Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹16,660
Closing Date
3 Oct 2026, 11:00 am6d left
Executive Engineer
JSD Katrain
Restoration of rain damages FIS Haripur to Nathan GP Naggar in Tehsil Distt Kullu HP SH CO RCC channel at RD 5600 390 390mtr damaged due to land slide 2 months
2026_HPIPH_144017_1
5025-51 dated 22-09-2026
Open Tender
Civil Works
Item Rate
KATRAIN
Please refer Tender documents.
2 documents required · 2 mandatory
₹350
Yes
₹16,660
Yes
23 Sept 2026
23 Sept 2026
3 Oct 2026
23 Sept 2026
3 Oct 2026
23 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundations, trenches etc., in earth work lift upto 1.50 Metres stacking the eacavated soil not more than 3 metres clear from the edge of the excavation and then returning the stacked soil in 15cm. layers, when required in to plinths sides of foundations etc., consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed with in a lead of 20 metres to the entire staisfaction of Engineer-in-charge with in all leads and lifts. | 78 | Cum | - | - |
| 2 | Providing and laying cement concrete 1:3:6 (1cement :3 sand :6 graded stone aggregate 20mm nominal size) and curing complete excluding the cost of form work in foundation and plinth. | 19.5 | Cum | - | - |
| 3Providing and laying cement concrete linning fifteen centimeters or less for irrigation channel using mixture of cement concrete 1:2:4( 1cement :2 sand :4 graded crushedstone aggregate 20mm nominal size) excluding extra allowances for form work in concrete linning within all leads and lifts as per the instructions of the Engineer-in-charge. | |||||
| 3.01 | Hand mixed concretre lining in bed | 17.55 | Cum | - | - |
| 3.02 | Hand mixed concrete lining in side slopes. | 19.5 | Cum | - | - |
| 4 | Extra allowances for form work in concrete lining on side slopes within all leads and lifts as per the instructions of the Engineer-in-charge. | 19.5 | Cum | - | - |
| 5 | Providing and laying tor steel reinforcement for RCC work including bending binding and placeing in position complete upto floor two level with in all leads and lifts and to the entire satisfaction of Engineer Incharge including cost of binding wires. | 1,111.5 | Kg. | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.30 MB
Form6.pdf
Tender Documents • 0.53 MB
Form8.pdf
Tender Documents • 1.22 MB
TC3.pdf
Tender Documents • 0.07 MB
BOQ_214153.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .