Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.6 LAccepted-Finance C O BABA GULKARI FLAT NO C 57 SHANKARRAO PADHYE APARTMENT WARDHA ROAD SAVITRI VIHAR SOMALWADA NAGPUR 440025 MH | NAGPUR | MAHARASHTRA | 440025 | L1 | Accepted-Finance L1 | |
| 2 | L1₹26.2 LAccepted-Finance A 21 SEC 23 NOIDA GAUTAM BUDH NAGAR GAUTAM BUDDHA NAGAR UTTAR PRADESH 201301 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | L1 | Accepted-Finance L1 | |
| 3 | L2₹23.4 LAccepted-Finance | L2 | Accepted-Finance L2 | |
| 4 | L3₹24.9 LAccepted-Finance 146 CP COLONY 7 NO CHOURAHA KALPANA NAGAR MORAR GWALIOR 474006 | GWALIOR | MADHYA PRADESH | 474006 | L3 | Accepted-Finance L3 | |
| 5 | Rejected-Technical | - | Rejected-Technical dOCUMENTS ARE NOT SUBMITTED AS PER nit |
Tender Value
₹23.4 L
EMD Value
₹46,753
Closing Date
7 Dec 2018, 6:30 pmClosed
T C KAMBLE AGMEE
AAI KOLHAPUR AIRPORT
AMC for electrical installations at Solapur airport
2018_AAI_17908_3
AAI/SOL/AMC/ENGG-E/2018-19
Open Tender
Repair and Maintenance Services
Item Rate
730 days
SOLAPUR AIRPORT
As per NIT
3 documents required · 3 mandatory
₹1,180
Yes
AIRPORTS AUTHORITY OF INDIA
₹46,753
Yes
22 Aug 2024
28 Nov 2018
12 Dec 2018
28 Nov 2018
7 Dec 2018
28 Nov 2018
28 Nov 2018 - 7 Dec 2018
Annual maintenance contract of E&M Installations at Solapur Airport to Carry out operation / routine / preventive / breakdown maintenance of all Internal & External Electrical Installations including runway lights,CCR's and office work such as data entry/SAP/E-tender etc. as required on all days including Sundays & holidays, attending complaints, repairs, documentation etc. as per the contract terms and conditions and directions of Engineer-in-charge as required. (a) 01No. Skilled (Electrician / Wireman) (b) (b) 01 No. Skilled ( DG Operator ) (c) 01 No. Skilled (Computer operator) (d) 02 Nos. Un-skilled (Helper) Total No of manpower not less than 05.
Annual comprehensive maintenance contract for following Air Conditioners which involves comprehensive maintenance of Air conditioners of different makes at different locations including supply of spares and consumables as per the contract terms & conditions and instructions of Engineer-in-charge as required.
1.5 TR /2.0 TR Split type AC units - 8 AC units per year = Total 16 units for two year
Dismantling of Existing Air conditioners of 1.5 TR/ 2.0 TR & Shifting the complete unit up to the AAI's store or direction of Engineer-in-charge.
Reinstallation of 1.5 TR/ 2.0 TR split Air-Conditioners including providing the refrigerant piping with insulation, cabling, drain piping (upto to 5 metres) and gas Charging with leak testing, connections complete etc as required.
GANGADHARA AGENCY
Manish Electricals
Sew Engineering Works Pvt Ltd
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .