Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 123 12TH FLOOR ATLANTA NARIMAN POINT NARIMAN POINT MUMBAI MAHARASHTRA 400021 | MUMBAI | MAHARASHTRA | 400021 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance 11 RK INDUSTRY HOUSE 11 R K INDUSTRY WALBHAT ROAD WALBHOT ROAD GOREGAON EAST MUMBAI MAHARASHTRA 400063 | MUMBAI SUBURBAN | MAHARASHTRA | 400063 | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
25 Feb 2021, 9:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ASD
NAVAL DOCKYARD VISAKHAPATNAM
ERDD OF BOMBAY PONTOON
2021_NAVY_417588_1
COM/0335/BOM PON/ERDD O/L-20/A
Open Tender
Marine Services
Turn-key
210 days
NAVAL DOCKYARD VISAKHAPATNAM
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
Exempted
COY CONFERENCE HALL
21 May 2021
30 Jan 2021
26 Feb 2021
30 Jan 2021
25 Feb 2021
31 Jan 2021
31 Jan 2021 - 25 Feb 2021
8 Feb 2021
240 days
BOMBAY PONTOONS -01 001 Docking- Vessel to be docked in both versions. Note 1:- Firms not to quote view docking, undocking and dock blocks preparation will be done by Navy and the job is required to be carried out in Navy Premises Last Undock -06 Mar 17
002 Hull Cleaning Under Water and Boot Top Area HP jet clean entire under water area and boot top area (with a pressure not exceeding 3000 PSI) including ship side and remove the marine growth/barnacles and prepare for survey. (a) U/W area: 45 Sqm, (b) Boot Top area: 10 Sqm
002 Hull Cleaning Above Water Area (a) Clean the entire above water area with HP Jet washing (with a pressure not exceeding 3000 PSI) I.A.W. No 01/15 and present for survey
002 Hull Cleaning Weather deck (b) Clean the entire weather deck including deck fittings with HP Jet washing (not exceeding 3000 PSI) I.A.W. No 01/15 and present for survey
002 Hull Cleaning Tanks (c) Manually clean internal tanks i.a.w. No 01/15 and present for survey.
003 Hull survey External and Internal Hull survey. Hull survey. Carry out visual and hammer survey/UTG survey in accordance with NO 19/06 of under water hull, boot top, above water hull, weather decks and all internal tanks etc, all stiffeners and deck fittings including lifting hooks/eyes. Approx area: 275 Sqm
004 UTG Survey Quote for UTG survey points at u/w hull ,above water and weater deck and internal tanks .
005 Steel Renewals Quote for steel renewal at various locations as per survey report. Note 1:- Quoted repair cost shall include cost of both sides blasted and primed Grade `A’ quality ship building steel for shell and IS 2062 Grade `B’ quality steel for non structural works, renewal of all obstructions in way of steel renewals including minor fittings with their foundations, etc., as indicated by survey team / RMT, proving of the weld runs by non-destructive tests and by hose test on completion of welding, pressure testing and proving of tanks where steel renewal undertaken etc.
006 Build ups Carry out build ups as indicated by the Hull survey team/ Surveyor (a) Approx size 2.5x2.5 mm-250
006 Build ups Carry out build ups as indicated by the Hull survey team/ Surveyor (b) Approx size 5x5 mm - 150 Nos
007 Fairing Carryout fairing of deformed structures as indicated by Hull Survey Team/ Surveyor
008 Re-welding run Carry out re-welding runs on weld seams as indicated by Hull survey team/ QC/ RMT.
009 Draught Marks Draught marks corroded/eaten away, to be renewed and painted. Both Roman and Numeric.
010 Sacrificial Anodes (a) Renew Sacrificial anodes (MK I) those consumed more than 50% Note:- Anodes Navy/COY supply.
011 Surface preparation with Grit Blasting Under Water area including Boot top area Spot blasting to SA 2.5 on paint damaged areas/ renewed plate areas as per the paint OEM rep recommendation for paint application.
012 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: Primer - penguard primer - 50 microns
012 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Anti Corrosive - Jotacote Universal (Aluminium) - 150 microns
012 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Anti Corrosive - Jotacote Universal (grey) - 150 microns
012 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Tie Coat: Safeguard ES - 125 microns
012 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (e) 5th Coat: A/F: Seaquantum Ultra(Brown/Light Red) - 150 microns
012 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (f) 6th Coat: A/F: Seaquantum Ultra(Red Brown/Dark Red) - 150 microns
012 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (g) 7th Coat: A/F: Seaquantum Ultra(Brown/Light Red/ Black) - 150 microns
012 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (h) 8th Coat: A/F: Seaquantum Ultra( Black) - 150 microns
013 Surface Preparation Above Water Area Carry out surface preparation w on above water area to SA2.5 standard under the suprvision of paint OEM.
014 Painting - JOTUN Scheme. Above Water Area Paint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: Penguard primer - 50 microns DFT
014 Painting - JOTUN Scheme. Above Water Area Paint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Jotamastic(Grey/ Red Brown) - 125 microns DFT
014 Painting - JOTUN Scheme. Above Water Area Paint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Jotamastic(Grey/ Red Brown) - 125 microns DFT
014 Painting - JOTUN Scheme. Above Water Area Paint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Hard Top XP Grey - 60 microns DFT
015 Surface Preparation Weather Decks and Fittings Carry out Surface pre[partion to WJ 2 standard as per survey report of Paint OEM for paint application for entire weather deck.
016 Painting - JOTUN Scheme Weather Decks and Fittings Paint weather decks and fittings with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Penguard Primer -50 microns DFT
016 Painting - JOTUN Scheme Weather Decks and Fittings Paint weather decks and fittings with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Jotamastic 87 of 200 microns
016 Painting - JOTUN Scheme Weather Decks and Fittings Paint weather decks and fittings with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Jota Armour Dark grey of 800 microns
017 Surface Preparation Internal Tanks (a) Carry out mechanical cleaning to ST3 standard at paint defective area/ as survey report of Paint OEM for paint application.
017 Surface Preparation Internal Tanks (b) Carry out mechanical cleaning to ST1 standard at paint defective area/ as survey report of Paint OEM for paint application.
018 Painting - JOTUN Scheme Paint all internal tanks with following paint scheme Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Penguard Primer -50 microns DFT
018 Painting - JOTUN Scheme Paint all internal tanks with following paint scheme Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Anticorrosive Balloxy (HB light) - 150 microns
018 Painting - JOTUN Scheme Paint all internal tanks with following paint scheme Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Anticorrosive Balloxy (HB light) - 150 microns
019 Deck Fitting Securing eyes (MS cleats) including base plate corroded/perished, to be renewed as per survey report (a) Size of eye plate- 230x550x20 mm thick plate,
019 Deck Fitting Twin bollards on weather deck including base plate corroded/perished, to be renewed as per survey report (b) Twin Bollard size dia- 400x800x20 mm height
020 Manhole cover (a) Manhole cover neoprene rubber joints perished, to be renewed (Rubber joint size: - 520mm x 760mm x08 mm)
020 Manhole cover (b) Manhole cover including coamings perihsed/ thinned to be renewed as per survey report (approx size - 3'x1'8")
020 Manhole cover c) Manhole Stud nut and bolts with washers corroded/ perished to be renewed.(Size of Stud Bolt -16 mm x 50mm length, 36 nos on each manhole, Mat SS).
020 Manhole cover (d) Handle of manhole covers corroded/ thinned, to be renewed as per survey reports (Mat-MS rod -12 mm thick)
021 APT Air Pressure Test the following tanks and rectify the defects any observed during pressure testing and prove to 0.14 kg/ cm2. Note:- APT and proving of those tanks wherein steel renewal undertaken as part of steel renewal DL. 0003(c) above is that of Firm's liability with No Additional Cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this DL. Serial. Internal Tank
022 Distortion Areas in which distortion of hull structures exceeds 3 times the thickness of plate or 1/20 of the frame spacing (which ever is smaller) shall be renewed. In the areas of dents, the structure shall be inspected for any distortion of the stiffeners inside and cracks by DP test.
023 D Type rubber Fenders -Horizontal fenders D" Shaped rubber fenders perished/cracked, to be renewed as per NES170 (a) Fenders details are as follows - Mat-EPDM, COLOUR-Black rubber 1050x350 mm mm- (16 +16 both side) in 12.2 mtrs length .
023 D Type rubber Fenders -Vertical fenders D" Shaped rubber fenders perished/cracked, to be renewed,as per NES 170 (b) Fenders details are as follows - Mat-EPDM, COLOUR-Black rubber 1050x350 mm (6+6 in 2.5 mtr)
024 Fenders Brackets - Horizontal Horizontal Fender securing brackets (Flat bars with MS pad of both ends, Mat- MS) corroded/thinned/perishe , to be renewed (a) Thickenss of the brackets 12 mm, 1100 X 370mm
024 Fenders Brackets Vertical Vertical Fender securing brackets (Flat bars with MS pad of both ends, Mat- MS ) corroded/thinned/perishe , to be renewed (b) Thickenss of the brackets 12 mm, 1100X370mm
025 Lifting eye Lifting eye corroded/thinned/perished including base plate size 400x260 mm to be renewed as per survey reports
025 Lifting eye (b) Carry out load testing of lifting eyes (24 tons on all four eyes together) post survey / renewal if any and submit a load test report to User dept.
BOMBAY PONTOONS -02 001 Docking- Vessel to be docked in both versions. Note 1:- Firms not to quote view docking, undocking and dock blocks preparation will be done by Navy and the job is required to be carried out in Navy Premises Last Undock -06 Mar 17
002 Hull Cleaning Under Water and Boot Top Area HP jet clean entire under water area and boot top area (with a pressure not exceeding 3000 PSI) including ship side and remove the marine growth/barnacles and prepare for survey. (a) U/W area: 45 Sqm, (b) Boot Top area: 10 Sqm
002 Hull Cleaning Above Water Area (a) Clean the entire above water area with HP Jet washing (with a pressure not exceeding 3000 PSI) I.A.W. No 01/15 and present for survey
002 Hull Cleaning Weather deck (b) Clean the entire weather deck including deck fittings with HP Jet washing (not exceeding 3000 PSI) I.A.W. No 01/15 and present for survey
002 Hull Cleaning Tanks (c) Manually clean internal tanks i.a.w. No 01/15 and present for survey.
003 Hull survey External and Internal Hull survey. Hull survey. Carry out visual and hammer survey/UTG survey in accordance with NO 19/06 of under water hull, boot top, above water hull, weather decks and all internal tanks etc, all stiffeners and deck fittings including lifting hooks/eyes. Approx area: 275 Sqm
004 UTG Survey Quote for UTG survey points at u/w hull ,above water and weater deck and internal tanks .
005 Steel Renewals Quote for steel renewal at various locations as per survey report. Note 1:- Quoted repair cost shall include cost of both sides blasted and primed Grade `A’ quality ship building steel for shell and IS 2062 Grade `B’ quality steel for non structural works, renewal of all obstructions in way of steel renewals including minor fittings with their foundations, etc., as indicated by survey team / RMT, proving of the weld runs by non-destructive tests and by hose test on completion of welding, pressure testing and proving of tanks where steel renewal undertaken etc.
006 Build ups Carry out build ups as indicated by the Hull survey team/ Surveyor (a) Approx size 2.5x2.5 mm-250
006 Build ups Carry out build ups as indicated by the Hull survey team/ Surveyor (b) Approx size 5x5 mm - 150 Nos
007 Fairing Carryout fairing of deformed structures as indicated by Hull Survey Team/ Surveyor
008 Re-welding run Carry out re-welding runs on weld seams as indicated by Hull survey team/ QC/ RMT.
009 Draught Marks Draught marks corroded/eaten away, to be renewed and painted. Both Roman and Numeric.
010 Sacrificial Anodes (a) Renew Sacrificial anodes (MK I) those consumed more than 50% Note:- Anodes Navy/COY supply.
011 Surface preparation with Grit Blasting Under Water area including Boot top area Spot blasting to SA 2.5 on paint damaged areas/ renewed plate areas as per the paint OEM rep recommendation for paint application.
012 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: Primer - penguard primer - 50 microns
012 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Anti Corrosive - Jotacote Universal (Aluminium) - 150 microns
012 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Anti Corrosive - Jotacote Universal (grey) - 150 microns
012 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Tie Coat: Safeguard ES - 125 microns
012 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (e) 5th Coat: A/F: Seaquantum Ultra(Brown/Light Red) - 150 microns
012 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (f) 6th Coat: A/F: Seaquantum Ultra(Red Brown/Dark Red) - 150 microns
012 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (g) 7th Coat: A/F: Seaquantum Ultra(Brown/Light Red/ Black) - 150 microns
012 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (h) 8th Coat: A/F: Seaquantum Ultra( Black) - 150 microns
013 Surface Preparation Above Water Area Carry out surface preparation w on above water area to SA2.5 standard under the suprvision of paint OEM.
014 Painting - JOTUN Scheme. Above Water Area Paint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: Penguard primer - 50 microns DFT
014 Painting - JOTUN Scheme. Above Water Area Paint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Jotamastic(Grey/ Red Brown) - 125 microns DFT
014 Painting - JOTUN Scheme. Above Water Area Paint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Jotamastic(Grey/ Red Brown) - 125 microns DFT
014 Painting - JOTUN Scheme. Above Water Area Paint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Hard Top XP Grey - 60 microns DFT
015 Surface Preparation Weather Decks and Fittings Carry out Surface pre[partion to WJ 2 standard as per survey report of Paint OEM for paint application for entire weather deck.
016 Painting - JOTUN Scheme Weather Decks and Fittings Paint weather decks and fittings with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Penguard Primer -50 microns DFT
016 Painting - JOTUN Scheme Weather Decks and Fittings Paint weather decks and fittings with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Jotamastic 87 of 200 microns
016 Painting - JOTUN Scheme Weather Decks and Fittings Paint weather decks and fittings with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Jota Armour Dark grey of 800 microns
017 Surface Preparation Internal Tanks (a) Carry out mechanical cleaning to ST3 standard at paint defective area/ as survey report of Paint OEM for paint application.
017 Surface Preparation Internal Tanks (b) Carry out mechanical cleaning to ST1 standard at paint defective area/ as survey report of Paint OEM for paint application.
018 Painting - JOTUN Scheme Paint all internal tanks with following paint scheme Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Penguard Primer -50 microns DFT
018 Painting - JOTUN Scheme Paint all internal tanks with following paint scheme Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Anticorrosive Balloxy (HB light) - 150 microns
018 Painting - JOTUN Scheme Paint all internal tanks with following paint scheme Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Anticorrosive Balloxy (HB light) - 150 microns
019 Deck Fitting Securing eyes (MS cleats) including base plate corroded/perished, to be renewed as per survey report (a) Size of eye plate- 230x550x20 mm thick plate,
019 Deck Fitting Twin bollards on weather deck including base plate corroded/perished, to be renewed as per survey report (b) Twin Bollard size dia- 400x800x20 mm height
020 Manhole cover (a) Manhole cover neoprene rubber joints perished, to be renewed (Rubber joint size: - 520mm x 760mm x08 mm)
020 Manhole cover (b) Manhole cover including coamings perihsed/ thinned to be renewed as per survey report (approx size - 3'x1'8")
020 Manhole cover c) Manhole Stud nut and bolts with washers corroded/ perished to be renewed.(Size of Stud Bolt -16 mm x 50mm length, 36 nos on each manhole, Mat SS).
020 Manhole cover (d) Handle of manhole covers corroded/ thinned, to be renewed as per survey reports (Mat-MS rod -12 mm thick)
021 APT Air Pressure Test the following tanks and rectify the defects any observed during pressure testing and prove to 0.14 kg/ cm2. Note:- APT and proving of those tanks wherein steel renewal undertaken as part of steel renewal DL. 0003(c) above is that of Firm's liability with No Additional Cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this DL. Serial. Internal Tank
022 Distortion Areas in which distortion of hull structures exceeds 3 times the thickness of plate or 1/20 of the frame spacing (which ever is smaller) shall be renewed. In the areas of dents, the structure shall be inspected for any distortion of the stiffeners inside and cracks by DP test.
023 D Type rubber Fenders -Horizontal fenders D" Shaped rubber fenders perished/cracked, to be renewed as per NES170 (a) Fenders details are as follows - Mat-EPDM, COLOUR-Black rubber 1050x350 mm mm- (16 +16 both side) in 12.2 mtrs length .
023 D Type rubber Fenders -Vertical fenders D" Shaped rubber fenders perished/cracked, to be renewed,as per NES 170 (b) Fenders details are as follows - Mat-EPDM, COLOUR-Black rubber 1050x350 mm (6+6 in 2.5 mtr)
024 Fenders Brackets - Horizontal Horizontal Fender securing brackets (Flat bars with MS pad of both ends, Mat- MS) corroded/thinned/perishe , to be renewed (a) Thickenss of the brackets 12 mm, 1100 X 370mm
024 Fenders Brackets Vertical Vertical Fender securing brackets (Flat bars with MS pad of both ends, Mat- MS ) corroded/thinned/perishe , to be renewed (b) Thickenss of the brackets 12 mm, 1100X370mm
025 Lifting eye Lifting eye corroded/thinned/perished including base plate size 400x260 mm to be renewed as per survey reports
025 Lifting eye (b) Carry out load testing of lifting eyes (24 tons on all four eyes together) post survey / renewal if any and submit a load test report to User dept.
BOMBAY PONTOONS -03 001 Docking- Vessel to be docked in both versions. Note 1:- Firms not to quote view docking, undocking and dock blocks preparation will be done by Navy and the job is required to be carried out in Navy Premises Last Undock -06 Mar 17
002 Hull Cleaning Under Water and Boot Top Area HP jet clean entire under water area and boot top area (with a pressure not exceeding 3000 PSI) including ship side and remove the marine growth/barnacles and prepare for survey. (a) U/W area: 45 Sqm, (b) Boot Top area: 10 Sqm
002 Hull Cleaning Above Water Area (a) Clean the entire above water area with HP Jet washing (with a pressure not exceeding 3000 PSI) I.A.W. No 01/15 and present for survey
002 Hull Cleaning Weather deck (b) Clean the entire weather deck including deck fittings with HP Jet washing (not exceeding 3000 PSI) I.A.W. No 01/15 and present for survey
002 Hull Cleaning Tanks (c) Manually clean internal tanks i.a.w. No 01/15 and present for survey.
003 Hull survey External and Internal Hull survey. Hull survey. Carry out visual and hammer survey/UTG survey in accordance with NO 19/06 of under water hull, boot top, above water hull, weather decks and all internal tanks etc, all stiffeners and deck fittings including lifting hooks/eyes. Approx area: 275 Sqm
004 UTG Survey Quote for UTG survey points at u/w hull ,above water and weater deck and internal tanks .
005 Steel Renewals Quote for steel renewal at various locations as per survey report. Note 1:- Quoted repair cost shall include cost of both sides blasted and primed Grade `A’ quality ship building steel for shell and IS 2062 Grade `B’ quality steel for non structural works, renewal of all obstructions in way of steel renewals including minor fittings with their foundations, etc., as indicated by survey team / RMT, proving of the weld runs by non-destructive tests and by hose test on completion of welding, pressure testing and proving of tanks where steel renewal undertaken etc.
006 Build ups Carry out build ups as indicated by the Hull survey team/ Surveyor (a) Approx size 2.5x2.5 mm-250
006 Build ups Carry out build ups as indicated by the Hull survey team/ Surveyor (b) Approx size 5x5 mm - 150 Nos
007 Fairing Carryout fairing of deformed structures as indicated by Hull Survey Team/ Surveyor
008 Re-welding run Carry out re-welding runs on weld seams as indicated by Hull survey team/ QC/ RMT.
009 Draught Marks Draught marks corroded/eaten away, to be renewed and painted. Both Roman and Numeric.
010 Sacrificial Anodes (a) Renew Sacrificial anodes (MK I) those consumed more than 50% Note:- Anodes Navy/COY supply.
011 Surface preparation with Grit Blasting Under Water area including Boot top area Spot blasting to SA 2.5 on paint damaged areas/ renewed plate areas as per the paint OEM rep recommendation for paint application.
012 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: Primer - penguard primer - 50 microns
012 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Anti Corrosive - Jotacote Universal (Aluminium) - 150 microns
012 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Anti Corrosive - Jotacote Universal (grey) - 150 microns
012 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Tie Coat: Safeguard ES - 125 microns
012 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (e) 5th Coat: A/F: Seaquantum Ultra(Brown/Light Red) - 150 microns
012 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (f) 6th Coat: A/F: Seaquantum Ultra(Red Brown/Dark Red) - 150 microns
012 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (g) 7th Coat: A/F: Seaquantum Ultra(Brown/Light Red/ Black) - 150 microns
012 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (h) 8th Coat: A/F: Seaquantum Ultra( Black) - 150 microns
013 Surface Preparation Above Water Area Carry out surface preparation w on above water area to SA2.5 standard under the suprvision of paint OEM.
014 Painting - JOTUN Scheme. Above Water Area Paint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: Penguard primer - 50 microns DFT
014 Painting - JOTUN Scheme. Above Water Area Paint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Jotamastic(Grey/ Red Brown) - 125 microns DFT
014 Painting - JOTUN Scheme. Above Water Area Paint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Jotamastic(Grey/ Red Brown) - 125 microns DFT
014 Painting - JOTUN Scheme. Above Water Area Paint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Hard Top XP Grey - 60 microns DFT
015 Surface Preparation Weather Decks and Fittings Carry out Surface pre[partion to WJ 2 standard as per survey report of Paint OEM for paint application for entire weather deck.
016 Painting - JOTUN Scheme Weather Decks and Fittings Paint weather decks and fittings with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Penguard Primer -50 microns DFT
016 Painting - JOTUN Scheme Weather Decks and Fittings Paint weather decks and fittings with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Jotamastic 87 of 200 microns
016 Painting - JOTUN Scheme Weather Decks and Fittings Paint weather decks and fittings with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Jota Armour Dark grey of 800 microns
017 Surface Preparation Internal Tanks (a) Carry out mechanical cleaning to ST3 standard at paint defective area/ as survey report of Paint OEM for paint application.
017 Surface Preparation Internal Tanks (b) Carry out mechanical cleaning to ST1 standard at paint defective area/ as survey report of Paint OEM for paint application.
018 Painting - JOTUN Scheme Paint all internal tanks with following paint scheme Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Penguard Primer -50 microns DFT
018 Painting - JOTUN Scheme Paint all internal tanks with following paint scheme Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Anticorrosive Balloxy (HB light) - 150 microns
018 Painting - JOTUN Scheme Paint all internal tanks with following paint scheme Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Anticorrosive Balloxy (HB light) - 150 microns
019 Deck Fitting Securing eyes (MS cleats) including base plate corroded/perished, to be renewed as per survey report (a) Size of eye plate- 230x550x20 mm thick plate,
019 Deck Fitting Twin bollards on weather deck including base plate corroded/perished, to be renewed as per survey report (b) Twin Bollard size dia- 400x800x20 mm height
020 Manhole cover (a) Manhole cover neoprene rubber joints perished, to be renewed (Rubber joint size: - 520mm x 760mm x08 mm)
020 Manhole cover (b) Manhole cover including coamings perihsed/ thinned to be renewed as per survey report (approx size - 3'x1'8")
020 Manhole cover c) Manhole Stud nut and bolts with washers corroded/ perished to be renewed.(Size of Stud Bolt -16 mm x 50mm length, 36 nos on each manhole, Mat SS).
020 Manhole cover (d) Handle of manhole covers corroded/ thinned, to be renewed as per survey reports (Mat-MS rod -12 mm thick)
021 APT Air Pressure Test the following tanks and rectify the defects any observed during pressure testing and prove to 0.14 kg/ cm2. Note:- APT and proving of those tanks wherein steel renewal undertaken as part of steel renewal DL. 0003(c) above is that of Firm's liability with No Additional Cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this DL. Serial. Internal Tank
022 Distortion Areas in which distortion of hull structures exceeds 3 times the thickness of plate or 1/20 of the frame spacing (which ever is smaller) shall be renewed. In the areas of dents, the structure shall be inspected for any distortion of the stiffeners inside and cracks by DP test.
023 D Type rubber Fenders -Horizontal fenders D" Shaped rubber fenders perished/cracked, to be renewed as per NES170 (a) Fenders details are as follows - Mat-EPDM, COLOUR-Black rubber 1050x350 mm mm- (16 +16 both side) in 12.2 mtrs length .
023 D Type rubber Fenders -Vertical fenders D" Shaped rubber fenders perished/cracked, to be renewed,as per NES 170 (b) Fenders details are as follows - Mat-EPDM, COLOUR-Black rubber 1050x350 mm (6+6 in 2.5 mtr)
024 Fenders Brackets - Horizontal Horizontal Fender securing brackets (Flat bars with MS pad of both ends, Mat- MS) corroded/thinned/perishe , to be renewed (a) Thickenss of the brackets 12 mm, 1100 X 370mm
024 Fenders Brackets Vertical Vertical Fender securing brackets (Flat bars with MS pad of both ends, Mat- MS ) corroded/thinned/perishe , to be renewed (b) Thickenss of the brackets 12 mm, 1100X370mm
025 Lifting eye Lifting eye corroded/thinned/perished including base plate size 400x260 mm to be renewed as per survey reports
025 Lifting eye (b) Carry out load testing of lifting eyes (24 tons on all four eyes together) post survey / renewal if any and submit a load test report to User dept.
BOMBAY PONTOONS -04 001 Docking- Vessel to be docked in both versions. Note 1:- Firms not to quote view docking, undocking and dock blocks preparation will be done by Navy and the job is required to be carried out in Navy Premises Last Undock -06 Mar 17
002 Hull Cleaning Under Water and Boot Top Area HP jet clean entire under water area and boot top area (with a pressure not exceeding 3000 PSI) including ship side and remove the marine growth/barnacles and prepare for survey. (a) U/W area: 45 Sqm, (b) Boot Top area: 10 Sqm
002 Hull Cleaning Above Water Area (a) Clean the entire above water area with HP Jet washing (with a pressure not exceeding 3000 PSI) I.A.W. No 01/15 and present for survey
002 Hull Cleaning Weather deck (b) Clean the entire weather deck including deck fittings with HP Jet washing (not exceeding 3000 PSI) I.A.W. No 01/15 and present for survey
002 Hull Cleaning Tanks (c) Manually clean internal tanks i.a.w. No 01/15 and present for survey.
003 Hull survey External and Internal Hull survey. Hull survey. Carry out visual and hammer survey/UTG survey in accordance with NO 19/06 of under water hull, boot top, above water hull, weather decks and all internal tanks etc, all stiffeners and deck fittings including lifting hooks/eyes. Approx area: 275 Sqm
004 UTG Survey Quote for UTG survey points at u/w hull ,above water and weater deck and internal tanks .
005 Steel Renewals Quote for steel renewal at various locations as per survey report. Note 1:- Quoted repair cost shall include cost of both sides blasted and primed Grade `A’ quality ship building steel for shell and IS 2062 Grade `B’ quality steel for non structural works, renewal of all obstructions in way of steel renewals including minor fittings with their foundations, etc., as indicated by survey team / RMT, proving of the weld runs by non-destructive tests and by hose test on completion of welding, pressure testing and proving of tanks where steel renewal undertaken etc.
006 Build ups Carry out build ups as indicated by the Hull survey team/ Surveyor (a) Approx size 2.5x2.5 mm-250
006 Build ups Carry out build ups as indicated by the Hull survey team/ Surveyor (b) Approx size 5x5 mm - 150 Nos
007 Fairing Carryout fairing of deformed structures as indicated by Hull Survey Team/ Surveyor
008 Re-welding run Carry out re-welding runs on weld seams as indicated by Hull survey team/ QC/ RMT.
009 Draught Marks Draught marks corroded/eaten away, to be renewed and painted. Both Roman and Numeric.
010 Sacrificial Anodes (a) Renew Sacrificial anodes (MK I) those consumed more than 50% Note:- Anodes Navy/COY supply.
011 Surface preparation with Grit Blasting Under Water area including Boot top area Spot blasting to SA 2.5 on paint damaged areas/ renewed plate areas as per the paint OEM rep recommendation for paint application.
012 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: Primer - penguard primer - 50 microns
012 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Anti Corrosive - Jotacote Universal (Aluminium) - 150 microns
012 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Anti Corrosive - Jotacote Universal (grey) - 150 microns
012 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Tie Coat: Safeguard ES - 125 microns
012 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (e) 5th Coat: A/F: Seaquantum Ultra(Brown/Light Red) - 150 microns
012 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (f) 6th Coat: A/F: Seaquantum Ultra(Red Brown/Dark Red) - 150 microns
012 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (g) 7th Coat: A/F: Seaquantum Ultra(Brown/Light Red/ Black) - 150 microns
012 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (h) 8th Coat: A/F: Seaquantum Ultra( Black) - 150 microns
013 Surface Preparation Above Water Area Carry out surface preparation w on above water area to SA2.5 standard under the suprvision of paint OEM.
014 Painting - JOTUN Scheme. Above Water Area Paint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: Penguard primer - 50 microns DFT
014 Painting - JOTUN Scheme. Above Water Area Paint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Jotamastic(Grey/ Red Brown) - 125 microns DFT
014 Painting - JOTUN Scheme. Above Water Area Paint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Jotamastic(Grey/ Red Brown) - 125 microns DFT
014 Painting - JOTUN Scheme. Above Water Area Paint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Hard Top XP Grey - 60 microns DFT
015 Surface Preparation Weather Decks and Fittings Carry out Surface pre[partion to WJ 2 standard as per survey report of Paint OEM for paint application for entire weather deck.
016 Painting - JOTUN Scheme Weather Decks and Fittings Paint weather decks and fittings with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Penguard Primer -50 microns DFT
016 Painting - JOTUN Scheme Weather Decks and Fittings Paint weather decks and fittings with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Jotamastic 87 of 200 microns
016 Painting - JOTUN Scheme Weather Decks and Fittings Paint weather decks and fittings with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Jota Armour Dark grey of 800 microns
017 Surface Preparation Internal Tanks (a) Carry out mechanical cleaning to ST3 standard at paint defective area/ as survey report of Paint OEM for paint application.
017 Surface Preparation Internal Tanks (b) Carry out mechanical cleaning to ST1 standard at paint defective area/ as survey report of Paint OEM for paint application.
018 Painting - JOTUN Scheme Paint all internal tanks with following paint scheme Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Penguard Primer -50 microns DFT
018 Painting - JOTUN Scheme Paint all internal tanks with following paint scheme Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Anticorrosive Balloxy (HB light) - 150 microns
018 Painting - JOTUN Scheme Paint all internal tanks with following paint scheme Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Anticorrosive Balloxy (HB light) - 150 microns
019 Deck Fitting Securing eyes (MS cleats) including base plate corroded/perished, to be renewed as per survey report (a) Size of eye plate- 230x550x20 mm thick plate,
019 Deck Fitting Twin bollards on weather deck including base plate corroded/perished, to be renewed as per survey report (b) Twin Bollard size dia- 400x800x20 mm height
020 Manhole cover (a) Manhole cover neoprene rubber joints perished, to be renewed (Rubber joint size: - 520mm x 760mm x08 mm)
020 Manhole cover (b) Manhole cover including coamings perihsed/ thinned to be renewed as per survey report (approx size - 3'x1'8")
020 Manhole cover c) Manhole Stud nut and bolts with washers corroded/ perished to be renewed.(Size of Stud Bolt -16 mm x 50mm length, 36 nos on each manhole, Mat SS).
020 Manhole cover (d) Handle of manhole covers corroded/ thinned, to be renewed as per survey reports (Mat-MS rod -12 mm thick)
021 APT Air Pressure Test the following tanks and rectify the defects any observed during pressure testing and prove to 0.14 kg/ cm2. Note:- APT and proving of those tanks wherein steel renewal undertaken as part of steel renewal DL. 0003(c) above is that of Firm's liability with No Additional Cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this DL. Serial. Internal Tank
022 Distortion Areas in which distortion of hull structures exceeds 3 times the thickness of plate or 1/20 of the frame spacing (which ever is smaller) shall be renewed. In the areas of dents, the structure shall be inspected for any distortion of the stiffeners inside and cracks by DP test.
023 D Type rubber Fenders -Horizontal fenders D" Shaped rubber fenders perished/cracked, to be renewed as per NES170 (a) Fenders details are as follows - Mat-EPDM, COLOUR-Black rubber 1050x350 mm mm- (16 +16 both side) in 12.2 mtrs length .
023 D Type rubber Fenders -Vertical fenders D" Shaped rubber fenders perished/cracked, to be renewed,as per NES 170 (b) Fenders details are as follows - Mat-EPDM, COLOUR-Black rubber 1050x350 mm (6+6 in 2.5 mtr)
024 Fenders Brackets - Horizontal Horizontal Fender securing brackets (Flat bars with MS pad of both ends, Mat- MS) corroded/thinned/perishe , to be renewed (a) Thickenss of the brackets 12 mm, 1100 X 370mm
024 Fenders Brackets Vertical Vertical Fender securing brackets (Flat bars with MS pad of both ends, Mat- MS ) corroded/thinned/perishe , to be renewed (b) Thickenss of the brackets 12 mm, 1100X370mm
025 Lifting eye Lifting eye corroded/thinned/perished including base plate size 400x260 mm to be renewed as per survey reports
025 Lifting eye (b) Carry out load testing of lifting eyes (24 tons on all four eyes together) post survey / renewal if any and submit a load test report to User dept.
BOMBAY PONTOONS -05 001 Docking- Vessel to be docked in both versions. Note 1:- Firms not to quote view docking, undocking and dock blocks preparation will be done by Navy and the job is required to be carried out in Navy Premises Last Undock -06 Mar 17
002 Hull Cleaning Under Water and Boot Top Area HP jet clean entire under water area and boot top area (with a pressure not exceeding 3000 PSI) including ship side and remove the marine growth/barnacles and prepare for survey. (a) U/W area: 45 Sqm, (b) Boot Top area: 10 Sqm
002 Hull Cleaning Above Water Area (a) Clean the entire above water area with HP Jet washing (with a pressure not exceeding 3000 PSI) I.A.W. No 01/15 and present for survey
002 Hull Cleaning Weather deck (b) Clean the entire weather deck including deck fittings with HP Jet washing (not exceeding 3000 PSI) I.A.W. No 01/15 and present for survey
002 Hull Cleaning Tanks (c) Manually clean internal tanks i.a.w. No 01/15 and present for survey.
003 Hull survey External and Internal Hull survey. Hull survey. Carry out visual and hammer survey/UTG survey in accordance with NO 19/06 of under water hull, boot top, above water hull, weather decks and all internal tanks etc, all stiffeners and deck fittings including lifting hooks/eyes. Approx area: 275 Sqm
004 UTG Survey Quote for UTG survey points at u/w hull ,above water and weater deck and internal tanks .
005 Steel Renewals Quote for steel renewal at various locations as per survey report. Note 1:- Quoted repair cost shall include cost of both sides blasted and primed Grade `A’ quality ship building steel for shell and IS 2062 Grade `B’ quality steel for non structural works, renewal of all obstructions in way of steel renewals including minor fittings with their foundations, etc., as indicated by survey team / RMT, proving of the weld runs by non-destructive tests and by hose test on completion of welding, pressure testing and proving of tanks where steel renewal undertaken etc.
006 Build ups Carry out build ups as indicated by the Hull survey team/ Surveyor (a) Approx size 2.5x2.5 mm-250
006 Build ups Carry out build ups as indicated by the Hull survey team/ Surveyor (b) Approx size 5x5 mm - 150 Nos
007 Fairing Carryout fairing of deformed structures as indicated by Hull Survey Team/ Surveyor
008 Re-welding run Carry out re-welding runs on weld seams as indicated by Hull survey team/ QC/ RMT.
009 Draught Marks Draught marks corroded/eaten away, to be renewed and painted. Both Roman and Numeric.
010 Sacrificial Anodes (a) Renew Sacrificial anodes (MK I) those consumed more than 50% Note:- Anodes Navy/COY supply.
011 Surface preparation with Grit Blasting Under Water area including Boot top area Spot blasting to SA 2.5 on paint damaged areas/ renewed plate areas as per the paint OEM rep recommendation for paint application.
012 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: Primer - penguard primer - 50 microns
012 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Anti Corrosive - Jotacote Universal (Aluminium) - 150 microns
012 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Anti Corrosive - Jotacote Universal (grey) - 150 microns
012 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Tie Coat: Safeguard ES - 125 microns
012 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (e) 5th Coat: A/F: Seaquantum Ultra(Brown/Light Red) - 150 microns
012 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (f) 6th Coat: A/F: Seaquantum Ultra(Red Brown/Dark Red) - 150 microns
012 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (g) 7th Coat: A/F: Seaquantum Ultra(Brown/Light Red/ Black) - 150 microns
012 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (h) 8th Coat: A/F: Seaquantum Ultra( Black) - 150 microns
013 Surface Preparation Above Water Area Carry out surface preparation w on above water area to SA2.5 standard under the suprvision of paint OEM.
014 Painting - JOTUN Scheme. Above Water Area Paint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: Penguard primer - 50 microns DFT
014 Painting - JOTUN Scheme. Above Water Area Paint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Jotamastic(Grey/ Red Brown) - 125 microns DFT
014 Painting - JOTUN Scheme. Above Water Area Paint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Jotamastic(Grey/ Red Brown) - 125 microns DFT
014 Painting - JOTUN Scheme. Above Water Area Paint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Hard Top XP Grey - 60 microns DFT
015 Surface Preparation Weather Decks and Fittings Carry out Surface pre[partion to WJ 2 standard as per survey report of Paint OEM for paint application for entire weather deck.
016 Painting - JOTUN Scheme Weather Decks and Fittings Paint weather decks and fittings with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Penguard Primer -50 microns DFT
016 Painting - JOTUN Scheme Weather Decks and Fittings Paint weather decks and fittings with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Jotamastic 87 of 200 microns
016 Painting - JOTUN Scheme Weather Decks and Fittings Paint weather decks and fittings with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Jota Armour Dark grey of 800 microns
017 Surface Preparation Internal Tanks (a) Carry out mechanical cleaning to ST3 standard at paint defective area/ as survey report of Paint OEM for paint application.
017 Surface Preparation Internal Tanks (b) Carry out mechanical cleaning to ST1 standard at paint defective area/ as survey report of Paint OEM for paint application.
018 Painting - JOTUN Scheme Paint all internal tanks with following paint scheme Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Penguard Primer -50 microns DFT
018 Painting - JOTUN Scheme Paint all internal tanks with following paint scheme Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Anticorrosive Balloxy (HB light) - 150 microns
018 Painting - JOTUN Scheme Paint all internal tanks with following paint scheme Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Anticorrosive Balloxy (HB light) - 150 microns
019 Deck Fitting Securing eyes (MS cleats) including base plate corroded/perished, to be renewed as per survey report (a) Size of eye plate- 230x550x20 mm thick plate,
019 Deck Fitting Twin bollards on weather deck including base plate corroded/perished, to be renewed as per survey report (b) Twin Bollard size dia- 400x800x20 mm height
020 Manhole cover (a) Manhole cover neoprene rubber joints perished, to be renewed (Rubber joint size: - 520mm x 760mm x08 mm)
020 Manhole cover (b) Manhole cover including coamings perihsed/ thinned to be renewed as per survey report (approx size - 3'x1'8")
020 Manhole cover c) Manhole Stud nut and bolts with washers corroded/ perished to be renewed.(Size of Stud Bolt -16 mm x 50mm length, 36 nos on each manhole, Mat SS).
020 Manhole cover (d) Handle of manhole covers corroded/ thinned, to be renewed as per survey reports (Mat-MS rod -12 mm thick)
021 APT Air Pressure Test the following tanks and rectify the defects any observed during pressure testing and prove to 0.14 kg/ cm2. Note:- APT and proving of those tanks wherein steel renewal undertaken as part of steel renewal DL. 0003(c) above is that of Firm's liability with No Additional Cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this DL. Serial. Internal Tank
022 Distortion Areas in which distortion of hull structures exceeds 3 times the thickness of plate or 1/20 of the frame spacing (which ever is smaller) shall be renewed. In the areas of dents, the structure shall be inspected for any distortion of the stiffeners inside and cracks by DP test.
023 D Type rubber Fenders -Horizontal fenders D" Shaped rubber fenders perished/cracked, to be renewed as per NES170 (a) Fenders details are as follows - Mat-EPDM, COLOUR-Black rubber 1050x350 mm mm- (16 +16 both side) in 12.2 mtrs length .
023 D Type rubber Fenders -Vertical fenders D" Shaped rubber fenders perished/cracked, to be renewed,as per NES 170 (b) Fenders details are as follows - Mat-EPDM, COLOUR-Black rubber 1050x350 mm (6+6 in 2.5 mtr)
024 Fenders Brackets - Horizontal Horizontal Fender securing brackets (Flat bars with MS pad of both ends, Mat- MS) corroded/thinned/perishe , to be renewed (a) Thickenss of the brackets 12 mm, 1100 X 370mm
024 Fenders Brackets Vertical Vertical Fender securing brackets (Flat bars with MS pad of both ends, Mat- MS ) corroded/thinned/perishe , to be renewed (b) Thickenss of the brackets 12 mm, 1100X370mm
025 Lifting eye Lifting eye corroded/thinned/perished including base plate size 400x260 mm to be renewed as per survey reports
025 Lifting eye (b) Carry out load testing of lifting eyes (24 tons on all four eyes together) post survey / renewal if any and submit a load test report to User dept.
BOMBAY PONTOONS -06 001 Docking- Vessel to be docked in both versions. Note 1:- Firms not to quote view docking, undocking and dock blocks preparation will be done by Navy and the job is required to be carried out in Navy Premises Last Undock -06 Mar 17
002 Hull Cleaning Under Water and Boot Top Area HP jet clean entire under water area and boot top area (with a pressure not exceeding 3000 PSI) including ship side and remove the marine growth/barnacles and prepare for survey. (a) U/W area: 45 Sqm, (b) Boot Top area: 10 Sqm
002 Hull Cleaning Above Water Area (a) Clean the entire above water area with HP Jet washing (with a pressure not exceeding 3000 PSI) I.A.W. No 01/15 and present for survey
002 Hull Cleaning Weather deck (b) Clean the entire weather deck including deck fittings with HP Jet washing (not exceeding 3000 PSI) I.A.W. No 01/15 and present for survey
002 Hull Cleaning Tanks (c) Manually clean internal tanks i.a.w. No 01/15 and present for survey.
003 Hull survey External and Internal Hull survey. Hull survey. Carry out visual and hammer survey/UTG survey in accordance with NO 19/06 of under water hull, boot top, above water hull, weather decks and all internal tanks etc, all stiffeners and deck fittings including lifting hooks/eyes. Approx area: 275 Sqm
004 UTG Survey Quote for UTG survey points at u/w hull ,above water and weater deck and internal tanks .
005 Steel Renewals Quote for steel renewal at various locations as per survey report. Note 1:- Quoted repair cost shall include cost of both sides blasted and primed Grade `A’ quality ship building steel for shell and IS 2062 Grade `B’ quality steel for non structural works, renewal of all obstructions in way of steel renewals including minor fittings with their foundations, etc., as indicated by survey team / RMT, proving of the weld runs by non-destructive tests and by hose test on completion of welding, pressure testing and proving of tanks where steel renewal undertaken etc.
006 Build ups Carry out build ups as indicated by the Hull survey team/ Surveyor (a) Approx size 2.5x2.5 mm-250
006 Build ups Carry out build ups as indicated by the Hull survey team/ Surveyor (b) Approx size 5x5 mm - 150 Nos
007 Fairing Carryout fairing of deformed structures as indicated by Hull Survey Team/ Surveyor
008 Re-welding run Carry out re-welding runs on weld seams as indicated by Hull survey team/ QC/ RMT.
009 Draught Marks Draught marks corroded/eaten away, to be renewed and painted. Both Roman and Numeric.
010 Sacrificial Anodes (a) Renew Sacrificial anodes (MK I) those consumed more than 50% Note:- Anodes Navy/COY supply.
011 Surface preparation with Grit Blasting Under Water area including Boot top area Spot blasting to SA 2.5 on paint damaged areas/ renewed plate areas as per the paint OEM rep recommendation for paint application.
012 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: Primer - penguard primer - 50 microns
012 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Anti Corrosive - Jotacote Universal (Aluminium) - 150 microns
012 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Anti Corrosive - Jotacote Universal (grey) - 150 microns
012 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Tie Coat: Safeguard ES - 125 microns
012 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (e) 5th Coat: A/F: Seaquantum Ultra(Brown/Light Red) - 150 microns
012 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (f) 6th Coat: A/F: Seaquantum Ultra(Red Brown/Dark Red) - 150 microns
012 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (g) 7th Coat: A/F: Seaquantum Ultra(Brown/Light Red/ Black) - 150 microns
012 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (h) 8th Coat: A/F: Seaquantum Ultra( Black) - 150 microns
013 Surface Preparation Above Water Area Carry out surface preparation w on above water area to SA2.5 standard under the suprvision of paint OEM.
014 Painting - JOTUN Scheme. Above Water Area Paint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: Penguard primer - 50 microns DFT
014 Painting - JOTUN Scheme. Above Water Area Paint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Jotamastic(Grey/ Red Brown) - 125 microns DFT
014 Painting - JOTUN Scheme. Above Water Area Paint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Jotamastic(Grey/ Red Brown) - 125 microns DFT
014 Painting - JOTUN Scheme. Above Water Area Paint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Hard Top XP Grey - 60 microns DFT
015 Surface Preparation Weather Decks and Fittings Carry out Surface pre[partion to WJ 2 standard as per survey report of Paint OEM for paint application for entire weather deck.
016 Painting - JOTUN Scheme Weather Decks and Fittings Paint weather decks and fittings with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Penguard Primer -50 microns DFT
016 Painting - JOTUN Scheme Weather Decks and Fittings Paint weather decks and fittings with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Jotamastic 87 of 200 microns
016 Painting - JOTUN Scheme Weather Decks and Fittings Paint weather decks and fittings with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Jota Armour Dark grey of 800 microns
017 Surface Preparation Internal Tanks (a) Carry out mechanical cleaning to ST3 standard at paint defective area/ as survey report of Paint OEM for paint application.
017 Surface Preparation Internal Tanks (b) Carry out mechanical cleaning to ST1 standard at paint defective area/ as survey report of Paint OEM for paint application.
018 Painting - JOTUN Scheme Paint all internal tanks with following paint scheme Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Penguard Primer -50 microns DFT
018 Painting - JOTUN Scheme Paint all internal tanks with following paint scheme Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Anticorrosive Balloxy (HB light) - 150 microns
018 Painting - JOTUN Scheme Paint all internal tanks with following paint scheme Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Anticorrosive Balloxy (HB light) - 150 microns
019 Deck Fitting Securing eyes (MS cleats) including base plate corroded/perished, to be renewed as per survey report (a) Size of eye plate- 230x550x20 mm thick plate,
019 Deck Fitting Twin bollards on weather deck including base plate corroded/perished, to be renewed as per survey report (b) Twin Bollard size dia- 400x800x20 mm height
020 Manhole cover (a) Manhole cover neoprene rubber joints perished, to be renewed (Rubber joint size: - 520mm x 760mm x08 mm)
020 Manhole cover (b) Manhole cover including coamings perihsed/ thinned to be renewed as per survey report (approx size - 3'x1'8")
020 Manhole cover c) Manhole Stud nut and bolts with washers corroded/ perished to be renewed.(Size of Stud Bolt -16 mm x 50mm length, 36 nos on each manhole, Mat SS).
020 Manhole cover (d) Handle of manhole covers corroded/ thinned, to be renewed as per survey reports (Mat-MS rod -12 mm thick)
021 APT Air Pressure Test the following tanks and rectify the defects any observed during pressure testing and prove to 0.14 kg/ cm2. Note:- APT and proving of those tanks wherein steel renewal undertaken as part of steel renewal DL. 0003(c) above is that of Firm's liability with No Additional Cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this DL. Serial. Internal Tank
022 Distortion Areas in which distortion of hull structures exceeds 3 times the thickness of plate or 1/20 of the frame spacing (which ever is smaller) shall be renewed. In the areas of dents, the structure shall be inspected for any distortion of the stiffeners inside and cracks by DP test.
023 D Type rubber Fenders -Horizontal fenders D" Shaped rubber fenders perished/cracked, to be renewed as per NES170 (a) Fenders details are as follows - Mat-EPDM, COLOUR-Black rubber 1050x350 mm mm- (16 +16 both side) in 12.2 mtrs length .
023 D Type rubber Fenders -Vertical fenders D" Shaped rubber fenders perished/cracked, to be renewed,as per NES 170 (b) Fenders details are as follows - Mat-EPDM, COLOUR-Black rubber 1050x350 mm (6+6 in 2.5 mtr)
024 Fenders Brackets - Horizontal Horizontal Fender securing brackets (Flat bars with MS pad of both ends, Mat- MS) corroded/thinned/perishe , to be renewed (a) Thickenss of the brackets 12 mm, 1100 X 370mm
024 Fenders Brackets Vertical Vertical Fender securing brackets (Flat bars with MS pad of both ends, Mat- MS ) corroded/thinned/perishe , to be renewed (b) Thickenss of the brackets 12 mm, 1100X370mm
025 Lifting eye Lifting eye corroded/thinned/perished including base plate size 400x260 mm to be renewed as per survey reports
025 Lifting eye (b) Carry out load testing of lifting eyes (24 tons on all four eyes together) post survey / renewal if any and submit a load test report to User dept.
SERVICES (A) Docking and undocking charges (Both Versions) Docking and Undocking will be done by Navy in Navy Permises i.e ND(V) /slipway.(Firm not to quote.)
(B) Dock blocks preparation & laying out as per docking plan Job will be done by Navy .(Firm not to quote.)
Dock hire charges for an estimated duration of 60 Days as per OCR Dry Dock facility will provided by Navy in Navy Permises i.e ND(v) /slipway.(Firm not to quote.)
Wet basin/alongside hire charges for the remaining duration (i.e. total refit duration of – 60 days docking period) Dry Dock facility will will provided by Navy in Navy Permises (Firm not to quote).
Quote for maintenance of two in no. fire lines for the refit duration .
Provision of two transports (cars) for entire refit duration (one for refit Co-ordinating staff and one for ND(V) monitoring Team) for 12 hrs or 100KM/day whichever is less
QC inspection for the entire scope of work by ND(V) QC Services will be provided by ND(V)/QC (Firm not to quote)
Patel Engineering Works Vizag
MANIMADHAVI ENTERPRISES
WINTECH ENGINEERING WORKS
ASMACS
Sadhav Offshore Engineering Company
M G Rajeev and Co.
Trinitech Infrastructure (India) Private Limited
HIGH SEAS SHIPPING ASSOCIATES
SRISAI OILFIELD EQUIPMENTS AND MARINE SERVICES PVT LTD
Flash Forge Private Limited
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .