Tender Value
₹51.7 L
EMD Value
₹1.0 L
Closing Date
14 Jul 2026, 3:00 pm
Similar tender results from the same govt authority in the past 3 years.
S&T work in c/w 1) Provision of Boundary Wall at CRO locations between Kurali- Mianpur stations.2) Provision of Boundary Wall at CRO locations between Ghanauli-Bharatgarh stations .3)Provision of Boundary Wall at CRO locations between Rup Nagar-Ganauli stations SIR-DLPC sections. 4)Provision of Boundary Wall at locations prone to encroachments in the approach of NLDM & KART Yard. 5)Provision of Boundary Wall along the track for safe running of trains on vulnerable CRO locations near Abohar Juncation.
OT-17-2026-27
OT-17-2026-27
Open
180 Days
Rupnagar, Punjab
₹0
₹1.0 L
19 Jun 2026
19 Jun 2026
30 Jun 2026
Preparation of Cable Route Preparation of Plan of buried S & T Cables using Radio 01 Detector 8200 GS or Similar model GPS Model, DGSP and Drone for Per Trench per Km. For existing cables as per the instruction of Engineer in charge. Submission of Drone Report in Hard Copy 1 set and DGPS output in KMZ File format. (Unit = Per Trench KM) In Yard Section. Inspection :by Consignee. Above/
Supply of Digital insulation Tester (Megger) 500 V, Motwani, Philips make or similar or better. Inspection: By Consignee.
Supply of single app. Case steel RE with 'E' type lock and key ward no. 42 and handle as per Drg. No. sketch no. RE/S&T/ALD/SK/219/82 and 221/82 with Alt. A & 221/82 with Alt. B .Inspection: by Consignee.
Supply of terminal block 25mm center M-6 (ARA terminals) as per IRS spec. No.IRS-S- 75/2006 (Rev.2) & IRS drawing No. SA-23741A(Alt.4), SA-23745(Alt.5), SA-23746 & SA-23756(Alt.3). Inspection : by RDSO.
Supply of HDPE duct 40/33 mm as per RDSO/SPN/TC/45/2013 Rev.2.0 with latest 04 amendments as available. For each KM of HDPE DUCT following items are to be supplied a) End plugs-2no b) Cable sealing plugs-2 no. © Plastic couples slip fit/push fit b type-2 no d) End plugs to be provided along with drum-2 nos. Inspection By-Consignee. Above/
Supply, testing and laying of 2nd class well burnt 'B' class bricks in trench 01 breadthwise over the top of cable throught i.e. 8 bricks in one meter over whole of the cables. Bricks shall be got staked and got inspected by Rly. Representative before laying. Inspection :by Consignee.
Supply and fixing of MS Flat 40mm x 6 mm size. Inspection by Consignee.
Supply and installation of earth electrodes as per std. practice. The item includes digging of pit in earth, 3 Mtrs. deep and fixing earth electrode pipe. Casting of cement concrete enclosures as per drg. No. (NR/S&T/CON/6.4/97). The soil treatement shall be done as per std. pratice. The item includes provn. of mild steel flat of size 35mm x 6mm (as per IRSEM) and nut 03 bolted connection of MS flat with earth electrode. The other end of mild steel flat to be connected to block instrument, cable sheath of power equipment, signal base, apparatus case, CT rack / relay racks, other equipments as per the instruction of Engr. at site & IRSEM. Earhting connection location to location shall be done through cable which shall be provided by Railway. Complete materials such as earth electrodes as per drg. No. (NR/S&T/CON/6.3/97), cement, wiring material, nut bolt for connection & mild steel flat of size 35mm x 6mm or 210 sqm as per SEM etc. to be supplied by the contractor. Inspection : by Consignee. Inspection : by Consignee.
Supply and fixing of GI pipe 75mm dia, 3 mm thick ,as per specn No.IS-1239, Medium 04 grade, perforated of required length at culverts/bridges/along the cutting, suitably concreted at both ends. G.I clamps of M.S flats bolts & nuts to be supplied by the contractor. Inspection : by Consignee.
Boring & Trenchless cabling along with supply and insertion of HDPE pipe of PE 80 PN 05 8 grade of 90mm dia with min. 6.7mm and max. 7.6mm wall thickness as per IS 4984:2016 in the bore for the laying of signaling/ Telecom/ Power cables under the track/ road.( cable lying is covered separately). HDPE pipe is to be supplied by the contractor supply portion-RITES. Execution Consignee.
Fabrication, supply and fixing of concrete cable marker as per IRSEM drg. No. 15-D1. The marker shall be fixed at various places of cable route as per instruction of Eng. at site. Inspection : by Consignee.
Supply and installation of optical fiber cable joint enclosure as per TEC spec 07 No.GR/OJC-02/01/March 99 with latest amendment and splicing of optical fiber cables(24 Fibers and testing), . This includes provision of joint pit (RCC/Prefabricated) as per instructions of Railway Engineer's Representative at site. Inspection by-Consignee.
Supply & provision of straight through joints thermo shrink jointing kit with the help 08 of thermo shrink jointing kit as per specifications, drawings and stipulations of tender documents and as per approved cable route plan at various locations for 06Quad/04 Quad cable. Jointing kits to be supplied as per RDSO specification IRS:TC 77-2012 (Rev.-3) or latest amendments. Inspection by Consignee for supply portion. Above/
Excavating and refilling of trench in Normal Soil to the level of ground with rammed 01 earth as per drg. No.(NR/S&T/CON/1.1/97-A) so as not to form a drain 0.3 Mtrs. Wide & 1Mtr. Deep on both side of the station alongside the track. It shall conform to the safe distance as per signalling and cable route plan in all type of soil, It also includes clearance of routes of trees & bushes. Lesser depth due to site condition shall be paid proportionately. Inspection : by Consignee.
Laying of signalling/Telecom/power cables of different sizes as per approved Drg. No. NR/S&T/CON/1-1/97C and as per cable route plan approved by Railways and meagering of cable before and after its laying of all type of outdoor cables. Inspection : by Consignee.
"Termination of all cores of all types of main outdoor cables after its laying on both ends and providing number ferrule on each core under supervision of Railway representative. This 03 also includes preparation of test report for core to core and core to earth on prescribed Performa for each core of the cable separately. This also includes dressing and lacing of cables on both ends. Performa for testing and material for lacing to be supplied by the contractor. Termination of both end of core will be counted as one. Inspection: By Consignee"
Casting, concreting and curing of foundation and erection of single apparatus cases of size (1160mmX760mm at surface and 650 mm deep as per approved drawing no. 04 NR/S&T/Con./2.7/97. A layer of 3mm of Bitumin compound has to be provided between foundation and location box to prevent ingress of water in the base of location box. All material such as cement, coarse, sand, aggregate & anchor bolts shall be supplied by the contractor. Appartus case single will be supplied by railway. Contractor is required to execute all type of repair works of foundation if required during inserting the cable for termination. Inspection : By Consignee.
Preparation of App. Case single not involving wiring of relays: Preparation & fixing of bakelite hylum sheet 910x800x6mm and Backelite shelf 900x450x25mm duly fixed by angle iron piece of different size inside all the app. Cases. Hylum board shall be fixed on an angle iron frame of 25mmx25mmx3mm. Angle iron frame will be fixed in location boxes secured by nuts and bolts.This includes fixing of fuses, ARA terminal, fixing and jamming of cables with 2 inch thick salwood plank provided at the bottom. This will include opening, pasting and jamming armour of each cable in the hole drilled separately for each cable through the salwood plank and all cable entry points on location boxes, location huts, Preparation of App. Case single not involving wiring of relays: Preparation & fixing of bakelite hylum sheet 910x800x6mm and Backelite shelf 900x450x25mm duly fixed by angle iron piece of different size inside all the app. Cases. Hylum board shall be fixed on an 05 angle iron frame of 25mmx25mmx3mm. Angle iron frame will be fixed in location boxes secured by nuts and bolts.This includes fixing of fuses, ARA terminal, fixing and jamming of cables with 2 inch thick salwood plank provided at the bottom. This will include opening, pasting and jamming armour of each cable in the hole drilled separately for each cable through the salwood plank and all cable entry points on location boxes, location huts, JBs relay room/battery room to be closed with suitable masonry Works covered with sand and plastering.Wiring description for terminal drawing of circuits, inside app. Case. Painting from out side as well inside with red oxide and aluminum paint is covered separately. Size of lettering will be 100mm or as per instructions of Engineer at site. All materials including Backelite shelf, hylum board, salwood plank, wire and wiring material, non deteriorating type HRC fuses with bases, catenary wires, nuts and bolts and other items shall be supplied by the contractor and shall be as per the RDSO spec.(as applicable). ARA terminals only shall be supplied by the Railways. Inspection : by Consignee.
Shifting of Apparatus case Single and it includes the Excavation of pit in and around the existing location boxes very carefully without damaging the working cables and shifting and turning the location boxes to clear of the infringement as instructed by the railway representative at 06 site. The work includes ensuring the safety of the signaling system, releasing the cables coils to give access for shifting/turning the location boxes. Necessary masonary work and earth work in and around the location boxes to the required level shall be done as instructed by the Railway representative at site, if the existing earth connection to the location boxes are disturbed the earth wires shall be the property reconnected. (All materials required for the work shall be supplied by the contractor).Inspection : By Consignee.
Laying of HDPE duct as per approved cable route plan in the exavated trenches/other protected work/RCC channel etc. including all accessories like end caps, collars, bends, couplers etc. 07 The ends of the duct to be sealed with end plugs till OFC blowing is done. Important: The layingof OFC cable indepedently or along with Quad cable/PIJF cable in same trench shall be governed by the RDSO drawings No.RDSO/TCDO/ COP-6 (a) and RDSO/TCDO/COP-8 (a) respectively issued vide Chapter XIII of The Telecom Manual. Inspection : by Consignee.
Blowing of OFC Cable in HDPE duct by mechanical system as per instruction of Railway engineer's representative at site. Inspection :by Consignee.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
STD-2022withAmndt1-11.pdf
ATTACHMENT
JPOforProtectionofcablesduringexecutionofvariousworks_2023.pdf JPO 2023
ATTACHMENT
Generalconditionsboundarywall.pdf
ATTACHMENT
JPOforProtectionofcablesduringexecutionofvariousworks_2023.pdf
ATTACHMENT
Download all tender documents and submit your bid