| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L 1₹49.3 LAccepted-Finance 46 A BARABAGAN LANE SERAMPORE HOOGHLY 712203 WEST BENGAL INDIA | SERAMPORE | HOOGHLY | WEST BENGAL | 712203 | L 1 | Accepted-Finance L 1 | |
| 2 | L 2₹51.1 L+₹1.8 L (3.63%)Rejected-Finance | L 2 | Rejected-Finance L 2 | |
| 3 | L 3₹60.0 L+₹10.7 L (21.6%)Rejected-Finance | L 3 | Rejected-Finance L 3 | |
| 4 | Rejected-Technical | - | Rejected-Technical Documents are not in order.Current challan for last three months from the date of publication of this tender notice not submitted. | |
| 5 | Rejected-Technical | - | Rejected-Technical Documents are not in order.Current challan for last three months from the date of publication of this tender notice not submitted |
| Sl No | Description | Qty | Unit | SOUMEN CONSTRUCTION CO L1 | KAMALA ENTERPRISE L2 | N K BUILDERS L3 |
|---|---|---|---|---|---|---|
| 1.00Supply of Labour Sweeping & cleaning of all floors including stair cases & head rooms, open spaces, common space & compound and disinfecting of all toilets & WCs with all necessary cleaning materials and equipments such as detergent powder, bleaching powder, muriatic acid or harpic, mopper, wiper etc. including disposal of refuse to the outside of the compound. Labour for Sweeping,Cleaning (Unskilled Labour) at day shift for 365 days 16 man x 365 days = 5840 mandays Labour for Sweeping,Cleaning (Unskilled Labour) at night shift (Except Sunday) 3 man x 313 days = 939 mandays Total number of labour Sweeping,Cleaning (Unskilled Labour) = 5840 + 939 = 6779 mandays Note:Mandays means per day per man working time 8 Hours Every labourers engaged with this work must be paid with minimum wages as laid down in the existing Labour Department order in vogue. | ||||||
| 1.01Unskilled worker [FREEZED ITEM] Total number of labour Sweeping,Cleaning (Unskilled Labour) = 5840 + 939 = 6779 mandays 6779 Man Days @ Rs.586.55 = Rs. 39,76,222.00 (Bidders are requested not to quote any rate of this item) [Rate is achieved from fixed minimum rates of Wages in the employment of pump operation Services from 01-01-2026 to 30-06-2026 as per Circular no. 04/Stat/14/RW/24/2023/ LCS/ JLC dated 09-12-2025 of the Addl. Labour Commissioner, W.B.] Rate is inclusive of minimum wages, bonus, EPF, ESI & GST as per existing rule. | ||||||
| 2.00Supply of Labour Supervisor for observing the duties of the sweepers and also the cleanliness of the compound. Supervisor (Semi-skilled Labour) for Sweepers 1 manday daily 1 man x 365 days = 365 mandays Note:Mandays means per day per man working time 8 Hours Every labourers engaged with this work must be paid with minimum wages as laid down in the existing Labour Department order in vogue. | ||||||
| 2.01Unskilled worker [FREEZED ITEM] Supervisor (Semi-skilled Labour) for Sweepers 1 manday daily 1 man x 365 days = 365 mandays 365 Man Days @ Rs.645.35 = Rs. 2,35,553.00 (Bidders are requested not to quote any rate of this item) [Rate is achieved from fixed minimum rates of Wages in the employment of pump operation Services from 01-01-2026 to 30-06-2026 as per Circular no. 04/Stat/14/RW/24/2023/ LCS/ JLC dated 09-12-2025 of the Addl. Labour Commissioner, W.B.] Rate is inclusive of minimum wages, bonus, EPF, ESI & GST as per existing rule. | ||||||
| 3.00 | Profit/Service charge
Service charge including profit and overhead for supply of all labours and materials. All materials and equipments, tools & plants for the cleaning and disinfecting purpose have to be supplied by the agency to the concren A.E. at the time of commencement of the month and concern A.E. will issue the materials in regularly basis to the agency.
Supply of Anticeptic liquid, Bleaching Powder, Napthalin, Detergent Powder, Wiper & Mopper scrubbing machine, Vaccum cleaner etc. of approved brand for cleaning / upkeeping of W/C pan, wash basin, Urinal, Sink, drain channel of toilet block and corridors, stairs & Ramps of the campus.
All the engaged labour has to supply by the contractor.
The bidder have to submit details break up month wise of the all supplied materials in a sperate sheet for justification of quoted rate.
(Rate inclusives all taxes & duties)
(Bidders are requested to quote rate for this item only) | 12 | Month | 60,090 ₹7,21,080 Lowest | 75,000 ₹9,00,000 | 1,49,019 ₹17,88,228 |
Tender Value
Refer Docs
EMD Value
₹1.1 L
Closing Date
6 Jul 2026, 2:00 pmClosed
EXECUTIVE ENGINEERS BNED PWDTE
ROOM NO. 117, 1ST FLOOR, PURTA BHAVAN, DF BLOCK, SECTOR I, SALT LAKE, KOLKATA 700 091.
Upkeeping day to day sweeping cleaning of entire campus of West Bengal Judicial Academy Academic Building upto G4 storied, Hostel Building, 4nos Gates and entire campus at Plot No AAIII B10, New Town, Kolkata.For one year period.
2026_WBPWD_5015454_1
WBPWD/EE /BNED/NIeQ-16 of 26-27
Open Tender
CIVIL WORKS
Item Rate
365 days
New Town
Please refer Tender documents.
4 documents required · 4 mandatory
₹1.1 L
Yes
18 Aug 2026
13 Jun 2026
8 Jul 2026
13 Jun 2026
6 Jul 2026
13 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Supply of Labour Sweeping & cleaning of all floors including stair cases & head rooms, open spaces, common space & compound and disinfecting of all toilets & WCs with all necessary cleaning materials and equipments such as detergent powder, bleaching powder, muriatic acid or harpic, mopper, wiper etc. including disposal of refuse to the outside of the compound. Labour for Sweeping,Cleaning (Unskilled Labour) at day shift for 365 days 16 man x 365 days = 5840 mandays Labour for Sweeping,Cleaning (Unskilled Labour) at night shift (Except Sunday) 3 man x 313 days = 939 mandays Total number of labour Sweeping,Cleaning (Unskilled Labour) = 5840 + 939 = 6779 mandays Note:Mandays means per day per man working time 8 Hours Every labourers engaged with this work must be paid with minimum wages as laid down in the existing Labour Department order in vogue. | |||||
| 1.01 | Unskilled worker
[FREEZED ITEM]
Total number of labour Sweeping,Cleaning (Unskilled Labour)
= 5840 + 939 = 6779 mandays
6779 Man Days @ Rs.586.55 =
Rs. 39,76,222.00
(Bidders are requested not to quote any rate of this item)
[Rate is achieved from fixed minimum rates of Wages in the employment of pump operation Services from 01-01-2026 to 30-06-2026 as per Circular no. 04/Stat/14/RW/24/2023/ LCS/ JLC dated 09-12-2025 of the Addl. Labour Commissioner, W.B.] Rate is inclusive of minimum wages, bonus, EPF, ESI & GST as per existing rule. | - | - | - | - |
| 2Supply of Labour Supervisor for observing the duties of the sweepers and also the cleanliness of the compound. Supervisor (Semi-skilled Labour) for Sweepers 1 manday daily 1 man x 365 days = 365 mandays Note:Mandays means per day per man working time 8 Hours Every labourers engaged with this work must be paid with minimum wages as laid down in the existing Labour Department order in vogue. | |||||
| 2.01 | Unskilled worker
[FREEZED ITEM]
Supervisor (Semi-skilled Labour) for Sweepers
1 manday daily
1 man x 365 days = 365 mandays
365 Man Days @ Rs.645.35 =
Rs. 2,35,553.00
(Bidders are requested not to quote any rate of this item)
[Rate is achieved from fixed minimum rates of Wages in the employment of pump operation Services from 01-01-2026 to 30-06-2026 as per Circular no. 04/Stat/14/RW/24/2023/ LCS/ JLC dated 09-12-2025 of the Addl. Labour Commissioner, W.B.] Rate is inclusive of minimum wages, bonus, EPF, ESI & GST as per existing rule. | - | - | - | - |
| 3 | Profit/Service charge
Service charge including profit and overhead for supply of all labours and materials. All materials and equipments, tools & plants for the cleaning and disinfecting purpose have to be supplied by the agency to the concren A.E. at the time of commencement of the month and concern A.E. will issue the materials in regularly basis to the agency.
Supply of Anticeptic liquid, Bleaching Powder, Napthalin, Detergent Powder, Wiper & Mopper scrubbing machine, Vaccum cleaner etc. of approved brand for cleaning / upkeeping of W/C pan, wash basin, Urinal, Sink, drain channel of toilet block and corridors, stairs & Ramps of the campus.
All the engaged labour has to supply by the contractor.
The bidder have to submit details break up month wise of the all supplied materials in a sperate sheet for justification of quoted rate.
(Rate inclusives all taxes & duties)
(Bidders are requested to quote rate for this item only) | 12 | Month | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.67 MB
BOQ_5084265.xls
BOQ • 0.29 MB
2911ii.pdf
Additional Documents • 0.88 MB
BLANKA_102.pdf
PDF • 0.00 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .