Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹3.2 LAccepted-AOC BASANTPUR KEDLA DIST RAMGARH JHARKHAND | BASANTPUR | RAMGARH | JHARKHAND | L-1 | Accepted-AOC Accept | |
| 2 | L-2₹3.2 L+₹3,590.71 (1.13%)Rejected-AOC BASANTPUR KEDLA DIST RAMGARH JHARKHAND | KEDLA | RAMGARH | JHARKHAND | L-2 | Rejected-AOC Accept | |
| 3 | L-3₹3.3 L+₹9,819.93 (3.09%)Rejected-AOC AT BASANTPUR PO KEDLA PS MANDU RAMGARH 825323 | MANDU | RAMGARH | JHARKHAND | 825323 | L-3 | Rejected-AOC Accept |
Tender Value
₹3.2 L
EMD Value
₹3,400
Closing Date
23 Sept 2024, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
RAVI RANJAN
KEDLA WASHERY, HAZARIBAG AREA, CCL
Dismantling, repairing, re-installation, fitting and tension adjustment work in Bucket Elevator unit no. 222, 223 and 207 main plant of Kedla Washery.
2024_CCL_317320_1
PO/KW/E-Tender/24-25/31, Dated-12.09.2024
Open Tender
Electrical and Maintenance Works
Item Rate
18 days
KEDLA WASHERY
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,400
Yes
16 Mar 2025
12 Sept 2024
24 Sept 2024
13 Sept 2024
23 Sept 2024
13 Sept 2024
13 Sept 2024 - 18 Sept 2024
Amount
Dismantling, repairing, re-installation, fitting and tension adjustment work in 222 and 223 Bucket Elevator. Dismantling of 05 sets of B/E .
Shifiting of B/E assly. for repairing.
Repairing of 05 sets B/E assly.
Re-assembling of repairing B/E for operation.
52Sub sets X82.50kh/Set=4290KgSay-4.290MT Tension adjustment for B/E.
Dismantling, repairing, re-installation, fitting and tension adjustment work in 207 Bucket Elevator. Dismantling of 05 sets of B/E .
Shifiting of B/E assly. for repairing.
Repairing of 05 sets B/E assly.
Re-assembling of repairing B/E for operation.
52Sub sets X82.50kh/Set=4290KgSay-4.290MT. Tension adjustment for B/E.
Profit
Total impact of GST for the purpose of CTC
A.K. ENTERPRISES
CHAHAT CONSTRUCTION COMPANY
techsummary_328873.pdf
PDF • 0.40 MB
finsummary_328873.pdf
PDF • 0.40 MB
317320W.pdf
PDF • 0.36 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .