DEPUTY GENERAL MANAGER (ELECTRICAL/CIVIL)
DEPUTY GENERAL MANAGER (ELECTRICAL/CIVIL), HOCL AMBALAMUGAL
PRE-MONSOON MAINTENANCE IN PLANT AND NON PLANT AREAS CLEANING STORM WATER DRAINS AND ROOF TOPS IN FACTORY 2026-2027
2026_HOCL_908721_1
CIV10257/2026
Limited
Civil Works
HOCL, AMBALAMUGAL
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹23,300
Yes
15 May 2026
15 May 2026
6 Jun 2026
15 May 2026
5 Jun 2026
15 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Cleaning storm water drains( rectangular / trapezoidal Sections ), culverts,catch pits etc of various depthsby removing all earth, silt, debries etc and all waste materials including cleaning the top portion of masonry drains of width of 1.00M (average)on either side, clearing the side berms and disposal of all the waste materials at places pointed out within the company premises etc complete in all respects, Drains upto 350 mm standard bottom width. | 15,800 | M | - | - | S4000688 |
| 2 | Cleaning storm water drains( rectangular / trapezoidal Sections ), culverts,catch pitsetc of various depthsby removing all earth, silt, debries etc and all waste materials including cleaning the top portion of masonry drains of width of 1.00M (average)on either side, clearing the side berms and disposal of all the waste materials at places pointed out within the company premises etc complete in all respects. Drains 450 mm standard bottom width. | 4,300 | M | - | - | S4000689 |
| 3 | Cleaning storm water drains( rectangular / trapezoidal Sections ), culverts,catch pits etc of various depths by removing all earth, silt, debries etc and all waste materials including cleaning the top portion of masonry drains of width of 1.00M (average)on either side, clearing the side berms and disposal of all the waste materials at places pointed out by Engineer in Charge within the company premises etc complete in all respects. Drains 600mm standard bottom width. | 3,396 | M | - | - | S4000690 |
| 4 | Cleaning storm water drains( rectangular / trapezoidal Sections ), culverts, catch pits etc of various depths by removing all earth, silt, debries etc and all waste materials including cleaning the top portion of masonry drains of width of 1.00M (average)on either side, clearing the side berms and disposal of all the waste materials at places pointed out by Engineer in Charge within the company premises etc complete in all respects. Drains 750mm standard bottom width. | 1,800 | M | - | - | S4000691 |
| 5 | Cleaning storm water drains( rectangular / trapezoidal Sections ), culverts,catch pitsetc of various depths by removing all earth, silt, debries etc and all waste materials including cleaning the top portion of masonry drains of width of 1.00M (average)on either side, clearing the side berms and disposal of all the waste materials at places pointed out within the company premises etc complete in all respects. Drains 2000 mm standard bottom width. | 360 | M | - | - | S4000692 |
| 6 | Cleaning of roof top, sunshade projections at all heights etcof buildings by removing dry leaves, grass and other waste materials including disposal of the same at places pointed out by Engineer in Charge within the company premises ( measurements will be in the plinth area basis ) and maintaining of roof clean till completion of work. | 14,220 | M2 | - | - | S4000693 |
| 7 | Cleaning RCC rain water gutters at roof levels at all heights as per the instructions of the Engineer in Charge. | 1,100 | M | - | - | S4000694 |
| 8 | Cleaning AC rain water gutters at roof levels at all heights as per the instructions of the Engineer in Charge. | 400 | M | - | - | S4000695 |
| 9 | Earth work cutting / excavation in all classes of soil lying along the road side berms, conveying and depositing the same at places pointed out any where within the company premises including all charges for loading, transportations, unloading, spreading in layers etc complete. | 20 | M3 | - | - | S4000696 |
| 10 | Clearing and removing dense overgrown vegetation, bushes, shrubs, weeds, creepers and similar jungle growth obstructing access to existing drains, including uprooting where required, area clearing an average width of 1.0 metre on either side of the drain alignment, disposing the cleared materials from site as directed by Engineer-in-Charge, complete for facilitating inspection, cleaning and pre-monsoon maintenance of drains. (measurement shall be in running meter along the drain) | 1,860 | M | - | - | S4001545 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.61 MB
TDCOMBINED.pdf
Tender Documents • 6.78 MB
BOQ_955088.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid