Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAccepted-AOC AVANTIKA COLONY NEAR RICE MILL AMROHA | AMROHA | AMROHA | UTTAR PRADESH | ₹1.7 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.8 CrRejected-Finance 14 15 VINAY NAGAR VIJITEM PUBLIC SCHOOL QUARSI RAMGHAT ROAD ALIGARH | ALIGARH | ALIGARH | UTTAR PRADESH | ₹1.8 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹1.9 CrRejected-Finance ALIGARH UTTAR PRADESH | ALIGARH | UTTAR PRADESH | 202001 | ₹1.9 Cr | L3 | Rejected-Finance L3 |
| 4 | L4₹2.1 CrRejected-Finance SHRI CHANDRAPAL SINGH VILLAGE BADRADURPUR POST KHEDA BUJURG DISTRICT ALIGARH | ALIGARH | UTTAR PRADESH | 202001 | ₹2.1 Cr | L4 | Rejected-Finance L4 |
| 5 | L5₹2.1 CrRejected-Finance TATARPUR LALU A 2 ADESH NAGAR NAJIBABAD BIJNOR UTTAR PRADESH | NAJIBABAD | BIJNOR | UTTAR PRADESH | ₹2.1 Cr | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | CHANDRA PAL SINGH L4 | BHAMAR SINGH L6 | M/S RIDAM ASSOCIATES L1 | ATUL KUMAR GUPTA L5 | S F INFRA PROJECTS L3 | GOMATINETRA CONSTRUCTIONS L2 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Laying and Jointing PVC Pipe. Heading | |||||||||
| 1.01 | Providing of E.C bag.(size bag.48 cm x 75 cm) and Nylon rope Crates size (0.90 X0.90X 0.90 M) & Filling of E.C bag.(size bag.48 cm x 75 cm) with local Earth i/c sewing and, Carriage upto 1.00 km. By power transport including laying, packing and tying in Nylon crates with placing in position i/c all cost of material, labour, carriage, T&P etc. Complete but excluding GST. | 10,202 | Nos. | 553.86 ₹56.5 L | 400 ₹40.8 L | 290 ₹29.6 L | 500 ₹51.0 L | 400 ₹40.8 L | 120 ₹12.2 L |
| 1.02 | Dismantling stone pitching including clearing and stacking of material within 60 M. T&P etc. complete. But excluding G.S.T. | 87.16 | M3 | 56.4 ₹4,915.82 | 100 ₹8,716 | 50 ₹4,358 | 30 ₹2,614.80 | 80 ₹6,972.80 | 100 ₹8,716 |
| 1.03 | Collection of silt/sand from river bed at river bank by mud pump including stacking, T&P, etc for proper completion of work. But excluding G.S.T. | 10,781.96 | M3 | 49.5 ₹5.3 L | 100 ₹10.8 L | 80 ₹8.6 L | 88 ₹9.5 L | 70 ₹7.5 L | 180 ₹19.4 L |
| 1.04 | Earth work in cutting or in embankment in ordinary soil excavation to be in the from of regular pits & Earth work in embankment including lift upto 1.5 m and lead upto 30 m. also including labour, T&P etc. complete. But excluding G.S.T. | 1,276.2 | M3 | 44.8 ₹57,173.76 | 50 ₹63,810 | 50 ₹63,810 | 44 ₹56,152.80 | 50 ₹63,810 | 50 ₹63,810 |
| 1.05 | Laying & packing of Old Boulders (20 to 40 Kg. wt.) and tying in hexagonal. G.I Wire crate (1.50x1.50x0.45 M) Size by head load with placing in position i/c all cost of material, labour, carriage, T&P etc. complete but excluding. GST. | 86 | Nos. | 1,284.44 ₹1.1 L | 1,800 ₹1.5 L | 1,500 ₹1.3 L | 1,500 ₹1.3 L | 1,500 ₹1.3 L | 3,500 ₹3.0 L |
| 1.06 | Providing, Laying & packing of New Boulders/Cut Stone (20 to 40 Kg. wt.) and tying in hexagonal G.I. Wire crate (1.50x1.50x0.45 M) Size by head load with placing in position i/c all cost of material, labour, carriage, T&P etc. complete but excluding. GST. | 2,863 | Nos. | 3,608 ₹1.0 Cr | 4,500 ₹1.3 Cr | 3,300 ₹94.5 L | 3,715 ₹1.1 Cr | 3,500 ₹1.0 Cr | 4,000 ₹1.1 Cr |
| 1.07 | Providing, laying & packing of Boulders/Cut stone (20 to 40 Kg. wt.) and tying in hexagonal G.I Wire crate (3x1.50x1.0 M) Size by head load with placing in position i/c all cost of material, labour, carriage, T&P etc. complete but excluding. GST. | 191 | Nos. | 13,406.18 ₹25.6 L | 9,000 ₹17.2 L | 12,200 ₹23.3 L | 14,000 ₹26.7 L | 12,500 ₹23.9 L | 10,500 ₹20.1 L |
| 1.08 | Providing and laying of Geo textile sheet made of 200 gsm woven multifilament polypropylene yarn / Non woven geo Sheet with placing in position i/c all cost of labour, carriage, T&P etc. complete but excluding. GST. | 704.7 | M2 | 48.3 ₹34,037.01 | 80 ₹56,376 | 50 ₹35,235 | 50 ₹35,235 | 60 ₹42,282 | 120 ₹84,564 |
| 1.09 | Providing and laying of Boulder Pitching with Boulders (20 to 40 Kg. wt.)in spur/Stud by head load with placing in position i/c all cost of labour, carriage, T&P etc. complete but excluding. GST. | 305.37 | M3 | 2,600.55 ₹7.9 L | 1,500 ₹4.6 L | 2,500 ₹7.6 L | 2,500 ₹7.6 L | 2,500 ₹7.6 L | 2,500 ₹7.6 L |
Tender Value
₹2.5 Cr
EMD Value
₹5 L
Closing Date
17 Mar 2026, 12:00 pmClosed
Superintending Engineer
Office of the Superintending Engineer Irrigation Work Circle Tubewell colony Moradabad
LOT 12 Janpad Amroha ke antargat Ganga nadi ke bayen kinare par sthit Tigri Ring Bandh par poorv nirmit Spur No. 04 ki punarsthapna ka karya.
2026_UPIDC_1122949_12
04/SEIWC/2025-26
Open Tender
Civil Works
90 days
AMROHA
AS PER NIT
2 documents required · 2 mandatory
₹2,354
₹5 L
10 Apr 2026
9 Mar 2026
17 Mar 2026
9 Mar 2026
17 Mar 2026
9 Mar 2026
Laying and Jointing PVC Pipe. Heading
Providing of E.C bag.(size bag.48 cm x 75 cm) and Nylon rope Crates size (0.90 X0.90X 0.90 M) & Filling of E.C bag.(size bag.48 cm x 75 cm) with local Earth i/c sewing and, Carriage upto 1.00 km. By power transport including laying, packing and tying in Nylon crates with placing in position i/c all cost of material, labour, carriage, T&P etc. Complete but excluding GST.
Dismantling stone pitching including clearing and stacking of material within 60 M. T&P etc. complete. But excluding G.S.T.
Collection of silt/sand from river bed at river bank by mud pump including stacking, T&P, etc for proper completion of work. But excluding G.S.T.
Earth work in cutting or in embankment in ordinary soil excavation to be in the from of regular pits & Earth work in embankment including lift upto 1.5 m and lead upto 30 m. also including labour, T&P etc. complete. But excluding G.S.T.
Laying & packing of Old Boulders (20 to 40 Kg. wt.) and tying in hexagonal. G.I Wire crate (1.50x1.50x0.45 M) Size by head load with placing in position i/c all cost of material, labour, carriage, T&P etc. complete but excluding. GST.
Providing, Laying & packing of New Boulders/Cut Stone (20 to 40 Kg. wt.) and tying in hexagonal G.I. Wire crate (1.50x1.50x0.45 M) Size by head load with placing in position i/c all cost of material, labour, carriage, T&P etc. complete but excluding. GST.
Providing, laying & packing of Boulders/Cut stone (20 to 40 Kg. wt.) and tying in hexagonal G.I Wire crate (3x1.50x1.0 M) Size by head load with placing in position i/c all cost of material, labour, carriage, T&P etc. complete but excluding. GST.
Providing and laying of Geo textile sheet made of 200 gsm woven multifilament polypropylene yarn / Non woven geo Sheet with placing in position i/c all cost of labour, carriage, T&P etc. complete but excluding. GST.
Providing and laying of Boulder Pitching with Boulders (20 to 40 Kg. wt.)in spur/Stud by head load with placing in position i/c all cost of labour, carriage, T&P etc. complete but excluding. GST.
Bricks (S.O.B) on edge pavement on patries laid and dry, joints filled with local sand including preparation of base to proper slope & its ramming. Spreading layer of 1 cm (3/8") depth of local sand over the sub-grade and including supply of all materials labour and T&P etc. required for proper completion of the work. But excluding GST.
Earth work in filling of bund including carriage of earth upto 1.00 km & lift 1.5 m with proper levelling dressing manual compaction , cost of earth, labour, T&P etc complete. But excluding G.S.T.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
techsummary_2091868.pdf
BOQ Comparative Chart
xlsx
finsummary_2091868.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.06 MB
BOQ_2091868.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid