Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.6 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹4.7 L+₹5,069.44 (1.10%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹4.7 L+₹9,678.02 (2.10%)Rejected-Finance | L3 | Rejected-Finance L3 |
Tender Value
₹4.6 L
EMD Value
₹9,217
Closing Date
5 Oct 2026, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Assistant Engineer
Nayabasti, Jalpaiguri
Sahu Bridge over Sahu river at ch. 6.10km on on Gondermore to Sahudangi Goramore approach side abutment protection work under Jalpaiguri Highway Division in the dist. of Jalpaiguri during the year 2026-27
2026_WBPWD_5075523_2
WBPWD/JHSD/AE/eNIT-14/26-27
Open Tender
CIVIL WORKS
Percentage
Sahudangi
Please refer Tender documents.
3 documents required · 3 mandatory
₹9,217
Yes
8 Oct 2026
25 Sept 2026
7 Oct 2026
29 Sept 2026
5 Oct 2026
29 Sept 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and Grubbing Road Land
Clearing and grubbing road land
including uprooting rank vegetation,
grass, bushes, shrubs, saplings and trees
girth up to 300 mm, removal of stumps
of trees cut earlier and disposal of
unserviceable materials and stacking of
serviceable material to be used or
auctioned, up to a lead of 1000 metres
including removal and disposal of top
organic soil not exceeding 150 mm in
thickness. (Reference to MoRT&H's
specification clause 201)
By Manual Means
3(I)(A) In area of light jungle | 0.01 | Hect | 65,471.56 | ₹916.6 |
| 2 | Excavation for Structures
Earth work in excavation of
foundation of structures as per
drawing and technical specification,
including setting out, construction of
shoring and bracing, removal of
stumps and other deleterious matter,
dressing of sides and bottom and
backfilling with approved material
(Reference to MORT&H's specification
304).
1(I) Ordinary soil
1(I)A Manual Means
1(I)A(i) Depth upto 3 m | 39.5 | cum | 151.66 | ₹5,990.57 |
| 3 | Boulder Apron Laid in Wire Crates
Providing and laying of boulder apron
laid in wire crates made with 4mm dia
wire dia not less than 4mm GI wire
conforming to IS: 280 & IS:4826 in
100mm x 100mm mesh Mesh size not
more than 150mm (weaved diagonally)
including 10 per cent extra for laps and
joints laid with stone boulders weighing
not less than 40 kg each ( Tensile
strength 300-450mpa, size of wire crates
3.0mx1.50mx1.25 m) (Reference to
MORT&H's specification 2503). | 70.31 | cum | 3,677.55 | ₹2,58,568.54 |
| 4 | Plain/Reinforced cement concrete in
open foundation complete all
including vibrating and compacting,
finishing, curing, sampling, testing
etc. as per drawing and Technical
Specifications (Reference to
MORT&H's specifications 1500, 1700 &
2200).
PCC Grade M15, With North Bengal Variety | 5.4 | cum | 4,865.84 | ₹26,275.54 |
| 5 | Providing and laying Filter material
underneath pitching in slopes complete
as per drawing and Technical
specification Gradation of filter ,
Thickness of filter 200/300 mm
(Reference to MORT&H's specification
2504). | 7.99 | cum | 1,710.72 | ₹13,668.65 |
| 6 | Providing and laying Pitching on slopes
laid over prepared filter media
including boulder apron laid dry in
front of toe of embankment complete
as per drawing and Technical
specifications (Reference to MORT&H's
specification 2504).
4A Stone/Boulder | 11.99 | cum | 1,756.78 | ₹21,063.79 |
| 7 | Footpaths and Separators
Construction of footpath/separator by
providing a 150 mm compacted
granular sub base as per clause 401
and 25 mm thick cement concrete
grade M15, over laid with pre-cast
concrete tiles of grade not less than
M-30 in cement mortar 1:3 including
provision of all drainage arrangements
but excluding kerb channel (Reference
to MoRT&H's specification 410). | 16.32 | sqm | 568.4 | ₹9,276.29 |
| 8 | Cast in Situ Cement Concrete M20
Kerb :
Construction of cement concrete
kerb with top and bottom width 115
and 165 mm respectively, 250 mm
high in M 20 grade PCC on M-15
grade foundation 150 mm thick,
foundation having 50 mm projection
beyond kerb stone, kerb stone laid
with kerb laying machine,
foundation concrete laid manually,
all complete as per clause 409
(Reference to MORT&H's
specification 409) | 54 | m | 280.82 | ₹15,164.28 |
| 9 | Providing and inserting nipples with
approved fixing compound after
drilling holes for grouting as per
Technical Specifications including
subsequent cutting/removal and sealing
of the hole as necessary of nipples after
completion of grouting with
Cement/Epoxy (Reference to MORT&H's
specification 2800). | 10 | each | 152.76 | ₹1,527.6 |
| 10 | Sealing of cracks/porous concrete (
within the limits of practical pressure
100kpa -400kpa until refusal ) by
injection process through
nipples/Grouting complete as per
Technical Specification
(Reference to MORT&H's specification
2806).
Cement Grout | 40 | kg | 246.32 | ₹9,852.8 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.51 MB
Tendernotice_2.pdf
PDF • 1.23 MB
BOQ_5165708.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .