PV) CALCULATION
Present Value for 1 No. of Compressor Package #REF! This value (PV) shall be manually entered on the nProcure Portal
PV as per Nprocure Portal Bidder to cross check PV entered as per Excel calulation sheet as well as Tendering Portal entry
Difference between actual and portal entry- Bidder to check if any. Both Portal as well as excel entry should match
In case of any discrepancies, the unit rates & Min Design parameters (Fuel Consumption and Gas Loss) quoted by the Bidder online on the nProcure portal shall prevail and Annual Fuel Cost as well as Annual Gas Loss Cost along with Resulting Unit Present Value (PV) shall be re-calculated / corrected and Bidder ranking shall stand revised accordingly and the same shall be binding to the Bidder
Company's decision of Commercial Bid Evaluation shall be final and binding to all the bidders in all cases.
PRESENT VALUE CALCULATION SHEET (Refer Pricing Notes which shall prevail)
RATE CONTRACT FOR SUPPLY, INSTALLATION, TESTING, COMMISSIONING AND COMPREHENSIVE OPERATION AND MAINTENANCE OF MOTOR DRIVEN, GAS ENGINE & VIP (VARIABLE INLET PRESSURE) DRIVEN CNG COMPRESSORS/PACKAGES
OPEN TENDER 296383
Interest rate assumed to be 10%
COMPRESSOR CAPACITY: 400 SCMH @ 3 kg/cm2 – Motor Driven COMPRESSOR PACKAGE
Bidder shall fill up their quoted basic unit rates (same as quoted by the Bidder on nProcure portal SoR) against each line item below, based on which Present Value (PV) for a Compressor Package OR Compressor + UPS shall be calculated below.
Item Description Qty Unit of Measure Name of the Bidder Remarks
Basic Unit Rate Total Basic Value O&M %
Compressor Capacity 400 SCMH @ 3 kg/cm2(g) 1 No 0
Car Dispenser Flow > 15 kg/min 1 No 0
Car Dispenser Flow > 15 kg/min 1 No 0
Cascade (3000 WL) 1 No 0
3 KVA- office Type UPS 1 No 0
INSTALLATION, TESTING & COMMISSIONING 1 No 0
CAPEX Total Cost for Supply, Installation, Testing & Commissioning of 1 No. of Compressor Package #REF! 0 0.00 This input shall include basic cost of Supply, Installation, Testing & Commissioning of 1 No. of Compressor Package (1 Compressor + 2 Dispensers + 1 Cascade + 1 UPS) - excluding GST.
OPEX - Total Operation & Comprehensive Maintenance Cost for 10 years This input shall include basic cost of Operation & Comp. Maintenance of 1 No. of Compressor Package (1 Compressor + 2 Dispensers + 1 Cascade + 1 UPS) for a period of 10 years from the date of commissioning - excluding GST.
Operations of Compressor package during the warranty period 12 Month 0.00 #DIV/0! This input shall include Operation cost during warranty period
Operations of Compressor package during 1st year after the warranty period 12 Month 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor Package during 1st year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Operations of Compressor package during 2nd year after the warranty period 12 Month 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor Package during 2nd year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Operations of Compressor package during 3rd year after the warranty period 12 Month 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor Package during 3rd year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Operations of Compressor package during 4th year after the warranty period 12 Month 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor Package during 4th year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Operations of Compressor package during 5th year after the warranty period 12 Month 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor Package during 5th year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Operations of Compressor package during 6th year after the warranty period 12 Month 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor Package during 6th year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Operations of Compressor package during 7th year after the warranty period 12 Month 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor Package during 7th year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Operations of Compressor package during 8th year after the warranty period 12 Month 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor Package during 8th year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Operations of Compressor package during 9th year after the warranty period 12 Month 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor Package during 9th year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Total Gas Loss Cost in 10 years 0.00
Year - 1 Per Package Per Year This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 2 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 3 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 4 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 5 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 6 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 7 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 8 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 9 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 10 This input shall include Gas Loss cost for 1 Compressor for 1 year
Total Fuel Consumption cost in 10 years
Year - 1 Per Package Per Year This input shall include Power Cost for 1 Compressor for 1 year
Year - 2 This input shall include Power Cost for 1 Compressor for 1 year
Year - 3 This input shall include Power Cost for 1 Compressor for 1 year
Year - 4 This input shall include Power Cost for 1 Compressor for 1 year
Year - 5 This input shall include Power Cost for 1 Compressor for 1 year
Year - 6 This input shall include Power Cost for 1 Compressor for 1 year
Year - 7 This input shall include Power Cost for 1 Compressor for 1 year
Year - 8 This input shall include Power Cost for 1 Compressor for 1 year
Year - 9 This input shall include Power Cost for 1 Compressor for 1 year
Year - 10 This input shall include Power Cost for 1 Compressor for 1 year
Total cost of Ownership Per Package 0.00 This shall be a summation of Capex and total cost for 10 years from the date of commissioning towards Comp. O&M + Gas Loss + Power Cost for 1 Compressor Pkg
PRESENT VALUE (PV) CALCULATION
Present Value for 1 No. of Compressor Package #REF! This value (PV) shall be manually entered on the nProcure Portal
PV as per Nprocure Portal Bidder to cross check PV entered as per Excel calulation sheet as well as Tendering Portal entry
Difference between actual and portal entry- Bidder to check if any. Both Portal as well as excel entry should match #REF!
Bidder shall calculate Present Value (PV) for each type of Compressor Pkg/Compressor + UPS and the same shall be entered on the nProcure portal manually.
In case of any discrepancies, the unit rates & Min Design parameters (Fuel Consumption and Gas Loss) quoted by the Bidder online on the nProcure portal shall prevail and Annual Fuel Cost as well as Annual Gas Loss Cost along with Resulting Unit Present Value (PV) shall be re-calculated / corrected and Bidder ranking shall stand revised accordingly and the same shall be binding to the Bidder
Company's decision of Commercial Bid Evaluation shall be final and binding to all the bidders in all cases.
PRESENT VALUE CALCULATION SHEET (Refer Pricing Notes which shall prevail)
RATE CONTRACT FOR SUPPLY, INSTALLATION, TESTING, COMMISSIONING AND COMPREHENSIVE OPERATION AND MAINTENANCE OF MOTOR DRIVEN, GAS ENGINE & VIP (VARIABLE INLET PRESSURE) DRIVEN CNG COMPRESSORS/PACKAGES
OPEN TENDER 296383
Interest rate assumed to be 10%
COMPRESSOR CAPACITY: 400 SCMH @ 3 kg/cm2 – Motor Driven ONLY COMP + UPS
Bidder shall fill up their quoted basic unit rates (same as quoted by the Bidder on nProcure portal SoR) against each line item below, based on which Present Value (PV) for a Compressor Package OR Compressor + UPS shall be calculated below.
Item Description Qty Unit of Measure Name of the Bidder Remarks
Basic Unit Rate Total Basic Value O&M %
Compressor Capacity 400 SCMH @ 3 kg/cm2(g) 1 No 0
3 KVA- office Type UPS 1 No 0
INSTALLATION, TESTING & COMMISSIONING 1 No 0
CAPEX Total Cost for Supply, Installation, Testing & Commissioning of 1 No. of Compressor #REF! 0 0.00 This input shall include basic cost of Supply, Installation, Testing & Commissioning of 1 No. of Compressor Package (1 Compressor + 2 Dispensers + 1 Cascade + 1 UPS) - excluding GST.
OPEX - Total Operation & Comprehensive Maintenance Cost for 10 years This input shall include basic cost of Operation & Comp. Maintenance of 1 No. of Compressor Package (1 Compressor + 2 Dispensers + 1 Cascade + 1 UPS) for a period of 10 years from the date of commissioning - excluding GST.
Operations of Compressor including UPS during the warranty period 12 Month 0 #DIV/0! This input shall include Operation cost during warranty period
Operations of Compressor including UPS during 1st year after the warranty period 12 Month 0 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor including UPS during 1st year after the warranty period 12 Month 0 This input shall include both Operation & Maintenance cost
Operations of Compressor including UPS during 2nd year after the warranty period 12 Month 0 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor including UPS during 2nd year after the warranty period 12 Month 0 This input shall include both Operation & Maintenance cost
Operations of Compressor including UPS during 3rd year after the warranty period 12 Month 0 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor including UPS during 3rd year after the warranty period 12 Month 0 This input shall include both Operation & Maintenance cost
Operations of Compressor including UPS during 4th year after the warranty period 12 Month 0 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor including UPS during 4th year after the warranty period 12 Month 0 This input shall include both Operation & Maintenance cost
Operations of Compressor including UPS during 5th year after the warranty period 12 Month 0 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor including UPS during 5th year after the warranty period 12 Month 0 This input shall include both Operation & Maintenance cost
Operations of Compressor including UPS during 6th year after the warranty period 12 Month 0 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor including UPS during 6th year after the warranty period 12 Month 0 This input shall include both Operation & Maintenance cost
Operations of Compressor including UPS during 7th year after the warranty period 12 Month 0 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor including UPS during 7th year after the warranty period 12 Month 0 This input shall include both Operation & Maintenance cost
Operations of Compressor including UPS during 8th year after the warranty period 12 Month 0 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor including UPS during 8th year after the warranty period 12 Month 0 This input shall include both Operation & Maintenance cost
Operations of Compressor including UPS during 9th year after the warranty period 12 Month 0 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor including UPS during 9th year after the warranty period 12 Month 0 This input shall include both Operation & Maintenance cost
#REF! 0.00 #REF!
Total Gas Loss Cost in 10 years
Year - 1 Per Compressor + UPS Per Year This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 2 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 3 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 4 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 5 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 6 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 7 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 8 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 9 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 10 This input shall include Gas Loss cost for 1 Compressor for 1 year
Total Fuel Consumption cost in 10 years
Year - 1 Per Compressor + UPS Per Year This input shall include Power Cost for 1 Compressor for 1 year
Year - 2 This input shall include Power Cost for 1 Compressor for 1 year
Year - 3 This input shall include Power Cost for 1 Compressor for 1 year
Year - 4 This input shall include Power Cost for 1 Compressor for 1 year
Year - 5 This input shall include Power Cost for 1 Compressor for 1 year
Year - 6 This input shall include Power Cost for 1 Compressor for 1 year
Year - 7 This input shall include Power Cost for 1 Compressor for 1 year
Year - 8 This input shall include Power Cost for 1 Compressor for 1 year
Year - 9 This input shall include Power Cost for 1 Compressor for 1 year
Year - 10 This input shall include Power Cost for 1 Compressor for 1 year
Total cost of Ownership Per Compressor + UPS Per Year 0.00 This shall be a summation of Capex and total cost for 10 years from the date of commissioning towards Comp. O&M + Gas Loss + Power Cost for 1 Compressor Pkg
PRESENT VALUE (PV) CALCULATION
Present Value for 1 No. of Compressor Package #REF! This value (PV) shall be manually entered on the nProcure Portal
PV as per Nprocure Portal Bidder to cross check PV entered as per Excel calulation sheet as well as Tendering Portal entry
Difference between actual and portal entry- Bidder to check if any. Both Portal as well as excel entry should match
Bidder shall calculate Present Value (PV) for each type of Compressor Pkg/Compressor + UPS and the same shall be entered on the nProcure portal manually.
In case of any discrepancies, the unit rates & Min Design parameters (Fuel Consumption and Gas Loss) quoted by the Bidder online on the nProcure portal shall prevail and Annual Fuel Cost as well as Annual Gas Loss Cost along with Resulting Unit Present Value (PV) shall be re-calculated / corrected and Bidder ranking shall stand revised accordingly and the same shall be binding to the Bidder
Company's decision of Commercial Bid Evaluation shall be final and binding to all the bidders in all cases.
PRESENT VALUE CALCULATION SHEET (Refer Pricing Notes which shall prevail)
RATE CONTRACT FOR SUPPLY, INSTALLATION, TESTING, COMMISSIONING AND COMPREHENSIVE OPERATION AND MAINTENANCE OF MOTOR DRIVEN, GAS ENGINE & VIP (VARIABLE INLET PRESSURE) DRIVEN CNG COMPRESSORS/PACKAGES
OPEN TENDER 296383
Interest rate assumed to be 10%
COMPRESSOR CAPACITY: 1000 SCMH @ 19 kg/cm2, VIP (Variable Inlet Pressure) – Motor Driven COMPRESSOR PACKAGE
Bidder shall fill up their quoted basic unit rates (same as quoted by the Bidder on nProcure portal SoR) against each line item below, based on which Present Value (PV) for a Compressor Package OR Compressor + UPS shall be calculated below.
Item Description Qty Unit of Measure Name of the Bidder Remarks
Basic Unit Rate Total Basic Value O&M %
Compressor Capacity 1000 SCMH @ 19 kg/cm2(g) VIP 1 No 0
Car Dispenser Flow > 15 kg/min 1 No 0
Car Dispenser Flow > 15 kg/min 1 No 0
Cascade (3000 WL) 1 No 0
3 KVA- office Type UPS 1 No 0
INSTALLATION, TESTING & COMMISSIONING 1 No 0
CAPEX Total Cost for Supply, Installation, Testing & Commissioning of 1 No. of Compressor Package 0.00 0 #REF! This input shall include basic cost of Supply, Installation, Testing & Commissioning of 1 No. of Compressor Package (1 Compressor + 2 Dispensers + 1 Cascade + 1 UPS) - excluding GST.
OPEX - Total Operation & Comprehensive Maintenance Cost for 10 years This input shall include basic cost of Operation & Comp. Maintenance of 1 No. of Compressor Package (1 Compressor + 2 Dispensers + 1 Cascade + 1 UPS) for a period of 10 years from the date of commissioning - excluding GST.
Operations of Compressor package during the warranty period 12 Month 0.00 #DIV/0! This input shall include Operation cost during warranty period
Operations of Compressor package during 1st year after the warranty period 12 Month 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor Package during 1st year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Operations of Compressor package during 2nd year after the warranty period 12 Month 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor Package during 2nd year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Operations of Compressor package during 3rd year after the warranty period 12 Month 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor Package during 3rd year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Operations of Compressor package during 4th year after the warranty period 12 Month 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor Package during 4th year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Operations of Compressor package during 5th year after the warranty period 12 Month 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor Package during 5th year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Operations of Compressor package during 6th year after the warranty period 12 Month 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor Package during 6th year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Operations of Compressor package during 7th year after the warranty period 12 Month 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor Package during 7th year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Operations of Compressor package during 8th year after the warranty period 12 Month 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor Package during 8th year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Operations of Compressor package during 9th year after the warranty period 12 Month 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor Package during 9th year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Total Gas Loss Cost in 10 years 0.00
Year - 1 Per Package Per Year 0.00 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 2 0.00 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 3 0.00 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 4 0.00 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 5 0.00 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 6 0.00 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 7 0.00 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 8 0.00 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 9 0.00 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 10 0.00 This input shall include Gas Loss cost for 1 Compressor for 1 year
Total Fuel Consumption cost in 10 years
Year - 1 Per Package Per Year This input shall include Power Cost for 1 Compressor for 1 year
Year - 2 This input shall include Power Cost for 1 Compressor for 1 year
Year - 3 This input shall include Power Cost for 1 Compressor for 1 year
Year - 4 This input shall include Power Cost for 1 Compressor for 1 year
Year - 5 This input shall include Power Cost for 1 Compressor for 1 year
Year - 6 This input shall include Power Cost for 1 Compressor for 1 year
Year - 7 This input shall include Power Cost for 1 Compressor for 1 year
Year - 8 This input shall include Power Cost for 1 Compressor for 1 year
Year - 9 This input shall include Power Cost for 1 Compressor for 1 year
Year - 10 This input shall include Power Cost for 1 Compressor for 1 year
Total cost of Ownership Per Package 0.00 This shall be a summation of Capex and total cost for 10 years from the date of commissioning towards Comp. O&M + Gas Loss + Power Cost for 1 Compressor Pkg
PRESENT VALUE (PV) CALCULATION
Present Value for 1 No. of Compressor Package #REF! This value (PV) shall be manually entered on the nProcure Portal
PV as per Nprocure Portal Bidder to cross check PV entered as per Excel calulation sheet as well as Tendering Portal entry
Difference between actual and portal entry- Bidder to check if any. Both Portal as well as excel entry should match
Bidder shall calculate Present Value (PV) for each type of Compressor Pkg/Compressor + UPS and the same shall be entered on the nProcure portal manually.
In case of any discrepancies, the unit rates & Min Design parameters (Fuel Consumption and Gas Loss) quoted by the Bidder online on the nProcure portal shall prevail and Annual Fuel Cost as well as Annual Gas Loss Cost along with Resulting Unit Present Value (PV) shall be re-calculated / corrected and Bidder ranking shall stand revised accordingly and the same shall be binding to the Bidder
Company's decision of Commercial Bid Evaluation shall be final and binding to all the bidders in all cases.
PRESENT VALUE CALCULATION SHEET (Refer Pricing Notes which shall prevail)
RATE CONTRACT FOR SUPPLY, INSTALLATION, TESTING, COMMISSIONING AND COMPREHENSIVE OPERATION AND MAINTENANCE OF MOTOR DRIVEN, GAS ENGINE & VIP (VARIABLE INLET PRESSURE) DRIVEN CNG COMPRESSORS/PACKAGES
OPEN TENDER 296383
Interest rate assumed to be 10%
COMPRESSOR CAPACITY: 1200 SCMH @19 kg/cm2 - Gas Engine Driven PACKAGE
Bidder shall fill up their quoted basic unit rates (same as quoted by the Bidder on nProcure portal SoR) against each line item below, based on which Present Value (PV) for a Compressor Package OR Compressor + UPS shall be calculated below.
Item Description Qty Unit of Measure Name of the Bidder Remarks
Basic Unit Rate Total Basic Value O&M %
Compressor Capacity 1200 SCMH @19 kg/cm2(g)-Engine Driven PACKAGE 1 No 0
Car Dispenser Flow > 15 kg/min 1 No 0
Car Dispenser Flow > 15 kg/min 1 No 0
Cascade (3000 WL) 1 No 0
3 KVA- office Type UPS 1 No 0
INSTALLATION, TESTING & COMMISSIONING 1 No 0
CAPEX Total Cost for Supply, Installation, Testing & Commissioning of 1 No. of Compressor #REF! 0 #REF! This input shall include basic cost of Supply, Installation, Testing & Commissioning of 1 No. of Compressor Package (1 Compressor + 2 Dispensers + 1 Cascade + 1 UPS) - excluding GST.
OPEX - Total Operation & Comprehensive Maintenance Cost for 10 years This input shall include basic cost of Operation & Comp. Maintenance of 1 No. of Compressor Package (1 Compressor + 2 Dispensers + 1 Cascade + 1 UPS) for a period of 10 years from the date of commissioning - excluding GST.
Operations of Compressor including UPS during the warranty period 1095 Shift 0.00 #DIV/0! This input shall include Operation cost during warranty period
Operations of Compressor and UPS during 1st year after the warranty period per shift of 8 hours (Nos. of package X 3 Shifts X 365 days) 1095 Shift 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor including UPS during 1st year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Operations of Compressor and UPS during 2nd year after the warranty period per shift of 8 hours (Nos. of package X 3 Shifts X 365 days) 1095 Shift 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor including UPS during 2nd year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Operations of Compressor and UPS during 3rd year after the warranty period per shift of 8 hours (Nos. of package X 3 Shifts X 365 days) 1095 Shift 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor including UPS during 3rd year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Operations of Compressor and UPS during 4th year after the warranty period per shift of 8 hours (Nos. of package X 3 Shifts X 365 days) 1095 Shift 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor including UPS during 4th year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Operations of Compressor and UPS during 5th year after the warranty period per shift of 8 hours (Nos. of package X 3 Shifts X 365 days) 1095 Shift 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor including UPS during 5th year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Operations of Compressor and UPS during 6th year after the warranty period per shift of 8 hours (Nos. of package X 3 Shifts X 365 days) 1095 Shift 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor including UPS during 6th year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Operations of Compressor and UPS during 7th year after the warranty period per shift of 8 hours (Nos. of package X 3 Shifts X 365 days) 1095 Shift 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor including UPS during 7th year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Operations of Compressor and UPS during 8th year after the warranty period per shift of 8 hours (Nos. of package X 3 Shifts X 365 days) 1095 Shift 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor including UPS during 8th year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Operations of Compressor and UPS during 9th year after the warranty period per shift of 8 hours (Nos. of package X 3 Shifts X 365 days) 1095 Shift 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor including UPS during 9th year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Total Gas Loss Cost in 10 years 0.000
Year - 1 Per Compressor + UPS Per Year 0.00 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 2 0.00 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 3 0.00 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 4 0.00 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 5 0.00 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 6 0.00 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 7 0.00 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 8 0.00 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 9 0.00 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 10 0.00 This input shall include Gas Loss cost for 1 Compressor for 1 year
Total Fuel Consumption cost in 10 years
Year - 1 Per Compressor + UPS Per Year This input shall include Power Cost for 1 Compressor for 1 year
Year - 2 This input shall include Power Cost for 1 Compressor for 1 year
Year - 3 This input shall include Power Cost for 1 Compressor for 1 year
Year - 4 This input shall include Power Cost for 1 Compressor for 1 year
Year - 5 This input shall include Power Cost for 1 Compressor for 1 year
Year - 6 This input shall include Power Cost for 1 Compressor for 1 year
Year - 7 This input shall include Power Cost for 1 Compressor for 1 year
Year - 8 This input shall include Power Cost for 1 Compressor for 1 year
Year - 9 This input shall include Power Cost for 1 Compressor for 1 year
Year - 10 This input shall include Power Cost for 1 Compressor for 1 year
Total cost of Ownership Per Compressor + UPS Per Year This shall be a summation of Capex and total cost for 10 years from the date of commissioning towards Comp. O&M + Gas Loss + Power Cost for 1 Compressor Pkg
PRESENT VALUE (PV) CALCULATION
Present Value for 1 No. of Compressor Package #REF! This value (PV) shall be manually entered on the nProcure Portal
PV as per Nprocure Portal Bidder to cross check PV entered as per Excel calulation sheet as well as Tendering Portal entry
Difference between actual and portal entry- Bidder to check if any. Both Portal as well as excel entry should match
Bidder shall calculate Present Value (PV) for each type of Compressor Pkg/Compressor + UPS and the same shall be entered on the nProcure portal manually.
In case of any discrepancies, the unit rates & Min Design parameters (Fuel Consumption and Gas Loss) quoted by the Bidder online on the nProcure portal shall prevail and Annual Fuel Cost as well as Annual Gas Loss Cost along with Resulting Unit Present Value (PV) shall be re-calculated / corrected and Bidder ranking shall stand revised accordingly and the same shall be binding to the Bidder
Company's decision of Commercial Bid Evaluation shall be final and binding to all the bidders in all cases.
PRESENT VALUE CALCULATION SHEET (Refer Pricing Notes which shall prevail)
RATE CONTRACT FOR SUPPLY, INSTALLATION, TESTING, COMMISSIONING AND COMPREHENSIVE OPERATION AND MAINTENANCE OF MOTOR DRIVEN, GAS ENGINE & VIP (VARIABLE INLET PRESSURE) DRIVEN CNG COMPRESSORS/PACKAGES
OPEN TENDER 296383
Interest rate assumed to be 10%
COMPRESSOR CAPACITY: 1200 SCMH @19 kg/cm2 - Gas Engine Driven ONLY COMP + UPS
Bidder shall fill up their quoted basic unit rates (same as quoted by the Bidder on nProcure portal SoR) against each line item below, based on which Present Value (PV) for a Compressor Package OR Compressor + UPS shall be calculated below.
Item Description Qty Unit of Measure Name of the Bidder Remarks
Basic Unit Rate Total Basic Value O&M %
Compressor Capacity 1200 SCMH @19 kg/cm2(g)-Engine Driven 1 No 0
3 KVA- office Type UPS 1 No 0
INSTALLATION, TESTING & COMMISSIONING 1 No 0
CAPEX Total Cost for Supply, Installation, Testing & Commissioning of 1 No. of Compressor #REF! 0 #REF! This input shall include basic cost of Supply, Installation, Testing & Commissioning of 1 No. of Compressor Package (1 Compressor + 2 Dispensers + 1 Cascade + 1 UPS) - excluding GST.
OPEX - Total Operation & Comprehensive Maintenance Cost for 10 years This input shall include basic cost of Operation & Comp. Maintenance of 1 No. of Compressor Package (1 Compressor + 2 Dispensers + 1 Cascade + 1 UPS) for a period of 10 years from the date of commissioning - excluding GST.
Operations of Compressor including UPS during the warranty period 1095 Shift 0.00 #DIV/0! This input shall include Operation cost during warranty period
Operations of Compressor and UPS during 1st year after the warranty period per shift of 8 hours (Nos. of package X 3 Shifts X 365 days) 1095 Shift 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor including UPS during 1st year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Operations of Compressor and UPS during 2nd year after the warranty period per shift of 8 hours (Nos. of package X 3 Shifts X 365 days) 1095 Shift 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor including UPS during 2nd year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Operations of Compressor and UPS during 3rd year after the warranty period per shift of 8 hours (Nos. of package X 3 Shifts X 365 days) 1095 Shift 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor including UPS during 3rd year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Operations of Compressor and UPS during 4th year after the warranty period per shift of 8 hours (Nos. of package X 3 Shifts X 365 days) 1095 Shift 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor including UPS during 4th year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Operations of Compressor and UPS during 5th year after the warranty period per shift of 8 hours (Nos. of package X 3 Shifts X 365 days) 1095 Shift 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor including UPS during 5th year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Operations of Compressor and UPS during 6th year after the warranty period per shift of 8 hours (Nos. of package X 3 Shifts X 365 days) 1095 Shift 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor including UPS during 6th year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Operations of Compressor and UPS during 7th year after the warranty period per shift of 8 hours (Nos. of package X 3 Shifts X 365 days) 1095 Shift 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor including UPS during 7th year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Operations of Compressor and UPS during 8th year after the warranty period per shift of 8 hours (Nos. of package X 3 Shifts X 365 days) 1095 Shift 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor including UPS during 8th year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Operations of Compressor and UPS during 9th year after the warranty period per shift of 8 hours (Nos. of package X 3 Shifts X 365 days) 1095 Shift 0.00 #DIV/0! This input shall include both Operation & Maintenance cost
Maintenance of Compressor including UPS during 9th year after the warranty period 12 Month 0.00 This input shall include both Operation & Maintenance cost
Total Gas Loss Cost in 10 years 0.000
Year - 1 Per Compressor + UPS Per Year 0.00 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 2 0.00 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 3 0.00 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 4 0.00 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 5 0.00 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 6 0.00 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 7 0.00 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 8 0.00 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 9 0.00 This input shall include Gas Loss cost for 1 Compressor for 1 year
Year - 10 0.00 This input shall include Gas Loss cost for 1 Compressor for 1 year
Total Fuel Consumption cost in 10 years
Year - 1 Per Compressor + UPS Per Year This input shall include Power Cost for 1 Compressor for 1 year
Year - 2 This input shall include Power Cost for 1 Compressor for 1 year
Year - 3 This input shall include Power Cost for 1 Compressor for 1 year
Year - 4 This input shall include Power Cost for 1 Compressor for 1 year
Year - 5 This input shall include Power Cost for 1 Compressor for 1 year
Year - 6 This input shall include Power Cost for 1 Compressor for 1 year
Year - 7 This input shall include Power Cost for 1 Compressor for 1 year
Year - 8 This input shall include Power Cost for 1 Compressor for 1 year
Year - 9 This input shall include Power Cost for 1 Compressor for 1 year
Year - 10 This input shall include Power Cost for 1 Compressor for 1 year
Total cost of Ownership Per Compressor + UPS Per Year 0.00 This shall be a summation of Capex and total cost for 10 years from the date of commissioning towards Comp. O&M + Gas Loss + Power Cost for 1 Compressor Pkg
PRESENT VALUE (PV) CALCULATION
Present Value for 1 No. of Compressor Package #REF! This value (PV) shall be manually entered on the nProcure Portal
PV as per Nprocure Portal Bidder to cross check PV entered as per Excel calulation sheet as well as Tendering Portal entry
Difference between actual and portal entry- Bidder to check if any. Both Portal as well as excel entry should match
Bidder shall calculate Present Value (PV) for each type of Compressor Pkg/Compressor + UPS and the same shall be entered on the nProcure portal manually.
In case of any discrepancies, the unit rates & Min Design parameters (Fuel Consumption and Gas Loss) quoted by the Bidder online on the nProcure portal shall prevail and Annual Fuel Cost as well as Annual Gas Loss Cost along with Resulting Unit Present Value (PV) shall be re-calculated / corrected and Bidder ranking shall stand revised accordingly and the same shall be binding to the Bidder
Company's decision of Commercial Bid Evaluation shall be final and binding to all the bidders in all cases.
PRESENT VALUE CALCULATION SHEET
Sample For Reference Purpose only towards Reverse Auction Methodology
RATE CONTRACT FOR SUPPLY, INSTALLATION, TESTING, COMMISSIONING AND COMPREHENSIVE OPERATION AND MAINTENANCE OF MOTOR DRIVEN CNG COMPRESSOR/ COMPRESSOR PACKAGES
Open e-tender 296383
Interest rate assumed to be 10% 10%
650 SCMH @ 19 BAR COMRPESSOR PACKAGE
Bidder shall fill up their quoted basic unit rates (same as quoted by the Bidder on nProcure portal SoR) against each line item below, based on which Present Value (PV) for a Compressor Package OR Compressor + UPS shall be calculated below.
Item Description Qty Unit of Measure Min. % of ‘Total Capital Cost’ defined above L1 Bidder Bidder X
Basic Unit Rate Total Basic Value O&M % Basic Unit Rate Total Basic Value O&M %
Compressor Capacity 650 SCMH @ 19 kg/cm2(g) 1 No 10,063,438 10,063,438 9,370,000 9,370,000
Car Dispenser Flow > 15 kg/min 1 No 1,250,000 1,250,000 1,460,000 1,460,000
Car Dispenser Flow > 15 kg/min 1 No 1,250,000 1,250,000 1,460,000 1,460,000
3KVA- Office Type UPS 1 No 222,857 222,857 320,000 320,000
INSTALLATION, TESTING & COMMISSIONING 1 No 1,000 1,000 150,000 150,000
CAPEX Total Cost for Supply, Installation, Testing & Commissioning of 1 No. of Compressor Package 14,726,689 14,820,000
OPEX - Total Operation & Comprehensive Maintenance Cost for 10 years
Operations of Compressor package during the warranty period 12 Per Package Per Month 3% 37,000 444,000 3.01% 38,000 456,000 3.08%
Operations of Compressor package during 1st year after the warranty period 12 Per Package Per Month 11% 39,405 472,860 11.00% 70,000 840,000 11.34%
Maintenance of Compressor Package during 1st year after the warranty period 12 Per Package Per Month 95,590 1,147,080 70,000 840,000
Operations of Compressor package during 2nd year after the warranty period 12 Per Package Per Month 12% 41,966 503,592 12.03% 75,000 900,000 12.15%
Maintenance of Compressor Package during 2nd year after the warranty period 12 Per Package Per Month 105,624 1,267,488 75,000 900,000
Operations of Compressor package during 3rd year after the warranty period 12 Per Package Per Month 13% 44,694 536,328 13.05% 85,000 1,020,000 13.77%
Maintenance of Compressor Package during 3rd year after the warranty period 12 Per Package Per Month 115,436 1,385,232 85,000 1,020,000
Operations of Compressor package during 4th year after the warranty period 12 Per Package Per Month 14% 47,599 571,188 14.10% 90,000 1,080,000 14.57%
Maintenance of Compressor Package during 4th year after the warranty period 12 Per Package Per Month 125,474 1,505,688 90,000 1,080,000
Operations of Compressor package during 5th year after the warranty period 12 Per Package Per Month 15% 50,693 608,316 15.24% 95,000 1,140,000 15.38%
Maintenance of Compressor Package during 5th year after the warranty period 12 Per Package Per Month 136,385 1,636,620 95,000 1,140,000
Operations of Compressor package during 6th year after the warranty period 12 Per Package Per Month 16% 53,988 647,856 16.48% 100,000 1,200,000 16.19%
Maintenance of Compressor Package during 6th year after the warranty period 12 Per Package Per Month 148,244 1,778,928 100,000 1,200,000
Operations of Compressor package during 7th year after the warranty period 12 Per Package Per Month 17% 57,498 689,976 18.57% 105,000 1,260,000 17.00%
Maintenance of Compressor Package during 7th year after the warranty period 12 Per Package Per Month 170,396 2,044,752 105,000 1,260,000
Operations of Compressor package during 8th year after the warranty period 12 Per Package Per Month 18% 61,235 734,820 20.95% 115,000 1,380,000 18.62%
Maintenance of Compressor Package during 8th year after the warranty period 12 Per Package Per Month 195,857 2,350,284 115,000 1,380,000
Operations of Compressor package during 9th year after the warranty period 12 Per Package Per Month 19% 65,215 782,580 23.66% 120,000 1,440,000 19.43%
Maintenance of Compressor Package during 9th year after the warranty period 12 Per Package Per Month 225,123 2,701,476 120,000 1,440,000
OPEX - Total Operation & Comprehensive Maintenance Cost for 10 years 21,809,064 20,976,000
Grand Total - Award Value - SITC and O&M Cost Per Package 36,535,753 35,796,000
Total Gas Loss Cost in 10 years
Year - 1 Per Package Per Year 33,697.82 118,086.39
Total Fuel Consumption cost in 10 years
Year - 1 Per Package Per Year 2,518,938.00 2,589,894.00
PRESENT VALUE (PV) CALCULATION
Cash Outflow Cash Outflow
Present Value for 1 No. of Compressor Package Rs.42,526,569.61 Rs.43,324,299.32
Unit Decrement - 0.1% of opening value 42,526.57 Value post 1st Bid Rs.42,484,043.04
Value post 2nd Bid Rs.42,441,559.00
Value post 3rd Bid Rs.42,399,117.44
Value post 4th Bid Rs.42,356,718.32
Final Closing Bid Rs.42,356,718.32
L1 Bidder post RA to submit unit rate break-up in such as way that
Total amount for 10 years towards Gas Loss and Fuel cost derived using Bidder's minimum guaranteed parameters quoted in the tender is kept same during post RA unit rate calculation
Only CAPEX and OPEX rates are revised keeping year-wise minimum % of capex to be maintained for Opex as sought in the Tender are complied with.
REPLY / CLARIFICATION TO BIDDERS QUERIES RAISED DURING PRE-BID MEETING
Tender Ref. No.: 296383
Tender Subject RATE CONTRACT FOR SUPPLY, INSTALLATION, TESTING, COMMISSIONING AND COMPREHENSIVE OPERATION AND MAINTENANCE OF MOTOR DRIVEN, GAS ENGINE DRIVEN & VIP (VARIABLE INLET PRESSURE) DRIVEN CNG COMPRESSORS/PACKAGES
Sr. No. Page No. / Clause No. Title of Clause as per tender Description of clause as per tender Bidder’s Query GGL Reply
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Bidder Qualification Criteria 296383.pdf
Gujarat Gas - User Guide to use Cisco WebEx.pdf
Section I - Instructions To Bidders (ITB) Open 296383.pdf
Sec II PRS SOW PART-02 Approved Vendor List 296383.pdf
Sec II PRS SOW PART-06 DS FLANGES-FITTING-PG-DPG 296383.pdf
Sec II PRS SOW PART-07 DS PAINTING-FAT-SAT-HT.pdf
Sec II QAP - Cascade Type-1 CNG Cylinder 296383.pdf
Sec II Tech Specs_Online UPS 296383.pdf
Sec II Technical Scope-CAMC CNG Dispenser 296383.pdf
Sec II Technical Scope-CAMC Engine Driven Comp 296383.pdf
Sec II Technical Scope-CAMC Motor Driven Comp 296383.pdf
Sec II Technical Specs-SITC CNG Dispenser 296383.pdf
Sec II Technical Specs-SITC Engine Driven Comp 296383.pdf
Sec II Technical Specs-SITC Motor Driven Comp 296383.pdf
Sec III Calculation Power n Gas Loss- Motor Driven Compressor.pdf
Sec III Schedule of Rates 296383.pdf
Sec III Format Calculation for Fuel and Gas loss - Engine Driven.xlsx
XLSX
Sec III Format Calculation for Power and Gas Loss- Motor Driven.xlsx
XLSX
Sec III Format- Present Value Calculation Sheet-296383.xlsx
XLSX
RA Methodology sample for RA Reference only - CNG Compressors.xlsx
XLSX
Section IV - GTC - Material-296383.pdf
Section V - STC - Services with Materials 296383.pdf
Section VI - Forms and Formats -296383.docx
DOCX
Pre Bid Query Format 296383.xls
XLS
ONLINE PRE BID DETAILS 296383.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .