| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.7 LQualified 2ND FLOOR B86 NEB SARAI FREEDOM FIGHTER ENCLAVE SOUTH DELHI 110068 | SOUTH DELHI | DELHI | 110068 | L1 | Qualified MII | |
| 2 | L2₹6.9 L+₹1.2 L (20.7%)Qualified C 7 M I D C GOKUL SHIRGOAN KOLHAPUR MAHARASHTRA 416234 | KOLHAPUR | MAHARASHTRA | 416234 | L2 | Qualified MSE, MII, Category: OBC | |
| 3 | L3₹7.5 L+₹1.8 L (30.8%)Qualified 002 GROUNDF FLOOR PANCHSHEEL APARTMENTS 8 1 DIAMOND HARBOUR ROAD SANTIVIHAR COLONEY | L3 | Qualified MII | |
| 4 | Disqualified 00 C O PARMOD SINGH BAKTA BARHI CHINTAMAN SITAMARHI BIHAR 843315 | SITAMARHI | BIHAR | 843315 | - | Disqualified MII |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
15 Sept 2025, 1:00 pmClosed
High Pressure Portable Pump for large fire fighting as per IS 12717 (Q3) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6593217 Dated : 25-08-2025 Bid Document 1/7
-- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 27 (a).
EMD & Performance securityshould be in favour of Beneficiary
wherever it is applicable. Beneficiary : Director IRDE
Raipur Road
Dehradun
Uttarakhand. (Dr. Ajay Kumar) Splitting
8248336
GEM/2025/B/6593217
Two Packet Bid
High Pressure Portable Pump for large fire fighting as per IS 12717 (Q3) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC)
30 days
Dehradun
Total value wise evaluation
PRODUCT
2 documents required · 2 mandatory
Exempted
25 Aug 2025
25 Aug 2025
15 Sept 2025
High Pressure Portable Pump for large fire fighting as per IS 12717 (Q3) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6593217 Dated : 25-08-2025 Bid Document 1/7
-- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 27 (a).
EMD & Performance securityshould be in favour of Beneficiary
wherever it is applicable. Beneficiary : Director IRDE
Uttarakhand. (Dr. Ajay Kumar) Splitting
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_8248336.pdf
GEM_BID
Specs_93b5af7b-d048-4015-89b51755771217117_IRDE_SSOI.pdf
OTHER
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .